  • 8/3/2019 Construction Project Quality Plan BLANK

    1/21

    Your Company Name

    CONSTRUCTION PROJECT

    CQC PLAN

    Origination Date: (month year)

    Document

    Identifier:Name, Number, Unique ID

    Date: Latest Revision Date

    Project: Customer, Unique ID, Part Number

    Document

    Status:Draft, Redline, Released, Obsolete

    (Your Project Description)

    CONTRACT NO. XXXXXXXXXXX

    Under the Supervision of

    (Your Customer Name)

    Abstract:

    This document describes the quality control plan for xxxxxx.

    Page 1 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    2/21

    Your Company NameQuality Program

    TBD Rev: Orig

    REVISION LOG

    Issue Date Comment Author

    0-0

    DOCUMENT CHANGE RECORDIssue Item Reason for Change

    Page 2 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    3/21

    Your Company NameQuality Program

    TBD Rev: Orig

    TABLE OF CONTENTS

    1.0 SCOPE .......................................................................................................................................4

    2.0 RESPONSIBILITY AND AUTHORITY ................................................................................. 4

    3.0 SUBMITTALS ..........................................................................................................................5

    4.0 INSPECTION SYSTEM ...........................................................................................................6

    5.0 TESTING ................................................................................................................................... 9

    6.0 DOCUMENTS AND RECORDS ..............................................................................................9

    7.0 CONTROL OF NONCONFORMANCES ................................................................................ 9

    8.0 DOCUMENTATION .............................................................................................................. 10

    9.0 WORKMANSHIP ...................................................................................................................11

    10.0 LIST OF DEFINABLE FEATURES OF WORK .................................................................11

    ATTACHMENT 1 - ORGANIZATION CHART .........................................................................20

    ATTACHMENT 2 - CQC RESUMES ..........................................................................................21

    Page 3 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    4/21

    Your Company NameQuality Program

    TBD Rev: Orig

    1.0 SCOPEThe Companys quality system has been fully documented and implemented and is

    maintained as needed to meet the requirements of the Company vision and governingpolicies.

    The Company has adopted a process-oriented method of management. This approachemphasizes the importance of:

    a) continuous improvement of processes based on objective measurement and analysis.

    b) need to consider processes in terms of added value,

    c) obtaining results of process performance and effectiveness and

    d) understanding, meeting and integrating Customer, statutory and regulatory

    requirements,

    The sequence and interaction of processes has been determined and are controlled by

    specific criteria and methods. Objectives are set for each process and then measured and

    monitored with appropriate data gathered and analyzed to ensure process effectiveness.During Management Review, process resources are discussed and allocated by

    management, as applicable. Corrective and preventive action is taken to ensure the

    processes achieve the desired results and continually improve.

    2.0 RESPONSIBILITY AND AUTHORITYAll employees are empowered to request corrective or preventive action to prevent theoccurrence of nonconformities relating to the construction process or the quality

    management system. The CQC Systems Manager oversees this effort and makes sure thatsuch issues are identified and recorded, that solutions are transmitted to and resolved by

    the proper functions, and that the solutions are verified for effectiveness.Project Superintendent

    The Project Superintendent oversees all aspects of the job - responsibilities include:

    Request and attend bi-weekly progress meetings

    Request monthly partnering meetings to be attended by the Company, Customer and

    other local agencies.

    Serve as alternate CQC Systems Manager

    Supervise the CQC Systems Manager

    Ultimately responsible for both production and quality of the project

    The Project Superintendent has the authority to direct all work, subcontractors and projectpersonnel, initiate and negotiate change orders, approve and disapprove any and allsubmittals, issue purchase orders and subcontracts or cancel them for noncompliance with

    contract documents, issue stop work orders and require corrective action on anydeficiencies.

