CONSTRUCTION & COMMISSIONING SUPPORT RDS assist our clients in the construction and commissioning of drilling rigs. Our approach is to assemble a support team looking after the drilling package and working in an integrated manner alongside the shipyard or the topsides contractor. Through years of experience, RDS has developed the knowledge and procedures to work towards successful commissioning of drilling facilities. RDS’ construction and commissioning services are supported by the strict application of certain principles around installation of builder furnished (BFE) and owner furnished (OFE) drilling equipment; integration, operability and functionality of equipment and systems (including the review of individual components as well as the interface with other areas); compliance with HSE, quality and project standards; factory inspection and acceptance testing (FAT); pre- commissioning check lists (PCLs); denition of commissioning procedures; mechanical completion certication and inspection test records (ITRs). Drilling facilities engineering design specialists The responsibilities of RDS’ Construction and Commissioning support team include: Integration within the client’s team to ensure knowledge and alignment of work packages from early stages of construction and engineering Assurance around equipment and mechanical completion, certication and functionality Review and sign-off the pre-commissioning and commissioning procedures Execution and supervision of drilling systems integration tests prior to sea trials Participation in sea trials Hand-over to operations Drilling Facilities Engineering Conceptual Engineering and Consultancy Aberdeen Baku Bergen Houston London Stavanger www.rdsoil.com Technical Integrity Assurance Engineering Design for New-builds Construction and Commissioning Support Rig Reactivation and Modication RDS is a division of internaonal drilling contractor KCA DEUTAG © KCA DEUTAG: All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmied in any form without prior permission of KCA DEUTAG

Upload: others

Post on 24-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

  • CONSTRUCTION &COMMISSIONING SUPPORT

    RDS assist our clients in the construction and commissioning of drilling rigs. Our approach is to

    assemble a support team looking after the drilling package and working in an integrated manner alongside

    the shipyard or the topsides contractor.

    Through years of experience, RDS has developed the knowledge and procedures to work towards successful commissioning of drilling facilities. RDS’ construction and commissioning services are supported by the strict application of certain principles around installation of builder furnished (BFE) and owner furnished (OFE) drilling equipment; integration, operability and functionality of equipment and systems (including the review of individual components as well as the interface with other areas); compliance with HSE, quality and project standards; factory inspection and acceptance testing (FAT); pre-commissioning check lists (PCLs); defi nition of commissioning procedures; mechanical completion certifi cation and inspection test records (ITRs).

    Drilling facilities engineering design specialists

    The responsibilities of RDS’ Construction and Commissioning support team include:

    ► Integration within the client’s team to ensure knowledge and alignment of work packages from early stages of construction and engineering

    ► Assurance around equipment and mechanical completion, certifi cation and functionality

    ► Review and sign-off the pre-commissioning and commissioning procedures

    ► Execution and supervision of drilling systems integration tests prior to sea trials

    ► Participation in sea trials

    ► Hand-over to operations

    Drilling Facilities EngineeringConceptual Engineering and Consultancy

    Aberdeen • Baku • Bergen • Houston • London • Stavanger

    www.rdsoil.com

    Technical Integrity Assurance

    Engineering Design for New-builds

    Construction and Commissioning Support

    Rig Reactivation and Modifi cation

    RDS is a division of internati onal drilling contractor KCA DEUTAG© KCA DEUTAG: All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitt ed in any form without prior permission of KCA DEUTAG

  • Drilling facilitiesengineering design specialistswww.rdsoil.com [email protected]

    Track Record

    In our experience, construction and commissioning success is primarily dependant on the appropriate management of all critical project interfaces to ensure the completion of the drilling package is coordinated and accomplished safely, effi ciently and expediently.

    CONSTRUCTION & COMMISSIONING SUPPORT

    AIOC - Azeri Development Following detail design, provided extensive support during construction and onshore/offshore commissioning of drilling facilities for CA, WA, EA, DWG facilities.

    Chevron - Benguela Belize DevelopmentDelivered drilling facility under EPC contract with full responsibility up to sailaway.

    BOL - BritanniaFollowing detail design, provided support during construction of drilling facilities as part of a JV organisation.

    Statoil - KvitbejornDetail design followed by full construction support as part of a JV with Heerema.

    Exxon - RinghorneDetail design followed by full construction support as part of a JV with Heerema and Hydralift.

    Benguela Belize drilling facility West Azeri drilling module assembly

  • CONSTRUCTION AND COMMISSIONING SUPPORT RDS assist our clients in the construction and commissioning of drilling rigs. Our approach is to assemble a support team looking after the drilling package and working in an integrated manner alongside the shipyard or the topsides contractor.

    RDS is a division of international drilling contractor KCA DEUTAG © KCA DEUTAG: All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form without prior permission

    VESSEL / FIELD NAME

    **Fact File available

    VESSEL / FIELD LOCATION

    CLIENT PHASE SCOPE OF WORK BUILDER YEAR

    ** Thistle

    UK North Sea

    Lundin EPC Major reactivation and refurbishment of a first generation North Sea platform including; detail design, construction and commissioning

    - 2006 to 2009

    ** Beryl Alpha

    UK North Sea

    Exxon EPC Upgrade of Rig 1 well control equipment from 5,000psi to 10,000psi including; detail design, construction and commissioning Major upgrade to permit extended reach drilling (ERD) including; detail design, construction and commissioning

    - 2009 to 2010

    2006 to 2007

    ** Deep Water Gunashli (DWG)

    Caspian AIOC EPCD Detail design based on earlier Azeri drilling rigs, then support client commissioning

    Mercon 2002 to 2007

    East Azeri

    Caspian AIOC EPCD Detail design based on West Azeri drilling rig, then support client commissioning

    Mercon 2002 to 2006

    ** Benguela Belize

    Angola Chevron Texaco

    EPCD Detail design, procurement, construction and installation of a large, mechanized drilling rig on a compliant tower

    NOV 2002 to 2005

    West Azeri

    Caspian BP EPCD Detail design based on Central Azeri then construction & commissioning support

    Mercon 2001 to 2005

    Chunxiao China CNOOC EPC Detailed design, construction & commissioning support for platform drilling facility

    CSE China

    2005

    CACT China CNOOC EPC Detailed design, construction & commissioning support for platform drilling facility

    CSE China

    2005

    ** Shah Deniz

    Caspian BP EPCD Study, FEED, detail design, procurement, construction & commissioning support for a fully integrated heavy duty, mechanized drilling rig on a Technip TPG500 self installing platform

    Nymo 2000 to 2005

    ** Chikyu (OD21)

    Drillship / deep water NK classification

    Jamstec Basic Engineering, package management & inspection services and construction support

    MHI 2000 to 2004

    Central Azeri

    Caspian BP EPCD Study, FEED, then provide client support through detail design and commissioning

    Eiffel 2000 to 2004

    ** Kvitebjørn Norwegian North Sea

    Statoil EPC Detailed design, construction & commissioning support for platform drilling facility

    Heerema Tonsberg

    2000 to 2003

    ** Ringhorne Norwegian North Sea

    Exxon Mobil

    EPC Detailed design, construction & commissioning support for platform drilling facility

    Zwijndrecht Tonsberg

    2000 to 2002

    ** Pride Brazil & Carlos Walter

    Semisubmersible dynamic positioning

    DeHoop Megathyst class D & P / Amethyst 2

    Petrodrill (Pride)

    Detail Design Detail design, on site construction & commissioning support

    Daewoo 1999 to 2001

    ** Leiv Eiriksson / Eirik Raude

    semisubmersible ultra deep water

    harsh env/dynamic positioning

    5th generation / Class DP3 Trosvik Bingo 9000

    Ocean Rig Detail Design

    Detail design including construction & commissioning support on site in US shipyard

    F&G Offshore

    1998 to 2000

    ** Saipem 10000

    Drillship / ultra deep water dynamic positioning / Class

    DP3

    Saipem Detail Design

    Detail design and construction support Samsung 1998 to 2000

    ** Deepwater Pathfinder

    drillship / deep water dynamic positioning /

    5th gen

    R&B Falcon Detail Design

    Detail design and construction support Samsung 1996 to 1998

    Britannia UK North Sea BOL EPCD As members of Topsides Alliance, conceptual design, detail design, construction, commissioning and follow-on engineering

