constructors oprerator form

23
SUMMARY OF THE DOCUMENTS REQUIRED TO BE ATTACHED WITH THE APPLICATION SUBMITTED FOR ISSUANCE OF LICENCE TO A CONSTRUCTOR/OPERATOR Company’s Name with present Registration Number and Category _____________________________________ ____ _____________________________________ ____________ _____________________________________ ____________ FOR BRANCH OFFICE USE Catego ry Applie d Recommend ed PCP’s Scored: ____________________ No. of Engineers with the Company: _________________ S # Documents to be Submitted TO BE FILLED IN BY PEC STAFF AT RECEPTION Enclos ed (Page No.) Remarks 0 1 . Application form duly filled 0 2 . Previous Original Registration Certificate (For Renewal/Up-gradation) 0 3 . Copy of Identity Card of Owner/Owners 0 4 . Undertaking from Engineers 0 5 . Works executed in last five years with certificate of satisfactory completion of works from the employer (authority whose signatures are borne on the contract) on specimen given at page-12 of the application 0 6 . Works in progress with percentage of work done up-to-date duly authenticated by the employer on specimen given at page-13 0 7 . List of Machinery, Equipment and Technical Staff etc. with present state of machinery and qualification of Technical Staff 0 8 Organizational Chart of the firm showing chain of command 1 APPENDIX-‘A’ PAKISTAN ENGINEERING COUNCIL

Upload: civilengineer8681096

Post on 21-Nov-2014

121 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Constructors Oprerator Form

SUMMARY OF THE DOCUMENTS REQUIRED TO BE ATTACHED WITH THE APPLICATIONSUBMITTED FOR ISSUANCE OF LICENCE TO A CONSTRUCTOR/OPERATOR

Company’s Name with present Registration Number and

Category _________________________________________

_________________________________________________

_________________________________________________

FOR BRANCH OFFICE USE

Category Applied Recommended

PCP’s Scored: ____________________

No. of Engineers with the Company: _________________

S# Documents to be Submitted

TO BE FILLED IN BY PEC STAFF AT RECEPTION

Enclosed(Page No.)

Remarks

01. Application form duly filled

02. Previous Original Registration Certificate(For Renewal/Up-gradation)

03. Copy of Identity Card of Owner/Owners

04. Undertaking from Engineers

05. Works executed in last five years with certificate of satisfactory completion of works from the employer (authority whose signatures are borne on the contract) on specimen given at page-12 of the application

06. Works in progress with percentage of work done up-to-date duly authenticated by the employer on specimen given at page-13

07. List of Machinery, Equipment and Technical Staff etc. with present state of machinery and qualification of Technical Staff

08. Organizational Chart of the firm showing chain of command09. Affidavit of Sole Proprietor/Partnership Deed/Article of Association/

Memorandum (in case applicable)

10. National Tax Number

11. Bank statement issued by the firm’s banker

12. Paid Copy of Challan (Fee shall be accepted/deposited if the documents mentioned above are attached and are complete)

FOR OFFICE USE (DO NOT WRITE BELOW)

CHECKED BY

a. Executive/Jr. Executive with date: ______________________________________________________b. Deputy Registrar with date: ___________________________________________________________c. Decision of the Council with date ______________________________________________________d. Signed by the Registrar on (date)______________________________________________________

Constructor's Category

Limit of Construction cost of Project (million Rs.)

PCPs Required

Operator's Category

Limit of Capita Cost of Project

(million Rs.)

PCPs Required

C-A No Limit 150 O-A No Limit 100C-B Upto 2000 100 O-B Upto 500 65C-1 Upto 1000 75 O-1 Upto 200 45C-2 Upto 500 30 O-2 Upto 100 25C-3 Upto 250 20 O-3 Upto 40 15C-4 Upto 100 15 O-4 Upto 20 10C-5 Upto 30 5 O-5 Upto 10 5C-6 Upto 15 5 O-6 Upto 5 5

The RegistrarPakistan Engineering CouncilAtaturk Avenue (EAST)Sector G-5/2, Islamabad.