    Page 4 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    5/21

    Your Company NameQuality Program

    TBD Rev: Orig

    CQC Systems Manager

    The Companys Superintendent/Contractor Quality Control Systems Manager (CQC) verifies

    conformance to all Plans and Specifications - responsibilities include but are not limited to:

    Approve submittals not requiring Customer approval

    Attend all scheduled progress meetings

    Complete and maintain Daily Report and copy to Project Superintendent

    Conduct and report preliminary, initial and follow-up inspections

    Conduct daily quality control inspections, report deficiencies, monitor progress and

    coordinate corrective actions with the Project Superintendent

    Conduct weekly QC Meetings

    Ensure all materials comply with the Plans and Specifications for the project

    Ensure approval and delivery of required submittals

    Ensure all tests are conducted according to the applicable procedure(s)

    Report all deficiencies to the President and Project Superintendent

    Review all construction for compliance with the Plans and Specifications as well asquality workmanship

    Stop work and require corrective action on any deficiencies

    Project Superintendent/CQC Systems Manager has the authority to direct all work,subcontractors and project personnel, approve and disapprove any and all submittals, issue

    stop work orders, require corrective action on any deficiencies and submit Requests forInformation. See attached letter signed by a responsible authority of the Company that

    outlines responsibilities of the CQC Systems Manager, which includes authority to stop workthat is not in compliance with the contract.

    Alternative Contractor Quality Control Representative

    In the event the CQC Systems Manager is not present at the jobsite, the Alternative QualityControl Representative assumes all responsibilities and authorities. See attached letter

    signed by a responsible authority of the Company that outlines responsibilities of the

    Alternative Quality Control Representative, which includes authority to stop work that is notin compliance with the contract.

    See Attachment 1 organization chart that shows lines of authority with the CQC SystemsManager reporting to the Project Superintendent. See Attachment 2 qualifications in resume

    format for the duties, responsibilities and authorities of each person assigned a CQCfunction.

    3.0 SUBMITTALSAll submittals are scheduled, reviewed, certified and managed to include submittals fromsubcontractors, offsite fabricators, suppliers, purchasing agents, designers of record,

    consultants, architect engineers (AE) and offsite fabricators.

    Page 5 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    6/21

    Your Company NameQuality Program

    TBD Rev: Orig

    Contractor Prepared Submittal Register

    The Submittal Register is tailored to meet project schedules and is used as a checklist toassure all material and equipment requiring submission is submitted. A preliminary

    submittal register will be submitted for approval at the preconstruction conference.Additional details will be submitted according to the construction schedule within 30 days

    after Notice to Proceed.

    General Submittal Procedure

    Prior to submittal, all items shall be checked and approved by the QC representative and

    each item shall be stamped, signed and dated by the QC representative indicating actiontaken. Submittals will include items such as: Contractors, manufacturers or fabricators

    drawings; descriptive literature including but not limited to catalog cut sheets, diagrams,operating charts or tables, certifications, warranties and other such required submittals

    according to the requirements of the Plans and Specifications.

    The Submittal Register may not be all-inclusive and additional submittals may be required.

    The approved submittal register will become the scheduling document and will be used tocontrol the submittals throughout the life of the project. The submittal register and the

    progress schedules will be coordinated. A transmittal form will be used for submitting both

    Customer-approved and information-only submittals.

    Scheduling Procedure

    The Company uses software program (your software name) to assure delivery of submittals

    according to requirements of (your Customer doc) and upon completion of constructionaccording to requirements of (your Customer doc).

    4.0 INSPECTION SYSTEMThe engineering drawing, other technical documentation and identified critical itemsincluding key characteristics provides the requirements for all construction work. In all

    cases, this must include criteria for acceptance/rejection; where this is not clear the CQCSystems Manager oversees clarification of these criteria with the Project Superintendent.

    Incoming materials are inspected by Quality to ensure they meet requirements before useand as a means of monitoring ongoing Supplier quality.

    Inspection consists of Preparatory, Initial and Follow-up Inspections and applicable records

    for each Inspection.

    Preparatory Inspections

    This inspection will be conducted prior to beginning all definable segments of work as well

    as at the beginning of all of the Phases of the Contract. The Customer/Inspector and otherinvolved personnel will be notified twenty-four (24) hours in advance of this inspection.

