contd2/- - suratmunicipal.gov.in · surat detailed project 4` report for slum relocation at...
TRANSCRIPT
Most ImmediateNo.59 (4)/PF-I / 2008 - 589
Government of IndiaMinistry of Finance
Department of ExpenditurePlan Finance-I Division
New Delhi , the ( March, 2009
ToThe Pay & Accounts Officer,Department of Expenditure,Ministry of Finance,New Delhi.
Subject: 'On' account payment of Grant component of Additional Central Assistance(ACA) for the ' Sub-Mission on Basic Services to Urban Poor underJNNURM ' for the States Annual Plan 2008-09 - Central Share)
The undersigned is directed to convey the sanction of the President of India to thepayment of Rs.52666 .68 lakh (Rupees Five Hundred Twenty Six Crore Sixty Six
Lakh and Sixty Eight Thousand Only) to the respective State Governments being theinstalments of Grant under "Sub-Mission on Basic Services to Urban Poor underJNNURM " , for States' Annual Plan 2008-09 as under:-
Rs. in lakh
S.No. Name of State ACA being released
1. Assam 65.00
2. Bihar 3330.40
3. Gujarat 2055.95
4. J&K 828.70
5. Jharkhand 17.00
6. Karnataka 428.14
7. Madhya Pradesh 498.92
8. Maharashtra 17734.189. -Manipur 34.00
10. Orissa 135.25
11. Uttar Pradesh 16789.48
12. Uttarakhand 248.14
13. West Bengal 10501.52Grand Total 52666.68
The statement showing details of the Schemes/Projects against which the aboveamounts stand sanctioned to States is given at Annexure.
3. Payment may kindly be made to the State Govt. immediately. The funds maythereafter be released to the implementing agency without any delay failing whichthe amounts would be recovered from the State Government with interest for theperiod of default.
Contd..........2/-
-2-
4. The payments are adjustable in the account of the Central Government in thebooks under the sub-head indicated as under:-
GRANTDEMAND NO. 353601-GRANTS-IN-AID TO STATE GOVERNMENTS.02-GRANTS FOR STATE PLAN SCHEMES.02.101-BLOCK GRANTS36 Jawahar Lal Nehru Urban Renewal Mission36.03- Sub-Mission on Basic Services to Urban Poor36.03.31-GRANTS-IN-AID.
5. The progressive totals of central assistance released to the State Governmentsunder the Sub heads at para 3 above in the current financial year 2008-2009 sofar including amounts released in this sanction letter as follows:-
Rs. in lakhsSI No. States BLOCK GRANT
1. Assam 358622.442. Bihar 259642.413. Gujarat 154009.564. J&K 465773.965. Jharkhand 55524.866. Karnataka 146023.347. Madhya Pradesh 179934.888. Maharashtra 475478.889. Manipur 109836.7510. Orissa 171330.2611. Uttar Pradesh 373946.41
12. Uttarakhand 180676.3413. West Bengal 219716.82
The action taken on this order may be acknowledged and correctness of theprogressive totals be confirmed.
Yours faithfully,
(Deen"ath )Dy. Director (PF.I)
Ph. 2309 5644
b'ontd..........3/-
-3-
Copy to:
1. Finance Secy./Ping. Secy., State Government concerned.2. Principal Secy, (Urban Dev. Deptt.), State Government concerned.3. Accountant General (A&E), State Concerned.4. DEA, Budget Div. (States), New Delhi.5. Planning Commission : SP Divn./FR Divn. New Delhi.6. Secretary, RBI, Central Office, Mumbai.7. Manager, RBI, CAS, Nagpur.8. Resident Commissioners, State Government concerned, New Delhi.9. Chief Controller of Accounts, Min. of Finance, North Block (3 Copies).10. Shri D.S. Negi, OSD, M/o Housing and Urban Poverty Alleviation, JNNURM,
Nirman Bhavan, New Delhi.11. Shri M.Jayachandra, Deputy Director, Ministry of Housing and Urban Poverty
Alleviation, JNNURM Mission Directorate, New Delhi.12. Hindi Section for stencil of Hindi version.
