    Construction ofConstruction ofConcrete PavementsConcrete PavementsJefferyJeffery RoeslerRoesler, Ph.D., P.E, Ph.D., P.E.AssociAssocate Professoriate ProfessorDepartment of Civil and EngineeringDepartment of Civil and EngineeringUniversity of IllinoisUniversity of IllinoisPontificia Universidad CatPontificiaUniversidad Catlica de Chilelica de ChileDepartamento de IngenierDepartamento de

    Ingeniera y Gestia y Gestin de la Construccin de la ConstruccinnOctober 19, 2009Octor 19, 2009AcknowledgmentsAcknowledgments..Dr. Dan Zollinger Professor, Texas A&M..NHI Training Course..Gary Fick Trinity Construction ManagementConstruction ofConstruction ofConcrete PavementsConcrete PavementsJefferyJeffery RoeslerRoesler, Ph.D., P.E, Ph.D., P.E.AssociAssocate Professoriate ProfessorDepartment of Civil and EngineeringDepartment of Civil and Engineering

    University of IllinoisUniversity of IllinoisPontificia Universidad CatPontificiaUniversidad Catlica de Chilelica de ChileDepartamento de IngenierDepartamento deIngeniera y Gestia y Gestin de la Construccin de la ConstruccinnOctober 19, 2009Octor 19, 2009AcknowledgmentsAcknowledgments..Dr. Dan Zollinger Professor, Texas A&M..NHI Training Course..Gary Fick Trinity Construction Management

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    2/48

    Types of Concrete PavementsTypes of Concrete Pavements..Jointed Plain Concrete Pavements (JPCP)..Continuously Reinforced Concrete Pavements (CRCP)..Jointed Reinforced Concrete Pavements (JRCP) Pre-stressed Concrete Pavements..Interlocking Concrete Block Pavements (ICBP)

    ..Fiber Reinforced Concrete (FRC) Pavements

    ..Whitetopping and Ultrathin Whitetopping (UTW)Types of Concrete PavementsTypes of Concrete Pavements..Jointed Plain Concrete Pavements (JPCP)..Continuously Reinforced Concrete Pavements (CRCP)..Jointed Reinforced Concrete Pavements (JRCP) Pre-stressed Concrete Pavements..Interlocking Concrete Block Pavements (ICBP)..Fiber Reinforced Concrete (FRC) Pavements..Whitetopping and Ultrathin Whitetopping (UTW)CONCRETE PAVEMENTSCONCRETE PAVEMENTS..Typical Cross Section:

    ..Less stiff layer with depthSubbase/ BaseSubgradeConcrete10cm Pervious Concrete/ OGDL29cm PCCPLimerock base

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    3/48

    JOINTED PLAIN CONCRETE PAVEMENT(JPCP) Portland CementConcreteSubgradeJoint withDowel Bar

    Joint Spacing3.5 to 6 mStabilized orGranular BaseJOINTED PLAIN CONCRETE PAVEMENT(JPCP) Portland CementConcreteSubgradeJoint withDowel BarJoint Spacing3.5 to 6 m

    Stabilized orGranular BaseCONTINUOUSLY REINFORCED CONCRETEPAVEMENT (CRCP)Portland CementConcreteSubgradeShrinkage Cracks,1 to 2 m spacingStabilized BaseContinuous Steel Barsthroughout Length ofPavement

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    4/48

    Horizontal ConstructionHorizontal ConstructionPrimary Steps in ConcretePrimary Steps in ConcretePavement ConstructionPavement Construction..Preparing the soil & base layer..Consistent concrete material..Placing & finishing concrete

    ..Texturing surface

    ..Curing & temperature management

    ..Sawing and Sealing

    ..Opening to trafficHorizontal ConstructionHorizontal ConstructionPrimary Steps in ConcretePrimary Steps in ConcretePavement ConstructionPavement Construction..Preparing the soil & base layer..Consistent concrete material..Placing & finishing concrete..Texturing surface..Curing & temperature management

    ..Sawing and Sealing..Opening to traffic

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    5/48

    Preparing the Support LayersPreparing the Support Layers..Construction starts with the subgrade(suelo)..Uniformity Soil type Moisture content

    Density..Remove unsuitable materials..Stabilize or treat poor soilsPreparation for PavingPreparation for Paving Construction staking alignment and elevation Setting string-linePreparing the Support LayersPreparing the Support Layers..Construction starts with the subgrade(suelo)..Uniformity Soil type Moisture contentDensity..Remove unsuitable materials