    - 1993 to 1998

    Hibernia NW Atlantic offshore Newfoundland

    HMDC EPC Conducted detail design, procurement, construction management of a twin drilling rig package on a GBS structure

    - 1993 to 1996

  • Thistle

    CONSTRUCTION & COMMISSIONING SUPPORT

    General Project Data

    Installation / Project / Field Thistle / Rig Reactivation / UK North Sea

    Owner / client Enquest (formerly Lundin UK Ltd)

    Type of contract Reimbursable (against agreed rates schedule)

    Contract start / finish October 2006 to July 2009

    Key RDS subcontractors NOV Varco (supply of topdrive and refurbishment of drawworks)

    RDS project no(s) GB 28 / 3207 & 4078

    Facility overview /

    RDS workscope

    Refurbishment of all Drilling Facilities which had been de-activated for 20 years. The work involved an extensive programme of destructing and rebuilding most of the drilling facilities modules.

    Equipment layout was reconfigured and installed as each module was refurbished. Several systems, i.e., kill system, BOP activation etc., were redesigned from the original to take account of changes in legislation. The derrick was refurbished and reconfigured for the fitting of a topdrive. The drillfloor layout was extensively changed to accommodate additional pipe-handling equipment. Drilling control and monitoring systems were replaced and upgraded to enhance management of the drilling process.

    The project was divided into 8 workscopes:

    Derrick and components

    Drilling equipment and systems

    Bulk mud systems

    Well control equipment and systems

    Pipe handling

    Lifting and transport equipment

    Power generation and electrical systems

    General steel repairs

    Each workscope was divided into 3 sections:

    Destruct

    Re-build and refurbishment

    Commissioning and certification

    Value delivered by RDS Thistle Drilling Rig, a first generation North Sea drilling package had been idle for 20 years. Following a significant and safely executed Brownfield upgrade, this facility restarted drilling operations in January 2010 and is now capable of drilling well depths of 17,500 ft.

    Derrick

    before after

  • Thistle

    CONSTRUCTION & COMMISSIONING SUPPORT

    Technical Project Data

    Issue(s) / Challenge(s) & RDS Solution(s)

    As advanced corrosion had occurred in all the Thistle drilling modules, a comprehensive structural survey was undertaken at the beginning of the project. This survey determined that although secondary steelwork was in very poor condition, primary steelwork, i.e., module frame supports, deck under-framing and derrick were serviceable. A destruct plan was devised such that module equipment and corroded structure could be removed without further damage to the primary elements. Work processes had to be devised to take account of personnel safety.

    On completion of the destruct phase, the re-build and refurbishment phase was designed such that modules and equipment were rebuilt from the ‘bottom up’. The ‘tie-in’ points for each module were carefully identified and kept to a minimum to alleviate any problems with alignment.

    Comprehensive commissioning and certification procedures were developed such that as each module was finished, equipment and part-system pre-commissioning checks could be undertaken, significantly reducing the time required to commission the completed project

    Drawworks

    before

    after

    Dog house

    before

    after

    Shale shakers

    before

    after

  • Beryl Alpha

    CONSTRUCTION & COMMISSIONING SUPPORT

    s

    General Project Data

    Installation / Project / Field Beryl Alpha

    Extended Reach Drilling (ERD)

    UK North Sea

    Owner / client Exxon Mobil

    Type of contract Reimbursable (against agreed rates schedule)

    Contract start / finish April 2006 to March 2007

    RDS project no(s) GB 12 / 3013

    Key RDS subcontractors NOV Varco (topdrive, ERD system & pipe handling equipment)

    Facility overview /

    RDS workscope

    Major drilling facility upgrade of both Beryl Alpha rigs to enable extended reach drilling from the installation. The project involved upgrading and modifying the following equipment / systems:

    Upgrade: Topdrive Electronic drilling system & auxiliary braking Pipe deck machinery including a pipe conveyor Hydraulic power unit

    Modifications: HP mud system

    Refurbishment: Mud process package

    The work involved an extensive engineering programme to deliver a comprehensive destruct and construct schedule. Several systems i.e., HP mud system were redesigned from the original to take into account the expected ERD well returns. The derrick was reconfigured to enable a more powerful TDS to be installed thus enabling greater depth wells to be drilled.

