construction - mkc associates, inc. hospital/14-148 new... · vapor barrier w/ taped seams. steel...
TRANSCRIPT
DESCRIPTIONDATEMARK
REVISIONS
1
www.mkcinc.com
ASSOCIATES, INC.
COLUMBUSMANSFIELDNEW PHILADELPHIA
DRAWN BY: PROJ. MGR:
14-148 A-310
A
SHEET CONTENT
JOB NO. SHEET
BLB
C 20132 3 4 5
B
C
D
ARCHITECTUREENGINEERINGPLANNING
D
C
B
A
PREL
IMIN
AR
Y - N
OT
FOR
CO
NST
RU
CTI
ON
54321
Prin
ted
4/21
/201
5
CONSULTANTS
PHONE : 419-525-1102FAX: 419-525-1428
40 W. 4th STREETMANSFIELD, OHIO 44902
AR
CH
ITEC
T O
F R
ECO
RD
Bria
n L.
Bau
er94
81Ex
pira
tion
12/3
1/20
15
SECTION DETAILS
Dover, Ohio
PROFESSIONALOFFICESUITES
FOR
UNIONHOSPITAL
04/13/2015PROGRESS SET:
4" SPLIT FACE CMU. GROUT CELLS FULLBELOW THRU WALL FLASHING AND BELOW
GRADE.
FINISHED GRADE (MIN. 6" BELOW FINISHEDFLOOR ELEVATION).
GROUT CAVITY FULL BELOW THRU WALLFLASHING.
6" METAL STUDS @ 24" C/C.
MIN R-19 BATTING INSULATION BETWEENSTUDS F/H OF WALL.
5/8" GYPSUM BOARD ON MIN. 6 MIL VISQUEENVAPOR BARRIER W/ TAPED SEAMS.
MORTAR NET.
METAL THRU WALL FLASHING W/ WEEPS@ 24" C/C MAX. EXTEND MIN. 12" UP WALL
AIR AND MOISTURE BARRIER ON 5/8"DENSGLASS GOLD EXTERIOR SHEATHING.
REINFORCED CONCRETE FOOTING. SEESTRUCTURAL DRAWINGS.
12" CMU BLOCK. GROUT CELLS FULL
8" CMU BLOCK. GROUT CELLS FULL.
2" RIGID PERIMETER INSULATION.
4" REINFORCED CONCRETE FLOOR SLABON MIN. 6 MIL VISQUEEN VAPOR BARRIER W/TAPED SEAMS.
4" GRAVEL BASE.
ENGINEERED FILL.
4" RUBBER BASE.
6" METAL STUDS @ 24" C/C.
MIN R-19 BATTING INSULATION BETWEENSTUDS F/H OF WALL.
6" METAL STUDS @ 24" C/C.
MIN R-19 BATTING INSULATION BETWEENSTUDS F/H OF WALL.
5/8" GYPSUM BOARD ON MIN. 6 MIL VISQUEENVAPOR BARRIER W/ TAPED SEAMS.
STEEL BEAM. SEE STRUCTURAL DRAWINGS.
STEEL ROOF JOISTS. SEE STRUCTURALDRAWINGS.
AIR AND MOISTURE BARRIER ON 5/8"DENSGLASS GOLD EXTERIOR SHEATHING.
AIR AND MOISTURE BARRIER ON 5/8"DENSGLASS GOLD EXTERIOR SHEATHING.
.060 EPDM ROOFING FULLY ADHERED TOBUILT-UP POLYISCYANURATE INSULATION(MIN. 3" THICKNESS, SLOPED MIN 1/4 : 12TO GUTTERS/ SCUPPERS) W/ STAGGEREDJOINTS, ON MIN. 6 MIL VISQUEEN VAPORBARRIER W/ TAPED SEAMS.
CANT STRIP FULL PERIMETER OF ROOF.
1 1/2" METAL ROOF DECK.
TURN EPDM ROOFING UP PARAPET WALL
3 5/8" x 3 5/8" x 7 5/8" FACE BRICK
METAL PARAPET COPING
1x12 CLAD WOOD FRIEZE BOARD
2x12 CLAD WOOD FRIEZE BOARD
TURN EPDM ROOFING OVER TOP OF PARAPET WALL
TURN EPDM ROOFING DOWN FRONT OFPARAPET WALL
6" METAL STUDS @ 24" C/C.
MIN. R-19 BATTING INSULATION BETWEENSTUDS F/H OF WALL.
5/8" GYPSUM BOARD ON MIN. 6 MIL VISQUEENVAPOR BARRIER W/ TAPED SEAMS.
4" SPLIT FACE CMU.
AIR AND MOISTURE BARRIER ON 5/8"DENSGLASS GOLD EXTERIOR SHEATHING.
8" CAST STONE SILL.
METAL SILL FLASHING W/ END DAMS ANDWEEPS @ 24" C/C MAX.
WINDOW STOOL.
RETURN GYPSUM BOARD TO WINDOW FRAME.
WINDOW (SEE WINDOW ELEVATIONS).CAULK ENTIRE PERIMETER OF WINDOW
(INTERIOR AND EXTERIOR).CAULK ENTIRE PERIMETER OF WINDOW
(INTERIOR AND EXTERIOR).
4" SPLIT FACE CMU.
3 5/8" x 3 5/8" x 7 5/8" FACE BRICK
MORTAR NET.6" METAL STUDS @ 24" C/C.
MIN. R-19 BATTING INSULATION BETWEENSTUDS F/H OF WALL.
5/8" GYPSUM BOARD ON MIN. 6 MIL VISQUEENVAPOR BARRIER W/ TAPED SEAMS.
RETURN GYPSUM BOARD TO WINDOW FRAME.
WINDOW (SEE WINDOW ELEVATIONS).
ACOUSTIC CEILING TILE (SEE RCP).
CAULK ENTIRE PERIMETER OF WINDOW(INTERIOR AND EXTERIOR).
CAULK ENTIRE PERIMETER OF WINDOW(INTERIOR AND EXTERIOR).
METAL FLASHING WITH WEEP HOLES @24" C/C MAX.
AIR AND MOISTURE BARRIER ON 5/8"DENSGLASS GOLD EXTERIOR SHEATHING.
RETURN GYPSUM BOARD TO WINDOW FRAME.
6" METAL STUDS @ 24" C/C.
MIN R-19 BATTING INSULATION BETWEENSTUDS F/H OF WALL.
STEEL ROOF JOISTS. SEE STRUCTURALDRAWINGS.
AIR AND MOISTURE BARRIER ON 5/8"DENSGLASS GOLD EXTERIOR SHEATHING.
AIR AND MOISTURE BARRIER ON 5/8"DENSGLASS GOLD EXTERIOR SHEATHING.
.060 EPDM ROOFING FULLY ADHERED TOBUILT-UP POLYISCYANURATE INSULATION(MIN. 3" THICKNESS, SLOPED MIN 1/4 : 12TO GUTTERS/ SCUPPERS) W/ STAGGEREDJOINTS, ON MIN. 6 MIL VISQUEEN VAPORBARRIER W/ TAPED SEAMS.
CANT STRIP FULL PERIMETER OF ROOF.
1 1/2" METAL ROOF DECK.
TURN EPDM ROOFING UP PARAPET WALL
3 5/8" x 3 5/8" x 7 5/8" FACE BRICK.
METAL PARAPET COPING
1x12 CLAD WOOD FRIEZE BOARD
2x12 CLAD WOOD FASCIA BOARD
TURN EPDM ROOFING OVER TOP OF PARAPET WALL
TURN EPDM ROOFING DOWN FRONT OFPARAPET WALL
1 1/2" METAL ROOF DECK.
.060 EPDM ROOFING FULLY ADHERED TOBUILT-UP POLYISCYANURATE INSULATION(MIN. 3" THICKNESS, SLOPED MIN 1/4 : 12
TO GUTTERS/ SCUPPERS) W/ STAGGEREDJOINTS, ON MIN. 6 MIL VISQUEEN VAPOR
BARRIER W/ TAPED SEAMS.
STEEL ROOF JOISTS. SEE STRUCTURALDRAWINGS.
STEEL BEAM. SEE STRUCTURAL DRAWINGS.
STEEL BEAM. SEE STRUCTURAL DRAWINGS.
GROUT CAVITY FULL BELOW FLASHING.
6" METAL STUDS @ 24" C/C.
MIN R-19 BATTING INSULATION BETWEENSTUDS F/H OF WALL.
5/8" GYPSUM BOARD ON MIN. 6 MIL VISQUEENVAPOR BARRIER W/ TAPED SEAMS.
5/8" GYPSUM BOARD
TURN EPDM ROOFING MATERIAL UP WALLAND BEHIND FLASHING
MORTAR NET.
METAL THRU WALL FLASHING W/ WEEPS@ 24" C/C MAX. EXTEND MIN. 12" UP WALL
MEMBRANE ROOF FLASHING
METAL COUNTER FLASHING INSTALLED UNDERTHRU WALL FLASHING AND OVER MEMBRANE
ROOF FLASHING.
6" METAL STUDS @ 24" C/C.
MIN R-19 BATTING INSULATION BETWEENSTUDS F/H OF WALL.
5/8" GYPSUM BOARD ON MIN. 6 MIL VISQUEENVAPOR BARRIER W/ TAPED SEAMS.
METAL FLASHING W/ WEEPS@ 24" C/C MAX.EXTEND MIN. 8" UP WALL
FINISHED GRADE (MIN. 6" BELOW FINISHEDFLOOR ELEVATION).
12" H. ALUMINUM PLATE WALL PANELS
AIR AND MOISTURE BARRIER ON 5/8"DENSGLASS GOLD EXTERIOR SHEATHING.
REINFORCED CONCRETE FOOTING. SEESTRUCTURAL DRAWINGS.
8" CMU BLOCK. GROUT CELLS FULL
2" RIGID PERIMETER INSULATION.
4" RUBBER BASE.
4" REINFORCED CONCRETE FLOOR SLABON MIN. 6 MIL VISQUEEN VAPOR BARRIER W/TAPED SEAMS.
4" GRAVEL BASE.
ENGINEERED FILL.
SCALE: 1 1/2"= 1'-0"
A1 DETAILA-310
SCALE: 1 1/2"= 1'-0"
C1 DETAILA-310 SCALE: 1 1/2"= 1'-0"
C2 DETAILA-310
SCALE: 1 1/2"= 1'-0"
D2 DETAILA-310
SCALE: 1 1/2"= 1'-0"
A2 DETAILA-310
SCALE: 1 1/2"= 1'-0"
C4 DETAILA-310