Connector Separation

Experimental Design

Doug Wilson

PVI Systems

iNEMI F2F at OFC 2011

Agenda

•Background

•Plan

•Test Fixture Description

•Test Protocol

•Status and Schedule

•Summary

2

Background

• “Foundational” experiment to support the

Particle Thickness Project

• Collection of IL/RL data at fine incremental

separation distances (~10 nm steps) using

nm precision stage and fixture

• Verifies that test setup ability to measure

effects of separation using multi-

wavelength IL/RL data

3

Connector Separation Plan

• Build test fixture to hold reference and

DUT halves of SC connectors

• Develop LabVIEW software to control the

PI nano-meter position stage and collect

IL/RL data

• Conduct experiments using this hardware

and software

• Report results to group

4

Test Fixture Description

• Test fixture

– optical bench base

– manually operated XYZ stage for initial alignment

– holders for the reference and DUT connectors

– load cell to measure compressive force during mating and

– nano precision stage (Z) for controlled connector separation

• Additional test system hardware

– IL/RL meter

– Drive electronics for stage

– computer

5

Test Fixture Picture

6

Piezo Stage

nm Z positionManual

XYZ

Stage

DUT Holder Load Cell

Ref Holder

Test Fixture Animation

7

• Movie removed to minimize file size

Test Protocol

1. Load clean connectors (UUT and Ref) into test fixture

2. Align the reference fiber and sleeve to the UUT

3. Cycle fixture to verify operation of load cell and determine

nominal starting location

4. Move to nominal contact force

5. Measure IL/RL*

6. Move selected step size (target is 10 nm steps)

7. Repeat 5 & 6 until specified distance (~3-5 μm)

8. Display and store IL/RL vs position

9. Compare to theoretical

8

* IL/RL measurements consist of user selected number of readings at each

wavelength

Status

• Fixture design completed

• Fixture custom parts machined by Tyco

• Fixture partially assembled; waiting on

load cell for completion

• LabVIEW software for control of IL/RL

instrument identified by Dave Fischer

9

Schedule

10

Task Completion

Date

Fixture final assembly 15 Mar 2011

LabVIEW framework 15 April 2011

Fixture motion via LabVIEW 30 April 2011

Integrate LabVIEW drivers for IL/RL meter 15 May 2011

Conduct IL/RL vs Position Tests 1-30 June 2011

Report Results 15 July 2011

Acknowledgments

•Rob Brucato of

–Design of test fixture

–Loan of PI stages and electronics

•Dave Fisher of

–Custom machined parts

–Loan of IL/RL instrument (TIA)

11