  • 7/31/2019 Condition Based Preventive Maintenance Action

    1/8

    Development of a Condition Based Preventive Maintenance Action for

    Coal Handling Plant of Thermal Power Station.

    In the onsite operation phase, failures are the main causes of worsenedperformance and degraded reliability. Consequently, an effectivemaintenance is the main approach to failure reduction.

    The basic theory of condition Based Preventive Maintenance is to Propose routineinspection to identify any degradation in the integrity of the systems during theirservice life and to provide an early warning in order that remedial action can betaken before failure occurs.

    Note :- Assessing the deteriorating condition is necessary to optimize inspectionand maintenance schedules, of Coal Handling Plant to make decisions and to avoidunplanned outages.

  • 7/31/2019 Condition Based Preventive Maintenance Action

    2/8

    A Basic Layout of Coal Handling Plant

    Unloading

    StationTransfer House

    Crushing &

    Screening

    Plant

    Transfer House Stockyard

    Bunker

    Transfer House

    The Main Objective :-

    1. Establishing an alarm level based on variation of a physical parameter.

    2. Prediction of impending failures of critical plant components in real time.

  • 7/31/2019 Condition Based Preventive Maintenance Action

    3/8

    Condition Monitoring Implementations: -

    The steps in implementing CBM are :-

    1. Divide Plant For Ease Of Maintenance

    Unloading Unit

    Feeding Unit

    Crushing & Screening Unit

    Stacking & Reclaiming Unit

    Bunkers2. Detection Of Physical Parameters

    3. In Service Examination By Using NDT

    4. Analysis or Fault Diagnosis

    5. Correction.

  • 7/31/2019 Condition Based Preventive Maintenance Action

    4/8

    Condition Measurement techniques :-

    Parameter Instrumentation Position Description

    Vibrations Vibration analyzers/data

    collectors, hand held overall

    meters

    Transducer placed in path

    of vibration transmission

    i.e. bearing housings

    Crushers & Pulley

    Bearings, Gearbox,

    Crusher Rotors

    Vibrations Detection meters, Shock pulse

    etc.

    As close to source of

    vibrations.

    Crushers & Pulley

    Bearings, Gearbox,

    Crusher Rotor

    Temperature

    (Contact)

    Thermocouples, RTD Surface or internally

    mounted

    Crushers & Pulley

    Bearings, Gearbox

    Temperature(Non-Contact)

    Infra red cameras, Pyrometers,Laser Thermometer

    Surface Crushers & PulleyBearings, Gearbox

    Lubricants

    (Condition)

    Analytical lab or Portable lab kit Any lubrication sample Gearbox, Fluid Couplings

    Lubricants

    (Wear Debris)

    Spectrographic analysis, On-line

    systems Ferrography

    Wear Debris in lubricant

    used between wear surface

    via magnetic plugs

    Gearbox, Fluid Couplings

    Speed and

    current

    Relations

    Taco generators with current

    transformer

    Mounted on shafts Fluid Couplings

    Current Load cell with Current

    Transformer

    Below the conveyors and in

    panels

    Electromagnetic vibrating

    feeders

  • 7/31/2019 Condition Based Preventive Maintenance Action

    5/8

    In Service Examination By Using NDT :-

    Parameter Instrumentation Positions Description

    Thickness Ultrasonic thickness gagelike Nova TG2

    Surface Transfer Chute Liners, Grindingjib of crushers, Conveyor

    structures etc.

    Thickness Digital Radiography Surface Transfer Chute Liners, Grinding

    jib of crushers, Conveyor

    structures etc.

    Flaw Ultrasonic Flaw Detectorlike Quantam TE

    Surface Crusher Rotors; Jack shaft,Grinding jibs; Suspension Bars,

    Arms, Sprocket Tiers etc.

    Flaw Acoustic Impact Technique Surface Crusher Rotors, Bearings

    Flaw Magnetic Flaw Detector

    like MD20 Wire Rope

    Tester

    Surface Wire ropes of Aerial Ropeway

  • 7/31/2019 Condition Based Preventive Maintenance Action

    6/8

    Limitations

    As the plant operating conditions change, it makes it hard to compare the readings andthe data scatter will be more difficult to trend.

    Condition based Maintenance may not easily achieve the confidence of maintenance,due to culture, management buy-in, or regulatory resistance.

    There needs to be a good balance between training of CBM technicians, goodequipment for monitoring, knowledge of the equipment being monitored, and planthistorical performance.

    Be aware of false indications and manage them so as not to discredit the programme.

    Data from the programme should be widely accessible.

    Although data management is very important, keep it simple so that it takes little timeto get it instituted.

    Team work is a requirement for the programme to be successful.

    The CBM programme is not an all inclusive programme and must be balanced withother maintenance processes.

  • 7/31/2019 Condition Based Preventive Maintenance Action

    7/8

    Technical paper on Quality Assured Maintenance Management For Coal Handling

    Plant by Makarand Joshi at web site

    Technical paper on Development and Implementation of Reliability centeredMaintenance using Vibration Analysis: Experiences at Rourkela Steel Plant byS.Parida, N.R.Kotu, M.M.Prasad Research & Development Centre for Iron andSteel, Steel Authority of India Limited (SAIL), Rourkela Centre.

    Technical paper on Maintenance Method For Critical Equipments Of CoalHandling Plant by Makarand Joshi at web site

    Technical paper on Application & Implementation of Residual Life AssessmentTechniques For Coal Handling Plant by Makarand Joshi presented in NationalSeminar of The Indian Society For Non Destructive Testing 5-7 December 2002 atChennai.

  • 7/31/2019 Condition Based Preventive Maintenance Action

    8/8

    Thankyou

    Q/A