concrete day 2015 - betonica.net · formule générale : eurocode 2, eq. 7.9 ( ) ( ) ... 1er cas :...

36
Renforcer le futur CONCRETE DAY 2015

Upload: nguyennhu

Post on 13-Sep-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Renforcerle futur

CONCRETE DAY 2015

2

Confidentiality

This document remains the exclusive property of NV Bekaert SA.

Communication thereof is wholly confidential and does not extend beyond thetechnical staff of the addressee, who is not authorized to duplicate this documentnor to make known to a third party any contents thereof.

NV Bekaert SA is exclusively entitled to apply for a patent for any patentableelement contained in this document.

NV Bekaert SA disclaims all liability which may arise out of the putting into use ofthe information contained in this document, provided it did not assume controlthereof. It also disclaims all liability for infringements of industrial property rightswhich may arise out of the putting into use of the information contained in thisdocument.

All the information contained in this document is based on reasonable research,but does not guarantee any result.

Concrete Day 2015

Apport des fibres Dramix® de la famille 4D

pour le contrôle de la fissuration dans le cas d’un renforcement

hybride

4 Concrete Day 2015

+

L’UNION SACRÉE

- La fissuration est un état normal du béton armé :S’il n’y a pas de fissures, c’est que l’armature ne travaille pas !

- Les fissures sont crées par le chargement ou par le retrait empêché (restriction de mouvement).

- Si les fissures ne peuvent être évitées, elle peuvent être contrôlées, les ELS (États Limites de Service) limitent l’ouverture de fissure.

- Deux armatures minimales• Ductilité / Sécurité État Limite Ultime• Ouverture de fissure État Limite de Service

5

Introduction

Concrete Day 2015

Théorie générale

Maîtrise de la fissuration : zone d’effet

- La limitation de l’ouverture des fissures par l’armature (mixte) est effective seulement sur la « hauteur efficace ».

- En-dehors de la « hauteur efficace » les fissures peuvent se rejoindre et donc s’ouvrir davantage.

h eff

heff

6

Introduction

Concrete Day 2015

7

les fibres

• couturent la fissure

• réduisent la contrainte enfond de fissure

« Pour chaque fissure il y a des fibres traversantes »

Introduction

Concrete Day 2015

Effet des fibres sur la fissuration

Effet des fibres sur la fissuration

8

Fissure secondaire

Fissure secondaire

friction

compression

Introduction

Concrete Day 2015

Fissuration du béton armé : Etat initial

9

Les

≤ fc,t / Ec,t

F F

Fs = FcrackDéformation:

εs(x)

εc(x) Les: longueur d’ancrage

εs

εc,t

Les Les Les

armature

Théorie : Béton armé (B.A.)

Concrete Day 2015

Fissuration du béton armé : Etat final

10

εs(x)

≤ fc,t / Ec,t

sr: espacement des fissures

εs

εc,t

Les Les Les

sr,maxsr,min

εsm

F F

Fs > FcrackDéformation

εc(x)

Théorie : Béton armé (B.A.)

Concrete Day 2015

armature

Effet des fibres d’acier sur l’ouverture de fissure

11

Contrainte avantfissuration force dans l’armature

armature

fissuréNon-fissuré

Contrainte post fissuration

fissuréNon-fissuré

Théorie : Béton armé et fibré

Concrete Day 2015

Effet des fibres d’acier sur l’ouverture de fissure

12

Théorie : Béton armé et fibré

Concrete Day 2015

Les fibres d’acier

- Donnent une contrainte post-fissuration non nulle

- Réduisent l’énergie disponible pour ouvrir d’autres fissures

- Couturent toute la section fissurée, y compris le béton de couverture

( )effctk ffw ,= ( )eqctmeffctk fffw ,, −=

sans fibre

Energie de fissuration :

BétonFM

fctm,res

fctm

13

Les

≤ fc,t / Ec,t

Fs = Fcrackεs(x)

εc(x)Les: Longueur d‘ancrageL’es: Longueur d‘ancrage apparente

εs

εc,t

Les Les Les

L‘esL‘es L‘es L‘es

Théorie : Béton armé et fibré

Concrete Day 2015

Fissuration du BARFM : Etat initial

F F

armature + fibres acier

Déformation

sr,max

14

εs(x)

≤ fc,t / Ec,t

Les Les

εsm

F F

Fs > Fcrack

sr,min

Les

ε‘sm

L‘es L‘es L‘esS‘r,min S‘r,max

Concrete Day 2015

sr: espacement des fissures

Théorie : Béton armé et fibré

armature + fibres acier

Déformation

Fissuration du BARFM : Etat final

εc(x)

εs

εc,t

Formule générale : EuroCode 2, Eq. 7.9

( )

( )

,max,

,

13,6

1 2 en cas de treillis soudé3,6

= − ⋅⋅

⋅≤ − ⋅ ≤ ⋅

sr f

s eff

s sf

ct eff

ds

d sf

αρ

σα

( )fk r,max sm cmw s = ⋅ ε − ε

σs = f(k, kc, hct, fctm, As)