    The drill floor layout was improved to accommodate the new equipment i.e., EDS, conveyor, TDS. The pipe deck was modified to accommodate a PTC & PDM which reduced manual handling of DP to ensure operation carried out safely.

    Drilling control and monitoring were replaced and upgraded to enhance management of drilling process.

    Pipe handling equipment was installed to enable ‘tripping’ at extended reach to be achieved in a safe and timely manner. A new hydraulic power system was installed to run the pipe handling equipment.

    As some of the envisaged wells to be drilled were to a greater depth than those drilled with the original equipment, the HP Mud system was upgraded from 7.5 kpi to 10 kpi. New shakers were installed to enhance mud flows from the well, back to storage tanks which were also increased in size.

    Value delivered by RDS Enabled ExxonMobil / KCA Deutag operations to reach previously unachievable drilling / well targets. Currently deepest well drilled 24,000 ft.

  • Beryl Alpha

    CONSTRUCTION & COMMISSIONING SUPPORT

    Technical Project Data

    Issue(s) / Challenge(s) & RDS Solution(s)

    In consultation with ExxonMobil and KCA Deutag operational personnel, a detailed analysis was undertaken by RDS to determine the most suitable drilling facility requirements for the envisaged wells.

    A conveyor system (PTC) was designed by NOV to fit between the pipe deck and drill floor. The PTC is a reliable and safe way to continuously feed tubulars on and off the rig floor. The PTC was a variable length conveyor that can be adjusted for varying transfer lengths during well slot skidding of the rig floor. To feed the conveyor from the pipe deck a pipe deck machine (PDM) was installed. This system handles tubulars on the pipe deck without physical intervention by rig crew. Moving horizontally along a deck mounted track, the PDM covers the entire pipe deck area to transfer tubulars to and from the pipe deck and conveyor.

    There are well known problems associated with drilling extended reach wells . In close consultation with NOV Varco, an Electronic Drilling System was installed that constantly measures the drilling parameters to control weight on bit by constant adjustment of the drawworks brake. These systems are monitored and displayed to the driller in a reconfigured doghouse.

    Pipedeck conveyor

  • Deep Water Gunashli: ACG Field Development

    CONSTRUCTION & COMMISSIONING SUPPORT

    General Project Data

    Project name / region Deep Water Gunashli (DWG)

    Southern Caspian Sea, Chirag zone

    Owner / client AIOC

    Type of contract Reimbursable

    Contract start / finish November 2002 to July 2007

    Construction yard(s) Mercon Steel Structures, Holland

    Key RDS subcontractors None

    RDS project no(s) FFD-C-073

    RDS man-hours 136,900 onshore

    (work comprised verification and re-use of previous Azeri rig design)

    Facility overview Fixed platform rig, 48 slots, 1.2 billion bbls oil in place, 6,000 psig max wellhead pressure

    RDS workscope Select (Conceptual), Define (FEED), Detail Design, Follow-on, Construction & Commissioning Support and Operations Support

    Technical Project Data

    Water depth 176m

    Rated drilling depth 7,204m (MD), 5,908m (step out)

    Total weight of drilling facilities Dry .....................................................4,224te Operating .......................................... 7,718te

    Mechanisation Fully mechanised pipe handling

    Generated power Power from topsides

    Drawworks 2,500 hp Wirth GH-2500EG-AC, 10,000ft, 1⅝” line

    Top drive MH DDM 650, 94.5 ftlb cont. torque. Twin motor 120rpm

    Derrick MH 50.0, base 11.2m x 11m. Rating (incl DDM) 500te

    Mud pumps 3 x 2,200 hp, Wirth TPK, 7,500 psi

    Shakers 4 x VSM 300

    Tank capacity Mud storage ....................................... 572m3 Other fluids ......................................... 222m

