content - design group content sl. no. description page no. 1 design group–a profile 1 2 iso...

157
Content Content Sl. No. Description Page No. 1 Design Group – A Profile 1 2 ISO Certificate 6 3 Membership Certificate of Consulting Engineers Association of India 7 4 Certificate of Incorporation 8 5 MoU with a M/s. WAPCOS Limited 9 b M/s. Maxiclean Energy Private Limited 17 c M/s. S.M. Energenco Limited 24 6 Empanelment with M/s. BHEL 26 7 Empanelment with M/s. Construction Industry Development Council 29 8 Merger of M/s. Subhadra Consulting Engineers with M/s. Design Group Project Consultants Pvt Ltd 30 9 Empanelment with Karnataka Neeravari Nigama Limited 32 10 Experience in Design Engineering – A few important projects 33 11 Detailed Engineering Services completed and the project is also completed 55 12 Ongoing Assignments and the projects under various stages of execution 65 13 Preparation of Detailed Project Report 70 14 Preparation of Due Diligence Report 80 15 Preparation of feasibility report 82 16 Miscellaneous Assignments such as Pre-Tender Services, Calibration of volume computation and efficiency of canal etc., 85 17 Organization Structure – Panel of Advisors 104 18 Brief Profile of Consultants 117 19 Some of the Certificates for Successfully Completed Projects 136

Upload: phungdung

Post on 10-Mar-2018

242 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Content

Content

Sl.No.

DescriptionPageNo.

1 Design Group – A Profile 1

2 ISO Certificate 6

3 Membership Certificate of Consulting Engineers Associationof India

7

4 Certificate of Incorporation 8

5 MoU with

a M/s. WAPCOS Limited 9

b M/s. Maxiclean Energy Private Limited 17

c M/s. S.M. Energenco Limited 24

6 Empanelment with M/s. BHEL 26

7 Empanelment with M/s. Construction Industry DevelopmentCouncil

29

8 Merger of M/s. Subhadra Consulting Engineers with M/s.Design Group Project Consultants Pvt Ltd

30

9 Empanelment with Karnataka Neeravari Nigama Limited 32

10 Experience in Design Engineering – A few important projects 33

11 Detailed Engineering Services completed and the project isalso completed

55

12 Ongoing Assignments and the projects under various stagesof execution

65

13 Preparation of Detailed Project Report 70

14 Preparation of Due Diligence Report 80

15 Preparation of feasibility report 82

16 Miscellaneous Assignments such as Pre-Tender Services,Calibration of volume computation and efficiency of canaletc.,

85

17 Organization Structure – Panel of Advisors 104

18 Brief Profile of Consultants 117

19 Some of the Certificates for Successfully Completed Projects 136

Page 2: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

An Introduction1

1. DESIGN GROUP –A PROFILE

was established in the year 1979 to offer consultancyservices for civil and electrical engineering projects. Having completed over 100prestigious and varied assignments in the last 5 years, DG is a leading consultancyfirm, offering full-fledged consultancy services across various fields of engineeringfor projects in India and Abroad.

Equipped to provide Design Engineering Consultancy for very large engineeringprojects, DG has been providing technical consultancy services to variousorganizations and companies for planning, detailed design, and implementation ofHydel, gas based thermal and other modes of power projects. These services,besides project formulation and feasibility studies, include analysis of financialaspects, design engineering for electrical installation of substations, switchyards andtransmission lines, design engineering for civil engineering structures includinglarge dams, tunnels, canals, power canals, cross drainage works, surge tanks,penstock, and power houses and their implementation aspects including variouscomponents of Irrigation projects. DG also provides services related to design andimplementation of projects in other civil engineering fields of Water Supply, andWaste Water Treatment Plants.

DG, which has an annual turnover of over Rs.400 lakhs, provides variousconsultancy services required for the implementation of projects, right from conceptto completion, commissioning, operation and maintenance, thereafter. DG’s serviceshave been utilized by Large Industrial Houses, Firms, and Independent PowerProducers in India, and elsewhere, for the planning and design engineering of theirprojects. In the year 2004, DG was honored with an ISO 9001:2008 certification for itsdesign engineering services and continues to hold the certification.

DESIGN GROUP

Page 3: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

An Introduction2

DG has entered into MOU / JV with a number of large engineering institutions inIndia and other Countries to enhance the availability of the required engineeringconsultancy Services to its clients and expand its horizon of its activities andservices. A few are named below:

1) WAPCO Limited, New Delhi.2) ILF Consulting Engineer, Abu Dhabi3) GEM Engineering Company Ltd., Uganda4) IL&FS Ltd., Hyderabad5) NihamShand Cape town South Africa6) Land Mark Holding Ltd. Nairobi, Kenya7) SSDC Damam KSA8) SOUTH ASIA ENGINEERING(P) Ltd., Kathmandu, Nepal9) Maxiclean Energy Pvt Ltd(MEPL), Gurgaon, New Delhi-48,10) SM Engergenco, Guwahati, Assam, India

Corporate Office

Page 4: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

An Introduction3

DG has been empanelled as consultant in a few large public sector undertakings.

1) BHEL, for extending design engineering services in Civil works of HydroPower projects

2) Karnataka Neeravari Nigam Limited, for engineering services for WaterResources Projects.

3) PFC consulting Limited, New Delhi for Power Projects.

Our clients include large organisations such as:

1) Nuclear Power Corporation Limited.2) Gammon India Limited.3) Fichtner Limited, Bangalore4) GMR Energy Limited, Bangalore5) ILFS Infra Limited, Hyderabad6) NTPC, New Delhi7) BHEL, Bangalore8) Ritwik Energy Limited Hyderabad9) Greenko Energy Limited Hyderabad10) AMR Mitra JV Ltd., Hyderabad

In order to provide appropriate and quick Design Engineering Services morethan 100 engineering softwares have been developed in house, over a period of20 years. In addition, more than a dozen engineering design softwares have beenacquired and are in use for day to day work .State of Art facilities have beencreated to take up large Water Resources Projects.

Presently the major consultancy jobs on hand are:

1. Detailed Engineering Services for Shanmukha Subramanya Mini HydelScheme, Dakshina Kannada District, Karnataka,

Page 5: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

An Introduction4

2. Detailed Design Engineering Services for Kumbenahalli Mini Hydel Scheme,Kumbenahalli village, Channarayanapattana Taluk, Hassan district,Karnataka

3. Two Multipurpose Projects in Afghanistan. namelya. Machalgho Multipurpose Project, near Kabulb. Pashdan Multipurpose Project in Herat region.

The assignment has been withdrawn due to security reasons.

4. Detailed Project Report for Hydro Power Generation Project of Khri Stage-I,West Khasi Hill District, Meghalaya,

5. Detailed Project Report for Hydro Power Generation Project of Khri Stage-II,West Khasi Hill District, Meghalaya, India

6. Detailed Engineering Services for Mahan Small Hydel Project Scheme-3Across River Mahan, Korhapur village, Surjpur Tehsil, Sarguja District,Chattisgarh State, India.

7. Detailed Design Engineering Services for Beedalli Mini Hydel Project,Somavarapet taluk, Coorg District, Karnataka, India.

8. Detailed Engineering Consultancy for 50 KLPD Distillery with FuelEthanol(with incineration boiler) project of Nandi Sahakari Sakkare KarkhaneNiyamit, Bagalkot district, Karnataka

9. Detailed Civil Design Engineering for Twin RCC thickners along with tunnelsand allied works for Tailing Thickner for gold benefication plant in Morroco,Africa.

Page 6: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

An Introduction5

10 Detailed Engineering services for Kabeli B1 Hydro Electric Project, in EasternProvince of Nepal.

11 Preparation of Detailed Project Report for Barachukki Hydro Electric Projecton Barachukki limb of River Cauvery(Upstream of Barachukki falls)Malavalli Taluk, Mandya District, Karnataka

12 Preparation of Detailed Project Report for Fandarya Hydro Power Project,Tajikistan.

13 Preparation of Detailed Project Report for Garm Hydro Power Project,Tajikistan

14 Preparation of Detailed Project Report for Tavildara Hydro Power Project,Tajikistan

15 Preparation of Detailed Project Report for 1000MW Thermal Power Plant inTajikistan

16 Detailed Design Engineering Services for Gatambe Small Scale HydropowerProject (12MW), Kandy, Sri Lanka

17 Detailed Engineering Services for implementation of the Tinget HEP(140MW)in Himachal Pradesh including Detailed Project Report preparation.

