96
Construction General Permit Overview Annalisa Kihara & Eric Berntsen State Water Resources Control Board Division of Water Quality Industrial/Construction Storm Water Unit

Upload: others

Post on 03-Aug-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Construction General Permit Overview

Annalisa Kihara & Eric BerntsenState Water Resources Control Board

Division of Water Quality Industrial/Construction Storm Water Unit

Page 2: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Who does this apply to?• Construction or demolition activity resulting in land

disturbance of equal to or greater than one acre (or less than 1 acre if part of a common plan of development)

• Construction activity related to residential, commercial, or industrial development on agricultural lands

• Construction activity associated with Linear Utility Projects.

• Construction activities associated with oil and gas exploration

• Discharges from dredge spoil placement outside of US Army Corp jurisdiction (1 acre or larger)

Page 3: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Construction Permit Timeline• Previous permit – Order 99-08-DWQ - “expired”

in 2004

• Spring 2007 - Preliminary draft CGP

• Spring 2008 - Tentative draft CGP

• Spring 2009 – Revised Tentative draft CGP

• September 2, 2009 – 2009-0009-DWQ Adopted

Page 4: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Construction Permit Timeline

EFFECTIVE DATE:JULY 1, 2010

Page 5: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

CGP Coverage Timeline • Existing Dischargers - Continue to comply with the

existing permit until July 1, 2010. Projects active on or after the July 1, 2010 effective date shall file electronically for coverage under the new permit.

• New dischargers - File Permit Registration Documents (PRDs) electronically on our after July 1, 2010.

Page 6: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Permit Registration Documents (PRDs)

PRD’s consist of:Notice of Intent (NOI), Risk Assessment, Site

Map, SWPPP, Signed Certification Statement, First Annual Fee.

•Electronically Filed by Legally Responsible Person (LRP) = landowner

• State Water Board’s Stormwater Multi-Application & Report Tracking System (SMARTS) website.

Page 7: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Grandfathering:Existing projects will be granted

Risk Level 1 status

Risk Level 1

99-08-DWQ

2009-009-DWQ

AdoptionDate

EffectiveDate

September 22009

July 12010

September 22011

• May 1st letters to existing dischargers with re-certification instructions

Page 8: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Grandfathering Exceptions

• Grandfathered Projects must be completed by 2 years after permit adoption (September 2, 2011)

• Regional Water Boards may require a risk assessment when:1) Site has a history of non-compliance2) Site poses a significant risk to water quality

Page 9: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

99-08-DWQ (Old Permit) & 2009-0009-DWQ (New Permit)

1. Risk Based Permitting Approach2. Rainfall Erosivity Waiver Option3. Technology Based Numeric Action Levels4. Technology Based Numeric Effluent Limitations5. Compliance Storm Event6. Active Treatment System Requirements7. Effluent Monitoring8. Receiving Water Monitoring9. Post Construction Requirements10. Rain Event Action Plan 11. Annual Reporting Requirements12. Certification and Training Requirements 13. Linear Utility Project Requirements

Page 10: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

1. Risk Based Permitting Approach

A project’s overall risk is broken up into two elements:

1) Project Sediment Risk -the relative amount of sediment that can be discharged, driven largely by schedulingand site characteristics.

2) Receiving Water Risk - the risk sediment discharges pose to the receiving waters.

Page 11: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Step 1:Project Sediment Risk

Revised Universal Soil Loss Equation (RUSLE)‏

A = (R)(K)(LS)(C)(P)‏

A = the rate of sheet and rill erosion (tons/acre)R = rainfall – runoff erosivity factor

*www.epa.gov/npdes/stormwater/cgpK = soil erodibility factor

*provided GIS map of K factor for the StateOR*particle size analysis

LS = length slope factor*provided GIS map of LS factor for the StateOR*site specific

Page 12: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •
Page 13: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Step 2:Receiving Water Risk

Sediment Sensitive Waterbodies

1. CWA 303(d) list for waterbodies impaired for a sediment pollutant (TSS, turbidity, etc).USEPA – approved Total Maximum Daily Load implementation plan for sediment.