    Page 6 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    7/21

    Your Company NameQuality Program

    TBD Rev: Orig

    Preparatory Inspections may include:

    PREPARATORY INSPECTION SHOULD BE POSTPONED UNTIL APPLICABLE

    SUBMITTALS ARE COMPLETED.

    Review requirements for quality control and/or performance testing during this phase

    of work. Emphasize testing methods and frequency. Establish who will be doing thetesting and verify that testing personnel will be present as needed.

    Review the contract drawings and specifications for this phase of work in detail.Discuss the construction procedures, tolerances, workmanship standards and repetitive

    deficiencies.

    Review the requirement for special items and verify all samples have been submitted

    and approved.

    Verify all mobile construction equipment has been inspected for safety using US

    Army Corp of Engineers form number SAD Form 1666-R.

    Verify all preliminary work required to start this phase of construction has beencompleted and the work to be built upon has no deficiencies.

    Verify all required materials and equipment are onsite, as specified, submitted and

    approved and properly stored.

    Verify all required submittals have been approved (review them as required).

    Verify all work clearance permits have been obtained.

    Verify MSDS for all material to be used are readily available on the jobsite.

    RECORD THE RESULTS OF THIS INSPECTION ON SEPARATE SHEETS AND ATTACH THEM TOTHE DAILY REPORT.

    Initial Inspections

    This inspection will be held after a representative portion of the work has beenaccomplished. The Customer/Inspector and other involved personnel will be notified

    twenty-four (24) hours in advance of this inspection.

    Initial Inspections may include:

    Determine necessary corrections if the work is not in compliance.

    Record the exact location where the initial inspection was held for future referenceand comparison during follow-up inspections.

    Review the records of the preparatory inspection and verify that all action items havebeen completed.

    Verify all required quality control inspections and test are being performed.

    Verify that the work being performed is in full compliance with contract

    requirements, including acceptable level of workmanship. Compare with approvedsamples as appropriate.

    Page 7 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    8/21

    Your Company NameQuality Program

    TBD Rev: Orig

    RECORD THE RESULTS OF THIS INSPECTION ON SEPARATE SHEETS AND ATTACH THEM TO

    THE DAILY REPORT.

    Follow-up Inspections

    This inspection will be performed as required. The Customer/Inspector and other involvedpersonnel may arrange with the CQC Systems Manager to be present for this inspection.

    Follow-up Inspections may include:

    Compliance with safety requirements.

    Documentation of this inspection will be noted on the Daily Report.

    Records of the Follow-up Inspection will be submitted to the Customer/Inspector not

    more than one (1) working day after the inspection.

    Review Noncompliance Tracking Log and ensure all deficiencies have been corrected

    or are being scheduled for corrective action. Review previous Inspection Reports to verify compliance with Contract requirements.

    Documentation and Control

    All Inspections will be documented on a separate form and submitted with the Daily

    Report (attach your sample form).

    All reports for inspection and applicable records will be electronically maintained by

    the Project Superintendent in a document management program (your name; forinstance, Constructware).

    Inspections will be conducted, controlled and tracked for each definable feature of

    work and sub-element identified herein using a project management program (yoursoftware name; for instance, Oracles Primavera SureTrak, USACE QCS System, etc.)

    Completion Inspection

    Punch-Out Inspection:

    The Project Superintendent and CQC Systems Manager shall conduct an inspection of thework and develop a punch list of items that do not conform to the approved drawings and

    specifications. The Responsible Authorities will document and include the estimated date bywhich the deficiencies will be corrected and make a second inspection to ascertain all

    deficiencies have been corrected. Once this is accomplished, the CQC Systems Managerand Project Superintendent will sign-off the punch list then notify the Customer that the

    project is ready for Customer Pre-Final Inspection.

