constellations, goes-r overview & goes-r data & … · constellations, goes-r overview...

15
COORDINATION GROUP ON SATELLITE DATA REQUIREMENTS FOR REGION III AND IV SECOND SESSION CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & PRODUCT ACCESS 6.1. GOES and POES Constellations and Flyout Charts Presented by: Paul Seymour, NOAA/NESDIS WMO SDR Meeting, Willemstad, Curaçao; September 5-8, 2016

Upload: lycong

Post on 16-Oct-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & … · CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & PRODUCT ACCESS 6.1. GOES and POES Constellations and Flyout Charts Presented

COORDINATION GROUP ON SATELLITE DATA REQUIREMENTS

FOR REGION III AND IV SECOND SESSION

CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & PRODUCT ACCESS

6.1. GOES and POES Constellationsand Flyout Charts

Presented by:Paul Seymour, NOAA/NESDISWMO SDR Meeting, Willemstad, Curaçao; September 5-8, 2016

Page 2: CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & … · CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & PRODUCT ACCESS 6.1. GOES and POES Constellations and Flyout Charts Presented

GOES Constellation

• GOES 13 Spacecraft Status Summary

• Spacecraft Letter: N - Operational Date: 04/14/2010

• Launch: 05/24/2006 - Spacecraft Location: 75 West

• Operational Status: Operational East

• Sounder - RED

Page 3: CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & … · CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & PRODUCT ACCESS 6.1. GOES and POES Constellations and Flyout Charts Presented

GOES Constellation

• GOES 13 Spacecraft Status Summary

• Spacecraft Letter: N - Operational Date: 04/14/2010

• Launch: 05/24/2006 - Spacecraft Location: 75 West

• Operational Status: Operational East

• Sounder - RED

Page 4: CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & … · CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & PRODUCT ACCESS 6.1. GOES and POES Constellations and Flyout Charts Presented

GOES Constellation

• GOES 15 Spacecraft Status Summary

• Spacecraft Letter: O - Operational Date: 12/06/2011

• Launch: 03/44/2007 - Spacecraft Location: 135 West

• Operational Status: Operational West

• Attitude Control, Communication Subsystem and Sounder - Yellow

Page 5: CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & … · CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & PRODUCT ACCESS 6.1. GOES and POES Constellations and Flyout Charts Presented

NOAA Geostationary Flyout ChartJune 8, 2016

http://www.nesdis.noaa.gov/pdf/flyout_pdf/GOES_Flyout_Chart_06_08_16.pdf

Page 6: CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & … · CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & PRODUCT ACCESS 6.1. GOES and POES Constellations and Flyout Charts Presented

GOES-R Launch Schedule

• LIFE CYCLE THROUGH PLANNED FY 2036

• GOES-R LAUNCH – November 4, 2016

• GOES-S LAUNCH – 2018

• GOES-T LAUNCH – 2019

• GOES-U LAUNCH – 2024

Page 7: CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & … · CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & PRODUCT ACCESS 6.1. GOES and POES Constellations and Flyout Charts Presented

GOES-R Deployment

• Becomes GOES-16 once it reaches geostationary orbit• Placed in the 89.5 ° checkout orbit• Extended checkout and validation phase ~ 1 Year• Transition to operations immediately afterward.• GOES-R’s operational orbit has not been determined.• Final decision based on the health/safety/performance of

the GOES constellation. • NOAA’s Office of Satellite and Product Operations will

be responsible for determining the operational orbit for GOES-R.

Page 8: CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & … · CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & PRODUCT ACCESS 6.1. GOES and POES Constellations and Flyout Charts Presented

POES Constellation

• NOAA-15 Spacecraft Status Summary

• Spacecraft Letter: K – Launch Date: 05/13/1998• Operational Date: 12/15/1998 - Status: AM Secondary• GAC: Yes / HRPT: Yes - STX-2/MSB 1702.5 MHz• LAC: No / APT: Yes - VTX-2 137.62 MHz

• High Resolution Infrared Radiation Sounder (HIRS) & Solar Backscatter Ultraviolet Radiometer (SBUV) –Red / Miniature Inertial Measurement Unit 1&2 Yellow

Page 9: CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & … · CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & PRODUCT ACCESS 6.1. GOES and POES Constellations and Flyout Charts Presented

POES Constellation

• NOAA-18 Spacecraft Status Summary

• Spacecraft Letter: N – Launch Date: 05/20/2005• Operational Date: 08/30/2005 - Status: PM Secondary• GAC: Yes / HRPT: Yes - - STX-3/HSB 1707.0 MHz• LAC: Yes / APT: Yes - VTX-2 137.9125 MHz

• High Resolution Infrared Radiation Sounder (HIRS) and Advanced Microwave Sounding Unit B (AMSU B - Red

Page 10: CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & … · CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & PRODUCT ACCESS 6.1. GOES and POES Constellations and Flyout Charts Presented

POES Constellation

• NOAA-19 Spacecraft Status Summary

• Spacecraft Letter: N – Launch Date: 05/20/2005• Operational Date: 08/30/2005 - Status: PM Primary

– For SARSAT and ADCS (Argos)

• GAC: Yes / HRPT: Yes - - STX-1/LSB• LAC: Yes / APT: Yes - VTX-1 137.1 MHz

• High Resolution Infrared Radiation Sounder (HIRS) –Orange (Degraded Performance)

Page 11: CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & … · CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & PRODUCT ACCESS 6.1. GOES and POES Constellations and Flyout Charts Presented

POES Constellation

• MetOp-B Spacecraft Status Summary

• International Designation: 2012-049A• Launch Date: 9/17/2012 - Operational Date: 4/24/2013• Operational Status: AM Primary• GDS: Yes AHRPT: Yes

• Data Collection System (ACDS) – Orange (Degraded Performance) and High Resolution Infrared Radiation Sounder (HIRS) – Yellow (Limitations)

Page 12: CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & … · CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & PRODUCT ACCESS 6.1. GOES and POES Constellations and Flyout Charts Presented

POES Constellation

• MetOp-A Spacecraft Status Summary

• International Designation: 2006-044A• Launch Date: 10/19/2012- Operational Date: 5/21/2007• Operational Status: AM Backup• GDS: Yes AHRPT: No LRPT: No

• All Green

Page 13: CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & … · CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & PRODUCT ACCESS 6.1. GOES and POES Constellations and Flyout Charts Presented

POLAR Constellation

• Suomi-NPP Spacecraft Status Summary

• Spacecraft Letter: SNPP – Launch Date: 10/28/2011

• Operational Date: 08/30/2005 - Status: PM Primary

• All Green

Page 14: CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & … · CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & PRODUCT ACCESS 6.1. GOES and POES Constellations and Flyout Charts Presented

NOAA & Partner Polar Flyout ChartJanuary 1, 2016

http://www.nesdis.noaa.gov/pdf/flyout_pdf/poes_flyout_jan2016.pdf

Page 15: CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & … · CONSTELLATIONS, GOES-R OVERVIEW & GOES-R DATA & PRODUCT ACCESS 6.1. GOES and POES Constellations and Flyout Charts Presented

JPSS Launch Schedule

• LIFE CYCLE THROUGH PLANNED FY 2038

• JPSS-1/NOAA-20 LAUNCH NLT 2ND QTR FY 2017

• JPSS-2 LAUNCH READINESS 4th Qtr FY 2021

• JPSS-3 LAUNCH READINESS FY 2026

• JPSS-4 LAUNCH READINESS FY 2031