Sr.No BOARD INSCRIPTION
1 Process safety managemnet depends on you.
2 A safe worker is an asset. Be protected
3 Emergency telephone numbers
4 Team work is the key to safety5 We need you work safely
6 Loading and unloading procedure of wash oil
7 Dragon: Compressed gas is his lair
8 Deadly vapour can sneak up on you . Wear PPE
9 Ear,Eye, Head and Foot protection to be worn
10 No naked flames
11 No unauthorised person beyond this point
12 No unauthorised person beyond this point
13 No naked flames
14 Danger: High voltage
15 No naked flames
16 No unauthorised person beyond this point
17 Caution: This mechinery is automatic and may start without warning
18 Flammable material
19 No unauthorised person beyond this point
20 No naked flames
21 Caution: This mechinery is automatic and may start without warning
22 Toxic, compressed gas and wear goggle
23 Caustic Soda, toxic , wear goggle and MSDS of Caustic soda
24 Caution: This mechinery is automatic and may start without warning
25 Compressed gas26 No unauthorised person beyond this point
27 No naked flames
28 No unauthorised person beyond this point
29 No naked flames
30 Caution: This mechinery is automatic and may start without warning
31 No unauthorised person beyond this point
32 No naked flames
33 Wear hard hat.No unauthorised vehicle
34 Toxic,Wear goggle,Mobile phone restricted.
35 Wear goggle.Toxic
36 Wear goggle.Toxic
37 Caustic Soda, toxic , wear goggle
38 Caution: This mechinery is automatic and may start without warning
39 Wear hard hat.No unauthorised person. No naked flames.mobile restricted
40 Flammable material
41 No unauthorised person beyond this point
42 No unauthorised vehicles
-
7/29/2019 Complex Safety Board Audit
2/15
43 Restricted area, No smoking.PTW required
44 No naked flames
45 No unauthorisea person
46 No naked flames
47 No unauthorised person beyond this point
48 No naked flames .No unauthorised person
49 No naked flames.No unauthorised perso.No vehicle.Restricted Area50 Fire prevention: Our commitment,Our concern
51 Emergency telephone numbers
52 Know you PASS System
53 Risk Assessment Procedure
54 A safe worker is an asset. Be protected
55 High Noise area
56 Safety Intention is accident prevention
57 Info on Triethyl Aluminum
58 High Noise area
59 Guideline Forklift Driving
60 No naked flames.No unauthorised perso.No vehicle.
61 Safety Shoe required.No unauthorised person.Wear hard hat
62 Mobile phone restricted.Wear hard hat.Safety shoe required.Restricted area
63 Eye ,ear ,foot, and head protection must be worn.Do not enter.No naked flames
64 No unauthorised person beyond this point.No vehicle.wear hard hat.safety boot required
65 Restricted area, No smoking.PTW required
66 One key to success is attitude
67 A safe worker is an asset. Be protected
68 Emergency telephone numbers
69 Pick up,clean up and keep our company clean
70 Know you PASS System71 Wear eye ,ear,foot and head protection must be worn
72 Info on Carbon monoxide
73 No unauthorised person.No unauthorised vehicle.Flammable material.No naked flames
74 Wear had hat.Wear safety boot.Wear eye goggle.Flammable material
75 Info on TEAL
76 No smoking.No unauthorised person
77 Restricted area, No smoking.PTW required
78 Guideline Forklift Driving
79 A safe worker is an asset. Be protected
80 Know you PASS System
81 Risk Assessment Procedure
82 Emergency telephone numbers
83 Hazardous chemicals
84 Don't guess use the MSDS.Eye protection required
85 Danger: High voltage
86 Eye protection Required.Info about H2SO4
87 Hazardous chemicals
88 Never give safety a day off
89 Working safely together takes a team work
-
7/29/2019 Complex Safety Board Audit
3/15
90 Ear protection sign