    Pre-Final Inspection

    The Customer will perform this inspection to verify the construction is complete and readyto be operated. A Customer Pre-Final Punch List may be developed as a result of this

    Page 8 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    9/21

    Your Company NameQuality Program

    TBD Rev: Orig

    inspection. The CQC Systems Manager shall ensure that all items on this list have been

    corrected to schedule a Final Inspection with the Customer.

    Final Acceptance Inspection

    The CQC Systems Manager or other primary management personnel and the CustomerRepresentative shall be in attendance at this inspection. The final acceptance inspection will

    be formally scheduled by the Project Superintendent based upon results of the Pre-FinalInspection. Notice shall be given by the Project Superintendent at least 14 days prior to the

    final acceptance inspection and shall include the Companys assurance that all specific itemspreviously identified under the contract will be complete and acceptable by the date

    scheduled for the final acceptance inspection.

    5.0 TESTINGThe Testing Plan for the (your project name) is as follows:

    Test reports will be attached to the Daily Report by the CQC Systems Manager

    Test reports will include the date, time and type of test to be performed, test name,

    specification paragraph requiring testing, feature of work to be tested, test frequencyand person responsible for each test. (Laboratory facilities will be approved by the

    Purchasing.)

    The CQC Systems Manager will notify the Customer/Inspector twenty-four (24)

    hours in advance of any scheduled test.

    Control, verification and acceptance testing procedures for each specific test will include the

    test name, specification paragraph requiring test, feature of work to be tested, testfrequency and person responsible for each test. Customer-directed laboratory facilities will

    be used when specified by Contract.

    6.0 DOCUMENTS AND RECORDSRecords are controlled to provide evidence of conformity to requirements. Documents are

    controlled so that the information on them is accessible, legible and suitably maintained.Documents are reviewed and approved prior to release and only the latest versions are

    available to users. Previous versions are stamped Superseded and legacy documents aresegregated and retained for historical purposes.

    7.0 CONTROL OF NONCONFORMANCESConstruction design and construction deficiencies that are found to be nonconformingagainst specified requirements are identified, documented, segregated (if possible),

    evaluated and dispositioned to prevent unintended use or delivery. Necessary corrective andpreventive actions are taken to contain the effect of the nonconformity on other products or

    processes and actions are verified to confirm that deficiencies have been corrected. Thisapplies to incoming product or services (vendor-supplied), in-process product or services,

    final product or services and Customer returned products.

    Page 9 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    10/21

    Your Company NameQuality Program

    TBD Rev: Orig

    REWORK PROCEDURES

    The Company has a long standing successful Noncompliance Management Program toensure all deficiencies are recorded, logged and pursued from identification through

    acceptable corrective action. Upon identification of a construction deficiency, anoncompliance report will be initiated by the CQC Systems Manager and forwarded to the

    appropriate subcontractor and Resident Engineer for notification of construction deficiency.

    A narrative will be provided describing the construction deficiency, its proposed corrective

    action, time frame for correction, required testing and follow-up inspections to be taken.

    The construction deficiency will be noted on the Daily Report and tracked daily until

    corrective action has been completed. The CQC Systems Manager will insure correctiveaction is accomplished according to the contract Plans and Specifications with approval of

    the Project Superintendent.

    The Noncompliance Program will be maintained throughout the life of the project. Copies of

    all noncompliance reports will be available for review by the Customer/Inspector as well as

    any Subcontractor involved in the deficiency.

    The Noncompliance Log will be updated monthly or as requested by the Project

    Superintendent.

    8.0 DOCUMENTATIONProcedure

    All reportable records shall include names of attendees.

    All submittals of records will be maintained at the job site field office.

    Test Reports will be attached to the Daily Report as they are received by the CQC Systems

    Manager.

    The CQC Systems Manager will submit all Inspection Reports not more than one (1) workingday after each inspection.