18 Preparation of Detailed Feasibility Report (i.e. DPR)for Trishuli GalchhiHEP(75MW) in Nepal.

The details of many more projects under consultancy assignments of DG areappended in this profile.

Page 7: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate6

2. ISO CERTIFICATE

Page 8: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate7

3. MEMBERSHIP CERTIFICATE OF CEAI - INDIA

Page 9: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate8

4. CERTIFICATION OF INCORPORATION

Page 10: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

MOU9

5. Memorandum of Understanding

Page 11: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

MOU10

5 (a)

Page 12: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

MOU11

Page 13: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

MOU12

Page 14: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

MOU13

Page 15: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

MOU14

Page 16: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

MOU15

Page 17: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

MOU16

Page 18: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

MOU17

5(b)

MOU for Project Assignments of NEEPCO

Page 19: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

MOU18

Page 20: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

MOU19

Page 21: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

MOU20

Page 22: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

MOU21

Page 23: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

MOU22

Page 24: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

MOU23

Page 25: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Vendor Registration24

6. VENDOR EMPANELMENT WITH BHEL

Page 26: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Registration25

7. Registration with CIDC

Page 27: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Empanelment26

9. Empanelment with Karnataka Neeravari Nigama Limited

Page 28: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project27

10. Experience in Design Engineering - A Few Important Projects

10.1 Harangi Dam Power House-9.00MW

Harangi Irrigation Project is a multi-purpose project with right and left bankirrigation canals with a total command area of 8000 Ha of irrigable land. Theavailable surplus water of the Harangi Reservoir during the monsoon and the14.00m head available between the MWL/FRL of the Reservoir and the left bankcanal bed level has been harnessed to generate 9 MW of electrical power and36GWHr of energy annually, at a total project cost of Rs. 360 million. The powergeneration scheme comprises of the construction of an approach channel, circularintake well with gates, 97.5m long RCC lined tunnel of 5.00m dia, M.S. penstocks,bifurcated into two at the surface power house, tail pool and tail channel, leadingthe water to the left bank canal and the bypass channel with an overflow weir and a

Harangi Dam Power House (2 x 4.5=9.00 MW)

Page 29: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project28

channel to lead off the excess discharge, from the power house, has been designedand implemented. M/s. EDCL, Calcutta, Developers of the 9 MW Harangi DamPower House Scheme had awarded an EPC contract to M/s. Sulzer Flovel Ltd.,Faridabad for implementation of the Project. Design of civil components andswitchyard portion of the Project has been successfully completed by DG.

10.2 Balance of Plant of Hail – 2 Power Plant – Saudi Arabia

M/s. Alfanar one of the leading EPC contractors in the Kingdom of Saudi Arabia,was awarded the construction of Hail-2 Gas based Power Plant extension, by SaudiElectric Company. M/s ILF Abu Dubai, UAE, were the principal consultants, M/s.DGPCPL was appointed as sub consultants by M/s. ILF for Detail Engineering andto issue all construction drawings and designs for complete plant except GTG.Siemens were the GTG equipment suppliers.

This was a fast track project, involving issue of more than 600 drawings in a shortspan of 4 months. The project was successfully commissioned on schedule in themonth of July 2011. The assignment included interaction with clients / SEC (Owners)during approval stage of design and drawing.

The project comprised of extension of Hail – 2 Power plant by adding 2 nos 55/70MW output Gas Turbine Generator sets to the existing 6 nos Gas TurbineGenerators, 132 kV GIS and 380 kV AIS. The extension project consisted of –

1. 132 kV, 220MVA Generator Transformer, 13.8kV / 4.16kV 15MVA unitauxiliary transformers, 10 nos. service transformers, MV & LV Switchgearsand other BOP.

2. Crude oil / Distillate oil fired Gas Turbine Generator two units of 55/70MWoutput.

3. Crude oil treatment and forwarding and distillate oil forwarding system fornew units.

4. Associated piping, cabling & services

Page 30: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project29

The Engineering services for the project consisted of –

Detail Civil Engineering involving structural designs, Architectural layouts,equipment foundations, for GTG Building, FOTP Building & SwitchgearBuilding, etc,.

Mechanical Engineering involving plant Layouts, piping, equipment sizing,fire fighting system, HVAC, etc,.

Process Engineering involving overall Process Flow Diagram, P & ID’s, etc,. Electrical Engineering involving system studies, development of SLD’s,

equipment sizing, for transformers, MV & LV, Switchgears, DC & UPSSystems, Cable & inter connection schedules.

INC illumination Engineering involving interfacing new unit & BOP toexisting control system.

GTG Building under Construction

Page 31: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project30

10.3 Sea Water Intake for PFBR Plant Systems Kalpakkam, India:

Nuclear Power Corporation Limited, Kalpakkam, awarded the construction ofSeawater Intake Cooling Water System, under the ambitious project of generatingpower through Plutonium Fast Breeder Reactor Project (PFBR), to M/s. GammonIndia Limited. The major components of the scheme were; off-shore intake shaft, on-shore outlet shaft, and a submarine tunnel connecting the two structures at a depthof about 45m below sea level. M/s. Design Group, were involved in the detailedengineering for the sub marine tunnel and shafts.

As per the investigation report, the dry density of rock in the area is 2.66 to 2.99 gmsper cubic centimeter. The tunnel was driven 45m below the sea level without anymajor geological surprises. The tunnel carries 29 cumecs of seawater required forcooling the PFBR Plant, with a bed gradient of 1 in 96.4. The density of Sea Waterfound to be 1.024 ton per cum.

Page 32: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project31

The total length of the sub marine tunnel is 565m. It is Horse shoe shaped with 3600mm finished diameter. The outer diameter varied from 4300mm to 4600mm,thickness of concrete lining adopted being 350mm in good rock zone and 500 thickRCC in zones with inadequate rock cover region and using M-45 grade cementconcrete. The tunnel passes through Charnockyte type II rock medium, havingmodulas of elasticity of 0.46 to 3.34 x 106 tons per square metre. The poissons’ ratioadopted ranged between 0.14 to 0.25 in rock and 0.15 in concrete. The SBC of soil is280 tonnes per sq. metre and strength of insitu rock is 75.60 Mpa.

Submarine Tunnel

Page 33: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project32

In addition, the inlet shaft (4250 / 5250 mm dia) and the outlet shaft (6000 / 7000 mmdia) were sunk at either end of the tunnel and lined with 500mm, thick cementconcrete lining using M-45 grade concrete.

10.4 Varahi Tail Race Mini Hydel Scheme-37.50MW:

River Varahi is an important West flowing river of Karnataka State with largeHydel power potential. Power development in the Varahi Valley with an installedcapacity of 239MW consisting of 2x4.5=9MW at Mani Dam Power House and2x115=230MW at Varahi Underground Power House was completed by KarnatakaPower Corporation Ltd. in the year 1989.

The generating capacity of Under Ground Power House has been enhanced by 230MW consisting of two units of 115 MW each.

The Varahi Tail Race Mini Hydel scheme has been planned and engineered byDesign Group for M/s. Sandur Power Co. Ltd. Varahi Tail Race Mini Hydel Schemeutilizes the tailrace discharges of Varahi Underground Power house and the

Outlet Shaft as Viewed from Submarine Tunnel

Page 34: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project33

available level difference between the point of confluence of tailrace of Under roundPower House with Varahi River and the FRL of Varahi Irrigation Dam proposeddownstream, for generation of power. The scheme comprises of the construction of adiversion weir across Varahi river just downstream of the confluence of tail race ofVUGPH with Varahi River, a gravity type intake, a 2290m long, 7m dia horse shoeshaped head race tunnel, 22m Dia simple type surge tank, 7m dia penstock tunnel, 3Nos. steel penstocks and a power house with three standard vertical shaft type fullKaplan turbines coupled to Synchronous generator of 7.5 MW capacity each underphase I and a tail race joining the Varahi River on its right flank. Under Phase II, twomore units of similar generating capacity have been added. The project has a totalinstalled capacity of 37.5MW.