1

APPENDIX-‘A’

PAKISTAN ENGINEERING COUNCIL

Page 2: Constructors Oprerator Form

Subject: ISSUE OF LICENCE AS CONSTRUCTOR/OPERATOR (RENEWAL/ UPGRADATION/NEW) CATEGORY C/ .

Dear Sir,

We are submitting application for issue of licence as Constructor/Operator duly completed alongwith necessary supporting documents. Engineers employed by us and their particulars are given below:

S. No. Name Regn No. Address

(i)

(ii)

(iii)

and overleaf

2. At present our firm is registered with the following departments/organizations:-

S. No. Name of the Department/ Organization

Category Name of Work in hand

3. We undertake to notify to the Council if any of above mentioned engineers leaves the job and also undertake to inform the Council about any events taking place after grant of licence, which render our firm ineligible for continuation of the licence, reduction in the category, suspension or cancellation of the licence as per Bye-laws 8(2).

Yours faithfully,

Name and Address of Constructor

2

Seal of the Company/FirmDuly signed by the

Chief Executive

Page 3: Constructors Oprerator Form

APPLICATION FORM FOR CONSTRUCTOR/OPERATOR

Registration Number __________________ Present Category _________________( Year ……………. )

Licence for One/Two/Three year(s) [ Tick() any one ]

RENEWAL UPGRADATIONNEW

LICENCECATEGORY APPLIED FOR

(Tick relevant column)

  

Present Category

Category Applied for

 C-A C-B C-1 C-2 C-3 C-4 C-5 C-6

   O-A O-B O-1 O-2 O-3 O-4 O-5 O-6

Fields of specialization (Supported by work orders) ( Add pages if required)

1. Name of firm/company

2. Country of origin

3. Type of ownership (Tick One Only)

4. Mailing address

5. Permanent address of head office

5.1 Phone 5.2 Fax

5.3 E-mail

6. PARTICULARS OF DIRECTORS/PARTNERS/EXECUTIVES:

3

Pakistani Foreign Name of Country

3.1

Individual 3.2 Sole Proprietor

3.3

Partnership 3.4 Private Limited Company

3. Public Limited company 3.6 Statutory Body

PAKISTAN ENGINEERING COUNCILAtaturk Avenue (East), Sector G-5/2, Islamabad

PH: 051-2829296, 2829348, 2829311, 9206974 Fax: 051-2276224 E-mail: [email protected]

Website: http://www.pec.org.pk

S. No.

Appendix-‘A’[see bye-law 4(2)]

Page 4: Constructors Oprerator Form

Names and Address

Designation PEC registration number (if any)

*National Identity Card No.

Percentage of share or No. of

Shares

6.1

6.2

6.3

6.4

6.5

6.6

7. CAPITAL AND NET WORTH:

7.1 Authorized capital of the company/partnership Rs.

7.2 Financial Certificate from scheduled bank

7.3 Net worth as on date of application Rs.

7.4 National Tax Number

8. PROFESSIONAL CREDIT POINTS (PCP):

Names of Professional engineers

PEC registration

No.

Length of experience

Partner or director,

Holding 15% share or

more

Duration of full-time

employment

Professional credit points

8.1

8.2

8.3

8.4

8.5

(Add separate sheet if required)

8.6 Bonus PCP credit { Bye-law 5(2)}

8.7 Extra Bonus PCP credit { Bye-law 5(3)}

8.8 Total PCP credit

*Passport no. in case of foreigners.

9. OTHER INFORMATION: (attach sheets)

4

Page 5: Constructors Oprerator Form

9.1 List of Major Projects Completed (Page ___)

9.2 List of works in progress (Page ___)

9.3 Machinery/Equipment/Plant available with Present Condition (Page ___)

9.4 List and qualification of technical staff (other than engineers) (Page ___)

9.5 Management Structure/Organization Chart (Page ___)

10. UNDERTAKING:

It is hereby certified that the above are true statements of facts and we take full responsibility for the correctness and accuracy of the information supplied herein to the best of our knowledge and belief. This is also to certify that none of the owners/ partners/directors against whose names PCP credit is claimed holds less than fifteen per cent shares in the firm / company. This is further to certify that this application fulfills the entire requirements of PEC Bye-laws for licensing of constructors/operators and we fully understand the provisions of the PEC Bye-laws and agree to abide by them.

