construction drawing portfolio

33
Title Page/Contents KPMB Architects Inc. H. Bradford Green Architect Inc. Independant Work Resume 1 2-23 24-31 32 33 Contents: Technical Drawing Porolio Clayton Albert Lent HBAS

Upload: clayton-lent

Post on 17-Mar-2016

240 views

Category:

Documents


6 download

DESCRIPTION

An up to date cross-section of my technical (construction) drawing experience

TRANSCRIPT

  • Title Page/Contents

    KPMB Architects Inc.

    H. Bradford Green Architect Inc.

    Independant Work

    Resume

    1

    2-23

    24-31

    32

    33

    Contents:

    Technical Drawing Portfolio

    Clayton Albert Lent HBAS

  • PROPOSED ELEMENTARY SCHOOLBINJITIWAABIK ZAAGING ANISHINAABEK

    Over three consecutive work terms (two four month, one eight) I worked for the small four person firm H.Bradford Green Architect in Thunder Bay. This allowed me to develop my technical architectural skills through a multitude of small projects and allowed me to see through the design & construction of a small elementary school for the Biinjitiwaabik Zaaging Anishinaabek First Nation in Rocky Bay, Ontario. The site was distinctly rural, set just below Lake Nipigon, with standard road access.

    The design brief was as follows:The Biinjitiwaabik Zaaging Anishinaabek First Nation is undertaking to hire a Consultant to provide professional architectural and engineering design services, as outlined in their Terms of Reference dated May 18, 2010, to provide the community with an elementary school facility, in conformance with INAC Space Accommodation Standards, which will accommodate appropriate programs for students ranging from kindergarten though grade 8. The design will reflect both the educational philosophy and goals of the Biinjitiwaabik Zaaging Anishinaabek First Nation while allowing for potential expansion to accommodate future growth of the community.

    My duties included: -Preparation of construction drawings with the aid of one technician

    -Coordination of Architectural drawings with HVAC, Electrical and Plumbing

    -Sourcing some of the required products

    -Preparation of some of the specifications

    -Preparation of presentation imagery

    Co-op 2009-2011: H. Bradford Green Architect Inc.Biinjitiwaabik Zaaging Anishinaabek First Nation Elementary School

    Final Proposal Vignette, Looking North

  • My duties included: -Preparation of construction drawings with the aid of one technician

    -Coordination of Architectural drawings with HVAC, Electrical and Plumbing

    -Sourcing some of the required products

    -Preparation of some of the specifications

    -Preparation of presentation imagery

    3

  • 5

  • 7

  • 9

  • 11

  • 13

  • 15

  • 17

  • While working with H.Bradford Green Architect I was fortunate to have the opportunity to work with Walter Kimbel, a mechanical engineer, on a small residential project. My duties included:

    -Preparation of required drawings

    -Coordination of supply/return ducts and vents with on-site contractor

    Co-op: H. Bradford Green Architect Inc. Anthes Residence Pool Wing HVAC

    Saddle Installation

    Hang unit with suspended rodsand "U" channel members.

    Threaded rod and U channel

    Vibration Isolators

  • 19

  • 21

  • While working with H.Bradford Green Architect I also worked on several small projects. One typical was a small project for the installation of a direct access entrance for St. Josephs Health Centre in Thunder Bay. The additional entrance was required in order to allow the services patients to enter at different times than the regular hours of Victoriaville Mall, which houses the medical facility. My duties included:

    -Preparation of required drawings

    -Recording of existing conditions

    -Sourcing required products

    View of Existing Window-Wall

    Co-op: H. Bradford Green Architect Inc. St.Josephss Health Centre New Entrance

  • 23

  • Under the guidance of Robert Sims (associate-in-charge) of KPMB Architects I worked for 2 months on various elements of the Telus Centre. I worked on change orders for the main lobby stair-case and the basement level percussion room.

    My duties included:

    -Revision of drawings to match new intentions/requirements

    -Coordination of drawings with shop drawings

    Co-op: Kuwubara Payne Mckenna Blumberg ArchitectsRoyal Conservatory TELUS Centre for Performance and Learning

  • 25

  • 27

  • 29

  • 31

  • No. 330EXISTING1 STOREY

    24'-0" (7.32m)

    9'-1

    1/2

    " (2

    .78m

    )

    24'-0

    " (7

    .32m

    )16

    '-4 1

    /2"

    (4.9

    9m)

    EE

    O.H.

    (SEPERATE SETOF DWG.S)

    NEW GARAGE

    NEW DECK(THIS SETOF DWG.S)

    8" RETAINING WALL

    LEGEND

    LOT LINES

    ENTRANCE/EXIT

    10'-0" OVERHEAD GARAGE DOOR

    O.H.

    E

    EXISTING APROX. 15'TALL CEDAR

    EXISTING FENCE

    PROPERTY LINE

    MO

    NTC

    LAIR

    STR

    EE

    T

    49'-6

    " (1

    5.09

    m)

    124'-0" (37.80m)

    19'-9 3/8" (6.03m) 24'-0" (7.32m) 24'-2 5/8" (7.38m)

    12'-6

    1/4

    " (3

    .82m

    )11

    '-0"

    (3.3

    5m)

    17'-0

    " (5

    .18m

    )

    3'-0" (0.91m)

    8'-1

    1 3/

    4" (

    2.74

    m)

    E

    O.H.

    24'-0" (7.32m) 8'-0" (2.44m)

    33'-0

    " (1

    0.06

    m)

    (LO

    T 15

    0)33

    '-0"

    (10.

    06m

    ) (L

    OT

    151)

    16' (

    4.88

    m)

    WID

    E L

    AN

    E

    6'-0

    " (1

    .83m

    )

    30'-0" (9.14m)

    3'-0" DIA. x 4'-0"DEEP DRY WELL

    SITE PLAN1/8"=1'-0"

    1SP1

    DECK ADDITION

    330 MONTCLAIR ST.THUNDER BAY, ONOWNER:JEFFREY LENT

    DATE:06/21/10

    N

    SP1

    LINE OF EXISTING HOUSE

    6"X6" COLUMN, SEE DETAIL 1/A4, TYP.

    DN5T @ 10"6R @ 7"

    DN

    4T @ 10"

    5R @ 7"

    DN

    4T @

    10"

    5R @

    7"

    DN

    1T @ 10"2R @ 7"

    (4)

    2"X

    8" B

    EA

    M

    (4) 2"X8" BEAM

    (4)

    2"X

    8" B

    EA

    M

    (4)

    2"X

    8" B

    EA

    M

    (4) 2"X8" BEAM

    (4) 2"X8" BEAM

    (4) 2"X8" BEAM

    (4) 2"X10" BEAM

    (4) 2"X8" BEAM

    2"X12" CARRIAGE STRINGER BELOW

    (2) 2"X8" JOIST, TYP.

    DECKINGDIRECTION, TYP.

    24'-0

    "

    24'-0"

    9'-0

    "6'

    -0"

    6'-0

    "3'

    -0"

    3'-0" 6'-0"

    10'-0"

    6'-0" 3'-0"

    4'-6

    "

    2'-8

    1/2

    "6'

    -0"

    12"Wx10"D CONC. STRIP FTG.

    2"X12" CARRIAGE STRINGER BELOW

    2"X12"CARRIAGESTRINGER

    BELOW

    10'-0"

    4'-3"

    6'-0"

    4'-3"

    DECK PLAN1/4"=1'-0"

    1A1

    DECK ADDITION

    330 MONTCLAIR ST.THUNDER BAY, ONOWNER:JEFFREY LENT

    DATE:06/21/10

    N

    A1

    1A2

    2A2

    1A3

    1A5

    2A4

    7 1/

    4"

    2A4

    3A2

    12" DIA. SONO TUBE, c/w FLARED END, TYP.

    TYP. CONSTRUCTION:- 2"X6" DECKING- 2"X8" JOISTS @ 24" o.c.- (4)2"X8" BEAMS, AS INDICATED- MIN. 4" CLEAN GRAVEL- CONT. FILTER CLOTH

    6'-9 3/4" 8'-11 7/8"8'-7 1/8"

    3'-4 7/8" 3'-4 7/8"

    3'-6

    "2'

    -10

    3/4"

    4'-6

    "

    5'-2 1/4" 3'-9 1/2"

    DECK ADDITION

    330 MONTCLAIR ST.THUNDER BAY, ONOWNER:JEFFREY LENT

    DATE:06/21/10

    SECTION A-A1/4"=1'-0"

    1A1

    A2

    3'-6

    "

    4"

    1"2"X6" RAILING, TYP.

