HOLLiAS MACS DCS has been used in China Largest 1000 MW Coal-fired Power Plant Taishan Power Plant by the Beijing Guohua Electric Power (Group) Investment Co., Ltd. located in the city of Taishan in Tonggu Bay of Guangdong Province. The Phase I construction of sub-critical 5 × 600 MW power generating units had all been put into operation. For the Phase II construction of 4 × 1000 MW super-critical power generating units. Taishan Power Plant are designed to reach a total installed capacity of 1000 MW and will become China’s largest on 29 March 2011 in a high-end standards. Taishan Power Plant is equipped with the most advanced production management system and technical expertise. Under the leading enterprise of Beijing Guohua Electric Power (Group), it plays an important role in the thermal power plant industry with numerous new technology implemented in Taishan Power Plant. THE BACKGROUND At a temperature of 347.15 °C and air pressure of 22.115 MPa, the density of water vapor would be increased to liquid water. With a temperature reaching 600 °C and air pressure in between 25 to 28 MPa, you will enter the ultra super-critical stage. turning wet steam into steam-gas and saturated steam delivering a lower coal consumption, environmental friendlier using a higher technological system. With lower coal consumption is its biggest advantage over any other super-critical thermal units in China with The development direction of the ultra super-critical generating units is to maintain its availability, reliability, enhancement on the steam parameters in order to achieve CHALLENGES & BENEFITS All Rights Reserved. Copyright © 2017 by HollySys International. SINGAPORE (INTERNATIONAL HQ) HollySys (Asia Pacific) Pte Ltd 200 Pandan Loop, #08-01, Pantech 21 Singapore 128388 Tel : +65 6777 0950 Fax : +65 6777 2730 CHINA HollySys Group Di Sheng Middle Road, No.2 Economic-Technological Development Area 100176 Beijing, China Tel : +86 10 58981000 Fax : +86 10 58981100 INDIA HollySys Automation India Pvt. Ltd No. 405, 4th Floor, Sewa Corporate Park Building, MG Road Gurgaon 122002 Haryana, India Tel : +91 124 6900705 INDONESIA PT HollySys Automation Indonesia Metropolitan Tower 10th Floor, Unit E, Jl. R. A. Kartini Kav. 14 Jakarta Selatan 12430 Fax : +62 21 2918 2936 CONTACT US Tel : +62 21 2918 2926

Upload: others

Post on 27-Jan-2022

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CONTACT US - HollySys

HOLLiAS MACS DCS has been used in China Largest 1000 MW Coal-fired Power Plant

Taishan Power Plant by the Beijing Guohua Electric

Power (Group) Investment Co., Ltd. located in the city

of Taishan in Tonggu Bay of Guangdong Province. The

Phase I construction of sub-critical 5 × 600 MW power

generating units had all been put into operation. For

the Phase II construction of 4 × 1000 MW super-critical

power generating units.

Taishan Power Plant are designed to reach a total installed

capacity of 1000 MW and will become China’s largest

on 29 March 2011 in a high-end standards.

Taishan Power Plant is equipped with the most advanced

production management system and technical expertise.

Under the leading enterprise of Beijing Guohua Electric

Power (Group), it plays an important role in the thermal

power plant industry with numerous new technology

implemented in Taishan Power Plant.

THE BACKGROUND

At a temperature of 347.15 °C and air pressure of 22.115

MPa, the density of water vapor would be increased to

liquid water. With a temperature reaching 600 °C and air

pressure in between 25 to 28 MPa, you will enter the ultra

super-critical stage.

turning wet steam into steam-gas and saturated steam

delivering a lower coal consumption, environmental

friendlier using a higher technological system.

With lower coal consumption is its biggest advantage

over any other super-critical thermal units in China with

The development direction of the ultra super-critical

generating units is to maintain its availability, reliability,

enhancement on the steam parameters in order to achieve

CHALLENGES & BENEFITS

All Rights Reserved. Copyright © 2017 by HollySys International.

