CONCRETE PLACEMENT AND FINISHING AndREW MERRICK. Purpose of Meeting. Describe measures that will be used to place and finish concrete within the requirements of By-Law Number N-200 – Respecting Noise and minimize effects on neighbours Review schedule of concrete placements. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: CONCRETE PLACEMENT AND FINISHING AndREW  MERRICK

CONCRETE PLACEMENT AND FINISHING

ANDREW MERRICK

Page 2: CONCRETE PLACEMENT AND FINISHING AndREW  MERRICK

Purpose of Meeting Describe measures that will be used to

place and finish concrete within the requirements of By-Law Number N-200 – Respecting Noise and minimize effects on neighbours

Review schedule of concrete placements

Page 3: CONCRETE PLACEMENT AND FINISHING AndREW  MERRICK

Attempt for an early morning start time within the by-law requirements

Goal is to get concrete in early so that it sets up early to allow finishing to start and be completed earlier.

If necessary, could be started later in the day to accommodate weather forecasts, inspections, etc.

Early Morning Start

Page 4: CONCRETE PLACEMENT AND FINISHING AndREW  MERRICK

Pour Sequence Sequence slab placements in a south to

north direction to provide a buffer between work and South Street after initial placement.

Page 5: CONCRETE PLACEMENT AND FINISHING AndREW  MERRICK

Placement of Slabs Place slab in thirds to cut down on the

volume of concrete to be placed and finished

Page 6: CONCRETE PLACEMENT AND FINISHING AndREW  MERRICK

Erection of Wind/Sound Screens Plywood barrier approximately 4 feet high

erected to cut down on wind and sound transmission.

Page 7: CONCRETE PLACEMENT AND FINISHING AndREW  MERRICK

Light Direction Lights when required to be directed away

from South and LeMarchant Streets.

Page 8: CONCRETE PLACEMENT AND FINISHING AndREW  MERRICK

Faster Concrete Set Time Money to be spent on admixture

additives placed in the concrete to shorten set time

Page 9: CONCRETE PLACEMENT AND FINISHING AndREW  MERRICK

Concrete Placement Method Traditional method with tower crane on

site is to use concrete bucket for slab placements which is time consuming.

Page 10: CONCRETE PLACEMENT AND FINISHING AndREW  MERRICK

Concrete Placement Method Slabs to be placed using a concrete

pump which will increase the rate that the concrete is placed.

Page 11: CONCRETE PLACEMENT AND FINISHING AndREW  MERRICK

Concrete Placement Method Supplement concrete pump with deck

placer from level 3 to roof. Articulating arm eliminates need to drag

hoses over slab increasing placement rate.

Page 12: CONCRETE PLACEMENT AND FINISHING AndREW  MERRICK

Schedule When concrete placements occur, Aecon

site office will be open and personnel can be contacted at 407-7730.

Estimated 26 slab placements to occur First placement scheduled is basement

slab on grade in mid-May 3 placements every 2 weeks once level 3

slab is completed and typical floors start Completion of concrete work scheduled

for early November

Page 13: CONCRETE PLACEMENT AND FINISHING AndREW  MERRICK

Questions