WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP 1 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT 1 Construction Material Procurement in Central Asia LTC John Hudson, P.E. Central Asian States Team Lead & Senior Engineer Joint Contingency Acquisition Support Office Defense Logistics Agency Mr. Chet Evanitsky CAS Class IV Project Manager Troop Support Construction & Equipment Division Defense Logistic Agency 1

Upload: others

Post on 06-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Construction Material Procurement in Central Asia...Electrical wire and cable Items DLA is prepared to procure if requisitions are received: Electrical switch gears Water heaters Welded

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

1 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT 1

Construction Material Procurement in Central Asia LTC John Hudson, P.E. Central Asian States Team Lead & Senior Engineer Joint Contingency Acquisition Support Office Defense Logistics Agency

Mr. Chet Evanitsky CAS Class IV Project Manager Troop Support Construction & Equipment Division Defense Logistic Agency

1

Page 2: Construction Material Procurement in Central Asia...Electrical wire and cable Items DLA is prepared to procure if requisitions are received: Electrical switch gears Water heaters Welded

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

2 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT 2

Agenda Background DLA Support to USACE Construction Program Benefits of Procuring Materials through DLA Process for Contractor to Purchase Materials

through DLA Contact Info Questions

Companies identified in this briefing are examples of potential suppliers and manufacturers that exist within

Central Asia. DLA is not specifically endorsing, directing or encouraging the use of any specific companies mentioned, identified or highlighted in this briefing. Identified companies should not be considered to have vetted or approved by DLA. Any business relationships entered into between a contractor and these manufacturers and suppliers are at the sole risk of the companies involved in the business transaction.

Page 3: Construction Material Procurement in Central Asia...Electrical wire and cable Items DLA is prepared to procure if requisitions are received: Electrical switch gears Water heaters Welded

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

3 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT 3

Background CENTCOM Policy Letter #40: Purpose – Expand economic partnership with the Central Asian States (CAS) in support of security cooperation and engagement missions and enable access to and expansion of capacity of the Northern Distribution Network in support of OEF DLA Prime Vendor Model – Seven Seas Shipchandlers (SSS) and

Theodor Wille Intertrade (TWI) DLA Market Surveys and Site Visits

► More than 40 construction material manufacturers visited

► Materials and equipment are manufactured to GOST standards

► Significant capacity exists within the region to produce a wide variety of quality construction materials and equipment.

Page 4: Construction Material Procurement in Central Asia...Electrical wire and cable Items DLA is prepared to procure if requisitions are received: Electrical switch gears Water heaters Welded

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

4 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT 4

DLA Support to USACE Construction Program Government Furnished Materials/Equipment – Identified in project

RFP under Spec Section 1701 ► Items will be ordered based on BOM submitted by Prime 30 to 90 days after NTP ► USACE will pay for materials through a funds transfer to DLA ► Material cost not included in contract award to Prime

Contractor Purchased Materials through DLA ► Contractor identifies material quantities and orders directly from DLA ► Contractor pays DLA for materials ► Material cost included in contract award to Prime ► Requires Prime Contractor to have project specific DODAAC

Page 5: Construction Material Procurement in Central Asia...Electrical wire and cable Items DLA is prepared to procure if requisitions are received: Electrical switch gears Water heaters Welded

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

5 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT 5

Benefits of Procuring Materials through DLA Government shipment of materials Ship directly from factory to project site Material made to regional specifications and known standards Materials may be less expensive then equivalent U.S. or European

items Replacement parts, equipment and technical support available in

the region Eliminates Pakistan border crossing issues

Page 6: Construction Material Procurement in Central Asia...Electrical wire and cable Items DLA is prepared to procure if requisitions are received: Electrical switch gears Water heaters Welded

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

6 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT 6

DS

T C

usto

mer

D

LA-T

S/M

RO

D

LA P

V

Process for Contractor to Purchase Materials through DLA Identifies BoM requirements: • Mfr/Mfr P/N • Technical Reqts • Quantity • RDD

Review final BOM requirements and submit to DLA-TS/MRO

Receive/Review final BOM requirement; Issue RFQ

Submit questions/alternate mfrs/mfr p/n’s

Provides clarifications; Approves alternates

Source and provide quote to DLA

Receive/Review quotes, recommend award, and submit to DST

Submits to customer for approval and funding

Reviews and approves; provides funding document (MILSTRIP/MIPR)