Company / Firm SealSignature of Chief ExecutiveName…………..…………….

Analysis by PEC HQ and recommendations

Decision for Enrolment

Chairman Enrolment Committee

FOR OFFICIAL USE ONLY

File No.

Date Received:

Date Approved:

Licence No.

Category:

Prescribed fee of Rs.……….… has been received and credit vide receipt No. ………………………

Dated………………….Bank Draft No. ………………Dated ………….. Amount Rs. …………………

Licence No. Issued ……………………..Dated …………………...Licence valid upto ………….…….

Signature of Scrutinizing Staff

Signature of Section Incharge

Signature of Deputy RegistrarRegistrar

5

- -

- -

Page 6: Constructors Oprerator Form

INSTRUCTIONS FOR FILLING IN APPLICATION FORM FOR NEW LICENCE/ RENEWAL FOR A CONSTRUCTOR/OPERATOR

1. Before filling in the application form, please see bye-laws 4 and 8 of the Construction and Operation of Engineering Works Bye-laws, 1987

2. Please write the name of your firm or company by which name you would like it to be called and registered. Please indicate whether you are a Pakistani firm or a foreign firm by striking out inapplicable.

3. Registration of Foreign firms: foreign firms can only be registered on project to project basis. The foreign firm must also attach the joint venture or association agreement with a Pakistani Constructor/Operator. Simultaneously, the foreign firm must also apply for registration of each engineer who is brought into Pakistan and who performs any engineering work in Pakistan (please refer to the Pakistan Engineering Council Act, 1976, in this connection).

4. Please give addresses of all your main offices and permanent branches as on the date of application.

5. The annual application fee for a licence, change of category of licence, or renewal of licence is as follows, which should accompany the application:-

CategoryPakistani applicantRupees)

Foreign applicant (Rupees)

C-A/O-A

C-B/O-B

C-1/O-1

100,000

30,000

20,000

300,000

200,000

165,000

C-2/O-2 15,000 60,000

C-3/O-3 13,000 40,000

C-4/O-4 8,000 25,000

C-5/O-5 5,000 15,000

C-6/O-6 4,000 10,000

A late fee @2% per month will be charged after 31st march of the current year subject to maximum of 18% of the annual fee.

6. For initial registration, change in category, and renewal, the applicant for the constructor’s or operator’s licence shall submit application to the Council in the form prescribed. The application for renewal shall be submitted to the Council by the 5th day of November of the year based on the constructor’s or operator’s status as on the 31st day of October of the same year. The licence shall stand expired on 31st day of December each year. If the renewal is not submitted by 31st day of March, a surcharge of 2% will be levied.

7. A licensee shall inform the Council of any events taking place after grant of a licence to him or renewal thereof, which render him ineligible for continuation of licence in accordance with the aforesaid bye-laws. On receipt of such information, the Council may decide to reduce the category of licence or suspend or cancel the licence as it may deem fit.

6

Page 7: Constructors Oprerator Form

REGISTRATION CATEGORIES AND SPECIALIZATIONOF CONSTRUCTIONS/ OPERATORS

CATEGORY CODE SPECILIZATION DESCRIPTION

CIVILENGINEERINGCONSTRUCTION(CE)

CE01 Road and PavementsDrainage & Retaining Structure

Signcraft Installation

Construction of road and road reinstatement, pavement, bus bays, open car parks and related works such as kerbs, footways.

Installation of an integrated sign posting system for complexes, airports, shopping centres, etc. Also includes setting up of exhibition stands and road signs.

Airports Taxiways, runways, aprons, aircraft parking bays, baggage handling system, track transit system, etc.

CE02 Bridge Structures

Piling

Construction of concrete, masonry, timber or steel bridges.

Installation of all types of piling sheet piles, driven precast reinforced and prestressed concrete piles, bored cast in situ piles and timber piles etc.

