Concrete Formwork Systems

2 www.victorybear.com

K-Form Screed Rail is out of this world! It’s so easy to put down, it does two jobs at once, and we could not get the work done as fast as we do without K-Form. I don’t know of any other concrete form out there that does what K-Form does. Alan Bullen - Commercial DeveloperA.B. Developments, Cambridgeshire, United Kingdom

K-Form - Straight and level every timeSave time and money using K-Form

K-Form set up to be used as: a form, screed rail, and control/expansion joint at the same time

”Victory Bear is proud to introduce K-FORM North America

Proven by a decade of use in the United Kingdom, K-FORM is an all-in-one screed rail and concrete forming system.

Simple to use, K-FORM saves time and labor costs by allowing you to pour more concrete per day and fi nish the job faster.

K-FORM outperforms steel and wood formwork in most aspects of application, and can be used in many locations (such as gas stations) where steel or wood formwork cannot.

3

The K-FORM PVC form system provides the construction

industry with an economical, effi cient and environmentally

friendly alternative to wood and steel forms.

Made from recycled materials, K-FORM is lightweight, durable,

and does not require removal after concrete pouring. It is

easily cut to length on site, and has pre-drilled holes in the

vertical face for installing dowel bars, and in the base for

mortar anchoring.

Once the contractor uses K-Form, he keeps coming back for more. The product sells itself! Andy Simms - Business ManagerBurdens (Civil Engineering products / Building Materials) Plymouth, Devon, United Kingdom

We can pour concrete continuously, without spending time stripping formwork, and setting up again. K-Form saved us thousands in labor costs. The job turns out brilliant using a new, true form every time. It would be safe to say, we would never go back to steel forms again. Duncan Piggott, Stuart WardScott & Scott Ground Work Contractors, Hertfordshire, United Kingdom(68,243 sq. ft. @ 6” thick using The “K-135” Screed Rail)

””

K-FORM: Winner

SED Award for Excellence

in Concrete Innovation

BBA Approved

(Site Equipment Demonstration

- The UK’s national event for

construction equipment)

” ”

4 www.victorybear.com

Why Choose K-FORM?

The K-FORM Screed Rail is a high quality

product designed to save you time and money, whatever the size of your contract.

The pouring of fl oor slabs has never been so easy. The simple, lightweight system can be set up four times faster than traditional forming methods.

With a built in expansion joint, click together design, and removable Void Cap, K-FORM’s patented design provides superior results over traditional forming methods.

Concrete Formwork Systems

K-Form’s rigid PVC design maintains integrity under pressure

K-Form is the perfect material for isolation joints

Benefi ts Of Using K-FORM:

��Manufactured from lightweight, durable PVC

��Integral expansion joint and void cap

��Removable void cap/screed rail

��Pre-drilled holes for dowel placement

��Plate dowel option

��Available in 8 ft. lengths

��Reduces production costs

��No special tools required

��One person can install

��Can anchor with wood or metal stakes

��Can be used with most screed methods

��Non-conductive

��Reduces the need for saw cuts

��No cleaning or removal, unlike traditional forming methods

��Fuel, oil, and chemical resistant

��Never rots or rusts

��Pour more concrete per week

5

Hardcore

Concrete Concrete

Dowel Bar

Top Strip

Bedding MortarBedding Mortar

Compacted Sub-Grade

(Optional) Vapor Barrier

Void CapCross Section of K-FORM.

Compression Test Carried Out On K135 And K85

Data Sheet

General Data for PVC MaterialUsed In Manufacturing Of KFORM Screed Rails

Density (Dependent on color)

Additional Properties Of PVC

Rockwell Hardness R Scale

Flammability (Oxygen Index)

Coefficient of Thermal Expansion

Volume Resistivity (ohm cm)

6 www.victorybear.com

Vapor Barrier Applications:

Concrete Formwork Systems

Benefi ts Of Using K-FORM:

�� No stakes or anchor points to compromise vapor barrier

�� Reduces form set up time

�� Allows for continuous pouring

�� Eliminates strip out time

�� Reduces pump site time

7

Pervious Concrete Applications:

Concrete Formwork Systems

Testimonial:

While consulting on the Washington, DC, Pervious “Green Alley” pilot program, we had the opportunity to incorporate K-Form into the pavement design in place of a cork expansion joint material that was typically used. On one particular alley that had three diff erent widths, we were not slowed down at all during the concrete placement trying to get the joint right. K-Form was easily cut to size and leveled using a string level to bring it to the fi nished elevation. Unlike wood forms that present an issue with pervious concrete falling when you remove the forms, K-Form allowed us to leave the form in place, off ering a much better-looking and structurally stronger pavement. We were so impressed with K-Form that we incorporated it into our pervious specifi cations immediately after the Washington, DC job.

– Pervious Concrete Association

�� Minimize expansion damage and enhance the performance of pervious concrete with K-FORM’s built-in expansion joint.

�� Suitable for use with most screed methods.

�� Product may be cut to exact size needed on jobsite.

�� Product is non-absorbent.

8 www.victorybear.com

8

How K-FORM Works:

5

9

6

10 11

7

12

21 3

4

Concrete Formwork Systems

9

With K-FORM you can pour more concrete:

Just set out your K-Form and pour bay

after bay.

With K-FORM’s removable Void Cap there

is no need to diamond cut joints for

sealant.

K-FORM’s patented design allows concrete

to set without any need to use additional

expansion joints.

