construction bill of quantities

7
SUPPLEMENT AL/BID BULLETIN ADDENDUM NO. 1 (Construction of a Two-Storey Office Building for the DBM Procurement Service) This Addendum No.1 dated May 19, 2010 is issued to clarify, modify or amend items in the Bidding Documents. Accordingly, this shall form an integral part of said Documents. ISSUES CLARIFICATION/AMENDMENT Instructions to Bidders Item 12.1(a) (iv) 12.1 Unless otherwise indicated in the BDS, the first envelope shall contain the following eligibility and technical documents: (a) Eligibility Documents- xxx xxx xxx (iv) Unless otherwise provided in the BDS, valid Philippine Contractors Accreditation Board (PCAB) license and registration for the type and cost of the contract for this Project; Only a valid PCAB license shall be considered as compliant with the requirements of this Project. Thus, an official receipt and/or application form is patently insufficient and will, thus, be considered as "failed". Bid Data Sheet Item 8.1 Subcontracting of any kind is not allowed. For emphasis Item 12.1 The following shall be submitted and I For emphasis included in the first envelope:

Upload: michael-parohinog-gregas

Post on 22-Oct-2014

1.212 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Construction Bill of Quantities

SUPPLEMENT AL/BID BULLETIN

ADDENDUM NO. 1(Construction of a Two-Storey OfficeBuilding for the DBM Procurement Service)

This Addendum No.1 dated May 19, 2010 is issued to clarify, modify or amend items in theBidding Documents. Accordingly, this shall form an integral part of said Documents.

ISSUES CLARIFICATION/AMENDMENT

Instructions to Bidders

Item 12.1(a) (iv)

12.1 Unless otherwise indicated in theBDS, the first envelope shallcontain the following eligibility andtechnical documents:

(a) Eligibility Documents-xxx xxx xxx

(iv) Unless otherwise provided inthe BDS, valid PhilippineContractors AccreditationBoard (PCAB) license andregistration for the type andcost of the contract for thisProject;

Only a valid PCAB license shall be consideredas compliant with the requirements of thisProject. Thus, an official receipt and/orapplication form is patently insufficient andwill, thus, be considered as "failed".

Bid Data Sheet

Item 8.1

Subcontracting of any kind is not allowed. For emphasis

Item 12.1

The following shall be submitted and I For emphasisincluded in the first envelope:

Page 2: Construction Bill of Quantities

xxx xxxxxx

3.) Statement of Compliance with theDrawings and Building Specificationsof the Project:3.1 Statement of Specific Compliance

of each Drawing and each Sectionof the Building Specifications;and

3.2 Statement of Generic Compliancewith the Drawings and BuildingSpecifications of the Project;

For item 3.1, the statement of specificcompliance of each drawing must bedone by affixing the signature andinitials of the bidder's authorizedrepresentative in each drawing. Saidsignature and initial signifiescompliance of the bidder to abide bythe specifications in the drawings. Thesame must be submitted together withthe "original" first envelope. Copies ofsaid drawings are not required to besubmitted together with "copy 1" and"copy 2" of the first envelope.

xxx xxx xxx

6.) Notarized Affidavit of 'Site Inspection(See sample form under Section IX.Bidding Forms).

Item 12.1 (a) (iii)

Statement of all ongoing constructioncontracts should include all ongoingconstruction contracts, whether or notsimilar to the Project, within ten (10) yearsfrom the date of submission and receipt ofbids, while Statement of completedconstruction contracts should only consistof all construction contracts similar to theProject, including the Single LargestContract, within ten (10) years from the dateof submission and receipt of bids. Seesample forms under Section IX. BiddingForms.

The supporting documents for each ongoingproiect are notices of award, notices to

In order to comply with the notarized affidavitof site inspection, all bidders are required toconduct a site inspection for this particularbidding.

