CONNECTING IDAHO CONNECTING IDAHO GARVEE PROGRAMGARVEE PROGRAM

UpdateUpdate

Page 2: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account
Page 3: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account
Page 4: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

Bonds sold on May 23. Proceeds from the Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited sell (approx $198M) has been deposited on the trustee Bank Account. on the trustee Bank Account.

Board authorized the Director on 7/14/06 Board authorized the Director on 7/14/06 to sign the contract when finalized. to sign the contract when finalized. Contract to manage the $200M was Contract to manage the $200M was executed on August 3 between ITD and executed on August 3 between ITD and Connecting Idaho Partners (CIP) a joint Connecting Idaho Partners (CIP) a joint venture of Washington Group International venture of Washington Group International and CH2M Hill.and CH2M Hill.

Page 5: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

The Program Manager for CIP is Dave The Program Manager for CIP is Dave Butzier. The program Administrator for ITD Butzier. The program Administrator for ITD is Nestor Fernandez. is Nestor Fernandez.

CIP is preparing a Program Execute Plan. CIP is preparing a Program Execute Plan. The plan would identified the framework The plan would identified the framework for the program including communication for the program including communication protocol and operational committees, protocol and operational committees, procedures to be follow, suggested procedures to be follow, suggested modification to current procedures and modification to current procedures and alignment with other IOTD sections. It is alignment with other IOTD sections. It is expected to have a draft plan by middle of expected to have a draft plan by middle of September. September.

Page 6: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

We are in the process to assigned current We are in the process to assigned current contract on GARVEE projects to CIP. contract on GARVEE projects to CIP.

First Construction Project – Topaz to Lava First Construction Project – Topaz to Lava Hot Spring – Contract award on 7/12/06. Hot Spring – Contract award on 7/12/06. Groundbreaking ceremony on August 18.Groundbreaking ceremony on August 18.

Status of other projects – See attached Status of other projects – See attached listlist

Page 7: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

Draft STIP shows potential Draft STIP shows potential investment of $411 M for next year investment of $411 M for next year bonding request. Board has not bonding request. Board has not acted on this, and may change. The acted on this, and may change. The draft includes funding for completion draft includes funding for completion of the current six corridors and adds of the current six corridors and adds three projects for development and three projects for development and construction (Thorn Creek to construction (Thorn Creek to Moscow, Twin Falls Alternate Route, Moscow, Twin Falls Alternate Route, and Timmerman to Ketchum).and Timmerman to Ketchum).

Page 8: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

A VisionA Vision

Connecting Idaho began more than a Connecting Idaho began more than a year and a half ago as Governor Dirk year and a half ago as Governor Dirk Kempthorne’s vision for improving Kempthorne’s vision for improving Idaho’s transportation infrastructure, Idaho’s transportation infrastructure, connecting all 44 counties, addressing connecting all 44 counties, addressing safety for Idaho motorists, and safety for Idaho motorists, and expanding opportunities for commerce expanding opportunities for commerce nationally and internationally. nationally and internationally.

Page 9: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

That vision resulted in the passage of SB-That vision resulted in the passage of SB-1183 legislation in 2005. The bill authorized 1183 legislation in 2005. The bill authorized the Idaho Transportation Board to request the Idaho Transportation Board to request bonding authority from the legislature to bonding authority from the legislature to finance $1.2 billion– the largest public works finance $1.2 billion– the largest public works project ever undertaken in this state - in project ever undertaken in this state - in regionally significant projects stretching regionally significant projects stretching from the northern-most part of Idaho almost from the northern-most part of Idaho almost to the Wyoming border. These bonds, to the Wyoming border. These bonds, which pledge the future federal revenue which pledge the future federal revenue stream and are commonly known as Grant stream and are commonly known as Grant Anticipation Revenue Vehicle or GARVEE Anticipation Revenue Vehicle or GARVEE bonds, are being used in at least a dozen bonds, are being used in at least a dozen other states to advance construction.other states to advance construction.

