1 City Hall Seismic Retrofit Project CONSTRUCTION PROGRESS UPDATE AUGUST 2005

Upload: others

Post on 06-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CONSTRUCTION PROGRESS UPDATEww2.cityofpasadena.net/cityHall/pdf/CH -Web... · 2 City Hall Project Elements • Seismic Strengthening • Mechanical, Electrical, Plumbing and Fire

1

City Hall Seismic Retrofit Project

CONSTRUCTION PROGRESS UPDATE

AUGUST 2005

Page 2: CONSTRUCTION PROGRESS UPDATEww2.cityofpasadena.net/cityHall/pdf/CH -Web... · 2 City Hall Project Elements • Seismic Strengthening • Mechanical, Electrical, Plumbing and Fire

2

City Hall Project Elements

• Seismic Strengthening• Mechanical, Electrical, Plumbing

and Fire suppression systems• Technology Upgrades (Council

Chambers)• Elevator Upgrades (3 elevators & 1

ADA lift)• Restoration of Interior Spaces

(historic and non-historic areas)• Restoration of Exterior Building

Areas• Landscape Restoration• ADA Upgrades• Fundraising Program

Page 3: CONSTRUCTION PROGRESS UPDATEww2.cityofpasadena.net/cityHall/pdf/CH -Web... · 2 City Hall Project Elements • Seismic Strengthening • Mechanical, Electrical, Plumbing and Fire

3

Aerial Photographs of Construction ActivityAugust 22, 2005

Bird’s eye view of City Hall Construction Activity Looking North East from Garfield Avenue

Page 4: CONSTRUCTION PROGRESS UPDATEww2.cityofpasadena.net/cityHall/pdf/CH -Web... · 2 City Hall Project Elements • Seismic Strengthening • Mechanical, Electrical, Plumbing and Fire

4

Exterior Demolition Euclid Avenue(East) Arcade Demolition

To install the seismic structural elements which will keep City Hall safe from suffering major earthquake damage, required that the Euclid Avenue arcade be removed. Don’t worry! Following installation of the base isolators, this beautiful structure will be re-built to its original splendor, with the added bonus of being structurally safe!

Page 5: CONSTRUCTION PROGRESS UPDATEww2.cityofpasadena.net/cityHall/pdf/CH -Web... · 2 City Hall Project Elements • Seismic Strengthening • Mechanical, Electrical, Plumbing and Fire

5

Tree Protection – Courtyard Oaks

Safeguarding the Health of the City Hall Courtyard Oak Trees During Construction Activity is a High Priority. The City and Building Contractor have engaged the services of Certified, Consulting Arborists to monitor the health of all Project Trees on an on-going basis!

Page 6: CONSTRUCTION PROGRESS UPDATEww2.cityofpasadena.net/cityHall/pdf/CH -Web... · 2 City Hall Project Elements • Seismic Strengthening • Mechanical, Electrical, Plumbing and Fire

6

Courtyard Fountain Protection

Our beautiful historic courtyard fountain is doubly protected by fencing and installation of construction “K”- rails to ensure it’s safety during construction of the moat, installation of the base isolators, and exterior restoration activities for the City Hall building structure. Fountain protection was completed under the oversight of the City’s Historic Preservation monitor and will be safeguarded throughout the project .

Page 7: CONSTRUCTION PROGRESS UPDATEww2.cityofpasadena.net/cityHall/pdf/CH -Web... · 2 City Hall Project Elements • Seismic Strengthening • Mechanical, Electrical, Plumbing and Fire

7

Exterior Building Protection

Building protection measures have been installed to safeguard City Hall ‘s original tile walkways and Decorative features throughout the structure.

All historic lighting fixtures and other elements have been removed , catalogued, boxed, and safeguarded during construction under the watchful eye of the City’s Historic Preservation monitors.

