conditions for accelerating the deployment of offshore wind power in the baltic sea region

7
In cooperation with Conditions for accelerating the deployment of offshore wind power in the Baltic Sea Region BSPC 26 August 2013 Jörg Neubauer Swedish Energy Agency

Upload: dugan

Post on 19-Mar-2016

28 views

Category:

Documents


2 download

DESCRIPTION

Conditions for accelerating the deployment of offshore wind power in the Baltic Sea Region. Jörg Neubauer Swedish Energy Agency. BSPC 26 August 2013. Point of departure. Ambitious. NREAP offshore target. Unambitious. Experienced. Inexperienced. Offshore MW installed. Available capacity. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Conditions for accelerating the deployment of offshore wind power in the Baltic Sea Region

In cooperation with

Conditions for accelerating the deployment of offshore wind power in the Baltic Sea Region

BSPC 26 August 2013

Jörg Neubauer

Swedish Energy Agency

Page 2: Conditions for accelerating the deployment of offshore wind power in the Baltic Sea Region

In cooperation with

Page 3: Conditions for accelerating the deployment of offshore wind power in the Baltic Sea Region

In cooperation with

Point of departure

NR

EAP

offs

hore

targ

et

Ambitious

Inexperienced

Offshore MW installed

Unambitious

Experienced

Page 4: Conditions for accelerating the deployment of offshore wind power in the Baltic Sea Region

In cooperation with © 2012 Deloitte

Availablecapacity

Page 5: Conditions for accelerating the deployment of offshore wind power in the Baltic Sea Region

In cooperation with

Page 6: Conditions for accelerating the deployment of offshore wind power in the Baltic Sea Region

In cooperation with

Area Reaching NREAP targets

Policy & Regulation • BSR level action plan with strong political mandate• FI, PL, EE & LV to develop offshore focused incentives

R & D and demonstration • Demo projects for technical & environmental issues (incl. impact of sea ice on foundation) • “Virtual” demonstration projects for wind farms on interconnection routes

Grid development and integration • SE & PL tackle back-log problems with large number of appl. to TSO• Sharing of deep connection costs in PL, EE & LV• Measures to prevent speculative applications – e.g. deposits

Spatial planning and permitting • One-stop-shop approach• Further and more detailed screening of potentially attractive areas• FI, EE, LV and PL in particular to develop SEAs identifying zones suitable for dev.

Page 7: Conditions for accelerating the deployment of offshore wind power in the Baltic Sea Region

In cooperation with

Mailto:[email protected]

Study results:www.basrec.net -> projects