Most Immediate No.59 ( 4)/PF-I / 2008 - 589 Government of India Ministry of Finance Department of Expenditure Plan Finance-I Division New Delhi , the ( March, 2009 To The Pay & Accounts Officer, Department of Expenditure, Ministry of Finance, New Delhi. Subject: 'On' account payment of Grant component of Additional Central Assistance (ACA) for the ' Sub-Mission on Basic Services to Urban Poor under JNNURM ' for the States Annual Plan 2008-09 - Central Share) The undersigned is directed to convey the sanction of the President of India to the payment of Rs.52666 . 68 lakh ( Rupees Five Hundred Twenty Six Crore Sixty Six Lakh and Sixty Eight Thousand Only) to the respective State Governments being the instalments of Grant under " Sub-Mission on Basic Services to Urban Poor under JNNURM " , for States' Annual Plan 2008-09 as under:- Rs. in lakh S.No. Name of State ACA being released 1. Assam 65.00 2. Bihar 3330.40 3. Gujarat 2055.95 4. J&K 828.70 5. Jharkhand 17.00 6. Karnataka 428.14 7. Madhya Pradesh 498.92 8. Maharashtra 17734.18 9. -Manipur 34.00 10. Orissa 135.25 11. Uttar Pradesh 16789.48 12. Uttarakhand 248.14 13. West Bengal 10501.52 Grand Total 52666.68 The statement showing details of the Schemes/Projects against which the above amounts stand sanctioned to States is given at Annexure. 3. Payment may kindly be made to the State Govt. immediately. The funds may thereafter be released to the implementing agency without any delay failing which the amounts would be recovered from the State Government with interest for the period of default. Contd..........2/-

Upload: vongoc

Post on 11-Mar-2019

230 views

Category:

Documents


0 download

TRANSCRIPT

Most ImmediateNo.59 (4)/PF-I / 2008 - 589

Government of IndiaMinistry of Finance

Department of ExpenditurePlan Finance-I Division

New Delhi , the ( March, 2009

ToThe Pay & Accounts Officer,Department of Expenditure,Ministry of Finance,New Delhi.

Subject: 'On' account payment of Grant component of Additional Central Assistance(ACA) for the ' Sub-Mission on Basic Services to Urban Poor underJNNURM ' for the States Annual Plan 2008-09 - Central Share)

The undersigned is directed to convey the sanction of the President of India to thepayment of Rs.52666 .68 lakh (Rupees Five Hundred Twenty Six Crore Sixty Six

Lakh and Sixty Eight Thousand Only) to the respective State Governments being theinstalments of Grant under "Sub-Mission on Basic Services to Urban Poor underJNNURM " , for States' Annual Plan 2008-09 as under:-

Rs. in lakh

S.No. Name of State ACA being released

1. Assam 65.00

2. Bihar 3330.40

3. Gujarat 2055.95

4. J&K 828.70

5. Jharkhand 17.00

6. Karnataka 428.14

7. Madhya Pradesh 498.92

8. Maharashtra 17734.189. -Manipur 34.00

10. Orissa 135.25

11. Uttar Pradesh 16789.48

12. Uttarakhand 248.14

13. West Bengal 10501.52Grand Total 52666.68

The statement showing details of the Schemes/Projects against which the aboveamounts stand sanctioned to States is given at Annexure.

3. Payment may kindly be made to the State Govt. immediately. The funds maythereafter be released to the implementing agency without any delay failing whichthe amounts would be recovered from the State Government with interest for theperiod of default.

Contd..........2/-

-2-

4. The payments are adjustable in the account of the Central Government in thebooks under the sub-head indicated as under:-

GRANTDEMAND NO. 353601-GRANTS-IN-AID TO STATE GOVERNMENTS.02-GRANTS FOR STATE PLAN SCHEMES.02.101-BLOCK GRANTS36 Jawahar Lal Nehru Urban Renewal Mission36.03- Sub-Mission on Basic Services to Urban Poor36.03.31-GRANTS-IN-AID.

