comprehensive dental solutions

1
JAMES E. TOTH, ARCHITECTURE PROPOSED COMPREHENSIVE DENTAL SOLUTIONS MEDICAL OFFICE BUILDING DRS MORRISH, EASTMAN AND JUNGMAN, BRADENTON, FL. See YouTube Video Presentation: http://www.youtube.com/watch?v=PKlSRiqFHHw The Proposed Comprehensive Dental Solutions Center and Medical Office Building includes 17,000 SF of combined General Dentistry, Prosthodontics, Restorative Dentistry, Periodontal Specialty, Oral Surgery and Orthodontics along with latest technology furnishing and fixtures support and digital dental imaging equipment and staff support, ancillary spaces and future practice expansion space, configured for 3 separate practices commonly residing in the same office space. The Architect worked with The Builder and the Dental Professional Group to Design the facility. The Project is fully permitted and awaiting final release to start construction. PHM Group, General Contractor, Smith Seckman Reid, MEP and FP Consultants. Dr’s James Morrish, Lindsey Eastman and Douglas Jungman, Associated Comprehensive Dental Team.

Upload: guestd52dc98

Post on 07-Aug-2015

223 views

Category:

Design


0 download

TRANSCRIPT

JAMES  E. TOTH, ARCHITECTURE  

PROPOSED COMPREHENSIVE DENTAL SOLUTIONS MEDICAL OFFICE BUILDING 

DRS MORRISH, EASTMAN AND JUNGMAN,   BRADENTON,  FL.

 

 

 

 

 

 

 

 

 

See You‐Tube Video Presentation: http://www.youtube.com/watch?v=PKlSRiqFHHw 

 

The Proposed Comprehensive Dental Solutions Center  and Medical Office Building  includes  17,000  SF  of combined    General  Dentistry, Prosthodontics,  Restorative Dentistry, Periodontal Specialty, Oral Surgery and Orthodontics along with latest  technology  furnishing  and fixtures  support  and  digital  dental imaging  equipment  and  staff support,  ancillary  spaces  and  future  practice expansion space, configured for  3  separate  practices  commonly residing in the same office space. 

  

 

 

 

 

 

 

 

 

 

The  Architect  worked  with  The Builder  and  the  Dental  Professional Group  to  Design  the  facility.    The Project  is  fully  permitted  and awaiting  final  release  to  start construction.    PHM Group, General Contractor,  Smith  Seckman  Reid, MEP and FP Consultants.  Dr’s James Morrish,  Lindsey  Eastman  and Douglas  Jungman,  Associated Comprehensive Dental Team.