✗✗

✓✓

✓✓

This is an authoritative document proving the fi tness for the purpose of a construction product and its compliance or contribution to compliance with the various building regulations applying in the United Kingdom. It is commonly referred to as a ‘BBA Agreement Certifi cate’.

K-FORM is ideal for concrete slabs of various thicknesses. The rail is simply laid on a lean mix or mortar bed to the required fi nished height:

1. Set up your string line.

2. Cut the fi rst Void Cap in half, attach to the fi rst rail and fi t Joint Clips.

3. Place spots of bedding mortar on the sub-base at intervals of 32” to correspond with holes in the base.

4. Place the rail on the bed and gently tap down with a rubber mallet until the top of the Void Cap is at the desired level.

5. Place bedding for the next rail as in Step 3.

6. Join the second rail to the fi rst with the Joint Clips.

7. Fit the full length of the Void Cap across rails.

8. Tap down the rail as in Step 4.

9. Each 8 foot K-FORM rail has pre drilled 7/8” holes for dowels.

10. Once the bedding mortar has cured, you can start pouring concrete.

11. K-FORM rails stay in place, therefore adjoining bays can be poured one after the other.

12. Once the concrete has cured, the Void Cap can either be left in place or removed. If removing, the gap can subsequently be fi lled with a joint sealant.

10 www.victorybear.com

6-1/4”

1-3/8”

Removable top strip

Eight holes drilled at 32” intervals (four per side) to aid

anchoring with mortar.

8’

MORE THAN

80%LIGHTER

THAN STEEL FORMS

Standard K-FormRemovable Screed Rail/

Void Cap

K35 is designed for pours of 2-3 / ” concrete slabs.Perfect for vertical multi-deck pours. Enables adjoining bays to be poured consecutively.Pre-drilled holes in base for anchoring with mortar.Fixing to steel deck possible with screws or shot nails.The profi le is made of durable PVC, with a built-in expansion joint.Once concrete is poured, K-FORM is left in place; no need to remove and clean.Separate Void Cap can be removed once concrete is set to allow joint sealing.

34✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓

K35 (2”)Specifi cations

11

6-1/4”

3-5/8”

Eight holes drilled at 32” intervals (four per side) to aid

anchoring with mortar.

7/8” holes pre-drilled at 11-3/4” centers

for dowel bars.

Removable top strip

8’

MORE THAN

80%LIGHTER

THAN STEEL FORMS

K85 is designed for pours of 4”-6” concrete slabs.Ideal for use with pervious concrete. Enables adjoining bays to be poured consecutively.Pre-drilled holes in base for anchoring with mortar.Pre-drilled holes in vertical face for locating dowel bars.The profi le is made of durable PVC, with a built-in expansion joint.Once concrete is poured, K-FORM is left in place; no need to remove and clean.Separate Void Cap can be removed once concrete is set to allow joint sealing.

✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓

K85 (4”)Specifi cations

Standard K-FormRemovable Screed Rail/

Void Cap

1” holes pre-drilled at 12” centers

for dowel bars.

12 www.victorybear.com

Designed for pours of 6” to 8-1/2” thick concrete

Enables adjoining bays to be poured consecutively

8’

6-1/4”

7/8” holes pre- drilled

at 11-3/4” centers

for dowel bars.

Eight holes drilled at 32” intervals (four per side) to aid

anchoring with mortar.

Removable top strip

5-3/4”

Standard K-FormRemovable Void Cap

MORE THAN

80%LIGHTER

THAN STEEL FORMS

K135 recommended for forming 6”-8” concrete slabs.Ideal for use with pervious concrete. K135 plus 1” riser recommended for forming 8”-10” concrete slabs.Enables adjoining bays to be poured consecutively.Pre-drilled holes in base for anchoring with mortar.Pre-drilled holes in vertical face for locating dowel bars.The profi le is made of durable PVC and has a built-in expansion joint.Once concrete is poured, K-FORM is left in place; no need to remove and clean.Separate void cap can be removed once concrete is set to allow joint sealing.

✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓

K135 (6”)Specifi cations

Standard K-FormRemovable Screed Rail/

Void Cap

1” holes pre-drilled at 12” centers

for dowel bars.

13

25mm Extension Strip

3000 mm

25mm Extension Strip

25mm

50mm

Standard K-FORMRemovable top strip

1” Extension Strip

MORE THAN

80%LIGHTER

THAN STEEL FORMS

1”

8’

1” Extension Strip

Extension strip enables the K-FORM system to increase height by 1”.

Integrates seamlessly with the K-FORM system.

✓✓

✓✓

r

Standard K-FORMRemovable Screed Rail/

Void Cap

14 www.victorybear.com

Void Cap AngleJoint Specifi cations

Void Cap Angle Joints

integrate seamlessly with

the K-FORM system and can easily

cut with a hand saw or utility knife.

They provide a clean joint detail at

intersections and should be used

when the Void Cap will be left in

place after pouring.

Our Void Cap Angle Joints can

be used with K-FORM K35, K85

and K135.

º CORNERS T-JUNCTIONS CROSSINGS

Top Strip Angle Joints

intergrate seamlessly with

K FORM Screed Rails

Easily cut with a hand saw

Made from the same resilient materials

15

Example of K-FORMbeing set up

for a 6” slab

www.victorybear.com

For a distributor near you, call:

VICTORY BEAR PRODUCTS

Customer Service: (937) 236-7288 ext. 247 or 231

Construction Sales: (513) 617-0131

Concrete Formwork Systems

by VICTORY BEAR

Rev. 12/12