Intro Status of UK DESPEC WP Spin off projects Construction of the UK DESPEC Array for Fast-Timing Measurements S. Lalkovski University of Surrey 10 October 2015 Agenda Intro Status of UK DESPEC WP Spin off projects S. Lalkovski Construction of the UK DESPEC Array for Fast-Timing Measurem

Upload: others

Post on 07-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Construction of the UK DESPEC Array for Fast-Timing ...ntl.inrne.bas.bg/events/sdanca15/SDANCA15_presentations/Lalkovsk… · Intro Status of UK DESPEC WP Spin off projects Evolution

IntroStatus of UK DESPEC WP

Spin off projects

Construction of the UK DESPEC Array for

Fast-Timing Measurements

S. Lalkovski

University of Surrey

10 October 2015

AgendaIntroStatus of UK DESPEC WPSpin off projects

S. Lalkovski Construction of the UK DESPEC Array for Fast-Timing Measurements

Page 2: Construction of the UK DESPEC Array for Fast-Timing ...ntl.inrne.bas.bg/events/sdanca15/SDANCA15_presentations/Lalkovsk… · Intro Status of UK DESPEC WP Spin off projects Evolution

IntroStatus of UK DESPEC WP

Spin off projects

Nuclear Landscape

• Typical time range: 45 orders of magnitude;50V, EC, T

1/2 > 2.1 × 10

17 y.;8Be, ground state:

T

1/2 = 1.4 × 10

−19 s;first excited state:T

1/2 = 7.1 × 10

−22 s.

10 10 10 10 1010 10−16 −14 −12 −10 −8 −6−18

DSA ETPR

NRF RDDS

CECB

LIFETIME (s)τ

Methods• PR Proton Resonances• DSA Doppler Shift Attenuation• ET Electronic timing• NRF Nuclear Resonance Fluorescence• RDDS Recoil Distance Doppler Shift• CB Channel blocking• CE Coulomb excitation

S. Lalkovski Construction of the UK DESPEC Array for Fast-Timing Measurements

Page 3: Construction of the UK DESPEC Array for Fast-Timing ...ntl.inrne.bas.bg/events/sdanca15/SDANCA15_presentations/Lalkovsk… · Intro Status of UK DESPEC WP Spin off projects Evolution

IntroStatus of UK DESPEC WP

Spin off projects

Evolution of collectivity in Zr-Cd region

S.Lalkovski and N.Minkov, J.Phys.G31 (2005) 427

54 56 58 60 62 64 66 68 70 72 74 76number of neutrons

1

10

100

BE

2(W

.u.)

SnCdPdRuMoZr

S.Kisyov et al., Phys.Rev.C84 (2011) 014324

S. Lalkovski Construction of the UK DESPEC Array for Fast-Timing Measurements

Page 4: Construction of the UK DESPEC Array for Fast-Timing ...ntl.inrne.bas.bg/events/sdanca15/SDANCA15_presentations/Lalkovsk… · Intro Status of UK DESPEC WP Spin off projects Evolution

IntroStatus of UK DESPEC WP

Spin off projects

GSI: Accelerators

Facility: LINAC SIS-18 synchrotronBeams: 136Xe and 238U : to 11.4 MeV per nucleon in the LINAC and to

750 MeV per nucleon in the SIS; 10 s spils - different experiments at

the same timeTarget: 1-4 g/cm2 Be

S. Lalkovski Construction of the UK DESPEC Array for Fast-Timing Measurements

Page 5: Construction of the UK DESPEC Array for Fast-Timing ...ntl.inrne.bas.bg/events/sdanca15/SDANCA15_presentations/Lalkovsk… · Intro Status of UK DESPEC WP Spin off projects Evolution

IntroStatus of UK DESPEC WP

Spin off projects

GSI: Fragment Separator

In-flight separation

A/q =e

u

Bρ2

βγ,Bρ

2

= Bρ1

(1 −x

2

− V

2

x

1

D2

) (1)

RISING Stopped beam campaignDetectors: Multiwire chamber (positions), Scintillators (TOF), Ionization chamber (∆E ), RISING (105 HPGeex-EUROBALL detectors)