    ..Stabilize or treat poor soilsPreparation for PavingPreparation for Paving Construction staking alignment and elevation Setting string-line

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    6/48

    Preparation for PavingPreparation for Paving..Fine grading Laser Level Critical for thickness control of every layer Establishes a foundation for smoothnessPreparation for PavingPreparation for Paving..Checking grade elevation and thickness

    quality control..Stretching a string across the gradebetween the two longitudinal stringlinesPreparation for PavingPreparation for Paving..Fine grading Laser Level Critical for thickness control of every layer Establishes a foundation for smoothnessPreparation for PavingPreparation for Paving..Checking grade elevation and thicknessquality control..Stretching a string across the gradebetween the two longitudinal stringlines

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    7/48

    Subbase OperationsSubbase Operations..Granular materials (agregados) Similar to subgrade preparation Usually higher density requirement..Cement-stabilized materials Placed using slipform or asphalt equipment

    Aggregate BaseAggregate BaseSubbase OperationsSubbase Operations..Granular materials (agregados) Similar to subgrade preparation Usually higher density requirement..Cement-stabilized materials Placed using slipform or asphalt equipmentAggregate BaseAggregate Base

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    8/48

    GeosyntheticGeosyntheticReinforcementReinforcementAggregateAggregate SubbaseSubbaseCompactionCompactionGeosyntheticGeosyntheticReinforcementReinforcementAggregateAggregate SubbaseSubbaseCompactionCompaction

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    9/48

    Cement Treated BaseCement Treated Base..Uniformity..Compressive strength for the mix design& measured by in-place densityLean orLean or EconocreteEconocreteBaseBase..Mixed, transported and placed the same as

    concrete pavement..No contraction joints typically..7-day curing period..Second application of wax curing compound asa bond inhibitorCement Treated BaseCement Treated Base..Uniformity..Compressive strength for the mix design& measured by in-place densityLean orLean or EconocreteEconocreteBaseBase..Mixed, transported and placed the same asconcrete pavement

    ..No contraction joints typically..7-day curing period

    ..Second application of wax curing compound asa bond inhibitor

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    10/48

    Open Graded Base (319)Open Graded Base (319)..Separator fabric is placed between soil layerand open graded base..Bituminous is placed with an asphalt paver andscreed compacted..Cement treated is placed similar to CTB without

    the roller (screed compacted)Open Graded Base (319)Open Graded Base (319)..Separator fabric is placed between soil layerand open graded base..Bituminous is placed with an asphalt paver andscreed compacted..Cement treated is placed similar to CTB withoutthe roller (screed compacted)

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    11/48

    Setting Dowel BasketsSetting Dowel Baskets..Planned joint location..Anchored firmly pins, clips and nails, etc...Alignment 3 planes (joint lockup willcause cracking)Setting Dowel BasketsSetting Dowel Baskets

    ..Planned joint location

    ..Anchored firmly pins, clips and nails, etc.

    ..Alignment 3 planes (joint lockup willcause cracking)

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    12/48

    FixedFixed--Form Paving OperationsForm Paving Operations..Paving form is the mold Holds concrete in place Establishes grade and alignment Serves as tracks for paving equipmentTypical Steel FormTypical Steel FormForm Lock

    FixedFixed--Form Paving OperationsForm Paving Operations..Paving form is the mold Holds concrete in place Establishes grade and alignment Serves as tracks for paving equipmentTypical Steel FormTypical Steel FormForm Lock

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    13/48

    Application AdvantagesApplication AdvantagesFixedFixed--Form PavingForm Paving..Tight tolerances -side clearance..Multiple changes of width..Blockouts..Intersections -quadrants open to trafficApplication AdvantagesApplication AdvantagesFixedFixed--Form PavingForm Paving

    ..Tight tolerances -side clearance

    ..Multiple changes of width

    ..Blockouts

    ..Intersections -quadrants open to traffic

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    14/48

    Eliminate high and low areasEliminate high and low areasSecure to prevent movementSecure to prevent movementEliminate high and low areasEliminate high and low areasSecure to prevent movementSecure to prevent movement

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    15/48

    MoistenMoisten SubbaseSubbase..Subbase surface should be kept damp, butwithout standing water Surface temperature controlTransporting ConcreteTransporting Concrete..Transit mix

    ..AgitatorMoistenMoisten SubbaseSubbase..Subbase surface should be kept damp, butwithout standing water Surface temperature controlTransporting ConcreteTransporting Concrete..Transit mix..Agitator

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    16/48

    Transporting ConcreteTransporting ConcreteDump Truck Dump TrailerLive Bottom TrailerTransporting ConcreteTransporting ConcreteDump Truck Dump TrailerLive Bottom Trailer