(een ath )Dy. Director (PF.I)
Ph. 2309 5644
AnnexureRelease of Central assistance under BSUP
A. Normal projects(Rs. in lakh)
S. State/ Project Total Approved 1ST instt. Install-N. City Project Central recommen ment
Cost Share ded forrelease
1. Bihar1. BSUP Scheme IS`
Patna Adalat anj, Patna 1960.74 785.37 196.342. BSUP Scheme is
Sector- 1,Phase-V,Patna West Patna 4251.87 1671.19 417.80
3. BSUP Scheme St
Sector-2,Phase-V,Patna West Patna 3843.60 1443.35 360.84
4. BSUP Scheme 1St
Sector-3,Phase-V,Patna West Patna 4018.71 1576.79 394.20
5. BSUP Scheme Ist
Sector-4,Phase-V,Patna West Patna 4018.71 1576.79 394.20
6. BSUP Scheme - lSSector-1,Phase-VI,
Patna South Patna 4251.87 1671.19 417.807. BSUP Scheme Ist
Sector-2,Phase-VI,Patna South Patna 3843.61 1443.35 360.84
8. BSUP Scheme isSector-3,Phase-VI,
Patna South Patna 4018.71 1576.79 394.199. BSUP Scheme 1St
Sector-4, Phase-VI,Patna South Patna 4018.71 1576.79 394,19
Total for Bihar 3330.40II. Gujarat10. Surat Detailed project 4`
Report for slumRelocation atSurat(DPR-I) 6274.120 3137.060 784.25
11. Surat Housing for Urban 4`Poor at Kosad(DPR-III), Surat 7203.345 3428.568 857.15
MunicipalCorporation
12. Rajkot JNNURM - BSUP 3rdHousing Scheme(Construction of2640 Dus) atdifferent EWSHousing proposedreserved plots fordifferent townplanning schemesat Rajkot
3415.87 1658.19 414.55Total for Gu ' a at 2055.95
III. Jammu an Kashmir13. Rehabilitation of is
slum dwellers atBhagwati NagarJammu City underBSUP (JNNURM)
Jammu 143.51 123.01 30.7514. Rehabilitation of Is
slum dwellers atvarious locations ofJammu City underBSUP (JNNURM)
Jammu 3341.12 2863.82 715.95otal for Jammu & ashmir 746.70
W. Karnata15. Bengaloor Construction of 880 Is`
u BSUP houses(G+3) anddevelopment worksatBhuvaneshwarinagar, Uttarahalli,Bangalore.
3767.61 1712.55 428.14Total for Karna ka 428.14
V. Madhya Pr desk16. Slum and Poor 3r
Locality IntegratedArea Development
Bhopal Scheme Phase-II 4111.13 1995.69 498.92Total for Madhya P adesh 498.92
VI. Maharash ra
17. Greater Implementation of 3538.43 1608.38 402.09 IsMumbai BSUP at(Ulhasnaga Ulhasnagar,r) Mumbai MR,
Thane district,Maharashtra
18. Nagpur BSUP at Nagpur, 2"Maharashtra
12081.07 3706.82 926.7019. Greater BSUP scheme for 7732.75 3514.49 878.72 1st
Mumbai Kulgaon-(Kulgaon- Badlapur, Distt.Badla ur) Than, Maharashtra
20. Nagpur BSUP Scheme for is
construction of1080 Dus inSavitribai PhuleNagar slum inNagpur,Maharashtra
5253.06 2387.75 596.9421. Nanded Implementations 7137.60 5190.98 1297.74 1-9
of Integratedhousing projects(1567 DUs) underBSUP at Nandedcity.
22. Nanded Implementations 7686.94 5590.50 1397.63 ISof Integratedhousing projects(1621 DUs) underBSUP at Nanded
-city.
23 Nanded Implementations 4202.00 3056.00 764.00 1stof Integratedhousing projects(958 DUs) underBSUP at NandedCity.
24. Nanded Implementations 3981.55 2895.67 223.92 1s`of Integratedhousing projects(1002 DUs) underBSUP at NandedCity.
25.
26.
27.
28.
29.
Nanded
Nanded
Nagpur
Nagpur
Nagpur
Implementationsof Integratedhousing projects(1183 DUs) underBSUP at NandedCam.
