Construction and Structures2
SRT 251
Major Project
Warehouse and Office Complex Scenario
Louis Kahn
Christopher Holder
400 163 208
Louis Kahn - Research
Louis Kahn used predominantly geometric forms, particularly in the openings.
Brick and concrete are the main materials in which Kahn worked.
Many of his buildings, particularly his most famous are of a large scale and contain an element of Monumentality
Roofs appear flat and even hidden.
Proposed Site
Construction and Structures 2 SRT 251Major ProjectWarehouse and Office Complex ScenarioChristopher Holder400 163 208
Design TechnologySpecifications and Capabilities
- Roof beam pitch 7 degrees 7 minutes (i.e. 1 in 8)
- Span Clear span capabilities are available up to 40m approx. - Bay width 6.0m is a recommended economic spacing of frames. - Eaves height 3.0 to 13.0 approx- Fire Resistance of 1-4 hours- Cladding is variable from
block work to metal sheeting
Concast – The G-Frame is a precast concrete structural frame which works similarly to a Steel Portal Frame structure.
Longitudinal support is be gained through the use of steel purlins or gurts.
All information found at www.concast.ie
Construction and Structures 2 SRT 251Major ProjectWarehouse and Office Complex ScenarioChristopher Holder400 163 208
All information found at www.concast.ie
Concast G-frame
Benefits-Larger span capabilities, allowing increased design flexibility. -Competitive pricing -Hygiene - ledges where dust and dirt collects can be minimised, which is ideal for high precision industries (such as pharmaceutical, computer or food processing facilities). -Inbuilt fire ratings avoid additional board or sprayed protection. -Factory production, quality checks prior to arriving on site. -Speed of erection. -Decreased maintenance costs – the frame is virtually maintenance free. -Clean finish. -Overhead gantry cranes – supports for overhead gantries can be provided in columns if requested at
design stage.
Construction Sequence
Footings
Construction and Structures 2 SRT 251Major ProjectWarehouse and Office Complex ScenarioChristopher Holder400 163 208
Construction and Structures 2 SRT 251Major ProjectWarehouse and Office Complex ScenarioChristopher Holder400 163 208
Structural System
Construction and Structures 2 SRT 251Major ProjectWarehouse and Office Complex ScenarioChristopher Holder400 163 208
Purlins and Gurts
Roofing
Safety and Drainage
Construction and Structures 2 SRT 251Major ProjectWarehouse and Office Complex ScenarioChristopher Holder400 163 208
Construction and Structures 2 SRT 251Major ProjectWarehouse and Office Complex ScenarioChristopher Holder400 163 208
Roof coverings
WallsConstruction and Structures 2 SRT 251Major ProjectWarehouse and Office Complex ScenarioChristopher Holder400 163 208
Flooring and Windows
Construction and Structures 2 SRT 251Major ProjectWarehouse and Office Complex ScenarioChristopher Holder400 163 208
Construction and Structures 2 SRT 251Major ProjectWarehouse and Office Complex ScenarioChristopher Holder400 163 208
Flashing
Construction and Structures 2 SRT 251Major ProjectWarehouse and Office Complex ScenarioChristopher Holder400 163 208
Final Product
Construction and Structures 2 SRT 251Major ProjectWarehouse and Office Complex ScenarioChristopher Holder400 163 208