Page 3: Construction Bill of Quantities

proceed, if applicable, and certificates ofaccomplishment signed by the Owner orProject Engineer. In case the project wasjust awarded or still in the mobilizationstage, a certification to that effect, in lieu ofa certificate of accomplishment, signed bythe Owner or Project Engineer, should besubmitted.

The supporting documents for only three (3)completed proiects . which must include theSingle Largest Contract, are notices ofaward or equivalent, notices to proceed, ifapplicable, and CPES rating sheets whichmust have a satisfactory rating orcertificates of satisfactory completion andowner's acceptance of the project, as thecase may be.

Bill of Quantities

In case a bidder has less than three (3)completed projects, supporting documents forone (1) or two (2) completed projects areenough to comply with the requirements of theProject, provided that said completed project/sis or includes the Single Largest Contract.

Attached herewith is the Revised Pages 12, 13and 19 of the Bill of Quantities, whichcontains the following:

1. Item XIX Fence/Guardhouse - plasteringworks for CHB#6 should be included underthis Item.

2. Item XVII Roofing/Insulation (Skylights) -the item "8 sets 2-6mm laminated glass1.0m x 2.0m with qty of 55.22 and unit ofsq.m." refers to roof skylight.

3. Item XXII. Fire Protection Works - theitems for fire protection works include bothnew and revised items and quantity.

It is also clarified that for CHB Layout 100mmthk and CHB Layout 150mm thk under ItemVIII Masonry works, steel reinforcements onsaid items are already included under Item VIReinforcing Steel Bars. Moreover, it shall beunderstood that the size of PPR pipes underItem XXI Plumbing Works refers to. insidediameter and should comply with PN 16.

The bidders, in formulating their bid prices,should take into consideration the items ofworks in the Bill of Quantities, as revised, andthe relevant details and specifications in theDrawings and Building Specifications.

Page 4: Construction Bill of Quantities

Other matters:

~ Late bids shall not be accepted. The deadline for submission and receipt of bids isMay 26, 2010 at 9:00 a.m.

~ The "No Contact Rule" is strictly observed. Bidders are not allowed to call or talk toany member of the Bids and Awards Committee, its Technical Working Group andSecretariat, and its Architectural and Engineering Consultants effective May 26, 2010right after the opening of bids.

For guidance and information of all concerned.

t';1ASEC. VERBO S. BONILLAChairperson, DBM Bid and Awards Committee

Page 5: Construction Bill of Quantities

Page 12 of 29

ITEMS Qtv Unit Unit Cost TOTAL COST

sch 40x2"dia 3 DCS I

AngleBar 446 DCS

C-Purlins 378 DCS

Plainroundbar 16mmx6m 74 DCS

Plainroundbar 12mmx6m 72 DCS

BIPIPESch60 75mmx 6m 20 DCS

MSPlate16mmx1220x2440m 2 DCS

Anchor bolts 16mmx200mm 151 OCS

Bolts& Nuts12mmx38mm 560 DCS

Tumbuckles16mm 24 DCS

WeldingRod 16 bxs

Cylinders oxygen 28 cvl

CylinderLPG 5 cvl

RedOxidePrimer 60 Qals

PaintThinner 20 qals

e. cistern cover 1 set

f. cistern ladder 1 set

g. 2"x6" tubular steel trellis 65 1m

h. canopy Structural Steel Columns W14x43 7.65 1m

g. canopy Structural Steel Beams W12x40 29.9 1m

h. canopy Structural Steel Beam W6x25 6 1mMaterial CostLabor/EauipmentfToolsDirect CostIndirect CostVAT

SUBTOTAL

XVII. ROOFING/INSULATION (REVISED)1. main roof, canopy & guard housea. Twin ribbed metal roofing 1585 sa.m.

b. insulation (12mm thk, double foil, double bubble) 1585 sa.m.