5. The progressive totals of central assistance released to the State Governmentsunder the Sub heads at para 3 above in the current financial year 2008-2009 sofar including amounts released in this sanction letter as follows:-

Rs. in lakhsSI No. States BLOCK GRANT

1. Assam 358622.442. Bihar 259642.413. Gujarat 154009.564. J&K 465773.965. Jharkhand 55524.866. Karnataka 146023.347. Madhya Pradesh 179934.888. Maharashtra 475478.889. Manipur 109836.7510. Orissa 171330.2611. Uttar Pradesh 373946.41

12. Uttarakhand 180676.3413. West Bengal 219716.82

The action taken on this order may be acknowledged and correctness of theprogressive totals be confirmed.

Yours faithfully,

(Deen"ath )Dy. Director (PF.I)

Ph. 2309 5644

b'ontd..........3/-

-3-

Copy to:

1. Finance Secy./Ping. Secy., State Government concerned.2. Principal Secy, (Urban Dev. Deptt.), State Government concerned.3. Accountant General (A&E), State Concerned.4. DEA, Budget Div. (States), New Delhi.5. Planning Commission : SP Divn./FR Divn. New Delhi.6. Secretary, RBI, Central Office, Mumbai.7. Manager, RBI, CAS, Nagpur.8. Resident Commissioners, State Government concerned, New Delhi.9. Chief Controller of Accounts, Min. of Finance, North Block (3 Copies).10. Shri D.S. Negi, OSD, M/o Housing and Urban Poverty Alleviation, JNNURM,

Nirman Bhavan, New Delhi.11. Shri M.Jayachandra, Deputy Director, Ministry of Housing and Urban Poverty

Alleviation, JNNURM Mission Directorate, New Delhi.12. Hindi Section for stencil of Hindi version.

(een ath )Dy. Director (PF.I)

Ph. 2309 5644

AnnexureRelease of Central assistance under BSUP

A. Normal projects(Rs. in lakh)

S. State/ Project Total Approved 1ST instt. Install-N. City Project Central recommen ment

Cost Share ded forrelease

1. Bihar1. BSUP Scheme IS`

Patna Adalat anj, Patna 1960.74 785.37 196.342. BSUP Scheme is

Sector- 1,Phase-V,Patna West Patna 4251.87 1671.19 417.80

3. BSUP Scheme St

Sector-2,Phase-V,Patna West Patna 3843.60 1443.35 360.84

4. BSUP Scheme 1St

Sector-3,Phase-V,Patna West Patna 4018.71 1576.79 394.20

5. BSUP Scheme Ist

Sector-4,Phase-V,Patna West Patna 4018.71 1576.79 394.20

6. BSUP Scheme - lSSector-1,Phase-VI,

Patna South Patna 4251.87 1671.19 417.807. BSUP Scheme Ist

Sector-2,Phase-VI,Patna South Patna 3843.61 1443.35 360.84

8. BSUP Scheme isSector-3,Phase-VI,

Patna South Patna 4018.71 1576.79 394.199. BSUP Scheme 1St

Sector-4, Phase-VI,Patna South Patna 4018.71 1576.79 394,19

Total for Bihar 3330.40II. Gujarat10. Surat Detailed project 4`

Report for slumRelocation atSurat(DPR-I) 6274.120 3137.060 784.25

11. Surat Housing for Urban 4`Poor at Kosad(DPR-III), Surat 7203.345 3428.568 857.15

MunicipalCorporation

12. Rajkot JNNURM - BSUP 3rdHousing Scheme(Construction of2640 Dus) atdifferent EWSHousing proposedreserved plots fordifferent townplanning schemesat Rajkot

3415.87 1658.19 414.55Total for Gu ' a at 2055.95

III. Jammu an Kashmir13. Rehabilitation of is

slum dwellers atBhagwati NagarJammu City underBSUP (JNNURM)

Jammu 143.51 123.01 30.7514. Rehabilitation of Is

slum dwellers atvarious locations ofJammu City underBSUP (JNNURM)

Jammu 3341.12 2863.82 715.95otal for Jammu & ashmir 746.70

W. Karnata15. Bengaloor Construction of 880 Is`

u BSUP houses(G+3) anddevelopment worksatBhuvaneshwarinagar, Uttarahalli,Bangalore.

3767.61 1712.55 428.14Total for Karna ka 428.14

V. Madhya Pr desk16. Slum and Poor 3r

Locality IntegratedArea Development

Bhopal Scheme Phase-II 4111.13 1995.69 498.92Total for Madhya P adesh 498.92

VI. Maharash ra

17. Greater Implementation of 3538.43 1608.38 402.09 IsMumbai BSUP at(Ulhasnaga Ulhasnagar,r) Mumbai MR,

Thane district,Maharashtra

18. Nagpur BSUP at Nagpur, 2"Maharashtra

12081.07 3706.82 926.7019. Greater BSUP scheme for 7732.75 3514.49 878.72 1st

Mumbai Kulgaon-(Kulgaon- Badlapur, Distt.Badla ur) Than, Maharashtra

20. Nagpur BSUP Scheme for is

construction of1080 Dus inSavitribai PhuleNagar slum inNagpur,Maharashtra

5253.06 2387.75 596.9421. Nanded Implementations 7137.60 5190.98 1297.74 1-9

of Integratedhousing projects(1567 DUs) underBSUP at Nandedcity.

22. Nanded Implementations 7686.94 5590.50 1397.63 ISof Integratedhousing projects(1621 DUs) underBSUP at Nanded

-city.

23 Nanded Implementations 4202.00 3056.00 764.00 1stof Integratedhousing projects(958 DUs) underBSUP at NandedCity.

24. Nanded Implementations 3981.55 2895.67 223.92 1s`of Integratedhousing projects(1002 DUs) underBSUP at NandedCity.

25.

26.

27.

28.

29.

Nanded

Nanded

Nagpur

Nagpur

Nagpur

Implementationsof Integratedhousing projects(1183 DUs) underBSUP at NandedCam.

Implementationsof Integratedhousing projects(788 DUs) underBSUP at NandedCam.Integrated deliveryof BSUP atPuchzopda &Nehru Nagar slumfor theconstruction of567 DUs inNagpur

BSUP scheme atJaibajrang Nagar,Kumbhar Toli andI and 2 slums forconstruction of858 DUs inNagpurIntegratedDelivery of basicservices to theurban poor inGopal Nagar andBh. Anand

5343.963242.77

2597.63

4533.45

3020.17

3886.51 971.632358.38 1 589.60

1180.74 1 29519-

2060.66 1 515.16

ISt

1372.81 343.20 1st

KauslalyayanNagar Slum forconstruction of642 DUs in nagpur

30. Nagpur Implementation of 40229.26 18286.03 1 4571.51 1stBSUP (6357 DUs)in Nagpur on PPPbasis

31. Pimpri, Implementation of 2837.58 1289.81 322.45 1stChinchwad BSUP at PimpriChinchwad (Pune)

32. Pimpri, Implementation of 37604.44 12866.42 1 3137.70 1stChinchwad BSUP in Pimpri

ChinchwadSection-12 atBhosari, Pune onPPP basis

To I for Mahar shtra 17734.18VI Orissa33. Bhubanesh BSUP scheme for 745.26 541.01 135.25 1st

war construction of192 DUs atBhubaneshwar

Total for Oris a 135.25VI Uttar Pra esh34. Allahabad, BSUP scheme for 738.52 341.91 85.48 1st