-OR-

2. Beneficial uses of COLD, SPAWN, andMIGRATORY

Page 14: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Receiving WaterRisk

Page 15: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Step 3:Project Risk Determination

LOW MED HIGH

LOW Level 1 Level 2

HIGH Level 2 Level 3

Page 16: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Risk Level 1 Requirements(Attachment C)

“BMPs only”• Narrative Effluent Standards• Good Site “Housekeeping”• Sediment Controls• Run-on & Runoff Controls (limited)• Inspection, Maintenance & Repair• Visual Monitoring

_______________________________________

Page 17: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Risk Level 2 Requirements(Attachment D)

Risk Level 1 Requirements, PLUS• Numeric Action Levels

- Turbidity: 250 NTU- pH: 6.5-8.5

• Additional Sediment Controls• Rain Event Action Plan• Effluent Monitoring

_______________________________________

Page 18: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Risk Level 3 Requirements(Attachment E)

Risk Level 2 Requirements, PLUS• Numeric Effluent Limitations

- Turbidity 500 NTU- pH: 6.0-9.0

• Additional Sediment Controls• Receiving Water Monitoring• Bioassessment (limited cases)

_______________________________________

Page 19: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Back to Old and New Permit Differences......

Page 20: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

2. Rainfall Erosivity WaiverPermit Exemption for projects:

1) >1 and <5 acres, and

2) Rainfall erosivity value (R value) less than or equal to 5

http://cfpub.epa.gov/npdes/stormwater/lew/lewcalculator.cfm

• Certification done through the PRD process in SMARTS.

• If schedule changes and R value is above 5, must apply for coverage

Page 21: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Initial earth disturbance Final site stabilization

Page 22: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

3. Technology Based Numeric Action Levels (NALs)‏

Risk Level 2 and 3 sites:

•pH NAL = 6.5 – 8.5

•Turbidity NAL = 250 NTU

For an NAL exceedance, the Regional Water Board may require the submittal of an NAL Exceedance Report.

Page 23: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

4. Technology Based Numeric Effluent Limitations

(NELs)‏Risk Level 3 sites:

•pH NEL = 6.0 – 9.0

•Turbidity NEL = 500 NTU

For an NEL exceedance: NEL Violation Report submitted within 24 hours after the NEL exceedance identified with: - sampling results- description of the onsite BMPs, and - corrective actions taken

Page 24: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

5. Compliance Storm Event

Permit Establishes a 5 year, 24 hourcompliance storm event exception

from NEL’s

Page 25: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

6. Active Treatment Systems (ATS)

• Specific Requirements for ATS use in Attachment F of Permit

• NEL’s based on effective ATS performance:10 NTU – Daily Flow Weighted Average 20 NTU – Single Sample

• Compliance Storm Event: 10 year 24 hour

• Proper Personnel Training

Page 26: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

7. Effluent Monitoring Risk Level 2 and 3 sites:

•pH & Turbidity compliance

A minimum of 3 samples per day collected from discharges subsequent to a qualifying rain event (producing precipitation of ½ inch or more at the time of discharge).Samples characteristic of discharge off the site

Results submitted electronically into SMARTS

Page 27: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

8. Receiving Water Monitoring

Risk Level 3 sites:

•Receiving Water – NEL exceedance & directdischarge to receiving waters

•Bioassessment – 30 acres or larger & direct discharge to freshwater wadeable receiving waters

Page 28: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

9. Post-Construction• Match Pre and Post runoff volumes- Emphasis on Low Impact Development (LID)- Calculator in Appendix 2

• Not covered by an active Phase I or Phase II Municipal Separate Storm Sewer System (MS4) NPDES permit that has an approved Storm Water Management Plan

• Effective 3 years after permit adoption(September 2, 2012)

Page 29: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •
Page 30: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •
Page 31: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

10. Rain Event Action Plan (REAP)‏Risk Level 2 and 3 sites:

•Designed to protect all exposed portions of the site within 48 hours prior to any likely precipitation event. (forecast: 50% or greater probability)

(per NOAA - http://www.wrh.noaa.gov)

•Templates provided in the California Storm water Quality Association (CASQA) Construction Best Management Practices Handbook (www.casqa.org)

Page 32: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

11. Annual Reporting• Projects enrolled for more than one continuous three month period shall prepare and electronically submit an Annual Report no later than September 1 of each year using SMARTS.

• First Submittal: September 1, 2011- July 1st – June 30th

• Provide information needed for overall program evaluation and public information. - summary and evaluation of all sampling and analysis results - laboratory reports- summary of all corrective actions taken during the compliance year, and - identification of any compliance activities

Page 33: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

12. Certification and Training• Qualified SWPPP developer (QSD) - registrations and certifications listed in Section VII of the CGP by July 1, 2010

• Qualified SWPPP practitioner (QSP) - registrations and certifications listed in Section VII of the CGP by September 2, 2011.

• Attended a State Water Board sponsored or approved QSD/QSP training course within two years after the permit adoption date - September 2, 2011.

•Information: www.CASQA.org (Available June 2010)

Page 34: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

13. Linear Utility Projects

• Includes requirements for all Linear Underground/Overhead Projects (LUPs) over one acre.

• Risk Based - LUPs will be broken into project segments designated as LUP Type 1, Type 2, and Type 3.