    2"X2" BALUSTERS @ 4" o.c., TYP.

    2"X4", TYP.

    3 3/

    4"

    1"

    2"X12" RIBBON BOARD, TYP.

    2"X8" RIM JOIST, TYP.

    TYP. RAIL. SECTION1/4"=1'-0"

    2A2

    DECK ADDITION

    330 MONTCLAIR ST.THUNDER BAY, ONOWNER:JEFFREY LENT

    DATE:06/21/10

    TYP. STAIR SECTION1/2"=1'-0"

    1A1

    A3

    7"

    10" 3'-6

    "

    3'-6

    "3'

    -6"

    PRESSURE TREATED 6"X10" BEARING PLATE

    (2) 2"X6" TREAD

    1"X6" RISER

    2"X12" HOUSED STRINGER

    2A3

    TYP. STAIR RAILING SECTION1/2"=1'-0"

    2A3

    3'-1

    0"

    2"X6" RAILING, TYP.

    4"X4" POST BEYOND, TYP. BOTH ENDS OF RAIL.

    2"X2" BALUSTERS @ 4" o.c., TYP.

    2"X12" HOUSED STRINGER, TYP.2"X12" CARRAIGE STRINGER WHERE INDICATED, TYP.

    DECK ADDITION

    330 MONTCLAIR ST.THUNDER BAY, ONOWNER:JEFFREY LENT

    DATE:06/21/10

    SECTION DETAIL1/2"=1'-0"

    1A1

    A4

    STEEL POST SADDLE, c/w 6" ANCHOR

    6"X6" PRESSURE TREATED POST, TYP.

    SIMPSON STRONG-TIE (MOD. HGUS7.25/10) BEAM HANGER,TYP.

    (4)2"X8" BEAM,TYP.

    (4)2"X8" BEAM

    12" SONO TUBE, TYP.

    SECTION DETAIL1/2"=1'-0"

    1A1

    Independant Design Work:My Parents Deck Work began in the summer of 2010 on my first independant de-sign project: a residential deck addition. The deck is reinforced to allow for the extra load of a 4 person hot tub in the centre.

  • Clayton Albert Lent HBAS (519) 501 4835 (807) 683 5875 [email protected] Education: University of Waterloo HBAS Cambridge, Ontario

    Bachelor in Architectural Studies, Honours, Co-op program

    Professional Experience: H. Bradford Green Architect Inc., Intern Thunder Bay, Ontario

    Prepared architectural presentation drawings, schematic designs, proposal documents and detailed construction drawings Responsible for Local Code & Bylaw research, materials research, document checking & coordination Assisted with administration, contract & general project management

    Kuwubara Payne Mckenna Blumberg Architects, Intern Toronto, Ontario

    Worked together with a team to develop a proposal presentation and created design proposal images Designed key building elements through large scale modeling and construction detail drawings

    Stevens Group Architects Inc., Intern Toronto, Ontario

    Participated in a design team, contributing actively from early Design iterations to presentation preparation Assisted Architects and designers through production of iterative design element models and drawings Worked independently developing a comprehensive construction staging demonstration model

    Lauren Services ULC., Scaffolder, 2nd Year Apprentice C.N.R.L. Plant (Fort Mckay), Alberta

    Worked with a team to assemble and disassemble temporary structures in a heavy industrial setting, while ensuring all safety practices were in place.

    Lawrence Wright Construction, Assistant Hardwood Flooring Specialist Thunder Bay, ON

    Worked together with a team to efficiently install, sand, refinish, and stain hardwood flooring as well as wooden trim detailing

    330 Montclair St. Thunder Bay, ON

    P7A 1M4 September 2006- August 2011 June-September 2009 January-September 2010 January-April 2011 September-December 2008 January- April 2008

    June-September, 2007 June- September, 2006

    Skills: - Digital 3D modeling using AutoDeSys Form Z and Sketchup - CAD using Vectorworks and Autocad - Adobe Creative Suite - Fine woodworking experience - Effective and enthusiastic team member

    Portfolio- http://www.architecture.uwaterloo.ca/portfolio/clent/Lent_Clayton.pdf

    (References available upon request)

    33