91 Nitrogen cold burning.use PPE
92 High Noise area
93 Danger: No smoking and No swimming
94 You are entering a safety zone pls put on your PPE.Poor house keeping hazardous
95 Restricted area, No smoking.PTW required
96 Info about H2SO497 Board completely Faded
98 Speed thrills.Follow speed limit,Wear seat beat
99 One key to success is attitude
100 Sharp bend,Drive very slowly
101 Safety comes in CAN;I can. You can. We can
102 Caution: busy crossing. No overtaking. Drive very slowly
103 Stay alert around the vehicle.SEE and BE SEEN.LISTEN
104 Know you PASS System
105 Reduce speed fire station
106 Learn about fire safety
107 Guideline Forklift Driving
108 Remember safety is important to you and others
109 Caution: busy crossing. No overtaking. Drive very slowly
110 Wear this helmet or bear that
111 A safe worker is an asset. Be protected
112 Use the bathing place ahead.stop the abuse of fire hydrant
113 Forklift mtce area.No unauthorised entry.there is no safety device like a safe worker
114 Emergency procedure
115 All product containers must be Firmly chained on the truck
116 No entry for ROAD tankers and Trailers left side diversion
117 No entry for ROAD tankers and Trailers right side diversion118 Unsafe loading of Truck/Van is not allowed
119 Emergency telephone numbers
120 Know you PASS System
121 Key to safe lifting
122 Guideline Forklift Driving
123 Lift correctly to avoid injury
124 Use the bathing place ahead.stop the abuse of fire hydrant
125 Restricted area, No smoking.PTW required
126 You are entering a safety zone.on the job safety begins here
127 In case of emergency raise alarm..
128 Forklift operating area
129 Know you PASS System
130
131
132
133
134
135
136
-
7/29/2019 Complex Safety Board Audit
4/15
137
138
139
140
141
142
143144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
-
7/29/2019 Complex Safety Board Audit
5/15
184
185
186
187
188
189
190191
192
193
194
195
196
197
198
-
7/29/2019 Complex Safety Board Audit
6/15
AREA / LOCATION NUMBER OF BOAR SIZES ( cm )
Front of Olefins controlroom. 1 120 x 180
Front of Olefin K1 area 1 120 x 180
Olefin main entrance gate 1 120 x 180
Side of Olefin control room 1 110 x 120Olefin close to road A 1 110 x 130
Olefin wash oil area 1 120 x120
Front of K1 and E- 57 area 2 120 x120
DMDS Olefin 1 120 x180
DMDS area Olefin 1 120 x 180
Olefin Boiler C 1 50 x 50
Boiler C 1 50 x 50
Olefin mechanical container 1 50 x 50
Olefin mechanical container 1 50 x 50
S/S 33 Olefin 1 50 x 50
Side of s/s 33 1 50 x 50
Side of s/s 33 1 50 x50
P-52A/B and P-212 2 50 x50
hydrogenation unit 1 50 x 50
Entrance of Olefin/S/S 33 1 50 x50
Entrance of Olefin/S/S 33 1 50 x 50
P-30A/B and P-32A/B 2 50 x 50
E-40 by pipe rack 3 50 x 50
Caustic unit by pipe rack 4 50 x 50
P-3C 1 50 x 50
Analyzer 2 1 50 x 50Propane loading area 1 50 x 50
Propane loading area 1 50 x50
End of hydr by road B 1 50 x 50
End of hydr by road B 1 50 x 50
P-33A/B and D-52,Olefin 2 50 x 50
Hydrogen loading area 1 50 x 50
Hydrogen loading area 1 50 x 50
Entrance of Olefin/road B 2 50 x 50
D-95 Area 3 50 x 50
Cold box area 2 50 x 50
Dox unit 2 50 x 50
Caustic unit by E-8 and 9 3 50 x 50
P-101A/B and P-63B 2 50 x 50
Front of furnace A 4 50 x 50
DMDS area Olefin 1 50 x 50
Entrancc of Olefin/Road A 1 50 x 50
Entrance of Olefin/Road A 1 50 x 50
COMPLEX SAFETY SIGNS AUDIT
-
7/29/2019 Complex Safety Board Audit
7/15
Entrance of Olefin/Road A 1 50 x50
Front of Boiler B 1 50 x 50
Front o Boiler B 1 50 x 50
Front of furnace F 1 50 x 50
Front of furnace F 1 50 x 50
Olefin close to Main W/shop junctin 1 50 x 50
Entrance to 2nd gate/Road 3 4 50 x 50.120 x 120P E Main Entrance Gate 1 120 x 120