    3

    Bulk storage capacity Cement ............................................... 133m3 Barite ................................................... 139m

    3

    Well control system 18¾”BOP, 10,000 psi

  • Benguela Belize

    CONSTRUCTION & COMMISSIONING SUPPORT

    General Project Data

    Project name / region Benguela Belize / Angola

    Owner / client Chevron Texaco

    Type of contract FPLS

    Contract start / finish February 2003 to February 2005

    Construction yard(s) Omega Natchiq, Louisiana Galena Park, Houston

    Key RDS subcontractors National Oilwell Varco (NOV)

    RDS man-hours 104,000 (without LTI)

    RDS project no(s) -

    Facility overview Drilling Production Platform (DPP) on a compliant tower, supporting 40 well slots (including 6 predrill / tiebacks)

    RDS workscope Drilling Rig: EPCD – Engineering, Procurement, Construction & Drilling (by parent company KCAD)

    Technical Project Data

    Water depth 390m

    Rated drilling depth 9,500m

    Total weight of drilling facilities Dry ......................................................3,500te Operating ........................................... 6,600te

    Mechanisation Fully mechanised

    Generated power Power from topsides

    Drawworks National Oilwell - SSGD-650-4600 (AC driven), 4,600 hp

    Top drive National Oilwell - PS2-750 (AC driven) 650 tonne, 60,000 ftlb torque

    Derrick 170ft clear working height, static hook load 1.3m lbs

    Mud pumps 3 x 2,200 hp 7,500 psi NOV 14‐P‐220 triplex pumps

    Shakers National Oilwell - 4 x DLMS-380P-BB

    Tank capacity mud capacity ...................................... 550m3

    Bulk storage capacity Cement ............................................... 150m3 Barite ................................................... 150m

    3

    Well control system 18¾”BOP, 5,000 psi

  • Shah Deniz

    CONSTRUCTION & COMMISSIONING SUPPORT

    General Project Data

    Project name / region Shah Deniz / Caspian

    Owner / client BP

    Type of contract Reimbursable

    Contract start / finish 2000 to 2005

    Construction yard(s) Nymo

    Key RDS subcontractors Hydralift

    RDS man-hours 468,108 onshore

    68,204 offshore

    RDS project no(s) 03 / 00 /04/1220

    Facility overview Fully integrated heavy duty, mechanised drilling rig on a Technip TPG500 self installing platform (Production Jack-up)

    RDS workscope EPCD: Study, FEED, Detail Design, Procurement and Construction & Commissioning support. Drilling by parent company (KCAD)

    Technical Project Data

    Water depth 101m

    Rated drilling depth 9,500m

    Total weight of drilling facilities Dry ......................................................4,370te Operating ........................................... 8,222te

    Mechanisation Fully mechanised

    Generated power -

    Drawworks 3,000 hp

    Top drive HPS-750 (AC driven) 680 tonne, 78,450 ftlb torque

    Derrick 170 ft clear working height. Static Hook Load 1.3 m lbs

    Mud pumps 3 x 2,200 hp 7,500 psi NOV 14‐P‐220 triplex pumps

    Shakers 4 x VSM 300

    Tank capacity Total fluid capacity .............................. 635m3

    Bulk storage capacity Cement ............................................... 200m3 Barite ................................................... 215m

    3

    Well control system 18¾”BOP, 15,000 psi

  • Chikyu

    CONSTRUCTION & COMMISSIONING SUPPORT

    General Project Data

    Project name / region Chikyu (OD21)

    Owner / client JAMSTEC (Japan Agency for Marine-Earth Science & Technology)

    Type of contract Reimbursable

    Contract start / finish 2000 to 2004

    RDS man-hours Phase II ........... 8,800 onshore

    Phase III .......... 15,000 onshore

    RDS workscope Phase II ........... Basic Engineering

    Phase III .......... Package Management, Inspection Services and Construction Support

    Construction yard(s) Hull ................. Tamano Shipyard, Mitsui Engineering & Shipbuilding Co

