CONSULTANT TRAINING FOR

PROJECT COST REDISTRIBUTION

SPREADSHEET

Page 2: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

The project cost initiative involves the improvement of project cost reporting by capturing detailed project information for the purpose of providing better data for decisions, managing resources and forecasting at the project and program levels.

INTRODUCTION

Page 3: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

Download Project Cost Redistribution Excel spread sheet from FDOT’s Procurement Internet site at project costing initiative webpagehttp://www.dot.state.fl.us/procurement/project%20costing% 20initiative.shtm

Page 4: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

For MS 2003 users, this message will be displayed when you open the file. Click on Show help

Page 5: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

Review displayed information about how to change the priority from High to low in order to enable the Macros associated with this spread sheet.

Page 6: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

Click on Enable Macros.

Page 7: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

For Microsoft 2007 Users, Security Warning is displayed with ‘Options’ Click on ‘Options’.

Page 8: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

Security Alert – Macros & Active X window is displayed. Click on ‘Enable This Content’ and then on ‘OK’

Page 9: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

Excel spread sheet is displayed and you are now ready to enter data. First click on Create File button to view all error messages.

Page 10: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

Click on OK.

Page 11: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

All required fields are in error. Look carefully on the right hand top corner in each cell, a red mark is visible.

Page 12: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

By moving the cursor near the cell, you will see an error message is displayed.

Page 13: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

Enter valid format for ‘Contact Email’.

Page 14: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

Enter valid ‘Contract number’. Contract number should be five characters long. Special characters are not allowed. Error message is displayed if invalid contract # is entered.(Valid Format = CXXXX)

Page 15: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

Enter valid ‘DOT Invoice’. Invoice numbers are between 0001 to 9999.

Page 16: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

From Project and To Project ID

Always 11 characters long, do not worry about entering spaces or dashes in this spreadsheet

Characters 1-6 is Item work program, 7 is Item segment, 8-9 is Phase and 10-11 is Sequence number

Example : 123456 7 89 12

Item Work Program

Item Segment

Sequence Number

Phase

Page 17: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

Enter ‘From Project Id’. Do not enter spaces or dashes, spreadsheet will format automatically with dashes when you move to another field!

Number should be a valid FM # which is included in the contract in CITS. To view all Valid ‘From Project IDs’ Log into CITS, go to your contract, and select projects.

Page 18: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

Enter valid ‘To Project Id’ (This number must be given to you by your FDOT Project Manager.)

Do not enter spaces/dashes, spreadsheet automatically formats with dashes after you move to the next field!

‘From Project id’ is formatted automatically.

Page 19: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

Enter valid ‘Amount’.

‘To Project id’ is formatted automatically.

Page 20: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

‘Total Amount’ is generated automatically.

Page 21: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

Enter valid ‘Project Description’. This is an optional field and is not a part of data which gets transmitted to FDOT server within Project Cost Redistribution file.

Page 22: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

To add new lines, type in a number and select “Insert”. You may enter any valid number from 1 to 1000

Page 23: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

If you type “1” in the Enter # of Rows to enter field and select “Insert”, you will notice that one blank line is added. Now enter From and To Project Id, amount and description in newly added line.

Page 24: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

From and To Project’s are formatted automatically. Total amount is automatically generated correctly. Project description is entered and converted into uppercase letters.

Page 25: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

In order to create a file, you should not have any blank rows in your file. If there is a blank row/rows remaining, select ‘Delete Blank Rows’

Page 26: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

In order to clear worksheet data select “Clear Worksheet”.

Use extreme caution when using this button, you will loose ALL entered data!!

Page 27: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

Once required information is entered.select “Create File”.

Page 28: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

A new window is displayed. File name (Contract number and Invoice number) is automatically populated. Do not change the file name. Select “Save”.

Default Drive is C: At this point if you want to change the drive ( D:, E: ) you can.

Page 29: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

File is saved, Go to C: drive and locate the file.Now open the file and make sure data is available in this file.

Page 30: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

Close the file and you are now ready to send an email to [email protected] be sure to attach this file.

NOTE: If your signature block contains a logo that is an image file, please be sure to delete this as the system will assume you have submitted two attachments, thus making an invalid transfer.

Page 31: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

Open your E-mail and begin a new message. Requirements for E-mail message:• Subject must be FDOT.PCR.FILE

CXXXXNNNN.• Mail should be sent to

[email protected]

Page 32: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

‘To’ must be ‘[email protected]’‘Subject line must be ‘FDOT.PCR.FILE CCCCCNNNN’

Where CCCCC=Contract Number (C8443 First five characters of file name) NNNN=DOT Invoice Number (584 Last three or four characters of the filename)

To email id

[email protected]

s

Subject LineFDOT PCR FILE

C8443584Attachment

C8443584.txt (7 kb)

Page 33: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

To email id

[email protected]

s

Subject LineFDOT PCR FILE

C8443584Attachment

C8443584.txt (7 kb)

Send email. If there are any errors, you will receive a response back from ‘[email protected]’ with an error description.

Page 34: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

At this point you can save the spread sheet with data for future reference. Click on ‘Yes’ file PCR_Redist_mmddyy.xls saved. (ex: mmddyy=030508)

Page 35: CONSULTANT TRAINING FOR PROJECT COST REDISTRIBUTION SPREADSHEET

REC:/PEN The system is waiting for the invoice to be paid.FAL: The distribution is incorrect or invalid (PCR must be corrected and re-submitted)DIS: Redistribution has been completed (Note is sent to Vendor)EXM: This specific invoice has been exempt from the requirement of sending a PCR file. All task work orders are already issued to the specific project. Redistribution file is not necessary.

If you would like to review the status of your invoices, please log in to CITS, click on the contract of interest, click on ‘Invoices’, then click ‘View all Invoices’, the last column you should see in the table is titled ‘Distribution Status’. After you submit a Distribution file, you can periodically check this column to see the status of your submittal.

QUESTION : WHAT DOES THIS STATUS MEAN?

Additional Info: