connectmckinleyville.com public engagement summary
DESCRIPTION
ConnectMcKinleyville.com public engagement summary for Central Ave, a project powered by Crowdbrite for Humboldt County Public Works. Hundreds of respondents and thousands of interactions help to shape the plan for Downtown.TRANSCRIPT
Design Workshop Summary 233 ideas + proposed design solutions summarized in six priority investment strategies:
*A combination of strategies is needed to improve Central Ave.
Slowing traffic
Improving bike/ped. safety
Reducing conflicts
Beautifying the corridor & place making
Access to business
Other ideas
12
3
45
6
123456
*A combination of strategies is needed to improve Central Ave.
Paint speed limit on roadway
Enhanced pedestrian crossings & bike
lanes
Enhanced striping or intermittent medians
with turn pockets
Colorized crosswalks & bike lanes
Create a central place/destination
Created on Streetmix.net a project of Code for America
Connect McKinleyville.com
Workshop Summary
Crowdbrite Design Workshop Summary 1. Slow Traffic A) Flashing light with speed indicators B) Paint speed limit on roadway? C) Public education for safe bike, pedestrian and vehicles D) Regulatory Traffic Control - Police
2. Improved Bicycle/Pedestrian Safety A). Enhanced pedestrian crossings and bike lanes (10) colorized crosswalks and bike lanes (5) with improved lighting /flashing lights B) Use bulb outs and shorten the distance across the street. C) Signal improvements – tied together, bike actuated (2), longer pedestrian walk signals. D) Complete sidewalk connections
3. Reduce Conflicts Reduce turn conflicts with enhanced striping or intermittent medians with turn pockets A) mountable and vegetated intermittent medians B) dedicated right turn lanes C) pullouts for buses
24. Beautify the Corridor A) Create a central place/destination B) Preserve trees, landscaping and Create a gateway to the South 5. *Access to Local Business
Investment Strategies
Connect McKinleyville.com
Top Priorities
www.connectmckinleyville.com
Implementation Strategies
www.connectmckinleyville.com
Alt 1 Comments
www.connectmckinleyville.com
Preferred Alternative
www.connectmckinleyville.com
Alt. 2 Feedback
www.connectmckinleyville.com
Treatment Options
www.connectmckinleyville.com
7600 Views (1600+) per Plan
www.connectmckinleyville.com
500+ responses 100+ respondents
www.connectmckinleyville.com
Sept – Oct 15
Overall Stats
2!
STATION #A -– Your Priorities !
www.connectmckinleyville.com!
At#the#Spring#Workshop#233#ideas#were#iden5fied#along#with#five#priori5es#for#the#corridor.#A#combina5on#of#strategies#is#needed.##Poll##1##Iden5fy#&#confirm#the#top#themes#from#the#Design#Workshop.#Iden5fy#your#top#2#priori5es#from#the#following#list:#• Slow#traffic#• Improve#bicycle/pedestrian#safety#
• Reduce#conflicts#• Beau5fy#the#corridor#&#place#making#
• Preserve#Access#to#business#
Add#addi5onal#comments.##Poll##2#Iden5fy#your#top#3#implementa5on#strategies#What#is#missing?#######
How#might#we#IMPROVE##Central#Avenue?#
McKinleyville Central Ave. Improvement Project
Crowdsourcing for Better Communities
SM
Workshop#Summary:#############
STATION #B -– Improvements!
www.connectmckinleyville.com!
A"combina*on"of"treatment"op*ons"is"needed."""Poll"#3"Iden*fy"which"treatment"op*ons"are"most"appropriate"for"Central"Avenue."You"may"also"provide"addi*onal"comments.""1."Intersec*on"Pedestrian"Refuge"Islands"2."Colored"Bike"Lanes"3."Mid"Block"Pedestrian"Crossings"4."Buffer"Strip"for"Bike"Lanes"5."Emergency"Vehicle"PreMemp*on"Equipment"6."Double"Red"Traffic"Light"Signals""""""""
McKinleyville Central Ave. Improvement Project
Crowdsourcing for Better Communities
SM
2!
3 !
Treatment"Op*ons"1.!
4.!
5.!