The cost of the project inclusive of escalation in costs during construction andfinancial charges is placed at Rs. 13,439 lakhs. The project has been successfullycommissioned during the year 2005 for phase-I and during the year 2007 for phase-II.

View of Diversion Weir Structure with radial gates

Page 35: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project34

Overview of Power House

Power House under Construction

Page 36: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project35

10.5 PERLA-24MW / SHAMBURI-24MW Mini Hydel Schemes:

M/s. AMR Power Pvt. Ltd. implemented the 24 MW (5 x4.8 MW) capacity MiniHydel Scheme across the lower reaches of river Nethravathi, a major west flowingriver in Karnataka. The power plant is situated 35kms from Mangalore, a major

Penstock Tunnel, Concrete Lining under Construction

22m dia Surge Shaft under construction

Page 37: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project36

costal city in western Karnataka. The project has a low power generating headfluctuating between 3.95 m to 10.8 m. The rated head of the turbines is 7.31m. Thedesign flood at the barrage site is 11500 cumecs. The design discharge utilized aspower draft is 78.47 cumecs per unit. ‘S’ type Kaplan turbines coupled to 4800 KWsynchronous generators through the gear box are adopted. The generating units arecapable of running at 15% continuous overload. During the initial stage ofconstruction, another developer M/s. Rithwik Energy Generation proposed a 24 MWcapacity power plant to utilize balance available flows. After mutual discussion, itwas agreed to utilize the existing facilities of the barrage proposed by M/s. AMRPower at the site for the scheme proposed by M/s. Rithwik Energy also.

Thus, a power house accommodating 10x4.8MW was planned and developed, witha combined annual energy generation of 115.14 GWHr. The scheme thus comprisesof, a barrage across river Nethravathi with 30 radial gates to safely pass the 11500cumecs flood, non-overflow sections, a power block on the left bank, a surfacePower House, and a 95.86m x 32m x Tail Race Pool and 2km long Tail Race Channelto lead the water back to the river. The power is evacuated to the nearest substationat Netlamanur, 15 km away, by a single line 110 KV rating transmission line. Theconstruction took 27 months and the plant was synchronized. DG provided the total

Overview of Generator Equipment

Page 38: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project37

design engineering for the project services from concept to commissioning. Theproject is successfully under operation.

10.6 Modernisation of Shivanasamudram Power Channel.

Shivanasamudram Power Project is the earliest of hydro power projects constructedin India, way back in year 1902 to supply electrical power to Kolar Gold minessituated 85kms away from Bangalore. Visveswaraiah Vidyut Nigam Limited(VVNL), a Public Sector Company, owned by earstwhile Karnataka ElectricityBoard, as a part of the Modernisation programme of the existing ShivanasamudramHydro Power Project, had proposed to increase the water carrying capacity of thepower channel upto the Shivanasamudram Balancing Reservoir and also increasingthe live capacity of the Shivanasamudram Balancing Reservoir to cater to theincreased needs of flow capacity of the power channel to meet the increased flowdemand of the Power House and also the increased needs of the drinking watersupply for Bangalore City which is being drawn from Netkal Balancing reservoirfurther downstream. Visveswraya Vidhuth Nigama Limited(VVNL), entrusted thework of planning for the improvements to the power channel and the detailedengineering of the same to Design Group.

R C C D iv id e r w a l l u n d e r C o n s t r u c t i o n

Divider wall under Construction

Page 39: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project38

Originally the 2000m long power channel connecting the Shiva head works and theShiva Balancing Reservoir had been constructed with a central earthen divider walland side slopes lined with stone pitching. The central divider wall was an earthenbund with stone pitching on the side slopes. The overall dimension of the dividerwall has been 3.7m at the top and 8.2m at the bottom.

Over a period of the last 100 years, the water carrying capacity of the channel hadbeen reduced to 22.6 cumecs, from the original capacity of 34 cumecs, due to silting,vegetation growth, etc. In order to increase the discharge carrying capacity of thechannel, the existing divider wall was replaced by a thin RCC dividing wall; thepitching of the side slopes was reset and covered with RCC lining. The vegetationgrowth was completely removed. After modernization, discharge carrying capacityof the power channel has increased to 59.5 cumecs. The live capacity of ShivaBalancing Reservoir has been substantially increased by desilting the reservoir andremoval of weed growth. During Construction, DG was asked to suggest a simplemethod of desilting of the Balancing Reservoir. A simple technique of using a shovelmounted on a raft made out of a battery of empty steel drums for desilting wassuggested and was used along with the ejection of the silt by a mud pump and apipe line supported on empty floating drums, and thus silt being taken to the shores.The project was completed successfully in the scheduled time and is functioningsatisfactorily.

10.7 Singatalur Mini Hydel Scheme (4 x 4.5=18.00MW)

Page 40: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project39

Tungabhadra River is a major river of Karnataka State, rising in the Western Ghatsand flowing east to join River Krishna near Kurnool in Andhra Pradesh. The waters

Power House of Singatalur Mini Hydel Scheme under Construction

A view of the Generator Floor, Equipment under Construction

Page 41: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project40

of the river are already harnessed for providing irrigation to large tracks of lands.The water is also used for power generation at Tungabhadra dam and Kamalapurpower houses. Some more irrigation Projects both major and minor and liftirrigation schemes are on the anvil to fully utilize the waters of the river as allocatedto Karnataka State. One such project is the Singatalur lift irrigation scheme, located ashort distance upstream of the back waters of Tungabhadra Reservoir. This projectenvisages construction of the Singatalur barrage raising the water level in the riverat the site by about 10.0m and creating a small pondage for lifting the water to thecanals. Large quantum of water will flows down the barrage to the Tungabhadrareservoir during the monsoon months and a few months thereafter. The Singatalur-Huligudda Mini Hydel Scheme contemplates using a portion of this large quantumof flow of the river and the head available at the Barrage for power generation.

The scheme comprises of the construction of:I. A power block on the right bank of the Singatalur barrage located across

Tungabhadra River near Thimmalapur village.II. An approach channel of a length 75.0m.

III. Intake structure.IV. Power House to accommodate four horizontal full Kaplan units generating

4.5 MW capacity each.V. Tail race pool

VI. Tail race channel of a length 474.0mVII. The outdoor yard measuring 52.0m x 77.0m.

The project has a total installed capacity of 18 MW and generates an annual energyof 52.34 Gwhr in an average year. The power is proposed to be fed to KPTCL gridthrough a 7.58 km long 66kv transmission lines.

The total project cost of the scheme inclusive of Transmission Lines and relatedfinancial costs as per the price level of the year 2005-06 is Rs.5997.00 lakhs. The costat completion inclusive of escalation, IDC and financial charges will be Rs.6706.00lakhs. The project was proposed to be implemented in 24 months from the zero date.

Page 42: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project41

The project has been completed and commissioned.

The net average annual energy is estimated at 52.34 Gwhr. The evaluated cost ofenergy generation as per CEA norms is Rs. 2.68 per kwhr. The sale rate of energy isRs. 2.80 per kwhr.

10.8 Link Canal Mini Hydel Scheme:

Karnataka Irrigation Department, as a part of the modernization of K.R. Sagarproject Irrigation Canal System, took up the scheme to construct a link canal takingoff from the Visveswaraya canal before Hulikere tunnel and joining the CauveryBranch canal at the 17th Mile (27.20 km) near Peehalli in Mandya District. At the tailend of this link canal, there is a difference in level of about 8.3m between the bed ofthe link canal and the bed of the Cauvery branch canal and is negotiated by theconstruction of a drop structure. Link Canal Mini Hydel Scheme was formulated toutilize the water flow of the link Canal and the head available at the drop at the endof Link Canal, for power generation.