CE03 Marine StructuresDredging

Underwater Works

Construction of marine structure such as jetties, ports, wharves, harbours, sea and river walls offshore construction works etc.

Underwater construction works and maintenance of underwater construction works.

CE04 Dams/Water Retaining Structures

Irrigation & Flood Control Systems

Construction of water retaining structure such as dams, reservoirs, aqueducts, treatment plants, pipe laying works etc.

Earth work/dredging in canal, river and offshore.

CE05 Offshore Works Offshore construction works including related works.

CE06 Tunneling and underpinning

Tunneling and underpinning works.

CE07 Railways Tracks Installation of railway tracks, distressing of rails and tracks.

CE08 Oil and Gas Pipe Lines

Installation, maintenance and repair of oil and gas pipelines.

CE09 Sewerage Works

Water Supply

Sewerage pipelines, disposal works, sewerage treatment works and allied works.

Installation, maintenance and repair of water supply pipelines, pumping stations, tube wells, water treatment works etc.

7

Page 8: Constructors Oprerator Form

CATEGORY CODE SPECILIZATION DESCRIPTION

CE10 General Civil Engineering Works

Slope Protection System

Concrete Repairs

Soil Investigation and Stabilization

Landscaping & Horticulture

Reclamation Works

General Buildings and Maintenance

Waterproofing

General civil engineering works, including earthworks, sub-soil drainage, etc.

Slope protection works.

Reinforcement of structures by way of pressure grouting, guniting, etc.

Services include sampling, investigation and testing services to determine soil classifications, strength and composition. Also includes soil stabilization works such as micro piling, ground anchoring, sand drains and ground grouting.

Provision of Landscaping services including tree planting, turfing, horticulture etc.

Reclamation works.

General building works, including fixing partitions, roofing and general maintenance of buildings.

Water proofing of basement, roofs and walls.

BC01 Prefabricated Buildings and Steel Framed Buildings and Industrial Plants

Construction of buildings and industrial plants using prefabricated components and systems. Construction of steel framed buildings and industrial plants.

Airports Terminal buildings, Satellite buildings, cargo terminals, air traffic control towers, contact piers, passenger loading bridges.

BC02 Restoration and Conservation

Building restoration and conservation.

BC03 High Rise Buildings

MECHANICALENGINEERING(ME)

ME01 HVAC Installation, Commissioning maintenance and repairs of air conditioning, refrigeration, cold rooms and ventilation system.

ME02 Fire Prevention and Protection System

Installation and maintenance of fire alarms, prevention and protection systems.

ME03 Lifts and EscalatorsCompressor Generators

Installation, commissioning and maintenance of lifts, escalators, travel lators and conveyor systems.

8

Page 9: Constructors Oprerator Form

CATEGORY CODE SPECILIZATION DESCRIPTION

ME04 Building Automation System

Building automation, industrial and process control systems, include installation and maintenance of microprocessors or computer based building control systems and industrial process control systems.

ME05 Workshop, Mill, Quarry System

Installation, commissioning and maintenance of workshop, mill and quarry systems such as cranes, hoist, crushing and screening plant, asphalt mixing plant, etc.

ME06 Specialized Fabrication and Treatment

Medical Equipment

Kitchen and Laundry Equipment

Heat Recovery System

Pollution Control System

Miscellaneous Mechanical Equipment

Chiller for Power Generation

Specialized Plant

Erection, maintenance and repair of exhaust stocks, tanks, reactors, separators, filters, scrubbers, dehydrators, evaporators, pipings, furnaces, grit blasting and painting, hot and cold insulation, flare system, bearing and welding.

Installation, commissioning and maintenance of medical equipment such as:

- Compressed air systems- Hot water installation- Sterilizer and autoclave- Medical gas installation- Hydrotherapy system- Dental chair- Mortuary refrigerator etc.

Installation, commissioning and maintenance of cooking and kitchen equipment, laundry equipment, etc.

Installation, commissioning maintenance and repair of boiler plant, heat exchangers, absorption chillers, unfired pressure vessels and hot water systems, etc.