    Topsides ......... Nagasaki Shipyard MHI

    RDS project no(s) -

    Key RDS subcontractors None

    Facility overview State-of-the-art deep water drillship for the Integrated Ocean Programme. Nippon Kaiji Kyokai (NK) classification

    Technical Project Data

    Water depth 2,500m

    Rated drilling depth 10,000m

    Total weight of drilling facilities Dry ................................................... 7,700te Operating ...................................... 32,480te

    Mechanisation Fully mechanised

    Generated power 5,000 kW, AC 6.6 KV, 60 Hz, 3 phase, each driven by Mitsui 12-ADD-30-V, 5,270 kW, 720 rpm

    Drawworks National Oilwell, EH-V-5000, driven by 4 x 750 VDC, 1,185 AC motors

    Top drive Hydralift, HPS 1000 2E-AC, hoisting capacity 907 tonne, continuous torque 90,800 ftlb, driven by 2 x 858 kW AC motors

    Derrick Bailey, dual well type bolted dynamic derrick, 230 x 72 x 60’, well centre spacing 32’, main well max. static hook load 1,250 tonne

    Mud pumps 3 x National Oilwell, 14-P-220, 7,500 psi, each driven by 2 x 820 kW DC motors

    Shakers 6 x Rigtech, VSM 300

    Tank capacity Total fluid capacity ........................... 2,211m3

    Bulk storage capacity Cement ................................................ 522m3 Barite / Bentonite ................................ 678m

    3

    Well control system 18¾” BOP, 15,000 psi

  • Kvitebjorn

    CONSTRUCTION & COMMISSIONING SUPPORT

    General Project Data

    Project name / region Kvitebjorn / Norwegian North Sea

    Owner / client Statoil

    Type of contract JV with Heerema Tonsberg & Hydralift (NOV)

    Contract start / finish August 2000 to July 2003

    Construction yard(s) Heerema Tonsberg

    Key RDS subcontractors None

    RDS man-hours 264,000 onshore

    RDS project no(s) -

    Facility overview Platform rig, 16 slots, 6gsm3 gas field

    High pressure, high temperature development

    RDS workscope Detail design, construction and commissioning support for the full drilling facility. No systems outside the rig

    Technical Project Data

    Water depth 190m

    Rated drilling depth 5,000m

    Total weight of drilling facilities Dry .....................................................4,028te Operating .......................................... 8,492te

    Mechanisation Fully mechanised pipe handling

    Generated power Power from topsides

    Drawworks 3,000 hp GH-3000EG-AC

    Top drive HPS 650 2 E AC 590 MT rating

    Derrick 52,500 clear height. 650 short tonne travelling equipment and hook load

    Mud pumps 2 x 2,200 hp, TPK 7½” x 14”

    Shakers 5 x GM-2000-H

    Tank capacity Active tanks .......................................... 70m3

    Reserve tanks ..................................... 352m3

    Mud storage ...................................... 440 m3

    Base oil ................................................ 110m3

    Pre-mix storage ................................... 220m3

    Completion fluid ................................. 275m3

    Bulk storage capacity Cement ............................................... 200m3 Barite ................................................... 300m

    3

    Well control system 18¾”BOP, 15,000 psi

  • Ringhorne

    CONSTRUCTION & COMMISSIONING SUPPORT

    General Project Data

    Project name / region Ringhorne / Norwegian North Sea

    Owner / client Exxon

    Type of contract JV with Heerema Zwijndrecht & Hydralift (NOV)

    Contract start / finish August 2000 to September 2002

    Construction yard(s) Fabrication: Heerema Zwijndrecht

    Assembly: Heerema Tonsberg

    Key RDS subcontractors None

    RDS man-hours 242,000 onshore

    RDS project no(s) -

    Facility overview Platform rig, 24 slots, 279 MB (44.4 M m3) from 14 producer wells, 8 water injection wells,

    1 source water and 1 cuttings and drains re-injection well

    RDS workscope Detail design, construction and commissioning support for the full drilling facility. No systems outside the rig

