complex aerospace systems exchange (case) 2012 conference planning committee meeting 11 jan 2012

17
Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012

Upload: maximilian-stewart

Post on 02-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012

Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting

11 Jan 2012

Page 2: Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012

2

CASE 2012 Planning Meeting Topics

• Review Planning Status CASE 2012 Program Overview:

– Tracks– Special Events/Features: Wrap-Up Session?– Potential Follow Up Communications– Logistics, Facility Layout/Constraints– Potential Partnering

• Proposed Session Chair Expectations• Proposed Submittal Guidelines• Program Details• Path Forward

Milestone Schedule

• Positioning for CASE 2013

Page 3: Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012

3

Review of Planning Status - CASE 2012 Overview

• Two and a half day event starting Tuesday afternoon• 11-13 Sep 2012, Sheraton Pasadena

• Same registration fee as SPACE - access to both events• 3 concurrent tracks (15 sessions, estimated 115 presentations): Track 1: Complex Systems Development Track 2: Integration, Test, and Verification of Complex Systems Track 3: Program Management to achieve Robust and Resilient Systems

• 1 plenary (Wednesday); shared plenary with SPACE (Tuesday AM)• Panel sessions

Page 4: Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012

4

Potential Peripheral Activities

Seminar prior to the event organized by the Management Technical Committee with Mike Griffin and leaders of the community we are trying to attract to discuss the event (locate it at a resort?)

Chief Engineer Summit or Roundtable as an exclusive part of the event to serve this community and provide them a forum (no-attribution discussion)

Program Manager Roundtable as part of the event

Page 5: Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012

5

Potential Follow On Activities

Teleconferences or webinars after the event to maintain momentum and shape CASE 2013

Evolving event to include courses or workshops addressing systems-related topics and challenges

Page 6: Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012

6

Session Model (continued)

• CONOPS Paper sessions will have a panel element, based on the

AMT/GT model The last 60 minutes of each session is used for the

presenters in that session to form a panel and delve into the session topic(s)

• Wrap-up session Conference organizers present the main themes and lessons

learned Work with sessions chairs for input, in addition to attending

the sessions to get the needed input

Page 7: Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012

7

Program Overview (Continued)

• Logistics

• Facility Layout/Constraints

Page 8: Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012

8

Potential Partnering ?

PMI – Program Management Association ICOSE – International Council on Systems Engineering

http://www.incose.org/about/leaders.aspx?id=wg NDIA – 14th Annual Systems Integration Conference, Oct 24-27,

2011 Risk Management Association (RMS) Risk Management Society (RIMS)

Page 9: Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012

9

Proposed Session Chair Expectations

Session Chairs are expected to:

• Work with the Track Chair in developing the Theme and Content for the Session

• Identify and recruit appropriate invited speakers/panel members

• Have ownership for the content and quality of their session to ensure that it: Supports the Event and Track Objectives Serves the interests of the targeted Audience (CEs, SEs, PMs, Designers, TEs, etc.) by

providing practical ideas, methods, capabilities, etc. that they can apply immediately to their own programs

Is oriented to the direct Execution of Complex Systems Development (not theoretical, not a study)

Page 10: Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012

10

Proposed Session Chair Expectations (Continued 2 of 4)

Session Chairs are expected to:

• Have direct engagement with the presenters/authors by: Conveying the intent for session content (see previous bullet) Reviewing outlines/plans for presentations/panel session

– To fit content expectations and time allocated

Working with the presenters to shape their material for the Session Maintaining contact with presenters up through the CASE Event to ensure that they and their material are

ready to go (No late withdrawals or no-shows) Builds in flexibility to their session

• Immediately identify any issues or concerns to Track Chairs

• Meet with presenters on the morning of the Session – need to figure this out (Jeff will help)

• Incite audience participation/panel discussion with prepared questions

Page 11: Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012

11

Proposed Session Chair Expectations (Continued 3 of 4)

Session Chairs are expected to:

• Record key observations from the session: Outrageous Comments (for recognition at Wrap-Up Plenary?)

Common themes Best Practices Lessons Learned Systemic Issues and limitations of current tools and techniques New insights, capabilities, or methods Unresolved issues or obstacles – opportunities for further work Areas of conflict or disagreement Surprises or unexpected results Level of audience engagement Number of attendees Anything else of special interest

Page 12: Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012

12

Proposed Session Chair Expectations (Continued 4 of 4)

Session Chairs are expected to:

• Provide and discuss observations with Track Chair by the end of the day

• Participate in CASE Wrap-Up Session

• Provide feedback and recommendations for CASE 2013 to Track Chair Suggestions to help shape next CASE Event

• Participate in editing of CASE Event documentation

Page 13: Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012

13

Proposed Submittal Guidelines

Page 14: Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012

14

Program Details

Page 15: Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012

15

Path Forward: Milestone Schedule

Page 16: Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012

16

Positioning for CASE 2013

Page 17: Complex Aerospace Systems Exchange (CASE) 2012 Conference Planning Committee Meeting 11 Jan 2012

1717