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    17/48

    Concrete Construction in ChinaConcrete Construction in China

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    18/48

    Concrete PlacerConcrete PavementConcrete PavementPlacer / SpreaderPlacer / SpreaderConcrete PlacerConcrete PlacerConcrete PavementConcrete PavementPlacer / SpreaderPlacer / Spreader

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    19/48

    Slipform Concrete PavingSlipform Concrete PavingTO EXTRUDE:To shape a material byforcing it through a mold.PaverPaverSetupSetup..Width fresh slab will expand afterextrusion

    ..Trueness cross-slope/crown

    ..Integral curb dimensions

    ..Vibrator spacing and operation

    ..Sensor operation -dailySlipform Concrete PavingSlipform Concrete PavingTO EXTRUDE:To shape a material byforcing it through a mold.PaverPaverSetupSetup..Width fresh slab will expand afterextrusion..Trueness cross-slope/crown..Integral curb dimensions

    ..Vibrator spacing and operation..Sensor operation -daily

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    20/48

    SlipformSlipformPaverPaverComponentsComponentsIMCPManualSlipformSlipformPaverPaver..Vibrators..Pan and Side formSlipformSlipformPaverPaverComponentsComponentsIMCPManualSlipformSlipformPaverPaver

    ..Vibrators

    ..Pan and Side form

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    21/48

    Slipform Paving OperationsSlipform Paving Operations..Establishing String Line and Elevation..Paver Set Up..Placement Steel..Slipform Paving ProcessSlipformSlipformPaverPaver

    ..Tractor

    ..Auger &Strike-offSlipform Paving OperationsSlipform Paving Operations..Establishing String Line and Elevation..Paver Set Up..Placement Steel..Slipform Paving ProcessSlipformSlipformPaverPaver..Tractor..Auger &Strike-off

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    22/48

    Pavement slab constructionPavement slab constructionPavement slab constructionPavement slab constructionPavement slab constructionPavement slab constructionPavement slab constructionPavement slab construction

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    23/48

    Global positioning system (GPS) controls will likely beable to eliminate the need for a string line in the futureGPS Receiver GPSControllerand LaserHeight Gages

    LaserSensorGlobal positioning system (GPS) controls will likely beGlobal positioning system(GPS) controls will likely beable to eliminate the need for a string line in the futureable to eliminate theneed for a string line in the futureGPS Receiver GPSControllerand LaserHeight GagesLaserSensorHigh

    ResolutionLaser

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    24/48

    Vibrator Sphere of InfluenceVibrator Sphere of InfluenceDumping/SpreadingDumping/Spreading..Regardless of the method, the goal is tomaintain a consistent amount of concrete infront of the paverVibrator Sphere of InfluenceVibrator Sphere of InfluenceDumping/SpreadingDumping

    /Spreading..Regardless of the method, the goal is tomaintain a consistent amount of concrete infront of the paver

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    25/48

    Paving Speed ~ 0.5 to 3m / min.Paving Speed ~ 0.5 to 3m / min. Paving Speed ~ 0.5 to 3m / min.Paving Speed ~ 0.5 to 3m / min.

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    26/48

    Discharging/placing PCCDischarging/placing PCCDowel bar inserterDischarging/placing PCCDischarging/placing PCCDowel bar inserterDischarging/placing PCCDischarging/placing PCCDowel bar inserterDischarging/placing PCCDischarging/placing PCCDowel bar inserter

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    27/48

    Discharging/placing PCCDischarging/placing PCCDowel bar inserterDischarging/placing PCCDischarging/placing PCCTie barsDischarging/placing PCCDischarging/placing PCCDowel bar inserterDischarging/placing PCCDischarging/placing PCCTie bars

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    28/48

    Crane Slab for Loading RailcarsCrane Slab for Loading RailcarsAirfield ConcretePavementAirfield Concrete PavementCrane Slab for Loading RailcarsCrane Slab forLoading RailcarsAirfield Concrete PavementAirfield Concrete Pavement

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    29/48

    Edge SlumpEdge Slump..Variability (non-uniform concrete) will resultin edge slump or edge failureEdge SlumpEdge Slump..Variability (non-uniform concrete) will resultin edge slump or edge failure

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    30/48

    FinishingFinishing..Burlap drag..Mechanicalfinishing..FinishingFinishing

    ..Burlap drag

    ..Mechanicalfinishing..From Fine AggregateParticlesMicrotextureMicrotexture

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    31/48

    Formed intosurfaceMacrotextureMacrotexture(Grooves)(Grooves)MicrotextureMicrotexture..Burlap drag..Turf drag