View of Power House as seen from Downstream

Page 43: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project42

The scheme is simple with minimum civil engineering works. The civil engineeringcomponents comprise of a 70m long approach channel, intake structure, gatedbypass weir with provision of automatic falling shutters, surface power house, tailchannel leading the water back to the branch canal. The installed capacity of thescheme is 1500 kW, with one unit of Vertical full Kaplan Turbine and generator. Theaverage annual energy generation is 10.10 GWHr. The cost of the scheme is Rs. 80Million. The Project was completed in the year 2003 by the Developers M/s GraphiteIndia Ltd., Bangalore, The civil engineering works were contracted to M/s MysoreConstruction Co., Bangalore. The Planning and Detailed Design Engineering washandled by Design Group.

10.9 Captive Power Plant of 5.8 MW capacity at John Welch Research Centre,Whitefield, Bangalore for M/s General Electric:

Overall view of DG Plant

Page 44: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project43

Inside view of Generator RoomDesign Group was associated as a major lead Consultants for the Planning, DetailedEngineering and construction co-ordination of the 5.8 MW Diesel Engine basedCaptive Thermal Station of the GE India Technology Centre at Bangalore, which hasbeen completed on a time bound schedule of 6 months.

10.10 Windmill Power

M/s. Doddanavar Brothers, who have planned to develop 100MW Wind Farm nearChikkodi, Belgaum district of Karnataka, India, availed our technical support forEngineering of balance of plant of the project. Critical main equipment of thecapacity 10x1.5MW was sourced from M/s. Sinovel, China, while the rest of theequipment was sourced locally.

Inside view of Generator Room

Page 45: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project44

DG assisted the developers by drafting technical specifications, preparing datasheets, floating tender for fabrication of towers, tower internals and electricalsright from generating voltage 690 volts to the grid connection. In addition,assistance was extended for procurement activities. The Civil Raft Foundationdrawings were provided after detail designs, to suit to the local sub-surface soilconditions. The entire assignment was completed in 9 months. The major taskshandled are as below:

Foundation of Wind Mill

Wind Turbine Generator Hub

Page 46: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project45

i. DG designed 33 kV outdoor yard sub-station at Wind farm, 33 kVtransmission line from Wind farm to pooling 33 / 110 kV sub-station, 33 /110 kV outdoor yard pooling station and 110 kV transmission line frompooling station to KPTCL evacuating 110 kV sub-station.

ii. DG prepared technical specification for 33 kV substation at Wind farm, 33kV transmission line, 33 / 110 kV pooling station and floated enquiry for theprocurement and scrutinized the Vendor offers and finalized placing theorders on suppliers.

iii. Vendor drawings and specification scrutinized.iv. Assisted in commissioning the sub-station and transmission line.

The first batch of 10x1.5MW wind generating units have been commissioned. Underthe second stage 20x1.6MW GE machines have been selected for installation , thecivil foundation work is under construction.

10.11 Scheme for Augmentation of Power Supply to John.F.Welch TechnologyCentre, Bangalore

Page 47: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project46

In March 2005, DG at the request of JFWTC, Bangalore, took up the study of thevarious alternatives for Augmentation of reliable power supply to JFWTC to meet itsload requirements upto the year 2009, at economical costs. After detailed study, DGformulated and suggested a scheme for drawing power at 66kv level from the newlyproposed 66kv EPIP MUSS of KPTCL, through a 900m 66kv cable upto the 66kv /11kv captive sub-station within the JFWTC campus and there from connecting to the11kv distribution system within the campus, along with the existing diesel sets asbackup. The scheme was the most economical one at Rs. 85 million and ensuredreliable power supply to meet the increasing load demand of JFWTC for the futureeven upto 20MVA. The scheme was accepted and implemented by JFWTC, within aperiod of 8 months with the Detailed Engineering and supervision assistance by DG.The scheme was commissioned successfully in March / April 2006 and is functioningsatisfactorily with adequate reliability.

10.12 Design of Vacuum Chambers

M/s. Hind High Vacuum Co. Pvt. Ltd., specializing in manufacture of PressureVessels and Vacuum Chambers for defence, pharmaceuticals, and solar panels,entrusted to DG, design and preparation of fabrication drawings for a Robotic TIGWelding chamber of size 7m x 5m x 3m. The M.S. Vacuum Chamber is designed for

Overall Site View 66/11 KV Substation at JFWTC

Page 48: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project47

negative pressure of 1 kg per sq.cm, with a rider that the deflection of internalstructural members must be limited to 0.5 mm.

The chamber consists of a main chamber, a man entry/exit chamber, robot entry/ exitchambers, tool chambers, etc. The robotic arm moves on rails. The welding will becarried out under Argon gas atmosphere. The chambers were analysed for extreme

Fabrication of Vacuum chamber under production

Page 49: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project48

conditions using NISA Software package and the analysis has been validated byIndian Institute of Science, Bangalore, the pioneer research institute, by using ETABsoftware. The analysis, design, and fabrication drawings have been furnished as perschedule to M/s. Hind High Vacuum Co. Pvt. Ltd. The fabrication of chamber hasbeen completed. The Robotic TIG Welding Chambers, is commissioned, and is one-of-its-kind in the world.

10.13 Software for Detailed Drawing of transmission line towers:

Design Group has successfully developed inhouse CAD software to prepare detaildrawings of Latice steel structures of Transmission Lines of any configuration andrating. Almost 8 years have been spent in developing accurate CAD drawingsoftware. Once a central line drawing of a transmission line tower structure isfurnished by the clients, about 2 days are required to produce individual componentdrawings, including tower extensions, developmental length of all angle members,central line distance between the bolt holes, BOQ of washers, HD bolt lengths,gusset plates with configuration, base plates with configuration, foundation bolts,lightening ground mats, fixing details etc.

Page 50: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project49

The software provides material take off concurrently, including dynamic changes ofinputs for alternative studies. All the drawings are produced in A4 size sheets,which can directly be sent to shop floor for manufacture of tower parts. There is afacility to feed the output directly to CNC machines for automatic manufacture. It isfirst of its kind in India, and a boon to manufactures of towers since the wastage ofmaterial is minimal. The services of this software has successfully availed by CPRI,KPTCL, Deepak Cables, L&T etc., DG’s future plan is to develop a software foraccurate tower spotting as well for transmission lines .

220 KV Transmission lines Tower under Erection

Page 51: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Brief on Power Project50

10.14 Pre-Tender and Post-Tender Services:

Design Group has been successfully providing pre-tender and post-tender servicesfor various public sector undertakings and several private sector undertakings, in asmuch as preparing and providing preliminary design and drawings for componentworks and structures involved and assessment of costs, detailed specifications ofvarious items of work, Conditions of Contracts, Tender Documents, Tender analysisand Reports leading to selection of construction and supply agencies as per timebound schedules and needs of clients.

Page 52: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Projects Completed50

11. DETAILED ENGINEERING SERVICES FOR PROJECTS COMPLETED

Sl.No.

Assignment Client/sInstalled

Capacity inMW

Completedcost ofproject

Rs. In lakhs

Cost ofassignmentRs. In lakhs

Refer to Work Order afterAcceptance

Remarks

1 Preparation of Hydraulic,Civil and Structural, ElectroMechanical Designs anddrawings for BPT and FootBridge for Water supplyscheme to Channagiri Townand 70 En-route villages inDavanagere District,Karnataka

M/s.NCC Limited,Bangalore

-- -- 0.75 NCC/DG/KWB-CNG/WO/12/05/2012

Assignmentcompleted

2 Detailed Design anddrawings including bill ofquantities and DPR for Waterpipeline from river Penna toBharathi Cement, Cuddaph,Andhra Pradesh

Bharathi CementLtd., Hyderabad

-- -- 27.575 No.5100000679 dated03.01.2011

Assignmentcompleted

3 Design drawings anddetailed estimate forconstruction of Diversionweir across River Varadanear Halsur village inSavanur Taluk, Haveridistrict, Karnataka.

Karnataka NeeravariNigama Niyamitha,Bangalore

Storage ofwater for Rabicrop sprinkler

irrigation

4400 4.187 Kaninini:mabada-4:dibi:Tendara:10-11/3342 dt

17.2.2011

Assignmentcompleted.