    Technical Project Data

    Water depth 128m

    Rated drilling depth 8,500m

    Total weight of drilling facilities Dry ......................................................6,048te Operating ......................................... 10,209te

    Mechanisation Fully mechanised pipe handling

    Generated power Power from topsides

    Drawworks 1,500 kw GH 2000EG-AC-K

    Top drive HPS 500 E AC 590 MT rating. 80,000 ftlb cont. torque

    Derrick 52,000 clear height. 500 short tonne travelling equipment and hook load. Racking capacity 374 stands

    Mud pumps 3 x 2,000 hp, TPK 7½” x 12”

    Shakers 5 x VSM-300

    Tank capacity Active tanks .......................................... 50m3

    Mud mix tank ....................................... 30m3

    Mud storage ........................................ 240m3

    Chemical mix ......................................... 20m3

    Bulk storage capacity Cement ............................................... 140m3 Barite ................................................... 210m

    3

    Well control system 18¾”BOP, 5,000 psi

  • Pride Carlos Walter & Pride Brazil

    CONSTRUCTION & COMMISSIONING SUPPORT

    General Project Data

    Project name / region Pride Carlos Walter & Pride Brazil

    Owner / client Petrodrill (now Pride subsidiary) RDS contracted to DSME

    Type of contract FPLS

    Contract start / finish 1999 to 2001

    RDS man-hours 106,000 onshore

    RDS project no(s) -

    Key RDS subcontractors None

    RDS workscope Detail Design to AFC for the deckbox and drilling substructure including all drilling substructure including all drilling systems. Provision of site support through construction & commissioning

    Construction yard(s) Daewoo Heavy Industries, Okpo, South Korea

    Facility overview Dynamically positioned, self propelled, DeHoop Megathyst class – Amethyst 2 semisubmersible drilling rig

    Technical Project Data

    Water depth 1,700m

    Rated drilling depth 7,620m

    Total weight of drilling facilities -

    Mechanisation Fully mechanised

    Generated power 6 x 4,460hp Caterpillar 3612-DITA Genset

    Drawworks Continental Emsco C-3 type II, 3,000hp

    Top drive MH DDM-650L-DC, 60,000 ftlb, 650 tonne capacity

    Derrick Pyramid 163 x 40 x 40ft, 1,300,000lbs static hook load with CMS

    Mud pumps 3 x Continental Emsco FC-1600 triplex, 1,600hp 5,000 psi

    Shakers 4

    Tank capacity Total fluid capacity ........................... 4,589m3

    Bulk storage capacity Cement ................................................ 283m3

    Well control system 18¾” BOP, 10,000 psi

  • Leiv Eiriksson & Eirik Raude

    CONSTRUCTION & COMMISSIONING SUPPORT

    General Project Data

    Project name / region Leiv Eiriksson & Eirik Raude

    Owner / client Ocean Rig (RDS contracted to Friede & Goldman Offshore Inc)

    Type of contract Detail Design ..................... lump sum Construction Support ........ reimbursable

    Contract start / finish 1998 to 2000

    Construction yard(s) Hull constructed at Dalian, China Outfitted at F&G Offshore Inc., USA

    Key RDS subcontractors None

    RDS man-hours Engineering ....................... 90,000

    Site Support ...................... 18,000

    RDS project no(s) -

    Facility overview Trosvik Bingo 9000, 5th

    generation, class DP3, dynamically positioned, ultra deep water, harsh environment semisubmersible

    RDS workscope Detail design, construction and commissioning support. RDS responsible for the system engineering for all drilling, power and utility systems; including ballasting systems within the pontoon and columns. Also provided on-going site support throughout vessel construction to assist in construction engineering and commissioning.