c. flashing/ridgeroll ga 26 stainless steel sheet 145 1m

2. SkylightRoof Skylight 8 sets 2-6mm thk laminated glass 55.22 sa.m

1m x 2m

Office Skylight 6 sets 2-6mm thk laminated glass 12 sa.m

1m x 2m

Material CostLabor/EauipmentfToolsDirect CostIndirect CostVAT

SUBTOTAL

Page 6: Construction Bill of Quantities

Page 13 of 29

1ITEMS ON Unit Unit Cost TOTAL COST

XVIII. PAINTING WORKSa. Interior Wall 4434 sq.m.b. Exterior Wall 2370 sq.m.

c. Ceiling Area 2800 sq.m.d. Cabinets 275 sq.m.

e. Doors (wood) 31 sets

f. Doors (steel) 2 sets

g. Steel Grille 448 sq.m.h. Steel Louver 68 sq.m.

i. Baseboard 1180 1m

'. Fire exit ladder 18 sq.m.k. Fire exit cover 4 sq.m.

Material CostLabor/Eauipmentrr oolsDirect CostIndirect CostVAT

SUBTOTAL

XIX. FENCE/GUARDHOUSE (REVISED)FenceExcavation 12.54 m3

Backfill 8.25 m3

Concrete 17.02 m3

Rebars 476.42 kgFormworks 14.4 m2

CHB #6 (Iincluding plastering) 24.65 m2

GIWire 12 kg

GuardhouseExcavation 2.95 m3

Backfill 2.05 m3

Concrete 2.1 m3

Rebars 155.86 kgFormworks 12 m2

CHB#6 (including plastering) 24.65 m2

G.I.Wire 6 kgPVC Door 1 set

Material CostLabor/Eauipmentrr oolsDirect CostIndirect CostVAT

SUBTOTAL

XX.MISCELLANEOUS

a. 25mm granite slab countertop 88.4 1m

b. 2"x6" aluminum tubular sunbreaker 33.4 1m

c. 2"x4" aluminum tubular sunbreaker 18.9 1m

Page 7: Construction Bill of Quantities

Page 19 of 29

-"".,

ITEMS Qty Unit Unit Cost TOTAL COST

XXII. FIRE PROTECTION WORKS (REVISED)100 mm dia B.I. Pipe 15 1m75 mm dia B.I. Pipe 160 1m

65 mm dia B.I. Pipe 36 1m40 mm dia B.I. Pipe 6 1m

100 mm dia x 100 Tee (Welded) 4 DCS.75 mm dia x 65 Tee reducer 8 pCS.65 mm dia x 65 Tee 8 DCS.

100 mm dia x 90° Bend 12 pCS.75 mm dia x 90° Bend 12 DCS.65 mmdia x 40mm dia 90° Bend reducer 8 DCS.

100 mm dia Blind Flange 2 pCS.100 mm dia x 75 reducer 2 pCS.100 mm dia Flange 12 DCS.75 mm dia Flange 26 pCS.65 mm dia Flange 16 pCS.65 mm dia Fire Hose Gate Valve 8 pCS.

w/ cap and chainFire Hose Cabinet 8 DCS.

Fire Department Connection 1 pc.100 mm dia Check Valve 2 pCS.100 mm dia Gate Valve 1 pCS.50 mm dia Check Valve 1 DCS.50 mm dia Gate Valve 1 pCS.75 mm dia Pressure Relief Valve 2 pCS.

Cap Screw with nut and washer 5/8 x 4 264 pCS.Miscellaneous Items

Teflon tape 30 rolls

Welding Rod 6 kilos

Oxygen/Acetylene 1 setGasket Maker 2 tubesRubber Gasket 1 rolls

Pipe Hanger/Supports L 0 T

Painting L 0 TMaterial CostLabor/EQuiDment/T oolsDirect CostIndirect CostVAT

SUB-TOTAL

PumpsFire Pump and Jockey Pump Accessories L 0 TWith Controllers and Others L 0 T

Material Cost

Labor/Equipment/T oolsDirect CostIndirect CostVAT

SUB-TOTAL