Constructionwork is

underway

Page 53: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Projects Completed51

4 Designing of electricals forbenefication plant atBagalkot, Bagalkot district,Karnataka

DoddanavarNanjinzhao Miningand MetallurgyPvt.Ltd.,Belgaum

-- -- 5.515 DNMMPL/BP/2010-11/01ADated 9.5.2011

Assignmentcompleted

5 Design and Detaileddrawings for Caisson wellfoundation in river, waterintake system(includingapproach bridge foundation)for 2x270 MW ThermalPower Plant, GoindwalSahib, Punjab, India

Through FichtnerIndia ConsultingEngineers(India)Private Ltd.,Bangalore

2x270MW -- 18 No.CNT/3160810001.3115 dt7.4.2010 CNT

1110107/7126/18.6.2011Amendment-2F1(B)-1110107-

PO(2011)-110 dt 16.8.2011

Assignmentcompleted

6 Civil Design EngineeringServices & Drawings for 18 mdia x 30 SWD RCC Tank forThickener

M/s. Delkor TechnikIndia Pvt Ltd.,Bangalore

-- -- 0.9 No.DTIPL/BGL/08.484/10068Dated 10.02.2009

Assignmentcompleted

7 Civil design for 25 m diasludge thickner tank forHutti Gold Mines Ltd., Huttivillage , Lingasugur taluk,Raichur district, Karnataka

M/s.Delkor TechnikIndia Pvt Ltd.,Bangalore

-- -- 2.1 DTIPL/BGL/09.567 Dated17.11.2009

Assignmentcompleted

8 Detailed EngineeringServices for foundation anddrawings for structural steelworks of water supplyscheme

M/s.HDOTechnologies Ltd.,Mumbai

-- -- 6 No. HFC 1A007/001 Dated21.11.2009

Assignmentcompleted

Page 54: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Projects Completed52

9 Consultancy Services forDesign & Drawings for E&MPackage for Bhavani Barrageturbine project inSamayapuram village inCoimbatore District,Tamilnadu

M/s. Sri SaravanaEngineering Works,EngineeringContractors, 367,Mettur Main Road,Bhavani - 638 601.

2x5 MW -- 17.5 SSEW/BVN/F.Bbi/D.No.009-2/2008, dtd: 09-01-2008

Assignmentcompleted

10 Consultancy Services for E &M Package for Bulb Turbinebased Hydro Electric PowerProject of Capacity atBhavani Barrage - II atUmaipalayam Village,Coimbatore, District,Tamilnadu.

M/s. MeclinFabricators PrivateLimited, No,.148,Iind Floor, ThambuStreet, Chennai - 600001

2 x 5 MW -- 17.5 MFPL/BB II/DG/Wo/15/08,dtd: 15.02.2008

Assignmentcompleted

11 Detailed Engineering forconstruction water supply to1050 MW GMR KamalangaThermal Power Project,Orissa, India

M/s.GMRKamalanga EnergyLtd.,

1050 MW GKEL/KTPP/BLR/008 -30.07.2008

Assignmentcompleted

12 Detailed Engineering forconstruction of weir acrossRiver Nethravathi at Thumbefor providing Water Supplyto Mangalore City,Karnataka.

Owner: M/s.Mangalore CityCorporation,Mangalore.Work Order throughM/s Rithwik

Water Supply -- 10 No. DG/AGIVPL/01/09 dated04.06.2009

Assignmentcompleted

13 Detailed Design EngineeringServices for Wind PowerProject near Chikodi,Belgaum district, Karnataka

M/S. DoddanavarBrothers, Belgaum,Karnataka

1.5 x 10=15MW

9000 15 No.DB-MO-WM-08-09/05Dated 27.11.2008

Assignmentcompleted

Page 55: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Projects Completed53

14 Design Engineering servicesfor Hosamatha MHS acrossGundia Hole nearHosamatha Village PutturTaluk of Dakshina KannadaDistrict, Karnataka

M/s. Dishaa PowerCorporation PvtLtd., Bangalore

3x1.20=3.60MW

-- -- No.DPCPL/DG/052/2006-07Dated 06.03.2007

Assignmentcompleted

15 Design of Spillway etc of theMid Manair Dam, Kerala

M/s. Sushee Hi-TechConstructions Pvt.Ltd., 202, RaghavaCottage, Plot No.2,DwarakapuriColony, Punjagutta,Hyderabad - 500082.

-- -- 14.59 DG/SHT/09/2007 Dated:02.05.07

Assignmentcompleted

16 Detail Design Engineeringfor Somanamaradi HEP at55th Km, Narayanapur RightBank Canal (NRBC),Deodurga Taluk, RaichurDistrict. Karnataka(II phase)

M/s. NarayanpurPower Company (P)Ltd., Bangalore

1x6=6MW(II Phase)

12000 -- No. NPCPL/2D.1/016/2007-08Dated.17.04.2007

Assignmentcompleted

17 Civil & Architectural Worksfor Design & Construction ofSea Water Intake Structure,Intake Submarine Tunnel,Approach Jetty & Seal Wellfor Outfall Structure for 500Mwe, Plutonium FastBreeder Reactor( PFBR)Project, Bhavini-Kalpakkam,Tamilnadu, India.

M/s. Gammon IndiaLtd., Mumbai

500 Mwe -- 32 No.TMS/8615/ID/735 Dated25.09.2007

Assignmentcompleted

Page 56: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Projects Completed54

18 Detailed Engineering forShamburi Mini HydelScheme, Shamburi village,Dakshina Kannada District,Karnataka.

M/s.Rithwik EnergyGeneration Pvt. Ltd.Hyderabad.

5 x 4.80=24MW 9726 -- No. NIL dated23.12.2005

Assignmentcompleted

19 Consuiltancy Services forNandikere Small HydelScheme , near Shimshapura,Mandya district, Karnataka,India

M/s, XS HydroEnergy Pvt Ltd, PlotNo. 58, 15h Main,Sector HSR Layout,Bangalore - 560034.

5x4.90=24.50MW -- 5.612 XSHP/NSHS/01/2006, dtd:28.08.2006

Assignmentcompleted

20 Design Engineering Servicefor 33 kV OutdoorSwitchyard Structure andcivil foundations for KhauliProject, HPSEB, HimachalaPradesh, India

M/s. V A TechEscher Wyes FlovelLtd., 13/1, MathuraRoad, Faridabad -121 003.

-- -- 0.825 4500006184/03.0-2.2004 Assignmentcompleted

21 Civil Works for CoalHandling Plant at SanjayGandhi TPS, MadhyaPradesh, India

M/s. The MysoreConstruction Co.,Industry House, 45,Race Course Road,bangalore - 560 001.

1x500 MW -- 0.4 MCC/916/2004, dtd: 07.05.2004 Assignmentcompleted

22 Detailed EngineeringServices for Hullahalla MiniHydel Scheme, Shimsha,Malavalli Taluk, MandyaDistrict, Karnataka.

M/s. LimbavaliPower Pvt. Ltd.,Bangalore

3 x 4=12MW 4740 24 No.LPPL/DG/01/104 dated11.10.2004

Assignmentcompleted

Page 57: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Projects Completed55

23 Design Engineering ServicesSomavathi Mini HydelScheme, ChickmagalurDistrict, Karnataka.

M/s.SRM Power Pvt.Ltd. Bangalore

2 x 3=6.00MW 2746 25 Work Orderno.DG.SRMP/08/05 dated

2.4.2005

Assignmentcompleted

24 Design Engineering Serviceof 66 KVA Substationm JFWLT centre, Electronicity city

M/s. GE IndiaTechnology CentrePvt Ltd., Bangalore

-- -- 5.5 20051157 - 09.05.2005 Assignmentcompleted

25 Processing Approval fromBESCOM/KPTCL, BangaloreProvide ProfessionalConsultancy work forEngineering Design for 66KVSubstation as per ContractTerms & Conditions inAddition to above PurchaseOrder Terms & Conditions

M/s. GE IndiaTechnology CentrePvt Ltd., Bangalore

-- -- 10 20051562 21.06.2005 Assignmentcompleted

26 Consultancy for evaluation ofAlaknanda HEP inUttaranchal

M/s. GMR EnergyLtd., Bangalore

140 MW -- 15 GEL/Alaknanda/DG/329/05-16.08.2005

Assignmentcompleted

27 Rehabilitation of WaterConducting System forPower Channel at existingShivanasamudram HydroElectric Project, Malavallitaluk, Mandya district,Karnataka