Implementationsof Integratedhousing projects(788 DUs) underBSUP at NandedCam.Integrated deliveryof BSUP atPuchzopda &Nehru Nagar slumfor theconstruction of567 DUs inNagpur
BSUP scheme atJaibajrang Nagar,Kumbhar Toli andI and 2 slums forconstruction of858 DUs inNagpurIntegratedDelivery of basicservices to theurban poor inGopal Nagar andBh. Anand
5343.963242.77
2597.63
4533.45
3020.17
3886.51 971.632358.38 1 589.60
1180.74 1 29519-
2060.66 1 515.16
ISt
1372.81 343.20 1st
KauslalyayanNagar Slum forconstruction of642 DUs in nagpur
30. Nagpur Implementation of 40229.26 18286.03 1 4571.51 1stBSUP (6357 DUs)in Nagpur on PPPbasis
31. Pimpri, Implementation of 2837.58 1289.81 322.45 1stChinchwad BSUP at PimpriChinchwad (Pune)
32. Pimpri, Implementation of 37604.44 12866.42 1 3137.70 1stChinchwad BSUP in Pimpri
ChinchwadSection-12 atBhosari, Pune onPPP basis
To I for Mahar shtra 17734.18VI Orissa33. Bhubanesh BSUP scheme for 745.26 541.01 135.25 1st
war construction of192 DUs atBhubaneshwar
Total for Oris a 135.25VI Uttar Pra esh34. Allahabad, BSUP scheme for 738.52 341.91 85.48 1st
Naini construction of233 DUs in Naini,Allahabad
35. Allahabad, BSUP scheme for 1514.03 700.94 175.24 1stNaini construction of 24
DUs in Allahabad36. Agra BSUP scheme for 9518.01 4406.48 1101.62 1st
construction of2335 DUs in Agra
37. Agra BSUP scheme for 7133.79 3302.68 825.66 1stconstruction of1536 DUs in A ra
38. Mathura BSUP scheme at 500.87 371.02 88.31 1stJaisingh Pura,Mathura
39. Agra Implementation of 3977.63 1841.49 460.37 1stBSUP project atAgra Nagar Nigamfor construction of950 DUs.
40. Agra Implementation of 3477.70 1610.05 402.51 1stBSUP project atDeori Road inAgra City (2420DUs)
41. Mathura Implementation of 8810.17 6526.05 1631.51 1stBSUP project forconstruction of2018 DUs atRadhayshyamColony, Mathura
42. Kanpur Implementation of 2850.38 1319.62 329.90 1stBSUP at Kanpur
for construction of816 DUs in threeSlums
43. Kanpur Implementation of 2856.27 1322.35 330.59 1stBSUP at Kanpurfor construction of753 DUs in threeSlums
44. Kanpur Implementation of 2939.20 1360.74 340.19 1stBSUP at Kanpurfor construction of704 DUs in sixSlums
45. Kanpur Implementation of 1401.75 648.96 662.24 I stBSUP at Kanpurfor construction of343 DUs in threeSlums
46. Agra DPR for integrated 1479.22 678.28 169.57development ofKansiram TajnagriPhase-11
47. Agra DPR for integrated 1903.77 787.66 196.92development ofManniya Shri JeeKalindi, Bihar 1s`and 2nd
48. Meerut BSUP scheme 2218.00 894.18 223.55 1stAchronda andKanshi, Meerut
49. Meerut BSUP scheme for 2731.85 1 001.38 275.34 1stAbdullahapur andKarim Nagar,Meerut
50. Meerut Implementation of 3044.59 1436.13 359.03 1stBSUP forconstruction of852 DUs at Meerut
51. Kanpur Implementation of 3667.63 1697.98 424.49 1stBSUP project forconstruction of887 DUs in sevenslums at Kanpur
52. Meerut Implementation of 3308.45 1582.99 395.75 1st
BSUP scheme atMeerut city forconstruction of768 DUs
53. Meerut Implementation of 3770.45 1804.04 451.01 1stBSUP scheme atMeerut city forconstruction of723 DUs
54. Meerut Implementation of 3098.01 1482.30 370.58 1stBSUP scheme atMeerut city forconstruction of629 DUs
55. Lucknow BSUP scheme for 1256.48 595. 52 148.88 1st(Chak the town of ChakMalhauri) Malhauri District
Lucknow56. Lucknow BSUP scheme for 4957.03 2349.31 587.33 1st
(Nai Basti the town of NaiTown) Basti District
Lucknow57. Lucknow BSUP scheme for 595.13 282.05 70.51 1st
(Umrao the town of UmraoHata Hata, Nishat Ganj,Town) District Lucknow
58. Kanpur BSUP project at 1971.42 912.70 228.17 1stKanpur for twoslums (BargadiyaPurwa)and BaraSerohi
59. Meerut Implementation of 2901. 19 1388 .13 347.03 1stBSUP at MeerutCity for theconstruction of655 DUs
60. Allahabad Implementation of 1915.46 886.79 221.70 1stBSUP atAllahabad city forthe construction of411 DUs
61. Mathura BSUP scheme for 3169.64 2347.88 586.97 1stthe GopalnagarMathura
62. Mathura BSUP scheme for 3762.69 2787.18 696.80 1stthe Laxmi Nagar,
Mathura63. Varanasi Implementation of
BSUP at Varanasi2480.78 1148.51 287.13 11st
for theconstruction of585 DUs
64. Kanpur BSUP project atKanpur for sevenslums
3550.97 1699.03 424.76 11st
65. Allahabad Implementation of 2343.91 1085.14 271 29 11stBSUP project forconstruction of483 DUs withinfrastructurefacilities atAllahabad city
.