Page 10: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

AccomplishmentsAccomplishments

The accomplishments for this The accomplishments for this program here in Idaho are very program here in Idaho are very impressive, and include many first impressive, and include many first for the State.for the State.

Page 11: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

Program Proposed……………………………………………………….January 2005Program Proposed……………………………………………………….January 2005 Connecting Idaho Authorized by Legislature……………………………...April Connecting Idaho Authorized by Legislature……………………………...April

20052005 Idaho Transportation Board Authorizes Program Manager Approach….July Idaho Transportation Board Authorizes Program Manager Approach….July

20052005 FHWA MOA Approved……………………………………………….September 2005FHWA MOA Approved……………………………………………….September 2005 Idaho Housing and Finance Association MOA Approved……………October Idaho Housing and Finance Association MOA Approved……………October

20052005 1st GARVEE Proposal by IT Board…………………………………..November 20051st GARVEE Proposal by IT Board…………………………………..November 2005 Program Manager Selected…………………………………………….January 2005Program Manager Selected…………………………………………….January 2005 Legislative Approval of $200 Million for 1 year authorization……………April Legislative Approval of $200 Million for 1 year authorization……………April

20062006 Connecting Idaho Partners/ITD Alignment Workshop……………………May Connecting Idaho Partners/ITD Alignment Workshop……………………May

20062006 1st GARVEE Bonds were Sold………………………………………………May 20061st GARVEE Bonds were Sold………………………………………………May 2006 1st Construction Contract Awarded…………………………………………June 1st Construction Contract Awarded…………………………………………June

20062006 Contract Executed…………………………………………………………August 2006Contract Executed…………………………………………………………August 2006

Page 12: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

Project Update8-24-06Project Update8-24-06The ProjectsThe Projects

The six Corridors approved for work The six Corridors approved for work under the GARVEE bond proceeds under the GARVEE bond proceeds are:are:

Page 13: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

A.)US-95, Garwood to SagleA.)US-95, Garwood to Sagle. This project . This project will create a multi-lane divided highway will create a multi-lane divided highway between Coeur d’Alene and Sandpoint between Coeur d’Alene and Sandpoint with at least partial access control. It with at least partial access control. It will provide a 52-mile multi-lane, high will provide a 52-mile multi-lane, high performance highway from I-90 in performance highway from I-90 in Coeur d’Alene to Colburn. $35 million Coeur d’Alene to Colburn. $35 million was approved to start this project, was approved to start this project, which will provide for engineering and which will provide for engineering and initial right-of-way acquisition.initial right-of-way acquisition.

Page 14: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

StatusStatus - The Draft Environmental Impact - The Draft Environmental Impact Statement (DEIS) has been submitted to the Statement (DEIS) has been submitted to the Federal Highway Administration (FHWA) for legal Federal Highway Administration (FHWA) for legal sufficiency review. The legal sufficiency review sufficiency review. The legal sufficiency review comments are back to the Division Office (week comments are back to the Division Office (week of August 21, 2006) and due to be forwarded to of August 21, 2006) and due to be forwarded to ITD by end of August. Once the review comments ITD by end of August. Once the review comments are incorporated, the DEIS will be available for are incorporated, the DEIS will be available for public review and comment. A Public Hearing is public review and comment. A Public Hearing is anticipated for fall of 2006. The preliminary anticipated for fall of 2006. The preliminary engineering and preparation of right-of-way plans engineering and preparation of right-of-way plans will begin in July 2006, so that as soon Record of will begin in July 2006, so that as soon Record of Decision on the EIS is issued (anticipated to be in Decision on the EIS is issued (anticipated to be in April 2007) the right-of-way acquisition will begin.April 2007) the right-of-way acquisition will begin.

Page 15: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

B.)US-95, Worley North. B.)US-95, Worley North. This project will This project will extend the recently completed extend the recently completed Bellgrove to Mica project south of Bellgrove to Mica project south of Coeur d’Alene. It is planned to be a Coeur d’Alene. It is planned to be a four-lane divided highway with partial four-lane divided highway with partial access control. This project will access control. This project will complete a 21-mile four-lane route complete a 21-mile four-lane route from Worley to Coeur d’Alene. The from Worley to Coeur d’Alene. The estimated construction cost of Stage 1 estimated construction cost of Stage 1 of this project is $45.6 million.of this project is $45.6 million.