M/s. VisveswaraiahVidyuth NigamaLtd.,Bangalore(KPCL)

-- 1000 1.14 No.VVNL/DIR(Tech)&JMD/DGM(T)/7256-62 Dated

11.03.2003

Assignmentcompleted

Page 58: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Projects Completed56

28 Detailed Engineering forKadamane MHP Scheme-1near Maranahalli Village,Sahakaleshpur Taluk ofHassan District in Karnataka

M/s. PaschimHoldings Pvt Ltd.,Hyderabad

2 x 4.5=9.00MW

5200 26 No.WO/PHPL/KMHS-1DG/0001 Dated 21.04.2003

Assignmentcompleted

29 Detailed Design EngineeringServices for SingatalurHuligudda MHS,Harapanahalli taluk, Bellarydistrict, Karnataka

M/s. ThungabhadraPower Company PvtLtd.,Bangalore

4x4.50=18 MW 8300 27 No.TPCPL/1107/2003-04 Dated12.11.2003

Assignmentcompleted

30 Detailed EngineeringServices for Varahi Tail RaceMini Hydel Scheme,Hosangadi, KundapuraTaluk, Udupi District,Karnataka

M/s Sandur PowerCompany Pvt.Ltd.,Hyderabad

3x7.50=22.50MW 1st stage +2x7.50=15MW

2nd stage

-- 46 No.DG/2002/01 dated28.01.2002

Assignmentcompleted

31 Detailed EngineeringServices for civil works ofLink Canal Mini HydelScheme, Peehalli village,Bannur Taluk, Mandyadistrict, Karnataka.

M/s MysoreConstruction Co.,Bangalore

1.50MW 400 6.5 No.MCC/B/771/2/001 dated26.09.2001

Assignmentcompleted

32 Design, Drawings andestimation of steel structuralworks for 110 kV switchyard,BPCL, Samayanallur,Madurai district, Tamil Nadu

M/s Bharat HeavyElectricals Ltd.,Bangalore

2x25.00=50MW -- 1 No.IS-1-00-2007/WO/StrlDated 09.10.2000

Assignmentcompleted

Page 59: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Projects Completed57

33 Design Engineering Servicesfor Somanamaradi HEP at55th KM, Narayanapur RightBank Canal (NRBC),Deodurga Taluk RaichurDistrict.

M/s. NarayanpurPower Company (P)Ltd., Bangalore

2x6=12MW1st stage

6300 22.5 No. NPCPL/F05/D No.98/2000-2001 Dated.16.09.2000

Assignmentcompleted

34 Detailed Engineering designfor Harangi Hydro ElectricProject at Harangi Dam,Kushalnagar District,Karnataka

Suzler Flovel HydroLtd., Faridabad,Haryana

2x4.50=9.00MW 3200 12 Work done during 1999 Assignmentcompleted

35 Detailed Engineering designfor Sheshadri Iyer MiniHydel Scheme,Shivanasamudram, Malavallitaluk, Mandya District,Karnataka

Atria PowerCorporationLimited, Bangalore

3x3.30=10.00MW 1200 11.25 Work done during 1999 Assignmentcompleted

36 Design of steel structures forthe proposed 66kV outdoorswitchyard at Avery Cycles,Ludhiana, Punjab

Kirloskar ElectricCompany,Bangalore

66kVswitchyard

200 12 Work done during 1999 Assignmentcompleted

37 Detailed Design EngineeringServices for implementationof DG sets for GEITC, Whitefield, Bangalore

M/s. GE PowerControls, Bangalore

2x1.6+1.2=4.4MW 144 20 PO.No.G.5.1./ETD Dated10.03.1999

Assignmentcompleted

38 Design & EngineeringServices for 66 kV OutdoorSwitchyard of Harangi HEP,Kushanagar Taluk, Coorgdistrict, Karnataka, India

M/s.Sulzer FlovelHydro Ltd.,Faridabad

2 X4.5=9.00MW

80 0.45 Job Order No.1100016/D-07/963/799 Dated 11.08.1998

Assignmentcompleted

Page 60: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Projects Completed58

39 Design & EngineeringServices of 66 kV OutdoorSwitchyard of HemavathyLBC , near Gorur village,Arakalagud Taluk, HassanDistrict, Karnataka

M/s.Sulzer FlovelHydro Ltd.,Faridabad

4 x 4=16.00MW

100 1.3 Job Order No.1100016/D-07/874/745 Dated 29.07.1998

Assignmentcompleted

40 Design of Outdoor yard SteelStructures for KSEB,Kozhikode, Kerala

M/s.Metallurgical &EngineeringConsultants (India)Ltd., Bangalore

8 x16 =128MW 384 0.6 No.01/83/9106/kseb/p-1785Dated 07.05.1998

Assignmentcompleted

41 Design Engineering Servicesto Maddur MHS, Mandyadistrict, Karnataka

M/s.L.K. PowerCorporation Ltd,Bangalore

2X1.50=3MW -- -- No.LKPC/MDR/01/93-94Dated 22.05.1993

Assignmentcompleted

42 Detailed Engineering forVarahi Under Ground PowerHouse, Hosangadi, UdupiDistrict, Karnataka, India

Owner: KarnatakaPower CorporationLtd., BangaloreThrough M/sSubhadraConsultants,Bangalore

2x215=430MW -- -- Work done during 2009 Assignmentcompleted

43 Detailed Engineering forconstruction of earthen bundfor Sarvaraja SarovaraReservoir near Cuddaph,Chittur District, AndhraPradesh.

M/s. ECC--CPPL PvtLtd., Hyderabad.

Irrigation -- 20 Work done during 2007 Assignmentcompleted

Page 61: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Projects Completed59

44 Preparation of DesignEngineering Services &Drawings for 13 mtr dia x 3.5SWD RCC Thickenerapplication plant.

M/s. Tenova-DelkorPvt Ltd

-- -- 0.84 No.DTIPL/BGL/06.279/2231Dated 20.12.2006

Assignmentcompleted

45 Detailed EngineeringServices for Perla Mini HydelScheme, Dakshina KannadaDistrict, Karnataka.

M/s.AMR PowerPvt. Ltd.Hyderabad.

5 x 4.80=24MW 9726 20 No. nil dated 23.12.2005 Assignmentcompleted

46 Detailed Engineering forNagarjuna Sagar Tail PondDam and Hydro PowerStation, Nalgonda, AndhraPradesh

Through M/s. STUPConsultants PrivateLtd., Bangalore

2 x 25=50MW 42500 -- Work done during 2005 Assignmentcompleted

47 Detailed Engineering for theworks of balance of plant forHail-2 Gas Based PowerPlant, Saudi Arabia

Through ILFConsultingEngineers, AbuDhabi

2 x 55 / 70 MW -- 120.00(US$235,000)

ILF/D-365 July 2010 Assignmentcompleted

48 Detailed Engineering ofGugal Mini Hydel Project,Gugal barrage, Yadgirdistrict, Karnataka

M/s SRS EnergyPrivate Ltd.,Bangalore

3x3.34=10.02MW

-- 24 DG/SRSEPL/07/04 dated29.07.2004

Assignmentcompleted

49 Design Consultancy Servicefor Civil Foundation of 132kV Sub-Station atHINDALCo, Renukoot

M/s. Bharat HeavyElectricals Ltd,Industrial System,Group, Group II,CNR, Rao Circle,IISc. Post,Malleshwaram,Bangalore - 560 012.

132 kV 9850.00 -- IS-I-02-2002-DG-36, dtd:03-10-2002

Assignmentcompleted

Page 62: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Projects Completed60

50 Consultancy Service forImprovements to waterconducting system andremodeling of power channelat Shivanasamudram as perthe agreement made on 18-08-1999 for KPCTCL,Bangalore.

M/s. VisveswarayaVidyuth NigamaLimited, Office ofthe Director(Technical), VVNL,No.16, 1st MainRoad, JayamahalExtension,Bangalore - 560046.

