comprehensive dental solutions
TRANSCRIPT
JAMES E. TOTH, ARCHITECTURE
PROPOSED COMPREHENSIVE DENTAL SOLUTIONS MEDICAL OFFICE BUILDING
DRS MORRISH, EASTMAN AND JUNGMAN, BRADENTON, FL.
See You‐Tube Video Presentation: http://www.youtube.com/watch?v=PKlSRiqFHHw
The Proposed Comprehensive Dental Solutions Center and Medical Office Building includes 17,000 SF of combined General Dentistry, Prosthodontics, Restorative Dentistry, Periodontal Specialty, Oral Surgery and Orthodontics along with latest technology furnishing and fixtures support and digital dental imaging equipment and staff support, ancillary spaces and future practice expansion space, configured for 3 separate practices commonly residing in the same office space.
The Architect worked with The Builder and the Dental Professional Group to Design the facility. The Project is fully permitted and awaiting final release to start construction. PHM Group, General Contractor, Smith Seckman Reid, MEP and FP Consultants. Dr’s James Morrish, Lindsey Eastman and Douglas Jungman, Associated Comprehensive Dental Team.