Landfill technology, incinerator, oil separators.

Installation, testing commission, maintenance and repair of mechanical based systems such as pumping installation, sewerage treatment plant installation, water treatment plant installation, rotary pumps, reciprocating pumps, centrifugal pumps and special purpose pumps, etc.

Installation, maintenance and repair of gas turbine driven chiller, steam turbine driven chiller and centrifugal chiller.

Erection, maintenance and repair of compressor station, metering station, onshore terminal station, co-generation plant, gas processing plant, petrochemical plant, oil refinery, aviation re-fuelling and de-fuelling system, petrol station, heating ventilation and air-conditioning.

9

Page 10: Constructors Oprerator Form

CATEGORY CODE SPECILIZATION DESCRIPTION

ELECTRICAL ENGINEERING(EE)

EE01 Sound System Public address system, audiovisual system, conference system, intercom system and MAT.

EE02 Security, Safety Surveillance System

Installation and maintenance of security, safety and surveillance systems (security, alarm, car park security control and card access control systems. CCTV, sensor/detection system, vibration monitoring system, gas protection system, platform alarm system, aircraft warning system, fire protection system and earthing and lighting protection.

EE03 Building Automation System and Energy Generation System

Building Automation, industrial and process control system, included installation and maintenance of microprocessors or computer based building control systems and industrial process control systems, includes installation and maintenance of energy generation systems.

EE04 Low Voltage Installation

General wiring and control system wiring works not exceeding 1 KV. Installation and maintenance of low tension overhead lines and underground cabling not exceeding 1KV. Also includes installation and maintenance of generating plant and equipment not exceeding 1 KV.

EE05 High Voltage Installation

Installation and maintenance of high voltage equipment and underground cabling, high-tension overhead line including transmission tower exceeding 1kV. Also includes installation and maintenance of generator plant and equipment exceeding 1KV.

EE06 Specialized Lighting System

Installation and maintenance of street lighting, stadium floodlighting, traffic lighting, airfield lighting, high mast lighting installation, laser system, stage lighting, special effect lighting, navigational aid, underwater lighting, platform lighting, petrochemical plant lighting, oil refinery plant lighting, etc

ELECTRONICS ENGINEERING

EE07 Telecommunication Installation

Telephone cabling and internal ducting, radio based communication system, PABX, microwave system, multiplex and signalling troposcatter system, satellite system, radar surveillance system, data communication equipment, remote subscriber system, vessels and navigational specialized system, etc.

EE08 External Telecommunication Works

Telecommunication cabling (underground/ overhead), manholes, underground ducting/pipes.

10

Page 11: Constructors Oprerator Form

CATEGORY CODE SPECILIZATION DESCRIPTION

EE09 IT & Software Engg

EE10 Miscellaneous Specialized

Installation, commissioning and maintenance of surgical/operating theater table and lights, radiography equipment, radiotherapy equipment, nurse call system, electronic scoreboard, uninterruptible power supply (UPS) system, etc.

Any other works* Any work not covered in above categorization and description relevant to any engineering discipline.

*Provide herein code(s) (CE11, BC04, ME06, EE11) as applicable and define work.

11

Page 12: Constructors Oprerator Form

APPENDIX – ‘B’[see bye-law 5(1)]

UNDERTAKING BY ENGINEER

I ……………………………………………………………………………, adult, resident of

……………………………………………………………………….. do hereby solemnly declare

as under:-

1. That I am registered as a ……………………………………………… and a certificate

of registration bearing No. …………….………………. dated ……………………. has

been issued by the Pakistan Engineering Council which has been renewed up

to ………………………….

2. That I am presently employed on regular/fulltime basis with ……………………………

……………………………………………………………………………………….. since

………………………………………………………… and presently hold the position of

……………………………………….. I further state that I am not employed on any

other assignment with any other private firm, government agency, office or bureau of

any other consulting engineer.

3. That I undertake to intimate the Pakistan Engineering Council about my

disassociation with the above-mentioned employer within thirty days of the same.

4. That I have enclosed with this undertaking my following document:-

a. Copy of National Identity Card

b. Copy of PEC Registration Card (Renewed)

c. Curriculum vitae as per specimen on page-11

d. Copy of appointment letter of the Firm/Company

e. Proof of monthly salary received from the firm

5. That I have not ever incurred any disqualification in any manner under the Pakistan

Engineering Council Act and Bye-laws. (if in the past any disqualification was

incurred please mention material detail).

6. That the contents of the above mentioned undertaking are true to the best of my

knowledge, belief and information received and nothing has been concealed

therefrom.

__________________________DEPONENT

I.D.CARD NO._______________________

DATE: _______________________

PLACE: _______________________

12

Page 13: Constructors Oprerator Form

CURRICULUM VITAE OF A PROFESSIONAL ENGINEERWORKING FULL-TIME FOR A CONSTRUCTOR/OPERATOR

REQUESTING PEC LICENCE

Name: _______________________________ Age: ______________ Sex: ___________

Res. Address ____________________________________ Tel. No. _________________

Date of Birth: ____________ Nationality: ____________ I.D.Card No. _____________

PEC Registration No. ______________________

EDUCATION NAME OF COLLEGE/ UNIVERSITY

INCLUSIVE PERIOD OF

ATTENDANCE

HONOR/DIVISION RECEIVED

B.Sc/B.E. Engineering

M.S/ M.Sc Engineering

Ph.D Engineering

RECORD OF IN-SERVICE TRAINING

TRAINING COURSE PERIOD OF TRAINING CONDUCTED BY

EMPLOYMENT RECORD (AFTER PROFESSIONAL QUALIFICATION)

INCLUSIVE DATE

FROM TO

NAME AND ADDRESS OF

ORGANIZATION

TYPE OF ORGANIZATION

DESIGNATION OR

POSITION

LENGTH OF

SERVICE YR-MO

Total length of Service _____________________

I certify that the above information is true to the best of my knowledge and belief and that I have expert knowledge and specialization in the following types of projects. (List not more than three).

Project code Project Profile

12…

12…

12… ______________________________ Signature of Professional Engineer/

Allied Professional

13

Page 14: Constructors Oprerator Form

PERFORMANCE CERTIFICATE

(For each major work during last five years)

NAME OF EMPLOYER

NAME OF PROJECT

NAME OF CONSULSTANT (IF EMPLOYED)

STARTING DATE

ORIGINAL COMPLETION DATE

ACTUAL COMPLETION DATE

DELAY PERIOD

LIQUIDATED DAMAGES

ORIGINAL CONTRACT VALUE

VALUE OF WORK DONE UPTO FINAL BILL

ENGINEERS EMPLOYED DURING THE EXECUTION OF THE WORK(Name including father’s name and PEC Registration No.)

a.

b.

c.

d.

QUALITY OF WORK EXECUTED AND REMARKS BY EMPLOYER

14

CONTRACTOR(Name of firm and category with official seal)

(Signatures of Chief Executive)Date: ______________________

EMPLOYER(Signatures, Name and official seal)

Date: _______________________

Page 15: Constructors Oprerator Form

PERFORMANCE CERTIFICATE OF EACH WORK IN HAND

NAME OF EMPLOYER

NAME OF PROJECT

NAME OF CONSULTANT (IF EMPLOYED)

STARTING DATE

PERCENTAGE OF WORK DONE WITH DATE

ACTUAL COMPLETION DATE

DELAY PERIOD

LIQUIDATED DAMAGES

ORIGINAL CONTRACT VALUE

VALUE OF WORK DONE UPTO LAST BILL

ENGINEERS EMPLOYED DURING THE EXECUTION OF THIS WORK(Name including father’s name and PEC Registration No.)

a.

b.

c.

d.

QUALITY OF WORK EXECUTED AND REMARKS BY EMPLOYER

15

CONTRACTOR(Name of firm and category with official seal)

Signatures of Chief ExecutiveDate: ________________________

EMPLOYER(Signatures, Name and official seal)

Date: ______________________