-- -- 5.00 Dir(Tech)/DGM(F&A)/Manager/AO1/AAO/797-800-2001-02,

dtd: 26/06/2001

Assignmentcompleted

51 Check Consultancy Servicesof design and execution ofnew derrrick supportedchimney at ITPL, Bangalore,Karnataka

M/s. InformationTechnology ParkLtd., Bangalore

-- NA 7.64 CE-ITPL-DPP-200754-13 dated4.2.2013

Assignmentcompleted

52 Detailed Civil EngineeringServices for TP1 and TP2 ofCoal Conveyor System,Tunnel in cut and cover, Boxpushing section and otherallied works for addition of2x250MW for Sikka TPP,Jamnagar District, Gujarat

Multi designInfraworks pvt.Ltd.,Bangalore

-- -- 11.91 MDIPL/DG/2011-12dated 9.11.2011

Assignmentcompleted

53 Design of 35.58 MLDcapacity Sewage TreatmentPlant under UGD Scheme toShimoga City

M/s. GVPREngineers Limited,Hyderabad

-- -- 4.50 -- Assignmentcompleted

54 Design and drawings for avillage road bridge of Span7.50m, total length 24m andwidth 5.2m across Barimarunalanear Barimaru Village

M/s. Perla HydroPower Pvt ltd.,Bangalore

-- 35 1 SO.No.PHPPL/SO/DesignGroup/07 Dated 17.12.2013

Assignmentcompleted

Page 63: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Projects on Hand61

12. ONGOING ASSIGNMENTAND PROJECTS UNDER VARIOUS STAGES OF EXECUTION

SlNo Assignment Client

InstalledCapacity in

MW

Cost ofcompletionof project

Rs. In lakhs

Cost ofassignmentRs. In lakhs

Work Order No. and Date Remarks

1 Civil Design Engineering Services ofFly Ash Silos, Bufer Hopper andCollecting Tank Tower and VaccumPump House with allied works for2x800MW Raichur PowerCorporation Limited, Yermaras TPS,near Raichur, Karnataka, India

M/s MacawberBeekay PvtLtd.,Noida, NCR,New Delhi

-- -- 18.00 MBPL/PO/24723 WO No.C-00001094 dated 18.2.2013

Underexecution

2 Detailed Design EngineeringServices for Kumbenahalli MiniHydel Scheme, Kumbenahallivillage, Channarayanapattana Taluk,Hassan district, Karnataka

M/s.Aparimita PowerVentures Pvt Ltd.,Bangalore

2x2=4MW 2487 40.00 Work Order No.DG/APVPL/KMHS/01/12

dated 19.02.2013

Underprocess ofexecution

3 Providing consultancy services for400 KV, 63 MVAR, 3 phase reactorfoundation at 400 kV Reactor Bay atRTPS, KPCL, Raichur, Karnataka

M/s Shreem ElectricLtd., Bangalore

-- -- 1.45 RRD/RTPS/DG/9379/2013dated 25.02.2013

Underexecution

4 Detailed Engineering Services forShanmukha Subramanya Mini HydelScheme, Dakshina Kannada District,Karnataka, India

M/s Perla HydroPower Private Ltd.,Bangalore

2x5=10MW 5000 .00 30.00 No.PHPPL/SO/DesignGroup/01/ dated

12/16.04.2013

Underexecution

Page 64: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Projects on Hand62

5 Detailed Engineering Services forKollya Mini Hydel Scheme, nearKollya village, Puttur taluk,Dakshina Kannada District,Karnataka

Greenko EnergyPrivate Limited,Hyderabad

24MW 13611.00(Projected)

37.00 -- Underexecution

6 Detailed Design EngineeringServices for Beedalli Mini HydelProject, Somavarapet taluk, CoorgDistrict, Karnataka

Kodagu Hydel PowerPrivate Ltd.,Bangalore

2x1.50 =3.00MW

2154 33.00 -- Underexecution

7 Detailed Engineering Consultancyfor 50 KLPD Distillery with FuelEthanol(with incineration boiler)project of Nandi Sahakari SakkareKarkhane Niyamit, Bagalkot district,Karnataka

M/s.Nandi SahakariSakkare KarkhaneNiyamit,Krishananagar,Bijapur

5.00MW -- 17.00 NSSK/Civil/Distillery/4060/2011-12 dated 18.02.2012

Underexecution

8 Detailed Engineering services forCivil and H&M works forimplementation of Kukke-I MHS,Sulya taluk, Dakshina Kannadadistrict, Karnataka

M/s.HaridwarInfrastructureLimited, Hyderabad

5x4.80=24MW -- 38.00 HIL/KUKKE-1/WO/HO/2012/01 Dt

21.02.2012

Underexecution

9 Detailed Civil Design Engineeringfor Twin RCC thickners along withtunnels and allied works for TailingThickner for Khouribga Mine toJorfLasfar Ore Slurry Transport,Including construction drawingsincluding supply of soft copy of thedrawing, Moracco, Africa

M/s.Tenova-DelkorTechnik IndiaPvt.Ltd., Bangalore

-- -- 19.38 Purchase Order No.DTIPL/ADI/11.1040/28607

dated 26.10.2012

Underexecution

Page 65: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Projects on Hand63

10 Detailed Engineering services forKabeli B1 Hydro Electric Project,East of Nepal, Nepal

M/s.Arun KabeliPower Limited(AKPL),Kathmandu,Nepal

3x8.333=25MW

Nepalese Rs.20721.00

US$230,000 Agreement Dated 23.11.2012 Underexecution

11 Design Engineering for Rafha PowerPlant, Rafha, Saudi Arebia

Through ILFConsultingEngineers, Abu Dhabi

2 x 55/70 MW+ 2 X 30/50

MW

-- US$375000 E351-ILFAb-AS-0011 dated03.02.2011

Final stageof

completion

12 Detailed Enginenering services forPashdan Hydro Electric Project,Herat Region, Afganisthan

Hiwadwal Group,Azeetq-JV, Char-e-Sherpoor,Afghanisthan

-- -- US $ 19,00,000 DG/HG/01/AA Dated07.04.2011- Jointly signed by

Hiwadwal Group andDGPCPL

Withdrawnthe services

Due toSecurityReasons

13 Detailed Engineering Services forimplementation of the Tinget HEP inHimachala Pradesh includingDetailed Project Report.

AMR-Mitra JV,Hydereabad

2 x 70 MW -- 221.00 Accepted on offerRef.DG/AMR/2011 dtd

21.06.2011

UnderPlanning

Stage

14 Detailed Enginenering services forMachalgo Multipurpose project,Machalgo, Afganisthan

Gulf CivilEngineering andconstructionco.,Afghanisthan

-- -- US$704000 DG/GCE&CC/02/10 dated1.12.2010 Jointly signed by

GCE&CC and DGPCPL

Withdrawnthe services

Due toSecurityReasons

15 Design Engineering Services toMudhol MHS, Mudhol Taluk,Bagalkot district, Karnataka

M/s.L.K. PowerCorporation Ltd,Bangalore

1.00MW -- -- No.LKPC/MDR/01/93-94Dated 22.05.1993

Workunder hold

Page 66: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Projects on Hand64

16 Design Engineering Services toDeverebelekere MHS, DavanagereTaluk, Karnataka

M/s.L.K. PowerCorporation Ltd,Bangalore

2x1=2MW -- -- No.LKPC/MDR/01/93-94Dated 22.05.1993

Workunder hold

17 Detailed Design EngineeringServices for Gatambe Small ScaleHydropower Project, Kandy, SriLanka

M/s. AsiaHydropowerGeneration Pvt Ltd.,Sri Lanka

12 .00MW -- US$ 23001 No. nil Dated 11.06.2009 -

18 Detailed Engineering Services forMahan Small Hydel Project Scheme-3 Across River Mahan, Korhapurvillage, Surjpur Taluk, Sargujadistrict, Chattisgarh State

M/s. Venika HydroProjects Pvt Ltd.Bangalore

3x8.25=24.75MW

12500 33.00 No. nil dated 12.11.2009Inward No. 111 dated13.11.2009 of DGPCPL

Underexecution

19 Design Engineering Services for110/11 kV Substation, TransmissionLine and Terminal Bay at SavanurSubstation, Savanur

M/s.Vasuki PowerPvt Ltd., Bangalore

3.75 PO.No.VPPL/PO/10/2013-14Dated 21.2.14

UnderExecution

20 Construction of Gated Barrage acrossKrishna River on the upstream ofconfluence of Krishna & Bhimarivers near Girijapur Village.