    Registers / Files Maintained at Company Field Offices

    As-Built Drawings

    Contract Documents (Plans, Specifications and Amendments)

    Control Testing Schedule

    Correspondence Files (Owner, Subcontractor, Supplier, etc)

    Daily Report

    Equipment and Material Delivery Schedule and Tracking Log

    Field Survey Log

    Inspection Reports (Preparatory, Initial and Follow-up)

    Material / Equipment Delivery Receipts

    Modifications

    Noncompliance Management Program

    Requests for Information (RFI) and RFI Log

    Safety Plan

    Page 10 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    11/21

    Your Company NameQuality Program

    TBD Rev: Orig

    Subcontract and Purchase Order Registers

    Submittal Data

    Submittal Register and Submittal Log

    9.0 WORKMANSHIPThe Company plans and carries out construction activities that include workmanship

    requirements for:

    Approval of work according to supporting documentation that includes the

    requirements of any applicable reference standards, regulatory codes, quality plans and

    other documented procedures.

    Completion of initial, follow-up, pre-final and final inspection activities.

    Construction work instructions or procedures that identify all necessary work steps

    (flowcharts, travelers, tickets).

    Designation of unapproved equipment, utilities and supplies with proper signage to

    prevent use.

    Documented work instructions where the lack of such instructions would affect

    conformity to requirements.

    Engineering documents for all construction characteristics (drawings, part lists,

    materials and specifications)

    Monitoring and measurement procedures.

    Monitoring and measuring devices.

    Skilled maintenance personnel and proper training of operators.

    10.0LIST OF DEFINABLE FEATURES OF WORK

    (Tailor this section to address key elements of the project. A definable feature of work is atask that is separate and distinct from other tasks, has separate control requirements and

    may be identified by different trades or disciplines or it may be work by the same trade in adifferent environment. This list should be agreed upon during the coordination meeting.)

    For instance breakdown each work element from your contract Plans and Specifications:

    General Requirements

    01050 Field Engineering

    Engineering ServicesSurvey Records/Cross-Sections

    Surveyor Information

    01320 Construction Video and Photographs01410 Testing and Quality Control

    01510 Temporary Utilities and Facilities01520 Temporary Pumping

    01530 Temporary Barriers and Controls01570 Traffic Control

    Page 11 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    12/21

    Your Company NameQuality Program

    TBD Rev: Orig

    Site Work

    02050 Demolition02110 Clearing & Land Preparation

    02200 Earthwork

    BackfillingCompaction

    Final GradingLevee Embankment

    Random FillSelect Fill

    Structure Excavation

    02211 Blasting

    Damage Investigation SurveyGradation

    Pre-blast Survey

    Shot PlanStemming

    Test DigVibration Control

    02221 Trenching, Backfilling and Compacting

    DensitiesMaterial Gradation

    Open ExcavationTrenching

    02262 Steel Sheet Piling

    Certificate of protective coatingsFasteners, Tie-Back, Caps

    Sheet Pile Design

    02277 Articulated Concrete Block Mattress SystemCertifications

    Material Compliance

    02368 Steel Pipe PilesMaterial Compliance

    Pile DesignPile Driving Equipment

    02370 RipRap System

    Handling and Storage of MaterialsMaterial Compliance

    02401 Dewatering and Cofferdam

    Page 12 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    13/21

    Your Company NameQuality Program

    TBD Rev: Orig

    Dewatering Plan

    Structural Certification

    02431 Catch Basins, Frames and GratesHandling and Storage of Materials

    InstallationMaterial Compliance

    02433 Storm Drainage System - Reinforced Concrete Pipe

    Handling and Storage of MaterialsMaterial Compliance

    Placement of Concrete PipeTesting

    02435 Turbidity Control & Monitoring02436 Environmental Protection

    02451 Guardrail

    Handling and Storage of Materials

    InstallationMaterial Compliance

    02455 Round Timber Piling

    Inspect for Preservation TreatmentInstallation

    Material CompliancePile Driving Equipment

    02486 Grassing

    InstallationMaintenance

    Watering02780 Floating Trash Barrier

    Handling and Storage of MaterialsInstallation

    Material Compliance

    02781 Staff GaugesHandling and Storage of Materials

    InstallationMaterial Compliance

    Concrete

    03100 Concrete Formwork and Accessories

    Handling and Storage of MaterialsInstallation

    Material Compliance

    Page 13 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    14/21

    Your Company NameQuality Program

    TBD Rev: Orig

    03200 Concrete Reinforcement

    Handling and Storage of MaterialsInstallation

    Material ComplianceShop Drawings

    03300 Cast in Place Concrete

    Concrete MixtureConstruction Tolerance

    Curing and ProtectionDesign Requirements

    EquipmentFinishing

    Government Testing

    Material CompliancePlacing

    Preparation and PlacingTests and Inspection

    03410 Precast Concrete Products for Below-Grade ConstructionDelivery

    Handling and Storage of MaterialsInstallation

    Material ComplianceTests and Inspections

    03600 Grout

    Handling and Storage of MaterialsInstallation

    Material Compliance

    Metals

    05060 WeldingCertifications

    05070 Bolted Fasteners

    Handling and Storage of MaterialsInstallation

    Material Compliance

    05100 Structural SteelHandling and Storage of MaterialsInstallation

    Material Compliance

    Shop Drawings

    05521 Handrails, Railings and GuardpostsHandling and Storage of Materials

    Page 14 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    15/21

    Your Company NameQuality Program

    TBD Rev: Orig

    Installation

    Material ComplianceShop Drawings

    05550 Fabricated Metalwork and Castings

    Handling and Storage of MaterialsInstallation

    Material ComplianceShop Drawings

    Thermal and Moisture Protection

    07920 Sealants and Caulkings

    Handling and Storage of Materials

    InstallationMaterial Compliance

    Tests and Inspections

    07921 Joint Sealants

    InstallationMaterial Compliance

    Tests and Inspections

    Doors and Windows

    08110 Hollow Metal Doors and FramesInspection

    InstallationMaterial Compliance

    08700 Finish Hardware and Accessories

    InspectionInstallation

    Material Compliance

    Finishes

    09805 Coal-Tar Epoxy Coating Systems for Steel Tie Rods and AccessoriesApplication

    InspectionMaterial Compliance

    09900 Protective CoatingsApplication

    Inspection

    Material Compliance

    Specialties

    Page 15 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    16/21

    Your Company NameQuality Program

    TBD Rev: Orig

    10200 Louvers

    InspectionInstallation

    Material Compliance

    Equipment

    11002 Rigid Equipment MountsInspection

    InstallationMaterial Compliance

    11106 Aluminum Stop Gates

    Handling and Storage

    InspectionInstallation

    Material ComplianceShop Drawings

    11171 Pump Station Intake Trash Collection Systems, Less than 600cfsInspection

    InstallationMaterial Compliance

    Shop Drawings

    11290 Slide GatesInspection

    InstallationMaterial Compliance

    Shop Drawings

