Page 1: "Construction & Waste Materials" - Ian Walton, Environment Agency
Page 2: "Construction & Waste Materials" - Ian Walton, Environment Agency

Construction and Waste Materials

Ian Walton

Senior Environment Officer

27th April 2010

Page 3: "Construction & Waste Materials" - Ian Walton, Environment Agency

• Who are the Environment Agency?

• Better Regulation.

• Illegal Waste Sites.

• Duty of Care.

• Forward Look.

Page 4: "Construction & Waste Materials" - Ian Walton, Environment Agency

We are responsible for protecting and improving the environment of England and Wales. We also have responsibility for protecting communities from the risk of flooding and managing water resources.

Page 5: "Construction & Waste Materials" - Ian Walton, Environment Agency

Who are we?

• The Environment Agency has a wide range of functions: Waste, Water, Flood Defence.

• Waste:– Environment Management Teams cover local areas and

visit regulated sites.– Environmental Crime Team are the regional lead on

intelligence led enforcement. Targets the ‘Big, Bad and Nasty’.

Page 6: "Construction & Waste Materials" - Ian Walton, Environment Agency

Better Regulation.

• Offer Advice and Guidance.• Consider environmental risk. • Do not ‘over-regulate’.• Take action against those that knowingly

offend, have no regard for the environment.

Page 7: "Construction & Waste Materials" - Ian Walton, Environment Agency

Waste from Construction Sites:

• Needs to be disposed of correctly.• Comply with ‘Duty of Care’.• Disposed of at a suitably permitted site.

Page 8: "Construction & Waste Materials" - Ian Walton, Environment Agency

Illegal Waste Sites:

• No sign on the gate.• Lots of lorries/vehicle movements.• Lack of proper infrastructure.• Evidence of pollution.

Page 9: "Construction & Waste Materials" - Ian Walton, Environment Agency

Legislation:

Environmental Protection Act 1990 Section 33 (1) (a) Depositing controlled waste on land

without an environmental permit/licence

Magistrates: Max fine £50000 or imprisonment for 12 months

Crown: Unlimited fine or imprisonment for up to 5 years

Page 10: "Construction & Waste Materials" - Ian Walton, Environment Agency

Legislation:

Environmental Permitting Regulations 2010. Regulation 38(1)(b)

Knowingly cause or knowingly permit the operation of a regulated facility or carrying on a waste operation, mining waste operation, radioactive substances activity, water discharge activity or groundwater activity, except under and to the extent authorised by an environmental permit.

Page 11: "Construction & Waste Materials" - Ian Walton, Environment Agency

Duty of Care:

• All those who produce or handle wastes from demolition, earthworks and construction activities have a legal responsibility, a Duty of Care, for its safe keeping, transport and subsequent recovery or disposal.

Page 12: "Construction & Waste Materials" - Ian Walton, Environment Agency

Waste Carrier.

Page 13: "Construction & Waste Materials" - Ian Walton, Environment Agency

Site Waste Management Plans.

– Any construction project in England costing over £300k needs a Site Waste Management Plan. Ensures that:

• Building materials are managed efficiently.• Waste is disposed of legally.• Material recycling, reuse and recovery is maximised.

Page 14: "Construction & Waste Materials" - Ian Walton, Environment Agency

Civil Sanctions:

From September 2010 the EA can issue certain civil sanctions for specific offences.

At the moment civil sanctions do not apply to offences under EPR, but this could change from as early as April 2011.

Page 15: "Construction & Waste Materials" - Ian Walton, Environment Agency

Finally…..

Page 16: "Construction & Waste Materials" - Ian Walton, Environment Agency

Other Information.

• 08708 506506

• www.environment-agency.gov.uk