Naini construction of233 DUs in Naini,Allahabad

35. Allahabad, BSUP scheme for 1514.03 700.94 175.24 1stNaini construction of 24

DUs in Allahabad36. Agra BSUP scheme for 9518.01 4406.48 1101.62 1st

construction of2335 DUs in Agra

37. Agra BSUP scheme for 7133.79 3302.68 825.66 1stconstruction of1536 DUs in A ra

38. Mathura BSUP scheme at 500.87 371.02 88.31 1stJaisingh Pura,Mathura

39. Agra Implementation of 3977.63 1841.49 460.37 1stBSUP project atAgra Nagar Nigamfor construction of950 DUs.

40. Agra Implementation of 3477.70 1610.05 402.51 1stBSUP project atDeori Road inAgra City (2420DUs)

41. Mathura Implementation of 8810.17 6526.05 1631.51 1stBSUP project forconstruction of2018 DUs atRadhayshyamColony, Mathura

42. Kanpur Implementation of 2850.38 1319.62 329.90 1stBSUP at Kanpur

for construction of816 DUs in threeSlums

43. Kanpur Implementation of 2856.27 1322.35 330.59 1stBSUP at Kanpurfor construction of753 DUs in threeSlums

44. Kanpur Implementation of 2939.20 1360.74 340.19 1stBSUP at Kanpurfor construction of704 DUs in sixSlums

45. Kanpur Implementation of 1401.75 648.96 662.24 I stBSUP at Kanpurfor construction of343 DUs in threeSlums

46. Agra DPR for integrated 1479.22 678.28 169.57development ofKansiram TajnagriPhase-11

47. Agra DPR for integrated 1903.77 787.66 196.92development ofManniya Shri JeeKalindi, Bihar 1s`and 2nd

48. Meerut BSUP scheme 2218.00 894.18 223.55 1stAchronda andKanshi, Meerut

49. Meerut BSUP scheme for 2731.85 1 001.38 275.34 1stAbdullahapur andKarim Nagar,Meerut

50. Meerut Implementation of 3044.59 1436.13 359.03 1stBSUP forconstruction of852 DUs at Meerut

51. Kanpur Implementation of 3667.63 1697.98 424.49 1stBSUP project forconstruction of887 DUs in sevenslums at Kanpur

52. Meerut Implementation of 3308.45 1582.99 395.75 1st

BSUP scheme atMeerut city forconstruction of768 DUs

53. Meerut Implementation of 3770.45 1804.04 451.01 1stBSUP scheme atMeerut city forconstruction of723 DUs

54. Meerut Implementation of 3098.01 1482.30 370.58 1stBSUP scheme atMeerut city forconstruction of629 DUs

55. Lucknow BSUP scheme for 1256.48 595. 52 148.88 1st(Chak the town of ChakMalhauri) Malhauri District

Lucknow56. Lucknow BSUP scheme for 4957.03 2349.31 587.33 1st

(Nai Basti the town of NaiTown) Basti District

Lucknow57. Lucknow BSUP scheme for 595.13 282.05 70.51 1st

(Umrao the town of UmraoHata Hata, Nishat Ganj,Town) District Lucknow

58. Kanpur BSUP project at 1971.42 912.70 228.17 1stKanpur for twoslums (BargadiyaPurwa)and BaraSerohi

59. Meerut Implementation of 2901. 19 1388 .13 347.03 1stBSUP at MeerutCity for theconstruction of655 DUs

60. Allahabad Implementation of 1915.46 886.79 221.70 1stBSUP atAllahabad city forthe construction of411 DUs

61. Mathura BSUP scheme for 3169.64 2347.88 586.97 1stthe GopalnagarMathura

62. Mathura BSUP scheme for 3762.69 2787.18 696.80 1stthe Laxmi Nagar,

Mathura63. Varanasi Implementation of

BSUP at Varanasi2480.78 1148.51 287.13 11st

for theconstruction of585 DUs

64. Kanpur BSUP project atKanpur for sevenslums

3550.97 1699.03 424.76 11st

65. Allahabad Implementation of 2343.91 1085.14 271 29 11stBSUP project forconstruction of483 DUs withinfrastructurefacilities atAllahabad city

.

