CONCRETE REPAIR
PROCEDURE & MEASURE
8/30/2015 1
APRIL 25, 2015
SAUDI DIYAR CONSULTANTS ARCHITECTS & ENGINEERS 24 North Jeddah building A & B Prince Sultan Street, Al-Nadha District Kingdom of Saudi Arabia Tel: +966 2 699 9888. Fax: +966 2 699 9777, E-mail: [email protected]; web: www.diyar.com
![Page 2: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/2.jpg)
Classification of Repair Minor Concrete Repair Deep Concrete Repair
Honey combed voids
Tie Rod holes
Minor voids
Cavities in concrete
Mass concrete in loose profile
8/30/2015 2
Range of Void
05 mm to 25mm (Approx)
Range of Void
30 mm to 125mm (Approx)
![Page 3: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/3.jpg)
Execution Sequence Minor Concrete Repair Deep Concrete Repair
• Surface preparation 1. Hammer, chisel, jack hammer
2. Cleaning with air blower/compressed air
• Application of bonding agent on substrata (old concrete)
• Application of Repairing material
• Curing
• Surface preparation 1. Chipping/scabbling of concrete by jack
hammer 2. Remove loose concrete, cleaning with air
blower or brush
• Expose the reinforcement of structural element
• Application of protection coat on the steel surface (against corrosion)
• Application of bonding agent on substrate surface(old concrete)
• Installation of rigid, water tight formwork
• Application of Repairing material
• Curing
8/30/2015 3
![Page 4: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/4.jpg)
8/30/2015 4
Diagnosis & Treatment (D&T)
Concrete repair, execution sequence
Engr: Adil Rehman
Engr: Emad Hamdy
Area Responsible:
![Page 5: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/5.jpg)
8/30/2015 5
MINOR CONCRETE REPAIR
TUNNEL WALLS/ COLUMNS:
Fair faced surface/ small voids repair
MATERIAL:
Nitobond AR Renderoc-FC Renderoc-HF
![Page 6: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/6.jpg)
8/30/2015 6
WORK SEQUENCE:
• Safe Access
• Mark repair area
• Surface cleaning ( Remove dirt, oil, other contaminants)
• Chipping/ scabbling by Hammer & chisel, jack hammer
• Cleaning of surface with air blower & brush.
• Apply Nitobond A.R on substrata surface (old concrete)
• Apply Renderoc-FC by hand tools (Trowels, scrapers)
• Apply Renderoc-HF by hand tools (Trowels, scrapers)
• Curing, Renderoc-FC ( may not be required or cured with A.R)
• Curing, Renderoc-HF ( curing compound)(Concure /A.R
or Traditional way, wet hessian, water etc)
• Review technical data sheets for particular material
![Page 7: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/7.jpg)
8/30/2015 7
Mixing:
Renderoc-FC: 4 Litres fresh water, 1.2 Litre (20-Kg bag) Nitobond A.R, 4 litre Renderoc-H.F: 3 Litres fresh water (25-Kg bag) Review data sheets particularly each material
![Page 8: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/8.jpg)
8/30/2015 8
Review the Illustrations
![Page 9: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/9.jpg)
9
Comments:
Location:
Honey combed in wall,
Minor voids
Retaining R.C Wall
in tunnel
Honeycombs in
![Page 10: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/10.jpg)
8/30/2015 10
Honeycombs in
![Page 11: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/11.jpg)
8/30/2015 11
Unrepaired area
Surface repair area
![Page 12: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/12.jpg)
8/30/2015 12
Surface repaired area
Unrepaired area
![Page 13: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/13.jpg)
8/30/2015 13
DEEP CONCRETE REPAIR
COLUMNS:
Deep voids repair
MATERIAL:
Nitoprime Zincrich (for steel protection) Nitobond EP (for concrete bonding agent) Renderoc HF (for repair material) Curing compound (Concure or traditional method)
![Page 14: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/14.jpg)
8/30/2015 14
WORK SEQUENCE:
Safe Access
Mark repair area
Surface cleaning ( Remove dirt, oil, other contaminants)
Concrete chipping by jack hammer, remove loose concrete, expose steel if necessary.
Cleaning of rebars by steel wire brush, sand blasting if necessary.
Apply Nitoprime Zincrich on clean rebars (two coats)
Apply Nitobond EP on clean substrata (old concrete), two coats
Install formwork (rigid and tight)
Apply silicone to seal the formwork (water tight)
Apply Renderoc-HF
Curing, (use curing compound )(concure/A.R or traditional way, wet hessian, water)
Review technical data sheets & method statement entire material.
![Page 15: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/15.jpg)
8/30/2015 15
Mixing:
• Renderoc-H.F: 4.3 to 4.5 Litres fresh water, 25-Kg bag • Nitobond EP (slow set base, slow set hardner) • Nitoprime Zincrich (2.5 Litre, ready to apply) • Review data sheets particularly each material
![Page 16: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/16.jpg)
8/30/2015 16
Review the Illustrations
![Page 17: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/17.jpg)
Requires deep Repair
8/30/2015 17
![Page 18: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/18.jpg)
Surface preparation
8/30/2015 18
Breaking by Jack hammer , Debris of concrete
![Page 19: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/19.jpg)
8/30/2015 19
Application of Nitoprime Zincrich
![Page 20: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/20.jpg)
8/30/2015 20
Application of Nitobond EP
![Page 21: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/21.jpg)
Install Formwork
8/30/2015 21
Application of silicone
![Page 22: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/22.jpg)
8/30/2015 22
Mixing of Renderoc-HF
Measurement of water
![Page 23: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/23.jpg)
8/30/2015 23
Application of Renderoc-HF
![Page 24: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/24.jpg)
8/30/2015 24
After remove formwork
Close up
![Page 25: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/25.jpg)
8/30/2015 25
Cure, Wet Hessain (water)
![Page 26: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/26.jpg)
8/30/2015 26
NON REPAIRABLE
WORK SEQUENCE:
• Fact and finding
• Cavities probing
• Prepare initial illustrations report
• Get Engr, David & Rehan expert opinion in this regard
• Demolish the structural element by jack hammer or stitch coring etc.
![Page 27: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/27.jpg)
Marked location plan V.B= Very bad columns Colored columns= Need repair
8/30/2015 27
![Page 28: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/28.jpg)
Column to be
demolished
8/30/2015 28
![Page 29: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/29.jpg)
8/30/2015 29
Column to be
demolished
![Page 30: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/30.jpg)
8/30/2015 30
Column to be
demolished
![Page 31: Concrete Repair Presentation Current](https://reader033.vdocuments.net/reader033/viewer/2022051006/58a82c721a28abbe408b59b5/html5/thumbnails/31.jpg)
8/30/2015 31
SPECIAL THANKS;
Sr, Manager, David oxley
Senior Engr, Rehan Ahmed Khan