Places order with PV

Orders from suppliers; provides shipping information; status; coordinates w/transportation

Coordinates trans with STCR

Receipts material

Addl. DST Roles: • Customer/contractor issues • Weekly tracking of orders • Order “closeout”

Page 7: Construction Material Procurement in Central Asia...Electrical wire and cable Items DLA is prepared to procure if requisitions are received: Electrical switch gears Water heaters Welded

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

7 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT 7

Government Procured Material and Equipment in CAS

Items currently procured in the region by DLA to support operations to date: Dimensional lumber

Plywood Roofing felt Corrugated metal roofing Portland cement

Ready-mix Concrete 55 gal fuel drums Wood pallets Concertina wire Rebar

Packaged generator units Transformers Rolled steel for arch-span Electrical wire and cable

Items DLA is prepared to procure if requisitions are received:

Electrical switch gears Water heaters Welded wire mess Gabion Baskets Steel wire

Steel pipe Structural steel tubing PVC pipe Screws and nails Paint

Sealants Sandwich panels Extruded aluminum and PVC Fire doors

Packaged wastewater treatment units Packaged substations with switchgears and transformers

Most construction materials are available in the region at reasonable prices.

Page 8: Construction Material Procurement in Central Asia...Electrical wire and cable Items DLA is prepared to procure if requisitions are received: Electrical switch gears Water heaters Welded

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

8 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT 8

Contact Info LTC John Hudson, P.E. CAS Team Lead & Senior Engineer DLA, JCASO Fort Belvoir, VA [email protected]

COM: (703)767-1159 Cell: (571)393-9593 Chet Evanitsky CAS Class IV Project Manager DLA Troop Support, C&E Philadelphia, PA [email protected] COM: 215-737-8048

Page 9: Construction Material Procurement in Central Asia...Electrical wire and cable Items DLA is prepared to procure if requisitions are received: Electrical switch gears Water heaters Welded

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

9 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT 9

Questions

Page 10: Construction Material Procurement in Central Asia...Electrical wire and cable Items DLA is prepared to procure if requisitions are received: Electrical switch gears Water heaters Welded

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

10 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT 10 10

Plywood – various grades/sizes Lumber – construction grade; untreated

► 5510-01-607-9425 – 2”x4”x16’(20’) ► 5510-01-607-9427 – 2”x6”x16’(20’) ► 5510-01-607-9430 – 2”x10”x16’(20’) ► 5510-01-607-9431 – 2”x12”x16’(20’) ► 5510-01-607-9434 – 4”x4”x16’(20’) ► 5510-01-607-9436 – 2”x8”x16’ (20’)

Steel Coil

► 1mm tested and approved ► 1.5mm pending

All material delivered via

STCR

CAS Available Items

Page 11: Construction Material Procurement in Central Asia...Electrical wire and cable Items DLA is prepared to procure if requisitions are received: Electrical switch gears Water heaters Welded

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

11 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT 11 11

Initial product specifications approved by USACE ► Generators – 1000kVA; 1600kVA ► Transformers – 300kVA; 500kVA ► Cable – 12-20kV Feeder Cable ► Water Heaters – 450L Capacity

Fuel Drums

CAS Available Items

Page 12: Construction Material Procurement in Central Asia...Electrical wire and cable Items DLA is prepared to procure if requisitions are received: Electrical switch gears Water heaters Welded

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

12 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT 12 12

Cement/Rebar Tested at U.S. laboratory

• Cement conforms to ASTM C150-11 Standard for Portland Cement • Rebar conforms to ASTM-A-370-010/ASTM-A-706-09

Pre-positioned stock at Defense Distribution Kandahar • Cement - 10,000 110-lb. bags

• Rebar – 500 Metric Tons (MT) - (150 MT12mm; 150MT 16mm; 200MT 20mm)

Direct Delivery via STCR

CEMENT-50KG-PC400 5610-01-610-3981 CEMENT-1 MT-PC400 5610-01-610-3983

REBAR-20MM-6M 5680-01-610-3963 REBAR-18MM-6M 5680-01-610-3967 REBAR-12MM-6M 5680-01-610-3970 REBAR-14MM-6M 5680-01-610-3974 REBAR-16MM-6M 5680-01-610-3977

CAS Available Items