conditions for accelerating the deployment of offshore wind power in the baltic sea region
DESCRIPTION
Conditions for accelerating the deployment of offshore wind power in the Baltic Sea Region. Jörg Neubauer Swedish Energy Agency. BSPC 26 August 2013. Point of departure. Ambitious. NREAP offshore target. Unambitious. Experienced. Inexperienced. Offshore MW installed. Available capacity. - PowerPoint PPT PresentationTRANSCRIPT
In cooperation with
Conditions for accelerating the deployment of offshore wind power in the Baltic Sea Region
BSPC 26 August 2013
Jörg Neubauer
Swedish Energy Agency
In cooperation with
In cooperation with
Point of departure
NR
EAP
offs
hore
targ
et
Ambitious
Inexperienced
Offshore MW installed
Unambitious
Experienced
In cooperation with © 2012 Deloitte
Availablecapacity
In cooperation with
In cooperation with
Area Reaching NREAP targets
Policy & Regulation • BSR level action plan with strong political mandate• FI, PL, EE & LV to develop offshore focused incentives
R & D and demonstration • Demo projects for technical & environmental issues (incl. impact of sea ice on foundation) • “Virtual” demonstration projects for wind farms on interconnection routes
Grid development and integration • SE & PL tackle back-log problems with large number of appl. to TSO• Sharing of deep connection costs in PL, EE & LV• Measures to prevent speculative applications – e.g. deposits
Spatial planning and permitting • One-stop-shop approach• Further and more detailed screening of potentially attractive areas• FI, EE, LV and PL in particular to develop SEAs identifying zones suitable for dev.