FRS focus: 126,130Cd and 120Rh

S. Lalkovski Construction of the UK DESPEC Array for Fast-Timing Measurements

Page 6: Construction of the UK DESPEC Array for Fast-Timing ...ntl.inrne.bas.bg/events/sdanca15/SDANCA15_presentations/Lalkovsk… · Intro Status of UK DESPEC WP Spin off projects Evolution

IntroStatus of UK DESPEC WP

Spin off projects

The UKNUSTAR Project - UK in FAIR

Work Packages

◮ DESEPC: FATIMA

◮ HISPEC: LYCCA Large Stop detector

◮ R3B: Si tracker

OrganizationPI: Prof. Zs. PodolyakManagement board 13 members

S. Lalkovski Construction of the UK DESPEC Array for Fast-Timing Measurements

Page 7: Construction of the UK DESPEC Array for Fast-Timing ...ntl.inrne.bas.bg/events/sdanca15/SDANCA15_presentations/Lalkovsk… · Intro Status of UK DESPEC WP Spin off projects Evolution

IntroStatus of UK DESPEC WP

Spin off projects

The UKNUSTAR Project - UK in FAIR

Project timescales

◮ Start: April 1st, 2010

◮ End: March 31st, 2016

Resources◮ Manpower: 75.517 FTE

◮ Budget: £ 8.3M

S. Lalkovski Construction of the UK DESPEC Array for Fast-Timing Measurements

Page 8: Construction of the UK DESPEC Array for Fast-Timing ...ntl.inrne.bas.bg/events/sdanca15/SDANCA15_presentations/Lalkovsk… · Intro Status of UK DESPEC WP Spin off projects Evolution

IntroStatus of UK DESPEC WP

Spin off projects

UK DESPEC Technical Breakdown

DESPEC

AIDAFast−timing ArrayPlatform/Ge Mods

EDAQ Software

RIB/Source Tests Detector Reqmnts

Detectors

Prototype

GEANT/Concept

Mechanical Struct.

Leader: Prof. P.H.ReganInstitutions: Brighton,Daresbury, Manchester, Surrey,UWSManpower: 11.947 FTEBudget: 1.2M

Status: buildCommissioning: 2015/2016

S. Lalkovski Construction of the UK DESPEC Array for Fast-Timing Measurements

Page 9: Construction of the UK DESPEC Array for Fast-Timing ...ntl.inrne.bas.bg/events/sdanca15/SDANCA15_presentations/Lalkovsk… · Intro Status of UK DESPEC WP Spin off projects Evolution

IntroStatus of UK DESPEC WP

Spin off projects

UK FATIMA: Status

Equipment

◮ Detectors: 36x 1.5in x 2in LaBr3

:Ce+ H10570

◮ EDAQ: VME-based:Analogue timing: CFD (V812), TDC (V1290A)digital energy: digitizers + DPP-PSD (V1751C),VME-PSI optical bridge

◮ Mechanical frame: built in Daresbury; 378 kg;detectors arranged in three rings - one ring at 4◦ and two at±44◦

◮ Use: NIPNE, RIKEN, Grenoble, Birmingham, JYFL

◮ to be used in: ANL, GANIL

Part ofThe International FATIMA collaboration(Bulgaria, Germany, Poland, Romania, Spain, UK)TDR: Technical Report for the Design, Construction andCommissioning of the FATIMA - the FAst TIming Array,L.M.Fraile et al.Mechanics: Daresbury STFC

S. Lalkovski Construction of the UK DESPEC Array for Fast-Timing Measurements

Page 10: Construction of the UK DESPEC Array for Fast-Timing ...ntl.inrne.bas.bg/events/sdanca15/SDANCA15_presentations/Lalkovsk… · Intro Status of UK DESPEC WP Spin off projects Evolution

IntroStatus of UK DESPEC WP

Spin off projects

Mechanics

S. Lalkovski Construction of the UK DESPEC Array for Fast-Timing Measurements

Page 11: Construction of the UK DESPEC Array for Fast-Timing ...ntl.inrne.bas.bg/events/sdanca15/SDANCA15_presentations/Lalkovsk… · Intro Status of UK DESPEC WP Spin off projects Evolution

