    OBJECTIVE:

    NYParkscontracttoconnecttheexistingparkpathwalkalongHudsonriverparalleltotheHenryHudsonParkway.

    Installadeepfoundationsolutiontosupportoverthewaterplatform.

    Minimizenoiseandmarineenvironmentalimpacts.

    Trafficflowcannotbeaffected.

    2

  • 7/24/2019 Construction of Pedestrian Bridges -Using Composite Column - 04 Prado and Coleman

    2/9

    3

    Henry Hudson Pkwy

    4

    104Drilledshafts16inchesindiameter

    20EachInstalledfromlandusingBauerDrillRigBG24

    84Eachinstalledfromwaterusingajackupbargeandcrawlercranewithfixedleads.

    DrilledshaftsinHudsonRiverrequiredrocksocketstoresisttheiceloadsandtidalforces.

    Averagedrilleddepthsrangefrom45to64feettobedrock.

  • 7/24/2019 Construction of Pedestrian Bridges -Using Composite Column - 04 Prado and Coleman

    3/9

    Entireareaunderwateratbeginningofthe20th

    century.

    Areafilledtodepthsof3040feetduringHenry

    HudsonPkwyconstruction.

    Fillconsistsofsignificantboulderandboulder

    fragments.

    Soilaggregatematerialsandtrappedorganicsiltsand

    clays.

    WeatherrockandMicaSchistbedrock.

    5

    6

  • 7/24/2019 Construction of Pedestrian Bridges -Using Composite Column - 04 Prado and Coleman

    4/9

    Workingontidalwater(6).

    Singlepassdrillingtoavoidsplicingofcasing.

    Controlofdrillspoilsonwater.

    UrbanEnvironment.

    Obstructions Boulders,riprap,andcobbles.

    7

    Drillingthru

    organics/clay

    deposits

    may

    plug

    up

    hammer.

    Materialhandling/placementinlimitedspace.

    ManmadematerialfillcoulddamageDHDtools

    WATERWORK

    Establishedbaselinecontractor/ownerforobstructionrisk.

    Drillingmethod combinationof:

    Symmetrix STDSystem(toadvancecasingthroughobstructions)

    Bermingham leadssystemusingareversecirculationHydraulicdrillhead(bringscuttingsthroughthedrillstring)

    Monitordrillrateatorganicsiltlayers.

    Backupplan changingovertriconerotarysystemifplugoccurs.

    8

  • 7/24/2019 Construction of Pedestrian Bridges -Using Composite Column - 04 Prado and Coleman

    5/9

    LAND

    WORK

    Conventionaldrillingtechniques Bauerdrillrig,augersandcorebarrels.

    ToaddresspotentialdamageofDHDduetopresenceofmanmadematerialobstructions.

    BuildingInformationModel

    (BIM)presented

    to

    client

    to

    demonstratemeansandmethods.

    9

    16diameterwallFy=

    35ksi.Epoxycoated

    permanentcasing.

    4,000psiconcreteAggr.

    14.69diameterrock

    socket4feetinlength

    (Watershaftsonly).

    10

  • 7/24/2019 Construction of Pedestrian Bridges -Using Composite Column - 04 Prado and Coleman

    6/9

    ORIGINALDESIGN ALTERNATEDESIGN

    11

    Reinforcingelementlengthsinexcessof70ft.

    OriginalDesigncageswouldbedifficulttohandle.

    AlternateDesignsteelbeam(samestiffness)are

    easiertohandle.

    12

    Projectwasfinishedwithinbudgetandschedule.

    Lowenvironmentalandtrafficimpact.

    Selecteddrillmethodsandtoolsmitigatedrisksduetositeconditions.

    Financialriskassociatedwithobstructionremovalwasmitigated.

    Establishedbaselinepenetrationratesusedtodeterminecompensabledelays.

    Approachwasadvantageousforownerandcontractor.

  • 7/24/2019 Construction of Pedestrian Bridges -Using Composite Column - 04 Prado and Coleman

    7/9

    13

    LookingNorth(FacingtowardsGeorge

    WashingtonBridge)

    LookingSouth

    (Facingtowards

    Manhattan)

    14

  • 7/24/2019 Construction of Pedestrian Bridges -Using Composite Column - 04 Prado and Coleman

    8/9

    15

    NewYorkCityDepartmentofParksand

    Recreation

    Designer:StantecConsulting.

    TrafficEngineer:VollmerAssociatesLLP

    LommaConstructionCorporation

    Proj.Manager:PradyGandavarapu.

    UnderpinningandFoundationSKANSKA

    Proj.Manager:CraigMeltzer

    Superintendent:JasonFrederick

    TechnicalConsultant:DavidColeman

    Proj.Engineer:AlfranioPrado.16