Modification Bekaert

ctmcceffct ftf ⋅= )(, β

se

c

EE

α =

s,eff s c,efa hρ =

Fts,mf

ct,m

ff

α =

15

���� � ��� �

1 � �� ���� ������

1 � ��. ��

��

� 0,6. �1 � �������

Théorie : Béton armé et fibré

Concrete Day 2015

Présentation d’un cas d’étude

Concrete Day 201517

LE PROJET :

ELIA Green Building “New Schaerbeek”

Construction d’un bassin de +/- 1500 m2 à côté du nouveaubâtiment d’ELIA à Schaerbeek

LE BUREAU D’ETUDES :

Département engineering de CFE

Concrete Day 2015

L’OUVRAGE :

Un bassin de +/- 1500 m2 (donc radier et voiles étanches)

18

Concrete Day 201519

Exigences à l’ELU :

- Moments de flexion (élastique) à reprendre proviennent de :

1er cas : bassin vide avec poussée des terres- la poussée du terrain sur les voiles (hauteur = 1,00 m)- la poussée horizontale due aux surchages mobiles

(20kN/m²)=> M = 15,00 kNm/m

2ème cas : bassin rempli sans remblai- la poussée de l’eau (hauteur = 1,00 m) et aucun remblai

contre les voiles=> M = 3,00 kNm/m

Concrete Day 201520

Détermination des sections d’armature (à l’ELU) :

- Section d’armatures requise : As = 155 mm2/m (inf. et sup.)

- Section d’armatures minimale (EC2) : As = 376 mm2/m (inf. et sup.)

=> PAS DETERMINANT

Concrete Day 201521

Exigences à l’ELS (déterminantes) :

- Limitation des ouvertures des fissures : wk = max. 0,30 mm (classe d’étanchéité 0 selon EC2-1-1 : un certain débit de fuite est admissible)

Autres exigences indépendantes du radier :- Liaison radier/voiles étanche- Voiles étanches

Concrete Day 201522

Détermination de l’ouverture des fissures en béton armé surbase de :- EC2- traction pure- épaisseur = 30 cm- béton C30/37- Ø 10 mm / 150 mm + Ø 10 mm / 600 mm soit 654 mm2/nappe

(double nappe)- …

Wk = Sr,max x ( ɛsm - ɛcm) avec :

wk = 0,27 mm ≤ 0,30 mm

Concrete Day 201523

Détermination de l’ouverture des fissures en béton renforcé au moyen d’une armature hybride (fibres + armature) sur base de :- EC2 modifié pour tenir compte des fibres- traction pure- épaisseur = 30 cm- béton C30/37- Ø 10 mm / 150 mm (1 nappe en partie supérieure)- 35 kg/m3 de fibres Dramix® 4D 65/60BG- …

Wk = Sr,max x ( ɛsm - ɛcm)

Concrete Day 201524

σs = f(k, kc, hct, fctm, As)

( )

( )

,max,

,

13,6

1 2 en cas de treillis soudé3,6

= − ⋅⋅

⋅≤ − ⋅ ≤ ⋅

sr f

s eff

s sf

ct eff

ds

d sf

αρ

σα

ctmcceffct ftf ⋅= )(, β

se

c

EE

α =

s,eff s c,efa hρ =

Fts,mf

ct,m

ff

α =

���� � ��� �

1 � �� ���� ������

1 � ��. ��

��

� 0,6. �1 � �������

Wk = 0,30 mm ≤ 0,30 mm

= 0,37 fr1,m

avec :

Concrete Day 201525

Solution en béton armé Solution avec armaturehybride

Epaisseur 30 cm 30 cmBéton C30/37 C30/37 + 35 kg/m³ Dramix® 4D

65/60BGArmatures inf. ∅10/150mm + ∅10/600mm

(654 mm²)-

Armatures sup. ∅10/150mm + ∅10/600mm(654 mm²)

∅10/150mm(524 mm²)

Wk 0,27 mm 0,30 mm

RÉSUMÉ :

Avantages techniques

Archipro 201527

Avantages techniques du béton renforcé au moyen d’une armature hybride

- Renforcement tridirectionnel (sécurité complémentaire)

- Réduction de la distance entre les fissures (donc réduction de l'ouverture des fissures)

- Gain de temps (pose plus rapide)

- Gain de main d’œuvre (moins de treillis et moins de barres)

- Gain sur les matériaux (chutes et recouvrements moins onéreux)

- Moins de risque d’erreurs de pose (pose incorrecte, oublis, erreur sur les sections, …)

=> solution plus simple et plus rapide

Avantage économique

Concrete Day 201529

Economie financière (déterminée par l’EG):

≈ 1 %+ gain de temps !

Réalisation

Concrete Day 201531

Concrete Day 201532

Concrete Day 201533

Concrete Day 201534

better together

Archipro 201536

Inscrivez-vous à notre bibliothèque

en ligne : Dramix Clubsur

http://dramixclub.bekaert.com