Page 8: CONSTRUCTION PROGRESS UPDATEww2.cityofpasadena.net/cityHall/pdf/CH -Web... · 2 City Hall Project Elements • Seismic Strengthening • Mechanical, Electrical, Plumbing and Fire

8

Arcade Brick and Tile Salvage

Arcade Tile Salvage

Arcade Brick Salvage

Bricks and clay floor tiles were carefully removed from the original Arcade prior to its demolition under the direction of the City’s Historic Preservation Monitor. These pavers, which are now in storage, will be reused in historic areas of the building.

Page 9: CONSTRUCTION PROGRESS UPDATEww2.cityofpasadena.net/cityHall/pdf/CH -Web... · 2 City Hall Project Elements • Seismic Strengthening • Mechanical, Electrical, Plumbing and Fire

9

Exterior Excavation for Base Isolation Installation

Excavation of the Moat for Base Isolator Installation. Construction Lagging & ‘I” Beam Supports in place.

Excavation Activities Underway in Courtyard

Note: All work, including exterior building protection is being undertaken under the direction of the City’s Historic Preservation Monitor

Page 10: CONSTRUCTION PROGRESS UPDATEww2.cityofpasadena.net/cityHall/pdf/CH -Web... · 2 City Hall Project Elements • Seismic Strengthening • Mechanical, Electrical, Plumbing and Fire

10

Interior Excavation – Basement Area

Excavation of the Basement Area Showing Existing Building Columns to Provide for the Installation of the Base Isolation System. The City’s Structural Engineer has reviewed this work to ensure its stability during construction , and assures us that the building won’t fall down during construction activity!

Page 11: CONSTRUCTION PROGRESS UPDATEww2.cityofpasadena.net/cityHall/pdf/CH -Web... · 2 City Hall Project Elements • Seismic Strengthening • Mechanical, Electrical, Plumbing and Fire

11

Interior Demolition – City Hall Attic

Before Demolition After Demolition

Existing Old and Outdated Electrical, Mechanical and Plumbing was removed from the Attic Area of the Building. New systems will be installed as part of the Building renovation.

Page 12: CONSTRUCTION PROGRESS UPDATEww2.cityofpasadena.net/cityHall/pdf/CH -Web... · 2 City Hall Project Elements • Seismic Strengthening • Mechanical, Electrical, Plumbing and Fire

12

Interior Demolition – City Hall 4th Floor

Fourth Floor Lobby & Office Areas following Demolition, showing the stairs leading up to 5th floor tower observation area. Note: All work, including building protection is being undertaken under the direction of the City’s Historic Preservation Monitor.

Page 13: CONSTRUCTION PROGRESS UPDATEww2.cityofpasadena.net/cityHall/pdf/CH -Web... · 2 City Hall Project Elements • Seismic Strengthening • Mechanical, Electrical, Plumbing and Fire

13

Interior Demolition/Framing – City Hall 3rd Floor

Installation of New Framing for 3rd Floor Offices.

Note: All work undertaken in historic areas of City Hall is monitored under the direction of the City’s Historic Preservation Monitor , for compliance with all historic preservation requirements.

Page 14: CONSTRUCTION PROGRESS UPDATEww2.cityofpasadena.net/cityHall/pdf/CH -Web... · 2 City Hall Project Elements • Seismic Strengthening • Mechanical, Electrical, Plumbing and Fire

14

City Hall 2nd Floor – Rehabilitation of Council Chambers & Other Historic Spaces

City Council Chambers will be rehabilitated to its original condition. All work undertaken in historic interior spaces of City Hall will be completed under the direction of the City’s Historic Preservation Monitor , for compliance with all historic preservation requirements.

Page 15: CONSTRUCTION PROGRESS UPDATEww2.cityofpasadena.net/cityHall/pdf/CH -Web... · 2 City Hall Project Elements • Seismic Strengthening • Mechanical, Electrical, Plumbing and Fire

15

Interior Demolition – City Hall 1st Floor

Demolition of 1st Floor Office Areas 1st Floor Office Area following Demolition

Note: Historic Office Areas within City Hall have been maintained and not demolished. These areas willbe restored to their original condition as part of the renovation of the building under the watchful eye Of the City’s Historic Preservation Monitor