• Types are analogous to the risk levels for traditional construction projects.

Page 35: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Stormwater Multi Application Reporting

& Tracking SystemSMARTS

Patrick [email protected]

State Water Resources Control BoardDivision of Water Quality

Industrial/Construction Storm Water Unit

Page 36: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

What is SMARTS?

• Purpose:Provide a platform where dischargers, regulators, and the public can enter, regulate, and/or comment on storm water data including NOIs, NOTs, compliance, and monitoring data.

• Internet-based

• Available 24/7

• Reports• SWRCB/RWQCB prioritize regulatory tasks (i.e.

inspections, view trends in compliance, provide data to the Legislature).

• Public reports - NOI, Inspections, Violations, and Enforcement data.

Page 37: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

SMARTS Users

• State & Regional Water Board Staff

• External Users• Legally Responsible Person (LRP)• Approved Signatory• Data Submitters• General Public

Page 38: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

LRPPrimary

Account Holder

LRPPrimary

Account Holder

Approved SignatoryEnter & Certify DataApproved SignatoryEnter & Certify Data

Data SubmitterEnter data only

Data SubmitterEnter data only

General PublicView Only

General PublicView Only

Page 39: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

PRD Process

• Register for SMARTS account

• Link Approved Signatories/Data Submitters

• Re-certify and file new NOIs

• Upload attachments

• Enter Sampling/Monitoring data

• Notice of TerminationTo SMARTS

Page 40: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •
Page 41: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Choose Account Type

Page 42: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Enter User Details

SMARTS allows users to choose a unique User ID.

Page 43: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Enter User Details (con’t)

Federal Tax ID is required for all business types except for Private Individual.

Page 44: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Enter User Details (con’t)

Page 45: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Email Conformation

Page 46: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Log into SMARTS

Page 47: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Discharger Menu

Page 48: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Update User Profile

Page 49: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Link & Manage Data Submitters

Page 50: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Link Data Submitter

Page 51: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Link Data Submitter

Page 52: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Verify Data Submitter

Page 53: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Link Data Submitter to NOI(s)

Page 54: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Assign Data Submitter User Rights

Note: Super data submitter = Approved SignatoryApproved Signatory must have same email domain as LRP

Page 55: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Re-certify existing NOI

• Active NOIs filed under 99-08-DWQ

• SWRCB sending Notification Letter• WDID• Secret Code Number (SCN)

• If Construction is complete prior to July 1, 2010 a NOT must be submitted to the local Regional Water Board

Page 56: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •
Page 57: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Re-certify Existing NOIs

Page 58: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Verify NOI Information

Page 59: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •
Page 60: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

View Notice of Intents

Page 61: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Approved/Terminated NOIs

Page 62: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Apply for new NOI

Page 63: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Select NOI Type

Page 64: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Select Property Owner

Page 65: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Owner Information

Page 66: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Developer Information

Page 67: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Site Information

Page 68: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Site Information con’t

Page 69: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Additional Site Info

Page 70: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Additional Site Info

Page 71: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Risk Calculation

If R Factor is <5, you can apply for the Erosivity Waiver

Page 72: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Risk con’t

Page 73: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Billing Information

Page 74: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Attachments

75 MB limitFile types accepted: MS Office, PDF, Picture files

Page 75: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Certification

Page 76: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Certification con’t

Page 77: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Certification con’t

Page 78: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Send copy of this letter with check to the SWRCB. Upon receipt of check WDID number will be assigned

Page 79: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

LRP and Data Submitter will receive email confirmation

Page 80: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Pending NOI/NOTs

Page 81: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •
Page 82: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Print NOI Receipt Letter

Page 83: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Monitoring Data Entry

Page 84: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Select Site

Page 85: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Start Event

Page 86: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Enter Sampling Data

Page 87: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Data Summary

Page 88: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Attachments

Page 89: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Certification

LRP or Approved Signatory must certify

Page 90: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Notice of Termination

Page 91: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

NOT Entry Form

Page 92: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

NOT Entry Form con’t

Page 93: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

NOT Attachments

Page 94: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

NOT Receipt Letter

Page 95: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Storm Water Help Desk

• General Permit [email protected]

• Database Inquiries:[email protected]

• Telephone Toll Free - 1-866-563-3107

• Fax - (916) 341-5543

Page 96: Construction General Permit Overvie€¦ · Construction Permit Timeline • Previous permit – Order 99-08-DWQ-“expired” in 2004 • Spring 2007 - Preliminary draft CGP •

Annalisa [email protected](916) 324-6786

Patrick [email protected](916) 341-5292

Eric [email protected](916) 341-5911

Questions on Presentation