    GOVERNMENT OF KHYBER PAKHTUNKHWA

    PLANNING AND DEVELOPMENT DEPARTMENT

    DIVISIONAL MONITORING AND EVALUATION OFFICE

    HAZARA DIVISION, ABBOTTABAD

    REPORT REGARDING FIELD VISIT OF COMPLETION OF INCOMPLETE

    WATER SUPPLY AND SANITATION SCHEMES IN KHYBER PAKHTUNKHWA

    (PHASE III) (ADP NO. !!"#$!1%)

    A field visit was made by Assistant Divisional Monitoring Officer (T) along with SDO and Sub-

    ngineer of Public !ealth ngineering De"artment on #$ thMay %& to monitor the "hysical and

    financial "rogress of the sub'ect scheme

    An umbrella scheme for com"letion of incom"lete water su""ly and sanitation schemes in hyber

    Pa*htun*hwa (Phase-+++) is reflected in the ADP %&&,-#& at So %$$and a""roved in the PD.P

    meeting dated #$/&0/%&&1 with a""roved cost of 2s 3%41&,million 5ollowing two schemes were

    visited on #$th

    May6 %& by ADMO (T) along with SDO and Sub ngineer of Public !ealth

    De"artment

    I. WSS &''*' PF+4#

    II. WSS C'-'*' PF+4

    Details of each sub scheme are as follow7

    I. SH/ WSS &''*' PF+4#

    A. DESCRIPTION AND PRO&ECT BACKGROUND

    The scheme is located in 8unda*a village with a "o"ulation of %104 "ersons The scheme is based

    on a trial bore being drilled in #,,, under tamer-i-Pa*istan "rogram Same bore was "ro"osed to

    convert to tube well The scheme was administratively a""roved at a cost of 2s #99%3 million on

    #&th5ebruary %&&1 and technically sanctioned for an amount of 2s #9,,3 million on $# stMarch

    %&&0

    B. SCOPE OF WORK AND PHYSICAL PROGRESS

    The sco"e of wor* is as under7 -

    (2s in millions)

    S.No

    Description Cost Physical

    Progress

    1Pum"ing :hamber and :ollecting Tan* %&6&&&

    gallons (#st and %nd Stage)&0&, 90% Completed

    3 Pum"ing Machinery (#stand %ndStage) %30Not yetpurchased

    4 2aising Main (#stand %ndStage) $,,$ 80% completed

    5 Surface Tan* %&6&&& gallons &3$4 Completed

    6 Distributions System 401% 50% Completed

  • 8/10/2019 Completion of Incomplete Water Supply Schemes in Khyber Paktunkhwa

    2/4

    Page of 4

    A ANALYSIS 0 RECOMMENDATIONS/

    #) Only the :ivil wor* on the tube well and collection tan* is com"leted and no mechanical

    installations are yet made

    %) Pi"es were bended near the tan* as shown in "hotogra"h This will result in "i"e strength

    reduction to withhold high "ressure near "um" and collection tan* The de"artment may be

    as*ed to use soc*et and 'oint system for bends

    $) Pi"es used for raising main and distribution networ* were chec*ed on site and was found to be

    obtained from a""roved firm

  • 8/10/2019 Completion of Incomplete Water Supply Schemes in Khyber Paktunkhwa

    3/4

    Page !of 4

    9) Distribution networ* is 3&; com"leted6 the de"artment may be as*ed to accelerate the laying of

    "i"es to com"lete the wor* in sti"ulated "eriod3) lectrification is still awaited The de"artment informed that .APDA has been a""roached and

    "ayment has been made but no "rogress has been made by .APDA till date The de"artment

    may a""roach .APDA for in time energi

  • 8/10/2019 Completion of Incomplete Water Supply Schemes in Khyber Paktunkhwa

    4/4

    Page 4of 4

    % After com"letion of the scheme it is left for o"eration to the local "eo"le and no "ro"er

    "rocedure has been followed to ma*e anyone res"onsible for o"eration and maintenance of the

    scheme During visit it was observed that tube well is sto""ed and no *eys of tube well control

    room was available with de"artment officials The de"artment may be as*ed to a""oint tube

    well o"erator or "ro"erly handover the scheme to a res"onsible "erson of the community for its

    o"eration and maintenance$ o record of connections drawn and o"erating hours has been maintained The de"artment may

    be as*ed to "ro"erly record the connections drawn and o"erating hours of the tube well9 @ea*age was observed from the main valve near tan* which needs immediate remedial

    measures as shown in "hotogra"h