2 www.victorybear.com
K-Form Screed Rail is out of this world! It’s so easy to put down, it does two jobs at once, and we could not get the work done as fast as we do without K-Form. I don’t know of any other concrete form out there that does what K-Form does. Alan Bullen - Commercial DeveloperA.B. Developments, Cambridgeshire, United Kingdom
”
K-Form - Straight and level every timeSave time and money using K-Form
K-Form set up to be used as: a form, screed rail, and control/expansion joint at the same time
”Victory Bear is proud to introduce K-FORM North America
Proven by a decade of use in the United Kingdom, K-FORM is an all-in-one screed rail and concrete forming system.
Simple to use, K-FORM saves time and labor costs by allowing you to pour more concrete per day and fi nish the job faster.
K-FORM outperforms steel and wood formwork in most aspects of application, and can be used in many locations (such as gas stations) where steel or wood formwork cannot.
3
The K-FORM PVC form system provides the construction
industry with an economical, effi cient and environmentally
friendly alternative to wood and steel forms.
Made from recycled materials, K-FORM is lightweight, durable,
and does not require removal after concrete pouring. It is
easily cut to length on site, and has pre-drilled holes in the
vertical face for installing dowel bars, and in the base for
mortar anchoring.
Once the contractor uses K-Form, he keeps coming back for more. The product sells itself! Andy Simms - Business ManagerBurdens (Civil Engineering products / Building Materials) Plymouth, Devon, United Kingdom
We can pour concrete continuously, without spending time stripping formwork, and setting up again. K-Form saved us thousands in labor costs. The job turns out brilliant using a new, true form every time. It would be safe to say, we would never go back to steel forms again. Duncan Piggott, Stuart WardScott & Scott Ground Work Contractors, Hertfordshire, United Kingdom(68,243 sq. ft. @ 6” thick using The “K-135” Screed Rail)
””
K-FORM: Winner
SED Award for Excellence
in Concrete Innovation
BBA Approved
(Site Equipment Demonstration
- The UK’s national event for
construction equipment)
” ”
4 www.victorybear.com
Why Choose K-FORM?
The K-FORM Screed Rail is a high quality
product designed to save you time and money, whatever the size of your contract.
The pouring of fl oor slabs has never been so easy. The simple, lightweight system can be set up four times faster than traditional forming methods.
With a built in expansion joint, click together design, and removable Void Cap, K-FORM’s patented design provides superior results over traditional forming methods.
Concrete Formwork Systems
K-Form’s rigid PVC design maintains integrity under pressure
K-Form is the perfect material for isolation joints
Benefi ts Of Using K-FORM:
��Manufactured from lightweight, durable PVC
��Integral expansion joint and void cap
��Removable void cap/screed rail
��Pre-drilled holes for dowel placement
��Plate dowel option
��Available in 8 ft. lengths
��Reduces production costs
��No special tools required
��One person can install
��Can anchor with wood or metal stakes
��Can be used with most screed methods
��Non-conductive
��Reduces the need for saw cuts
��No cleaning or removal, unlike traditional forming methods
��Fuel, oil, and chemical resistant
��Never rots or rusts
��Pour more concrete per week
5
Hardcore
Concrete Concrete
Dowel Bar
Top Strip
Bedding MortarBedding Mortar
Compacted Sub-Grade
(Optional) Vapor Barrier
Void CapCross Section of K-FORM.
Compression Test Carried Out On K135 And K85
Data Sheet
General Data for PVC MaterialUsed In Manufacturing Of KFORM Screed Rails
Density (Dependent on color)
Additional Properties Of PVC
Rockwell Hardness R Scale
Flammability (Oxygen Index)
Coefficient of Thermal Expansion
Volume Resistivity (ohm cm)
6 www.victorybear.com
Vapor Barrier Applications:
Concrete Formwork Systems
Benefi ts Of Using K-FORM:
�� No stakes or anchor points to compromise vapor barrier
�� Reduces form set up time
�� Allows for continuous pouring
�� Eliminates strip out time
�� Reduces pump site time
7
Pervious Concrete Applications:
Concrete Formwork Systems
Testimonial:
While consulting on the Washington, DC, Pervious “Green Alley” pilot program, we had the opportunity to incorporate K-Form into the pavement design in place of a cork expansion joint material that was typically used. On one particular alley that had three diff erent widths, we were not slowed down at all during the concrete placement trying to get the joint right. K-Form was easily cut to size and leveled using a string level to bring it to the fi nished elevation. Unlike wood forms that present an issue with pervious concrete falling when you remove the forms, K-Form allowed us to leave the form in place, off ering a much better-looking and structurally stronger pavement. We were so impressed with K-Form that we incorporated it into our pervious specifi cations immediately after the Washington, DC job.
– Pervious Concrete Association
�� Minimize expansion damage and enhance the performance of pervious concrete with K-FORM’s built-in expansion joint.
�� Suitable for use with most screed methods.
�� Product may be cut to exact size needed on jobsite.
�� Product is non-absorbent.
9
With K-FORM you can pour more concrete:
Just set out your K-Form and pour bay
after bay.
With K-FORM’s removable Void Cap there
is no need to diamond cut joints for
sealant.
K-FORM’s patented design allows concrete
to set without any need to use additional
expansion joints.