IntroStatus of UK DESPEC WP

Spin off projects

Performance

Energy resolution: 19% (121 keV); 8% (343 keV); 4%(779 keV);

Time resolution: 272 psM.Rudigier

S. Lalkovski Construction of the UK DESPEC Array for Fast-Timing Measurements

Page 12: Construction of the UK DESPEC Array for Fast-Timing ...ntl.inrne.bas.bg/events/sdanca15/SDANCA15_presentations/Lalkovsk… · Intro Status of UK DESPEC WP Spin off projects Evolution

IntroStatus of UK DESPEC WP

Spin off projects

UK FT Array at GANIL: Mechanical Integration

FATIMA at GANIL

UK: A.Grant & I.Burrows

Experiments

◮ Thick target experiments: P.Regan (Surrey)

◮ Thin target experiment: P.John (Padova),W.Korten (CEA)

Set up

◮ 22 LaBr3

:Ce 11.5 cm from the target

◮ ≈ 23 AGATA clusters

◮ VAMOS

Mechanics: Designed; A prototype tests at GANILwith EXOGAM structure - Feb 2015.; Now inproduction.Concerns: Magnetic shielding (two scenarios -costly & less costly) - Needs more testing

S. Lalkovski Construction of the UK DESPEC Array for Fast-Timing Measurements

Page 13: Construction of the UK DESPEC Array for Fast-Timing ...ntl.inrne.bas.bg/events/sdanca15/SDANCA15_presentations/Lalkovsk… · Intro Status of UK DESPEC WP Spin off projects Evolution

IntroStatus of UK DESPEC WP

Spin off projects

UK FT Array at GANIL: EDAQ Integration

LaBr3 PMT

CFD

V812

TDC

V1290A

Energy (x8/card)

Time (x32/card)

Current

Gate

Stop

Common Start

V1495 CENTRUM

For 30 channels:

2x V812 CFD (16ch)

1x V1290A TDC (32ch)

4x V1751 (8ch)

1x v1495

1 VME crate + CPU

1 NIM crate?

anode

dynode

BNC

BNC

MCX

Lemo 00

Fast Nim

Diff ECL

X16

Lemo

Analogue

Lemo

Analogue

Diff ECL

X16 x2

Lemo-MCX

cables

Lemo

NIM

Lemo

NIM

Lemo 00

Fast Nim

NIM

Anti�coinc

V1495

busyLemo

NIM

AIDA

Or Beam

V1751

DPP�PSD

Ext Trg

TDC

start

Analogue In

UK: I.Lazarus & V.Pucknell & M.RudigierFrance: F.Saillant, Ch.Houarner

Set Up

◮ 2xLaBr3

:Ce

◮ 2xV1751C

◮ 1xV812B

◮ 1xV1290A

◮ 1xV1495

Outcome◮ γ − γ coinc.

◮ γ − t

Data merging - to bedone

S. Lalkovski Construction of the UK DESPEC Array for Fast-Timing Measurements

Page 14: Construction of the UK DESPEC Array for Fast-Timing ...ntl.inrne.bas.bg/events/sdanca15/SDANCA15_presentations/Lalkovsk… · Intro Status of UK DESPEC WP Spin off projects Evolution

IntroStatus of UK DESPEC WP

Spin off projects

UK FT Array at ANL

FATIMA at ANL

A.Grant & I.Burrows

Set Up

◮ ≈55 GS detectors

◮ 25 LaBr3

:Ce 13 cm

The Proposal

◮ Source: ≈ 40 µCi 252Cf

◮ Duration: 30 days

◮ Accepted and planned for Dec/Jan 2015

S. Lalkovski Construction of the UK DESPEC Array for Fast-Timing Measurements

Page 15: Construction of the UK DESPEC Array for Fast-Timing ...ntl.inrne.bas.bg/events/sdanca15/SDANCA15_presentations/Lalkovsk… · Intro Status of UK DESPEC WP Spin off projects Evolution

IntroStatus of UK DESPEC WP

Spin off projects

Summary

◮ Mechanics: Designed, build and (partially) tested

◮ EDAQ: Designed, procured; to be commissioned.

Thank you!