    Technical Project Data

    Water depth 3,000m

    Rated drilling depth >9,144m

    Total weight of drilling facilities Operating ...........................................6,467te

    Mechanisation Fully mechanised

    Generated power 6 x 7,300 kW engines (space for 2 x 7,300 kW future)

    Drawworks 4,000 hp

    Top drive 600 tonne

    Derrick 12.2m base x 56.4m free travelling height, 900te dynamic hook load

    Mud pumps 3 x 2,200 hp, 7,500 psi

    Shakers 5 installed (space for 3 future)

    Tank capacity Total fluid capacity ........................... 1,743m3

    Bulk storage capacity Total ..................................................... 720m3

    Well control system 18¾”BOP, 15,000 psi

  • Saipem 10000

    CONSTRUCTION & COMMISSIONING SUPPORT

    General Project Data

    Project name / region Saipem 10000

    Owner / client Saipem

    Type of contract FPLS

    Contract start / finish 1998 to 2000

    Construction yard(s) Koje Shipyard, Korea by Samsung

    Key RDS subcontractors None

    RDS man-hours 62,000 onshore

    RDS project no(s) 7017

    Facility overview Class DP3, dynamically positioned, ultra deep water, double hull, dual activity, EWT capability drillship

    RDS workscope Detail Design and construction support

    Technical Project Data

    Water depth 3,000m

    Rated drilling depth 9,200m

    Total weight of drilling facilities Dry .................................................. 22,350te Operating ........................................ 33,616te

    Mechanisation Integrated, automated control and monitoring drilling systems

    Generated power Total vessel power generation of 42,000 kW

    Drawworks 4,200 hp, Wirth GH 4500, re-generative braking, Baylor 7838 and single disk brake. Powered by 3 x General Electric GEB 22A1, 1,420 hp each

    Top drive Hydralift HPS 750 2E, rated capacity 680t. Driven by 2 x GEB 752 22 A1AC motors

    Derrick Bailey Dynamic: base 80 x 60 ft / top 60 x 20 ft / height 200 ft. Static hook load 2,000,000 lbs

    Mud pumps 4 x Wirth TPK 2,200 hp, 7,500 psi

    Shakers Brandt 6 VMS 300

    Tank capacity Drilling mud ...................................... 2,000m3

    Bulk storage capacity Cement ............................................... 520m3 Barite ................................................... 450m

    3

    Well control system 18¾”BOP, 15,000 guidelineless with Vetco HD-H4 connector Multiplex with 5,000 psi accumulator unit

  • Deepwater Pathfinder

    CONSTRUCTION & COMMISSIONING SUPPORT

    General Project Data

    Project name / region Deepwater Pathfinder

    Owner / client R&B Falcon

    Type of contract FPLS

    Contract start / finish 1996 to 1998

    Construction yard(s) Samsung Heavy Industries, Kyungnam, South Korea

    Key RDS subcontractors None

    RDS man-hours 55,000 onshore

    RDS project no(s) -

    Facility overview Dynamically positioned, 5th

    generation, deepwater drillship. Based on R&B/Conoco double hull tanker

    RDS workscope Detail design and construction support. RDS also carried out detail design on Deepwater Millennium, Frontier & Discovery (copies of Deepwater Pathfinder)

    Technical Project Data

    Water depth 3,048m

    Rated drilling depth 9,144m

    Total weight of drilling facilities -

    Mechanisation Fully mechanised

    Generated power Main generator to provide 35,100 kW (47,000 hp)

    Drawworks 6,600 hp, 1,500,000lb. hook load driven by 6 x 1,100 hp GE AC motors

    Top drive Varco TDS-8S (AC), 750 tonne capacity, 67,000 ftlb @ 88rpm

    Derrick 170ft high with 40ft x 48ft base, 2,000,000 lb static load. Setback for 192 stands of 6⅝” drill pipe, 228 stands of 5½” drill pipe and 16 stands of 9¾” collars

    Mud pumps 4 x National Oilwell 14, 2,200 hp, 7,500 psi

    Shakers 4 x derrick high speed linear motion HI-G

    Tank capacity Total fluid capacity ........................... 8,551m3

    Bulk storage capacity Total ..................................................... 962m3

    Well control system 18¾” BOP, 15,000 psi

    Construction & Commissioning SupportCCS_experienceThistleBeryl AlphaDeep Water GunashliBenguela BelizeShah DenizChikyuKyitebjornRinghornePride Carlos Walter & Pride BrazilLeiv Eiriksson & Eirik RaudeSaipem 10000Deepwater Pathfinder