✗✗
✓✓
✓✓
This is an authoritative document proving the fi tness for the purpose of a construction product and its compliance or contribution to compliance with the various building regulations applying in the United Kingdom. It is commonly referred to as a ‘BBA Agreement Certifi cate’.
K-FORM is ideal for concrete slabs of various thicknesses. The rail is simply laid on a lean mix or mortar bed to the required fi nished height:
1. Set up your string line.
2. Cut the fi rst Void Cap in half, attach to the fi rst rail and fi t Joint Clips.
3. Place spots of bedding mortar on the sub-base at intervals of 32” to correspond with holes in the base.
4. Place the rail on the bed and gently tap down with a rubber mallet until the top of the Void Cap is at the desired level.
5. Place bedding for the next rail as in Step 3.
6. Join the second rail to the fi rst with the Joint Clips.
7. Fit the full length of the Void Cap across rails.
8. Tap down the rail as in Step 4.
9. Each 8 foot K-FORM rail has pre drilled 7/8” holes for dowels.
10. Once the bedding mortar has cured, you can start pouring concrete.
11. K-FORM rails stay in place, therefore adjoining bays can be poured one after the other.
12. Once the concrete has cured, the Void Cap can either be left in place or removed. If removing, the gap can subsequently be fi lled with a joint sealant.
10 www.victorybear.com
6-1/4”
1-3/8”
Removable top strip
Eight holes drilled at 32” intervals (four per side) to aid
anchoring with mortar.
8’
MORE THAN
80%LIGHTER
THAN STEEL FORMS
Standard K-FormRemovable Screed Rail/
Void Cap
K35 is designed for pours of 2-3 / ” concrete slabs.Perfect for vertical multi-deck pours. Enables adjoining bays to be poured consecutively.Pre-drilled holes in base for anchoring with mortar.Fixing to steel deck possible with screws or shot nails.The profi le is made of durable PVC, with a built-in expansion joint.Once concrete is poured, K-FORM is left in place; no need to remove and clean.Separate Void Cap can be removed once concrete is set to allow joint sealing.
34✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓
K35 (2”)Specifi cations
11
6-1/4”
3-5/8”
Eight holes drilled at 32” intervals (four per side) to aid
anchoring with mortar.
7/8” holes pre-drilled at 11-3/4” centers
for dowel bars.
Removable top strip
8’
MORE THAN
80%LIGHTER
THAN STEEL FORMS
K85 is designed for pours of 4”-6” concrete slabs.Ideal for use with pervious concrete. Enables adjoining bays to be poured consecutively.Pre-drilled holes in base for anchoring with mortar.Pre-drilled holes in vertical face for locating dowel bars.The profi le is made of durable PVC, with a built-in expansion joint.Once concrete is poured, K-FORM is left in place; no need to remove and clean.Separate Void Cap can be removed once concrete is set to allow joint sealing.
✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓
K85 (4”)Specifi cations
Standard K-FormRemovable Screed Rail/
Void Cap
1” holes pre-drilled at 12” centers
for dowel bars.
12 www.victorybear.com
Designed for pours of 6” to 8-1/2” thick concrete
Enables adjoining bays to be poured consecutively
8’
6-1/4”
7/8” holes pre- drilled
at 11-3/4” centers
for dowel bars.
Eight holes drilled at 32” intervals (four per side) to aid
anchoring with mortar.
Removable top strip
5-3/4”
Standard K-FormRemovable Void Cap
MORE THAN
80%LIGHTER
THAN STEEL FORMS
K135 recommended for forming 6”-8” concrete slabs.Ideal for use with pervious concrete. K135 plus 1” riser recommended for forming 8”-10” concrete slabs.Enables adjoining bays to be poured consecutively.Pre-drilled holes in base for anchoring with mortar.Pre-drilled holes in vertical face for locating dowel bars.The profi le is made of durable PVC and has a built-in expansion joint.Once concrete is poured, K-FORM is left in place; no need to remove and clean.Separate void cap can be removed once concrete is set to allow joint sealing.
✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓
K135 (6”)Specifi cations
Standard K-FormRemovable Screed Rail/
Void Cap
1” holes pre-drilled at 12” centers
for dowel bars.
13
25mm Extension Strip
3000 mm
25mm Extension Strip
25mm
50mm
Standard K-FORMRemovable top strip
1” Extension Strip
MORE THAN
80%LIGHTER
THAN STEEL FORMS
1”
8’
1” Extension Strip
Extension strip enables the K-FORM system to increase height by 1”.
Integrates seamlessly with the K-FORM system.
✓✓
✓✓
r
Standard K-FORMRemovable Screed Rail/
Void Cap
14 www.victorybear.com
Void Cap AngleJoint Specifi cations
Void Cap Angle Joints
integrate seamlessly with
the K-FORM system and can easily
cut with a hand saw or utility knife.
They provide a clean joint detail at
intersections and should be used
when the Void Cap will be left in
place after pouring.
Our Void Cap Angle Joints can
be used with K-FORM K35, K85
and K135.
º CORNERS T-JUNCTIONS CROSSINGS
Top Strip Angle Joints
intergrate seamlessly with
K FORM Screed Rails
Easily cut with a hand saw