66. Lucknow Implementation ofBSUP project forconstruction of763 DUs with
3595.64 1664.65 416.16 11st
infrastructurefacilities atLucknow city
67. Lucknow Implementation ofBSUP project forconstruction of346 DUs with
1932.74 894.79 223.70 11st
infrastructurefacilities atLucknow city
68. Lucknow Implementation ofBSUP project forconstruction of487 DUs with
2662.36 1232.58 308.14 1 1st
infrastructurefacilities atLucknow city
69. Agra Implementation ofBSUP project atAgra Nagar Nigamat Gover Chauki(604 DUs)
3514.33 1627.01 406.75 11st
70. Meerut Implementation of 2884.16 1379.98 345 00 1 1stBSUP project atMeerut forconstruction of
.
71.
72.
73.
74.
75.
Meerut
Meerut
Varanasi
Varanasi
Varanasi
694 DUsImplementation ofBSUP project forconstruction of677 DUs withinfrastructurefacilities at Meerut
CityImplementation ofBSUP project forconstruction of731 DUs withinfrastructurefacilities at MeerutcityImplementation ofBSUP project forconstruction of728 DUs withinfrastructurefacilities atVaranasi cityImplementation ofBSUP project forconstruction of776 DUs withinfrastructurefacilities atVaranasi cityBSUP scheme forthe city ofVaranasi (1305DUs)Total for Uttar Pri
3165.92
3470.93
3431.66
3058.73
5674.26
deshIx Uttarakhan Id76. Dehradun BSUP DPR for
Rotary KusthrogAshram, Dehradun
163.34
77. Dehradun BSUP DPR forShanti KusthrogAshram, (Malin
137.20
Basti), Dehradun78. Dehradun BSUP DPR for
Ram MandirKusthrog Ashram,(Malin Basti),
163.64
1491.05 372.76 1 1st
1598.43 399.61 1 1st
1588.73 397.18 1 1st
1416.08 354.02 1 1st
2626.97 656.73 I 1st
16550.48
115.93 28.98 I St
109.76 27.44 I S`
111.80 27.96 I St
Dehradun79. Dehradun BSUP DPR for
Chaksha NagarSlum (BalinBasti), Dehradun
860.20 655.05 1 163.76 I St
Total for Vttarakhand 248.14X West Bengal80. Kolkata
(GaruliaMA)
BSUP Scheme forthe Town ofGarulia (KolkataMA), West Bengal
3275.51 1637.76 1 409.44 Pr
81. Kolkata(Konnagar
MA)
BSUP Scheme forthe Town ofKonnagar (Phase-II) (Kolkata MA),West Bengal
1,261.20 630.60 1 157.65
I St
82. Asansol BSUP scheme forthe town ofAsansol (Phase-II),(2232 DUs)Bardhman, WestBengal
5816.27 2908.14 727.03 151
83. Asansol BSUP scheme forthe town of
13086.03 6543.01 1 1635.75 1 St
84.
85.
86.
87.
88.