66. Lucknow Implementation ofBSUP project forconstruction of763 DUs with

3595.64 1664.65 416.16 11st

infrastructurefacilities atLucknow city

67. Lucknow Implementation ofBSUP project forconstruction of346 DUs with

1932.74 894.79 223.70 11st

infrastructurefacilities atLucknow city

68. Lucknow Implementation ofBSUP project forconstruction of487 DUs with

2662.36 1232.58 308.14 1 1st

infrastructurefacilities atLucknow city

69. Agra Implementation ofBSUP project atAgra Nagar Nigamat Gover Chauki(604 DUs)

3514.33 1627.01 406.75 11st

70. Meerut Implementation of 2884.16 1379.98 345 00 1 1stBSUP project atMeerut forconstruction of

.

71.

72.

73.

74.

75.

Meerut

Meerut

Varanasi

Varanasi

Varanasi

694 DUsImplementation ofBSUP project forconstruction of677 DUs withinfrastructurefacilities at Meerut

CityImplementation ofBSUP project forconstruction of731 DUs withinfrastructurefacilities at MeerutcityImplementation ofBSUP project forconstruction of728 DUs withinfrastructurefacilities atVaranasi cityImplementation ofBSUP project forconstruction of776 DUs withinfrastructurefacilities atVaranasi cityBSUP scheme forthe city ofVaranasi (1305DUs)Total for Uttar Pri

3165.92

3470.93

3431.66

3058.73

5674.26

deshIx Uttarakhan Id76. Dehradun BSUP DPR for

Rotary KusthrogAshram, Dehradun

163.34

77. Dehradun BSUP DPR forShanti KusthrogAshram, (Malin

137.20

Basti), Dehradun78. Dehradun BSUP DPR for

Ram MandirKusthrog Ashram,(Malin Basti),

163.64

1491.05 372.76 1 1st

1598.43 399.61 1 1st

1588.73 397.18 1 1st

1416.08 354.02 1 1st

2626.97 656.73 I 1st

16550.48

115.93 28.98 I St

109.76 27.44 I S`

111.80 27.96 I St

Dehradun79. Dehradun BSUP DPR for

Chaksha NagarSlum (BalinBasti), Dehradun

860.20 655.05 1 163.76 I St

Total for Vttarakhand 248.14X West Bengal80. Kolkata

(GaruliaMA)

BSUP Scheme forthe Town ofGarulia (KolkataMA), West Bengal

3275.51 1637.76 1 409.44 Pr

81. Kolkata(Konnagar

MA)

BSUP Scheme forthe Town ofKonnagar (Phase-II) (Kolkata MA),West Bengal

1,261.20 630.60 1 157.65

I St

82. Asansol BSUP scheme forthe town ofAsansol (Phase-II),(2232 DUs)Bardhman, WestBengal

5816.27 2908.14 727.03 151

83. Asansol BSUP scheme forthe town of

13086.03 6543.01 1 1635.75 1 St

84.

85.

86.

87.

88.

Asansol(Durgapur)

Kolkata(Titagarh)

Asansol

Asansol(Kulti)

Kolkata(Baruipur)

Asansol (Phase-III), (4626 DUs)Bardhman, WestBengalBSUP scheme forthe town ofDurgapurBardhman, WestBengalBSUP scheme forthe town ofTitagarh (Phase-1),24 Paragnas(North), KolkataRehabilitation ofslums in Durgapur,Asansol UrbanAreaBSUP scheme forthe town of KultiBSUP scheme forthe town of

4465.62 2232.81 1 558.20

1 St

1673.50 836.75 209.19 1 St

10601.62 5300.81 1325.20 2"