Front of P E control room. 1 120 x 120
Front of P E control room. 1 120 x 120
Catalyst Area P E 1 120 x 120
Catalyst Area P E 1 120 x 120
Extrusion P E 1 120 x 120
Catalyst Area P E 1 120 x120
Catalyst Area P E 1 120 x 180
Classifier Area PE Bagging 1 90 x 90
Entrance to PE Bagging 1 120 x 120
perimeter fence /Road 3 and RoadB 3 120 x120
Entrance gate /Road 3 3 50 x50
Entrance Gate/3-DR-901A 4 50 x 50
Front of vaporizer A PE 3 50 x 50
Entrance gate by road 2 4 50 x 50
Entrance gate by road 2 1 90 x 90
Front of PP Control roon 1 120 x 120
Front of PP Control roon 1 120 x 180
PP mechanical contain 1 120 x 180
Drum washing area PP 1 120 x 180
Front of 06-E-771 PP 1 120 x 120Front of 06-PA-301B 1 120 x 180
Back of PP extrusion 1 120 x 180
Main entrance gate to PP plant 4 50 x 50
Front of Teal house 4 50 x 50
Teal house 1 120 x 120
PP Gate /Road 2 close to extrusion 2 50 x 50
PP Gate /Road 2 close to extrusion 1 120 x120
Front of PP Bagging 1 120 x 120
Front of power plant control room 1 120 x 120
Front of power plant control room 1 120 x 120
Front of power plant control room 1 120 x 120
Front of power plant control room 1 120 x 180
chem store. Entrance to unit 23 1 50 x x 50
chem store. Entrance to unit 23 2 50 x 50
Front of unit 23 1 50 x 50
Chem dosing area. Unit 22 1+ 2 50 x 50.120 x 180
Chem store.Unit 22 1 50 x 50
inside the chem store.Unit 22 1 60 x 60
inside the chem store.Unit 22 1 60 x 60
-
7/29/2019 Complex Safety Board Audit
8/15
Nitrogen plant 1 50 x 50
Nitrogen plant 1 50 x 50
Nitrogen plant 1 120 x 120
ETP Basin 3 120 x 120
Chem store ETP 2 60 x 60
ETP Control room front 120 x x120
36-TK-55 1 120 x x120S/S32 by road 5 ext 1 120 x 120
Barrier B Junction 1 120 x 190
PTDC Junction 1 120 x 120
Barrier C junction 1 120 x 120
Road A interception with Road 6 1 120 x 120
Road A / Lab Fence 1 120 x 120
Interception of Road A and Road 5 1 120 x 120
Interception of Road A and Road 5 1 120 x 120
Few metres to fire station from both sides 1 120 x 120
Entrance to fire station 1 120 x 120
Road A /Road 2 interception 1 50 x 50
Main W/shop junction 1 120 x 180
Road A/42-HB-309 1 90 x 90
Road B 1 120 x 120
Road B 1 120 x 180
back of PE bagging 2 120 x 180
PE Bagging /Loading bay 3 120 x 120
PE Bagging /Loading bay 1 120 x 120
Truck loading bay PE and PP 2 90 x 90
Road 2 /Road A 1 120 x 120
Road 2/Road c junction 1 120 x 120Inbetween MMD and W/Shop gate 1 120 x 120
Inbetween MMD and W/Shop gate 1 120 x120
Inbetween MMD and W/Shop gate 1 120 x 120
Inbetween MMD and W/Shop gate 1 120 x 120
Front of MMD 1 120 x 120
Front of MMD 1 120 x 120
Road C/ PP Bagging 1 120 x 180
31-TK-6B(Road E) 1 120 x 120
Chem Ware house gate 1 90 x 90
Chem Ware house gate 1 120 x 120
Chem Ware house gate 1 50 x 60
Chem Ware house gate 1 120 x 120
-
7/29/2019 Complex Safety Board Audit
9/15
-
7/29/2019 Complex Safety Board Audit
10/15
-
7/29/2019 Complex Safety Board Audit
11/15
STATUS REMARK
Ok
Ok
Ok
OkOk
Ok No such board for propane loading
Ok Such boards to be fixed in all the w/shops highlighting spark arrestors
Ok No board on the safe use of safety showers
Ok No PASS acronym for fire extinguisher operation in Ole
Ok
Ok
Ok
Ok
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OKOK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK Faded mobile phone sign
OK
OK
0K
-
7/29/2019 Complex Safety Board Audit
12/15
0K
OK
OK
OK
OK
Ok
OKOK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OKOK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
-
7/29/2019 Complex Safety Board Audit
13/15
OK
OK
OK
OK
OK
OK
OKOK Fadded
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
Faded
OK
OKOK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
-