Page 1: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

CONTACT HYDROCLYDE

ROXBURGHHAWEA

Page 2: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

CLUTHA CATCHMENT OVERVIEW

Largest catchment in New Zealand

Largest volume river

Most volatile in terms of rainfall andflow variation

Lakes Wakatipu and Wanaka are un-controlled, Lake Hawea is controlled

Page 3: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

GENERAL INFORMATION

• Mean Clutha River Flow at Clyde is 490 cumecs

• Hawea, Clyde and Roxburgh are all Controlled from the Clutha Control Centre at Clyde

• Annual Output from the two Clutha Power Stations is around 3,700 GWHrs

Page 4: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

LAKE HAWEA

• Hydro Storage Dam only

• Natural Lake which has been artificially raised for Water Storage

• 142 Square Kilometres in Area

• 8m Operating range

• Storage Capability is about 300 GWHrs

Page 5: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

HAWEA DAM

• Earth Dam

• Commissioned in 1958

• No Generating Capability at Present

• Four Radial Arm Deep Water Sluices

• Outflow Range 10 to 200 cumecs

Page 6: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

LAKE DUNSTAN

• Impounded by the Clyde Dam

• 1 metre operating range

• 26.4 square kilometres in area

• Landslide Management Plan for Cromwell Gorge Landslides

Page 7: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

CLYDE DAM

• Concrete Gravity Dam

• Commissioned in 1992

• 60m Head

• 490m Crest Width

• 4 Spillways with Radial Arm Gates

• 1 Radial Arm Low Level Sluice Gate

• Earthquake Slip Joint

Page 8: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

CLYDE POWER PLANT• Station Capability is 432 MW

• Four 108 MW Machines

• Francis Turbines made by Hitachi

• Salient Pole Generators made by Hitachi

• Rotational Speed is 125 RPM

• All HV Equipment is Gas Insulated Switchgear

• Station Export Voltage is 220kV

Page 9: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

LAKE ROXBURGH

• Impounded by the Roxburgh Dam

• 6 Square Kilometres in Area

• 1.8m Operating Range

• Extends Back to the Outlet of Clyde Dam

Page 10: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

ROXBURGH DAM

• Concrete Gravity Dam

• Commissioned in 1956

• 48m Head

• Crest Width is 358m

• Three Spillway Gates have recently been upgraded.

• Two Low Level Sluice Gates

Page 11: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

ROXBURGH POWER PLANT• Station Capability is 320 MW

• Eight 40 MW Machines

• Francis Turbines made by Canadian Dominion Engineering

• Salient Pole Generators are British Thompson Houston (BTH)

• Rotational Speed is 136.4 RPM

• Station Export Voltage is 110kV or 220kV

Page 12: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

RESOURCE CONSENTS• In March 2001 Contact submitted

RMA applications to renew consents to operate its Clutha hydro generation plants.

• Key operational requirements were finalised in 2007 including a 35 year term.

• These consents provide operational certainty in terms of access to water and ramp rates.

• Contact also has consents to install two new generators at Hawea

Page 13: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

SITE MANAGEMENT STRUCTURE

Page 14: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

DAM SAFETY TEAM

• Dam Safety Monitoring

• Landslide Monitoring

• Environmental

• Civil Engineering

Page 15: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

ASSET TEAM

• Day-to-Day Plant Operation

• Safety Permit Management

• Asset Management and Plant Maintenance

• Electrical, C&I and Mechanical Engineering

• Contract Supervision

• Facilities Maintenance

Page 16: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

DISPATCH TEAM• The Efficient and Safe Operation of

Hawea Gates as well as Clyde and Roxburgh Generators, Spillgates and Sluices

• Planning and Optimisation of the Clutha’s Generation Offer to NZEM

• Analysis of the Catchment Hydrology and Meteorology Conditions.

• Catchment Management (Predominantly through the Control of Hawea Releases)

• 24 Hour Responsibility for Contact’s Market and Dispatch (Trading) Function

Page 17: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

HISTORICAL PRODUCTION

0

1000

2000

3000

4000

5000

1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Hydro Gross GWHrs

Page 18: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

PLANT AVAILABILITY

Hydro Equivalent Availability Factor (%)

0102030405060708090

100

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

Page 19: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

FORCED OUTAGE FACTOR

Hydro Forced Outage Factor (%)

0

1

2

3

4

5

6

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

Page 20: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

NUMBER OF START-UPS

Unit Starts Per Year

0

500

1000

1500

2000

2500

3000

3500

1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Yea

r

ClydeRoxburghHydro

Page 21: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility

START RELIABILITY

Hydro Start Reliability (%)

95

96

97

98

99

100

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

Page 22: CONTACT HYDRO - Ministry for the Environment NPS... · • 1 Radial Arm Low Level Sluice Gate ... • Analysis of the Catchment Hydrology ... Hawea Releases) • 24 Hour Responsibility