Page 16: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

StatusStatus - The design of Stage 1 is nearly - The design of Stage 1 is nearly complete. The right-of-way required is complete. The right-of-way required is being appraised and acquisition should being appraised and acquisition should be completed later this year. There is be completed later this year. There is a cultural resource that recently a cultural resource that recently surfaced and so plans are being surfaced and so plans are being modified to avoid the resource. modified to avoid the resource. Construction will most likely begin in Construction will most likely begin in April 2007.April 2007.

Page 17: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

C.)SH-16, I-84 to South Emmett.C.)SH-16, I-84 to South Emmett. This project This project will provide planning and initial right-of-will provide planning and initial right-of-way acquisition to connect I-84 between way acquisition to connect I-84 between Nampa and Meridian with SH-16 and Nampa and Meridian with SH-16 and proceed to the bottom of Freeze Out Hill. proceed to the bottom of Freeze Out Hill. The highway is planned to be a controlled The highway is planned to be a controlled access, four-lane divided highway. $5 access, four-lane divided highway. $5 million was allocated to begin work on the million was allocated to begin work on the potential alignment from I-84 to SH-44 potential alignment from I-84 to SH-44 near Star and begin right-of-way near Star and begin right-of-way acquisition.acquisition.

Page 18: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

StatusStatus – The scope of work for developing the – The scope of work for developing the corridor study from SH-44 to I-84 is being developed. corridor study from SH-44 to I-84 is being developed. We have been planning a couple of open houses to We have been planning a couple of open houses to inform the public on the status of the corridor. The inform the public on the status of the corridor. The residents between SH-44 and I-84 are anxious to find residents between SH-44 and I-84 are anxious to find out where the alignment might go, and how it will out where the alignment might go, and how it will impact their property. The public along and users of impact their property. The public along and users of the existing SH-16 between SH-44 and Emmett are the existing SH-16 between SH-44 and Emmett are anxious to find out when improvements to that anxious to find out when improvements to that section of the corridor might happen. There have section of the corridor might happen. There have been several willing sellers contact ITD about parcels been several willing sellers contact ITD about parcels of land in the area around the SH-44 and SH-16 of land in the area around the SH-44 and SH-16 interchange that would like to sell their parcels to interchange that would like to sell their parcels to ITD. We are exploring options for accelerating the ITD. We are exploring options for accelerating the acquisitions where possible.acquisitions where possible.

Page 19: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

D.)I-84, Meridian to Caldwell. D.)I-84, Meridian to Caldwell. This section of I-This section of I-84 has seen a significant increase in traffic 84 has seen a significant increase in traffic volumes over the past several years, and volumes over the past several years, and has become very congested. Increased has become very congested. Increased capacity is the focus of the initial phase of capacity is the focus of the initial phase of this project. $70 million was approved to this project. $70 million was approved to begin widening the interstate from begin widening the interstate from Meridian to the west. It will also fund Meridian to the west. It will also fund preliminary engineering and environmental preliminary engineering and environmental process and right-of-way acquisition for the process and right-of-way acquisition for the new Ten Mile Interchange.new Ten Mile Interchange.

Page 20: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

StatusStatus - Planning has begun for adding a third - Planning has begun for adding a third lane to the interstate between the Meridian lane to the interstate between the Meridian Interchange and Garrity Interchange. The aerial Interchange and Garrity Interchange. The aerial mapping of that segment has been completed mapping of that segment has been completed and the geotechnical investigation to determine and the geotechnical investigation to determine whether the existing pavement can be rotomilled whether the existing pavement can be rotomilled and overlayed or completely reconstructed is well and overlayed or completely reconstructed is well underway. underway.

The preliminary design and environmental The preliminary design and environmental evaluation of the Ten Mile Interchange has also evaluation of the Ten Mile Interchange has also begun for selecting the type of interchange that begun for selecting the type of interchange that will be constructed at Ten Mile Road. A public will be constructed at Ten Mile Road. A public meeting will be held August 31, 2006 and notices meeting will be held August 31, 2006 and notices have gone out to the public.have gone out to the public.

Page 21: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

E.)I-84, Orchard to Isaacs Canyon. E.)I-84, Orchard to Isaacs Canyon. This project will This project will ultimately reconstruct and modernize the ultimately reconstruct and modernize the existing interstate and interchanges through the existing interstate and interchanges through the City of Boise. The existing concrete pavement City of Boise. The existing concrete pavement was constructed in the 1960’s and has reached was constructed in the 1960’s and has reached the end of it’s useful life. The upgrades would the end of it’s useful life. The upgrades would begin about ½ mile west of the Orchard Street begin about ½ mile west of the Orchard Street Interchange and ends near the Isaacs Canyon Interchange and ends near the Isaacs Canyon (also known as Eisenman Road). The total (also known as Eisenman Road). The total project design and construction cost is presently project design and construction cost is presently estimated at $285 million. $13.9 million was estimated at $285 million. $13.9 million was approved to begin the engineering for the approved to begin the engineering for the reconstruction and widening and possible right-reconstruction and widening and possible right-of-way acquisition.of-way acquisition.

Page 22: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

StatusStatus – The preliminary engineering – The preliminary engineering and Environmental Assessment (EA) and Environmental Assessment (EA) for the corridor is proceeding. The for the corridor is proceeding. The draft EA is being reviewed by FHWA draft EA is being reviewed by FHWA at this time. A Public Hearing on the at this time. A Public Hearing on the EA is scheduled for November 2006.EA is scheduled for November 2006.

Page 23: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

F.)US-30, McCammon to Lava Hot Springs. F.)US-30, McCammon to Lava Hot Springs. This project will complete a four-lane This project will complete a four-lane roadway from I-15 at McCammon to Lava roadway from I-15 at McCammon to Lava Hot Springs. The initial funding approved Hot Springs. The initial funding approved for this corridor was $30.5 million. That for this corridor was $30.5 million. That will fund the construction of the first phase will fund the construction of the first phase of the corridor called Topaz to Lava Hot of the corridor called Topaz to Lava Hot Springs and allow final engineering design Springs and allow final engineering design to begin on other segments between to begin on other segments between McCammon and Topaz.McCammon and Topaz.

Page 24: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

StatusStatus - This is the first construction project - This is the first construction project to be realized by selling the bonds. It will to be realized by selling the bonds. It will rebuild and widen a 4.5 mile section of US rebuild and widen a 4.5 mile section of US 30 west of Lava Hot Springs. It was 30 west of Lava Hot Springs. It was advertised for bid on May 12, 2006, with advertised for bid on May 12, 2006, with bids opened on June 13, 2006 and Western bids opened on June 13, 2006 and Western Construction of Boise, was the winning Construction of Boise, was the winning contractor. The Engineers Estimate was contractor. The Engineers Estimate was $21.3 million, and the bids came in at $21.3 million, and the bids came in at $18.34 million. Western Construction $18.34 million. Western Construction began construction on August 14th. A began construction on August 14th. A Groundbreaking Ceremony was held August Groundbreaking Ceremony was held August 18th with nearly 200 people attending to 18th with nearly 200 people attending to celebrate the start of this major project.celebrate the start of this major project.

Page 25: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account
Page 26: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account
Page 27: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account
Page 28: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account

Right of Way: Acquire and manage real Right of Way: Acquire and manage real property for the statewide transportation property for the statewide transportation system. Enforce Highway Beautification Act.system. Enforce Highway Beautification Act.

Page 29: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account
Page 30: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account
Page 31: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account
Page 32: CONNECTING IDAHO GARVEE PROGRAM Update. Bonds sold on May 23. Proceeds from the sell (approx $198M) has been deposited on the trustee Bank Account