Asansol(Durgapur)
Kolkata(Titagarh)
Asansol
Asansol(Kulti)
Kolkata(Baruipur)
Asansol (Phase-III), (4626 DUs)Bardhman, WestBengalBSUP scheme forthe town ofDurgapurBardhman, WestBengalBSUP scheme forthe town ofTitagarh (Phase-1),24 Paragnas(North), KolkataRehabilitation ofslums in Durgapur,Asansol UrbanAreaBSUP scheme forthe town of KultiBSUP scheme forthe town of
4465.62 2232.81 1 558.20
1 St
1673.50 836.75 209.19 1 St
10601.62 5300.81 1325.20 2"
1555.13 724.81 1 181.21 1 --2-n7d
1008.02 484.60 121.15 2a
Barui ur89. Kolkata Relocation of four 264.85 120.39 30.10 2"
slums to one slumin Bally(Phase-I),Kolkata
90. Kolkata Rehabilitation of 1104.94 502.26 125.57 2"(Serampore two slums in
Serampur Phase-I,Kolkata
91. Kolkata Slum 5415.45 2707.73 676.93 2"Developmentprogramme underBSUP throughKMDA
92. Kolkata BSUP scheme for 5727.81 2863.90 715.98 15`(Rajarhat- Rajarhat -Gopalpur) Gopalpur (Phase-
11) , KMA, Kolkata93. Kolkata BSUP scheme for 5812.60 2906.30 726.57 1st
(North North Dam DamDam Dam) (Phase-II), KMA,
Kolkata94. Asansol Rehabilitation of 8895.00 4446.00 1111.12 2"
slums in AsansolUrban Area
95. Kolkata BSUP scheme for 2085.87 1001.93 250.48 3`the town ofMadh amgram
96. Kolkata BSUP scheme for 3244.17 1622.09 405.52(Bally)(Bally) the town of Bally
(Phase-II), KMA,Howra
97. Kolkata BSUP scheme for 1357.69 678 85 169 71 is(Bidhannag the town of
. .
ar) Bidhannagar(Phase-II) North24 Paragnas
98. Kolkata Housing for 1577.34 888.67 197.17 15Urban Poor withinKolkata MunicipalCorporation(KEIP)
99. Kolkata Rehabilitation of 1398.91 635.87 558.97 2°(Champdan one slum iny) Champdany,
Kolkata
10 Kolkata Housing for Urban 1577.34 788.67 197.17 2"Poor withinKolkata MunicipalCorporation(KEIP)
101 Kolkata Rehabilitation 1885.27 856.95 214.24 3`Rajarhat- 9slums inGopalpur Rajarhat-Gopalpur
Phase-I), Kolkata10 Kolkata Housing for Urban 1577.34 788.67 197.17 3`
Poor withinKolkata MunicipalCorporation(KEIP)
Total for West Bengal 10501.52Grand Total 52229 (,R
B. Release of IS` Installment of Central assistance for setting up of PMU/ PIUs
SI.No. Name of State/ City Amount to be released1. Assam (PMU) 20.002. Assam, 1 PIU in Guwahati 17.003. 2 PIUs for covering all IHSDP towns in
Assam28.00
Total for Assam 65.004. Jammu & Kashmir (PMU) 20.005. 2 PIUs (1 each in Jammu & Srinagar) 34.006. 2 PIUs for covering all IHSDP towns in
Jammu & Kashmirl
28.00
Total for Jammu Kashmir 82.007. Jharkhand, setting up of PIU for Ranchi 17.00Total for Jharkhand 17.008. Manipur (PMU) 20.009. Manipur, setting up of PIU in Imphal 14.00Total for Manipur 34.00
Uttar Pradesh (PMU) 20.00
r
Uttar Pradesh, setting up of 6 PIUs (1each in Allahabad, Agra, Lucknow,Meerut, Kan ur, Varanasi)
120.00
Uttar Pradesh, I PIU in Mathura 14.0013 Uttar Pradesh, setting up of 5 PIUs for
covering all IHSDP towns in UttarPradesh
85.00
Total for Uttar Pradesh 239.00Grant total for PMU & PIU 437.00
akh)
State- wise total is as under:Rs
SI. No. Name of State Amount to bereleased
1. Assam 65.002. Bihar 3330.403. Gurajat 2055.954. Jammu & Kashmir 828.705. Jharkhand 17.006. Karnataka 428.147. Madhya Pradesh 498.928. Maharashtra 17734.189. Manipur 34.0010. Orissa 135.2511. Uttar Pradesh 16789.4812. Uttarakhand 248.1413 West Bengal 10501.52
Grand Total 52666.68