    11291 Electric ActuatorsHandling and Storage

    InstallationMaterial Compliance

    Shop Drawings

    11321 Submersible Axial Flow Type Pumps Electric Motor DrivenHandling and Storage

    InspectionInstallation

    Material ComplianceShop Drawings

    Building

    13120 Precast Concrete Building

    Handling and StorageInspection

    Page 16 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    17/21

    Your Company NameQuality Program

    TBD Rev: Orig

    Installation

    Material ComplianceShop Drawing

    13200 LPG Fuel Systems for Emergency Generator

    Handling and StorageInstallation

    Material ComplianceShop Drawings

    Mechanical

    15010 Piping

    Handling and Storage

    InstallationMaterial Compliance

    15020 Pipe Supports

    Inspection

    InstallationMaterial Compliance

    Shop Drawings

    15101 Valves and AppurtenancesHandling and Storage

    InstallationMaterial Compliance

    15510 Fans

    Handling and StorageInstallation

    Material Compliance

    Electrical

    16050 Basic Materials and MethodsFactory Test Reports

    Field Test ReportsHandling and Storage

    InstallationMaterial Compliance

    Operating Tests

    16061 Cathodic Protection System

    Handling and Storage

    InstallationMaterial Compliance

    Tests and Inspections

    Page 17 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    18/21

    Your Company NameQuality Program

    TBD Rev: Orig

    16110 Raceways, Boxes, Fittings, Supports

    Handling and StorageInstallation

    Material ComplianceTests and Inspections

    16120 Wires and Cable

    Handling and StorageInstallation

    Material ComplianceTests and Inspections

    16140 Wiring Devices

    Handling and Storage

    InstallationMaterial Compliance

    Tests and Inspections

    16150 Motors

    Handling and StorageInstallation

    Material ComplianceTests and Inspections

    16155 Motor Starters

    Handling and StorageInstallation

    Material ComplianceTests and Inspections

    16160 Panelboards & General Purpose Dry Type Transformers

    Handling and StorageInstallation

    Material ComplianceShop Drawings

    Tests and Inspections

    16289 Transient Voltage Surge SuppressorsHandling and Storage

    InstallationMaterial Compliance

    Tests and Inspections

    16440 Disconnect Safety Switch

    Handling and Storage

    InstallationMaterial Compliance

    Tests and Inspections16450 Grounding

    Page 18 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    19/21

    Your Company NameQuality Program

    TBD Rev: Orig

    Handling and Storage

    InstallationMaterial Compliance

    Tests and Inspections

    16500 Lighting DevicesHandling and Storage

    InstallationMaterial Compliance

    Tests and Inspections

    16620 Propane Fueled Generator and Transfer SwitchHandling and Storage

    Installation

    Material ComplianceShop Drawings

    Tests and Inspections

    16621 Diesel Fueled Generator and Transfer Switch

    Handling and StorageInstallation

    Material ComplianceShop Drawings

    Tests and Inspections

    16670 Lightning Protection SystemHandling and Storage

    InstallationMaterial Compliance

    Tests and Inspections

    16910 Structure Remote Terminal Unit (RTU)Handling and Storage

    InstallationMaterial Compliance

    Shop DrawingsTests and Inspections

    16920 Portable Water Samplers

    Handling and StorageInstallation

    Material ComplianceShop DrawingsTests and Inspections

    Page 19 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

  • 8/3/2019 Construction Project Quality Plan BLANK

    20/21

    Your Company NameQuality Program

    TBD Rev: Orig

    ATTACHMENT 1 - ORGANIZATION CHART

    Page 20 of 21

    PROPRIETARY INFORMATIONThis document expires 30 days after printing unless marked "Issued".

    Date Printed: 25-Jan-12Form Rev: Orig

    PROJECT

    SUPERINTENDENT

    CQC SYSTEMSMANAGER

    FACILITIES

    MANAGER

    PROJECT

    FOREMAN

    PROJECT

    ENGINEER

    ADMINISTRATIVE

    ASSISTANT

    ACCOUNTING

    MANAGER

    ENVIRONMENTALHEALTH & SAFETY

    RECEIVING

    Maintenance

    INSPECTORS

    PRODUCTION

    SUPERVISOR

    Contracts

    PURCHASING

    HR

    PRODUCTION CREW

    SHIPPING

  • 8/3/2019 Construction Project Quality Plan BLANK

    21/21

    Your Company NameQuality Program

    TBD Rev: Orig

    ATTACHMENT 2 - CQC RESUMES

    (your CQC Systems Manager)

    Mr/Mrs xxxxx is in charge of inspections and will verify that the contractors are in

    compliance with the project specifications & engineering design drawings. In addition,Mr/Mrs xxxxx is responsible for ensuring that the project is constructed, tested, inspected,

    and documented according to project specifications. Mr/Mrs xxxxx will also be responsiblefor quality control in the following areas: materials management, subcontractors, document

    controls, discrepancy control, system acceptance and turnover.

    (your CQC Inspector)

    Mr/Mrs xxxxx performs inspections to ensure conformance to quality, performance, safety

    and/or code requirements. Inspector assists with general guidance to other inspectors andprovides QA/QC reports to supervisor for approval and maintains inspection records.