1555.13 724.81 1 181.21 1 --2-n7d

1008.02 484.60 121.15 2a

Barui ur89. Kolkata Relocation of four 264.85 120.39 30.10 2"

slums to one slumin Bally(Phase-I),Kolkata

90. Kolkata Rehabilitation of 1104.94 502.26 125.57 2"(Serampore two slums in

Serampur Phase-I,Kolkata

91. Kolkata Slum 5415.45 2707.73 676.93 2"Developmentprogramme underBSUP throughKMDA

92. Kolkata BSUP scheme for 5727.81 2863.90 715.98 15`(Rajarhat- Rajarhat -Gopalpur) Gopalpur (Phase-

11) , KMA, Kolkata93. Kolkata BSUP scheme for 5812.60 2906.30 726.57 1st

(North North Dam DamDam Dam) (Phase-II), KMA,

Kolkata94. Asansol Rehabilitation of 8895.00 4446.00 1111.12 2"

slums in AsansolUrban Area

95. Kolkata BSUP scheme for 2085.87 1001.93 250.48 3`the town ofMadh amgram

96. Kolkata BSUP scheme for 3244.17 1622.09 405.52(Bally)(Bally) the town of Bally

(Phase-II), KMA,Howra

97. Kolkata BSUP scheme for 1357.69 678 85 169 71 is(Bidhannag the town of

. .

ar) Bidhannagar(Phase-II) North24 Paragnas

98. Kolkata Housing for 1577.34 888.67 197.17 15Urban Poor withinKolkata MunicipalCorporation(KEIP)

99. Kolkata Rehabilitation of 1398.91 635.87 558.97 2°(Champdan one slum iny) Champdany,

Kolkata

10 Kolkata Housing for Urban 1577.34 788.67 197.17 2"Poor withinKolkata MunicipalCorporation(KEIP)

101 Kolkata Rehabilitation 1885.27 856.95 214.24 3`Rajarhat- 9slums inGopalpur Rajarhat-Gopalpur

Phase-I), Kolkata10 Kolkata Housing for Urban 1577.34 788.67 197.17 3`

Poor withinKolkata MunicipalCorporation(KEIP)

Total for West Bengal 10501.52Grand Total 52229 (,R

B. Release of IS` Installment of Central assistance for setting up of PMU/ PIUs

SI.No. Name of State/ City Amount to be released1. Assam (PMU) 20.002. Assam, 1 PIU in Guwahati 17.003. 2 PIUs for covering all IHSDP towns in

Assam28.00

Total for Assam 65.004. Jammu & Kashmir (PMU) 20.005. 2 PIUs (1 each in Jammu & Srinagar) 34.006. 2 PIUs for covering all IHSDP towns in

Jammu & Kashmirl

28.00

Total for Jammu Kashmir 82.007. Jharkhand, setting up of PIU for Ranchi 17.00Total for Jharkhand 17.008. Manipur (PMU) 20.009. Manipur, setting up of PIU in Imphal 14.00Total for Manipur 34.00

Uttar Pradesh (PMU) 20.00

r

Uttar Pradesh, setting up of 6 PIUs (1each in Allahabad, Agra, Lucknow,Meerut, Kan ur, Varanasi)

120.00

Uttar Pradesh, I PIU in Mathura 14.0013 Uttar Pradesh, setting up of 5 PIUs for

covering all IHSDP towns in UttarPradesh

85.00

Total for Uttar Pradesh 239.00Grant total for PMU & PIU 437.00

akh)

State- wise total is as under:Rs

SI. No. Name of State Amount to bereleased

1. Assam 65.002. Bihar 3330.403. Gurajat 2055.954. Jammu & Kashmir 828.705. Jharkhand 17.006. Karnataka 428.147. Madhya Pradesh 498.928. Maharashtra 17734.189. Manipur 34.0010. Orissa 135.2511. Uttar Pradesh 16789.4812. Uttarakhand 248.1413 West Bengal 10501.52

Grand Total 52666.68