SINGAPORE (INTERNATIONAL HQ)

HollySys (Asia Pacific) Pte Ltd200 Pandan Loop, #08-01, Pantech 21Singapore 128388

Tel : +65 6777 0950Fax : +65 6777 2730

CHINA

HollySys GroupDi Sheng Middle Road, No.2Economic-Technological Development Area100176 Beijing, China

Tel : +86 10 58981000Fax : +86 10 58981100

INDIA

HollySys Automation India Pvt. LtdNo. 405, 4th Floor,Sewa Corporate Park Building, MG RoadGurgaon 122002Haryana, IndiaTel : +91 124 6900705

INDONESIA

PT HollySys Automation IndonesiaMetropolitan Tower10th Floor, Unit E, Jl. R. A. Kartini Kav. 14Jakarta Selatan 12430

Fax : +62 21 2918 2936

CONTACT US

Tel : +62 21 2918 2926

Page 2: CONTACT US - HollySys

THE SOLUTION

The two current 1,000 MW super-critical power generating units was designed by Guangdong Electric Power Design

Institute. All the main control and desulfurization (FGD) system are utilizing the HollySys’s MACS DCS control system

with a total of 36,128 I/O points.

No Name of System I/O Configuration Content

1 Main DCS

I/O Configuration 32000 points Single Unit: Boiler, Turbine, Electrical, Denitration

Common Unit: Auxiliary Circulating Feed Water Pump,

Compressor, Ammonia Storage System, and other

Common ElectricalDPU Configuration 96 sets

2 Desulfurization DCS

I/O Configuration 4128 points FGD System For Unit No. 1, Wastewater System,

Electrical, 10 KV Power Distribution Between Buildings,

and other Common SystemDPU Configuration 11 sets

Total 36128 points

Boiler Main Parameters

Maximum Continuous Evaporation of Superheated Steam (B-MCR) 3091 t/h

Superheated Steam Pressure 27.56 MPa(a)

Superheated Steam Temperature 605 °C

Turbine Main Parameters

Power Capacity 1000 MW

Maximum Continuous Power (T-MCR) 1053.485 MW

Frontal Main Steam: Steam Pressure Condition 26.25 MPa(a)

Frontal Main Steam: Steam Temperature Condition 600 °C

HollySys will deliver the DCS system which includes its proprietary control of generating units; Flue Gas Desulfurization

(FGD), Utilities, Electrical Control System (ECS) for the two 1000 MW super-critical power generating units and the

Distributed Control System (DCS) reserves communication interface with Management Information System (MIS),

Supervisory Information System (SIS), etc.

1000 MW 14 units

600 ~ 800 MW 21 units

300 MW 204 units

Turbine ControlOver 3000 projects ranging from 6 MW to 1000 MW

REFERENCE

The scope of DCS of generating units includes the boiler

main and auxiliary system, turbine main and auxiliary

system, electric generating, ECS, etc. The scope of DCS

of FGD includes the desulfurization booster, absorber,

oxidation fan, etc. The scope of DCS of Utilities includes

the ECS, air conditioner system, air compressor and

ammonia store system.

At the same time, DCS communicates with turbine Digital

Electro Hydraulic (DEH), generating TSI, protection

system, Balance of Plant (BOP), to achieve integrated

control, monitor and manage to a generating unit.

The functions of DCS includes:

• Data Acquisition System (DAS)

• Modulation Control System (MCS)

• Bypass Control System (BPCS)

• Sequence Control System (SCS)

• Furnace Safety Supervisory System (FSSS)

• MEH + METS (Steam-Driven Feed Water Pump)

• Electrical Control System (ECS)

• Flue Gas Desulfurization (FGD)

“The 2 × 1000 MW units DCS project in Taishan Power Plant is outstanding in terms of safety, economic efficiency

and environmental protection, as well as investment control. It is the leading lever in China. The direct station service

power consumption rate for power supply coal consumption is 3.77 %, which takes lead in China’s 1000 MW units.

The service rate for protection devices, automation equipments and instruments is 100 %. The desulfurization and

denitration systems have been put into service in parallel with the main equipment. The overall performance fully

meets our design requirements.”

From Taishan Power Plant, China

TESTIMONIAL