    ..BroomFormed intosurfaceMacrotextureMacrotexture(Grooves)(Grooves)MicrotextureMicrotexture..Burlap drag..Turf drag..Broom

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    32/48

    MacrotextureMacrotexture..Transverse tining..Straight and clean tinesMacrotextureMacrotexture..Transverse tining..Straight and clean tines

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    33/48

    Final TexturingFinal Texturing..Transverse tining..Longitudinal tiningFinal TexturingFinal Texturing..Transverse tining..Longitudinal tining

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    34/48

    Concrete Pavement (US Practices)Concrete Pavement (US Practices)..Alternative Surface TexturesGrinding Exposed AggregatesCuring CompoundCuring CompoundConcrete Pavement (US Practices)Concrete Pavement(US Practices)..Alternative Surface Textures

    Grinding Exposed AggregatesCuring CompoundCuring Compound

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    35/48

    CuringCuring..Why?..Plastic shrinkagecracking..Permeability..When?..Before the surface

    can dry weatherwill influence thisgreatly..How much?COMPLETECOVERAGECuringCuring..Why?..Plastic shrinkagecracking..Permeability..When?..Before the surface

    can dryweatherwill influence this

    greatly..How much?COMPLETECOVERAGE

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    36/48

    Joint Saw and Seal OperationsJoint Saw and Seal OperationsJoint Saw and Seal OperationsJoint Saw and Seal Operations

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    37/48

    Types of Pavement Joints TransverseContractionConstructionExpansion/Isolation Longitudinal

    ContractionConstructionTypes of Pavement Joints TransverseContractionConstructionExpansion/Isolation LongitudinalContractionConstruction

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    38/48

    Sawing JointsSawing Joints Why? So it cracks where we wantit to When? Before it cracks, but afterraveling is minimized

    Green saw at T/3 or earlyentry is shallower (20 to25mm) Dimension sawing isoptional with 6mm jointwidthSawing JointsSawing Joints Why? So it cracks where we wantit to When? Before it cracks, but afterraveling is minimizedGreen saw at T/3 or earlyentry is shallower (20 to

    25mm) Dimension sawing isoptional with 6mm jointwidth

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    39/48

    SawsSawsWet Walk Behind Early EntrySpan SawSawsSawsWet Walk Behind Early EntrySpan SawSawing WindowSawing WindowTimeConcrete SetToo

    EarlyRavelingTooLateRandom Cracking

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    40/48

    Sawing JointsSawing JointsSawing JointsSawing JointsSealing JointsSealing Joints Backer rod Silicone sealant Longitudinalconstruction joints

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    41/48

    Sawing Window.. Concrete mix characteristics Cement type Admixtures Fast Track.. Base Type

    Aggregate, Stabilized, Open graded.. Production schedule- Early cut or conventional.. Weather conditions Ambient temperature, Wind, Humidity, CloudcoverSawing WindowSawing Window..Concrete mix characteristics Cement typeAdmixtures Fast Track..Base TypeAggregate, Stabilized, Open graded..Production schedule

    -Early cut or conventional..Weather conditions Ambient temperature, Wind, Humidity, Cloudcover

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    42/48

    Two-Lift Concrete Pavement.. New U.S. TrendsTwoTwo--Lift Concrete PavementLift Concrete Pavement..New U.S. TrendsTwoTwo--Lift Concrete PavementLift Concrete Pavement..New U.S. Trends

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    43/48

    Continuously ReinforcedContinuously ReinforcedConcrete PavementConcrete PavementChair SetChair Set--upupContinuously ReinforcedContinuously ReinforcedConcrete PavementConcrete PavementChair SetChair Set--upup

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    44/48

    Steel LayoutSteel LayoutCRCP Chairs (Steel)CRCP Chairs (Steel)Steel LayoutSteel LayoutCRCP Chairs (Steel)CRCP Chairs (Steel)

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    45/48

    Steel TiesSteel TiesSteel TyingSteel TyingSteel TiesSteel TiesSteel TyingSteel Tying

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    46/48

    Bar SplicesBar SplicesSingle Layer SteelSingle Layer SteelBar SplicesBar SplicesSingle Layer SteelSingle Layer Steel

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    47/48

    Roller Compacted Concrete (RCC)Roller Compacted Concrete (RCC)Roller Compacted Concrete (RCC)Roller Compacted Concrete (RCC)

  • 8/6/2019 Construction of Concrete Pavements (Jeff Roesler)[1]

    48/48