Page 1: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

1COMPLETE QUALITY ASSURANCE (QA) TESTING AND INSPECTION

ITEM #10, OAPC TOP 10 LIST WAYS TO GET MORE DURABLE HMA PAVEMENTS

Presented by

Doubra Ambaiowei, Ph.D., P.Eng., MCSCEORBA, OAPC - Council of ORBA, Technical Director

Page 2: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

OAPC TOP 10 LIST – QUICK OVERVIEW2

Page 3: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

A REMINDER: DOWNLOAD OAPC PUBLICATIONS

3

www.onasphalt.orgLook Under Publications & Education Section

Page 4: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

QUALITY FACTORS IN HOT MIX ASPHALT

ENGINEERING

What is Quality Asphalt Pavement?

4

✓ A Durable Pavement

✓ A Smooth Ride

✓ A Safe Pavement

✓ A Performing Pavement

Page 5: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

QUALITY CHALLENGES

What Are the Challenges?

5

✓ Low-bid Contract Practices

✓ Limited Budgets

✓ Use of Substandard Materials

✓ Specification Proliferations, et.al

Page 6: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

CONTRACTUAL TESTING REQUIREMENTS6

◼ Preliminary Design Testing

Ensures prospective material sources can satisfy specification

requirements.

Page 7: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

CONTRACTUAL TESTING REQUIREMENTS7

◼ Job Mix Control Testing – Mix Design Development

Ensures the paving mixture designed under the job-mix formula meets

all specification requirements.

Page 8: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

CONTRACTUAL TESTING REQUIREMENTS8

◼ Job Mix Control Testing – During Production

Ensures the paving mixture produced under the job-mix formula meets

all specification requirements.

Page 9: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

CONTRACTUAL TESTING REQUIREMENTS9

◼ Construction Control Testing

Performed as a routine and periodic item of inspection during/post

paving.

Page 10: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

QUALITY ASSURANCE (QA) TESTING DEFINED10

• According to TRB’s Research Circular, No. E-C010 and E-C173, QA

is an all-encompassing term, that includes: “Quality Control (QC)”,

“Acceptance”, Inspection, and “Independent Assurance (IA)”.

• QA consists of all the planned and systematic actions necessary to

provide adequate confidence that a product or service will satisfy

given requirements for quality.

Page 11: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

QUALITY ASSURANCE (QA) TESTING DEFINED11

Quality Control (QC):

• Consists of QA actions to ensure

materials and products conform

to the specification and/or end

result requirements; whether

manufactured or processed by

the contractor or procured from

suppliers or subcontractors.

Acceptance:

• Includes sampling, testing, and

the assessment of test results to

determine whether or not the

quality of produced material or

construction is acceptable in

terms of the specifications.

Inspection:

• Consists of observing and

monitoring production and

paving operations to ensure

compliance with plans and

specifications.

• Effective inspection at every

stage of the operation can be

the difference between a poor or

excellent performing pavement.

Independent Assurance (IA):

• These are third party activities

requiring an independent and

unbiased assessment of process

control, acceptance, and

inspection procedures, to verify

reliability.

Page 12: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

IMPORTANCE OF SAMPLING AND TESTING12

✓ Proper Sampling is CRITICAL for any Product Testing

✓ Quality of Sample = Quality of Test Result

✓ Test in Accordance with Appropriate and Applicable Governing Standards

Page 13: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

A REMINDER: PREMATURE PAVEMENT

FAILURES

TTI’s forensic investigation revealed three primary causes for the

pavement failures:

13

o The Lack of bonding between layers of HMA;

o Cracks reflecting from existing lower pavement layers through asphalt overlays; and

o Dense aggregate gradations that do not provide sufficient room for the asphalt binder in the mixture or coarse gradations which may be sensitive to asphalt content, thus limiting the amount of asphalt in the mixture and which may be overly permeable.

Page 14: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

QUALITY OF ASPHALT REVIEW: FINDINGS

SPECIFIC TO QA TESTING

14

◼ Generally not enough qualified inspectors to provide adequate supervision and inspection of road pavement contracts.

◼ Perception on underbidding on projects in anticipation of “getting away with cutting corners”, and negative effects of outsourcing QA roles.

◼ Transferred risk of errors and self-policing.

◼ General consensus that QA processes and practices are a significant contributing factor to poor asphalt quality.

Page 15: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

QUALITY OF ASPHALT REVIEW: RECOMMENDATIONS SPECIFIC TO QA TESTING

15

◼ Development of acceptable QA process and a specific test that enables owners to independently verify, weigh, control, and record the quantity of RAP, REOBs etc., that goes into hot mix asphalt in the plant.

◼ Design and enforce stronger independent QA inspection programs at refineries producing AC, and at independent AC supplier facilities (AC terminals).

◼ Collaborate to design and provide specific training to municipal and industry’s QA/QC inspectors.

◼ Collaborating to review and support recommendations on increasing the frequency of testing, and the minimum required ratio of qualified municipal owner QA inspectors.

Page 16: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

Towards Quality Asphalt16

What We Are Doing?

Page 17: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

Towards Quality Asphalt17

What is Coming?

Page 18: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

TO CONCLUDE18

Page 19: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …

Tel: 905-507-1107 ext. 232

Cell: 437-388-8246

E-mail: [email protected]

THANK YOU FOR LISTENING

Page 20: COMPLETE QUALITY ASSURANCE (QA) TESTING AND 1 …