As this year comes to a close, I reflect back on all of our projects this year. All of our projects presented great opportunities for creative design solutions but the one that stands out the most is TechTown’s 1st Floor Renovation project. This involved renovating nearly 26,000sf of existing office space and transforming the floor into Detroit’s premier Co-Working Space named Junction440 (opening in January 2014). I started posting these slideshares to capture the construction progress of this project every month starting back in May 2013. As the construction for this project finishes up I encourage everyone to view all of progress posted on my slideshare profile. We are blessed & proud of this accomplishment at Centric Design Studio. Enjoy!TRANSCRIPT
![Page 1: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/1.jpg)
Slide Show of Construction Progress at TechTown - DetroitTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 2: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/2.jpg)
Reception Desk Construction ProgressTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 3: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/3.jpg)
Sliding Door Installation at 2 Person Meeting RoomTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 4: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/4.jpg)
View Looking at Reception Desk and Co-Working AreaTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 5: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/5.jpg)
View Outside of Future TechTown Suite + Video Conf. Rm.TechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 6: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/6.jpg)
Future Lobby Waiting AreaTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 7: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/7.jpg)
Interior View of Future TechTown Management SuiteTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 8: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/8.jpg)
Interior View of Future TechTown Management SuiteTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 9: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/9.jpg)
Interior View of Reception + Conference RoomsTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 10: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/10.jpg)
Co-Working Kitchen AreaTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 11: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/11.jpg)
Glass Tile + Shelves Installed at Co-Working KitchenTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 12: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/12.jpg)
Video Monitor Installation at Video Conference RoomTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 13: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/13.jpg)
Co-Working Cubical AreaTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 14: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/14.jpg)
Soft Seating Furniture at Co-Working AreaTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 15: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/15.jpg)
Soft Seating (Foreground) Conference Room (Background)TechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 16: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/16.jpg)
Co-Working Cubical ChairsTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 17: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/17.jpg)
View Looking West at Reception + Lobby AreaTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 18: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/18.jpg)
View Inside Conference Room 2 with Conf. Table + ChairsTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 19: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/19.jpg)
View Inside Conference Room 5 with Lounge FurnitureTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 20: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/20.jpg)
View of Corridor 2 with Bench SeatingTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 21: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/21.jpg)
Copy CenterTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 22: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/22.jpg)
Co-Working Seating AreaTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 23: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/23.jpg)
Co-Working Seating AreaTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 24: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/24.jpg)
Waiting Lobby FurnitureTechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
![Page 25: Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30](https://reader036.vdocuments.net/reader036/viewer/2022062312/556265f2d8b42aab1a8b4cb1/html5/thumbnails/25.jpg)
TechTown’s Grand Opening of Junction440, Coming Jan. 2014TechTown 1st Floor Renovation