M/s.KPC Ltd.,Bangalore

19.00 WO.CD/RTPS/BRG/Consult/2499 Dated 21.2.14

UnderExecution

21 Design Engineering Services for EPCPackage of Natural Draught CoolingTowers, Condenser Cooling WaterPump house & Allied works forRAPP – 7 & 8.

Gammon India Ltd., 2 x 700 MW 73.00 WO:GIL/TNE/117 Dated29.3.14

UnderExecution

Page 67: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Projects on Hand65

13(a). PREPARATION OF DETAILED PROJECT REPORTS BY DGPCPL (ON HAND)

Sl.No.

Assignment ClientInstalledCapacityin MW

Cost ofcompletionof project

Rs. Inlakhs

Cost ofassignment

Rs. Inlakhs

Work Order No. andDate

Remarks

1Detailed Project Report for Barachukki HydroElectric Project in Barachukki limb of RiverCauvery(Upstream of Barachukki falls) MalavalliTaluk, Mandya District, Karnataka

M/s Sri SreeramMallige, Bangalore

2x12=MW 7200 9.00 Work order No. nildated 14.06.2013

Ongoingassignment

2 Detailed Project Report for Fandarya HydroPower Project, Tajikistan

M/s Fandarya PowerCompany Limited,Singapore

2x55+1X25= 135MW

1928.5714 -- Work OrderNo.KIPL-DG/01/12/13Dated 10.01.2013

OngoingAssignment

3 Detailed Project Report for Garm Hydro PowerProject, Tajikistan

M/s Garm PowerCompany Limited,Singapore

4x115=460MW

6571.4286 --Work Order

No.KIPL-DG/01/12/13

Dated 10.01.2013Ongoing

Assignment

4 Detailed Project Report for Tavildara HydroPower Project, Tajikistan

M/s Tavildara PowerCompany Limited,Singapore

4x100=4 00MW

5714.2857 --Work Order

No.KIPL-DG/01/12/13

Dated 10.01.2013

OngoingAssignment

5 Detailed Project Report for1000MWThermalPower Plant in Tajikisthan

M/s Tavildara PowerCompany Limited,Singapore

1000MW -- -- During the year, 2013 OngoingAssignment

6 DPR for Hydro Power Generation station of KhriStage-I, West Khasi Hill District, Meghalaya,India

M/s SM Energenco Ltd.,Guwahati, Assam

15 MW -- 23.60 SMEnergenco/3013/14/3

dated 12.4.2013

Assignmentcompleted

7 DPR for hydro power generation station of KhriStage-II, West Khasi Hill District, Meghalaya,India

M/s.SM Energenco Ltd.,Guwahati, Assam

10 MW -- 23.60 SMEnergenco/2013/14/4

dated 12.4.2013

Assignmentcompleted

Page 68: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Projects on Hand66

Page 69: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Completed Projects66

13(b). PREPARATION OF DETAILED PROJECT REPORTS BY DGPCPL (COMPLETED)

Sl.No. Assignment Client

InstalledCapacity in MW

Cost ofcompletionof project

Rs. Inlakhs

Cost ofassignmentRs. In lakhs

Work Order No. and Date Remarks

1 DPR for Kolar Dam WS SmallHydro Electric Project, LawaKhadi village, Ichhawartaluk,Sehore district, MadhyaPradesh, India

ClearGEN PowerPrivate Ltd., NewDelhi

2x0.75 =1.50MW 1455 5.00

Work OrderNo.DG/CGPPL/01/13 andDated 13.06.2013

Assignmentcompleted

2 Detailed Project ReportDeogarh Mini Hydel Project,near Deogarh Town, Deogarhdistrict, Orissa, India

Odisha HydroPower CorporationLtd., Bhuvaneswr,through WAPCOS,New Delhi

30KW 60 --

--

Assignmentcompleted

3Detailed Project Reportincluding pre-selection oftechnology for electrification ofun-electrified Habitations(Hamlet/jc/db/tc/Thandas) andBPL households throughdecentralised distributedgeneration (DDG) underRGGVY Scheme in Mangalorejurisdiction, Karnataka

M/s.KarnatakaRenewable EnergyDevelopmentLimited, Bangalore

Varies from1KW to 55KW

Rs.7307.00 14.50 Kredl/07/sog/ddg/2012/3373 dt 12.12.2012

Assignmentcompleted

Page 70: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Completed Projects67

4 Detailed Project Report forChikkodi Windmill project9x1.6 MW-Toranahalli village8x1.6MW- Jainapur village,3x1.6 MW Chinchini village,Chikkodi taluk, Belgaumdistrict, Karnataka, India

Doddanavar GlobalEnergyPvt.Ltd.,Chikkodi,Belgaum district,Karnataka

20x1.60=32.00MW

-- 1.00 DGEPL/WM/10-11/01 dt16.11.2011

Assignmentcompleted

5 Detailed Project Report forKomaram Bheem Mini HydroElectric Project at AdilabadDistrict, Andhra Pradesh, India

M/s.Rohit EnergyPower Private Ltd.,Hyderabad

1x3=3MW -- 1726.00 REPPL/Engg/2011/001dated 21.12.2011 Assignment

completed

6 Detailed Project Report forDananahalli MHS, MandyaDistrict, Karnataka

M/s. Punam powerPvt Ltd, Bangalore.

2 x 3=6.00MW 4750 5.00 During the year 2011Assignmentcompleted

7Detailed Project Report forAugmentation of Water SupplyScheme at Hutti Gold MinesRaichur District, Karnataka

M/s. Hutti GoldMines Co Ltd.Bangalore

Water Supply -- -- During the year 2010

Assignmentcompleted

8Detailed Project Report onMHS Reports on Idigan,Karnataka

M/s. Punam Powers(P) Ltd., No.228, 1stMain, 5th phase, 60ft. Road, WOC Road,Shivanagar,Bangalore - 560 010.

6MW -- 4.500 Punam/IMHS/2010-11/01,dtd:- 18.09.2010

Assignmentcompleted

9Detailed Project Report forTokapur Mini Hydel Scheme,Shahapur Taluk, YadgirDistrict, Karnataka, India

M/s. Adarsh EnergyPvt Ltd, Shahapur

1x1.40=1.40MW 936 4.00W.O. SEPL/DG/2008-09/106dated 11.3.2009 Assignment

completed

Page 71: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Completed Projects68

10 Detailed Project Report forMagundi Mini Hydel Schemeacross river Bhadra nearMagundi village,Chikkamagalur district,Karnataka, India

M/s. ShakuntalamPower Pvt Ltd.,Bangalore

2x4.50=9.00MW 4962 2.50

No.SPPL/DG/JUNE/2009-2010/001 Dated 30.06.2009

Assignmentcompleted

11 Detailed Project Report ofAnusha Mini Hydel SchemeNear Jurreu and Kunduconfluence in Kurnool district,Andhra Pradesh, India

Dhenu Hydropvt.Ltd.,Hyderabad

2x1.90= 3.80MW 2778 4.00 No.DG/DHPL/01/09 dated26.08.2009 and No.34 dated5.10.2009 Assignment

completed

12 Detailed Project Report forRamya Mini Hydel Scheme ond/s of Nandyal bridge nearChapirevula village, Kurnooldistrict, Andhra Pradesh, India

Kurnool EnergiesPrivate Ltd.,hyderabad

2x2MW=4MW 2900 4.00 No.DG/DHPL/01/09 dated26.08.2009 and No.34 dated5.10.2009 Assignment

completed

13 Detailed Project Report forNavya Mini Hydel Scheme inbetween Santhajuturu anicutand Bandi Atmakuru village,Kurnool district, AndhraPradesh, India

Mitra EnergyPvt.Ltd., Hyderabad

2x1.3=2.60MW 2281 4.00 No.DG/DHPL/01/09 dated26.08.2009 and No.34 dated5.10.2009 Assignment

completed

14 Detailed Project Report ofKoilakuntla Mini HydelScheme Near Koilakuntlavillage, Kurnool district,Andhra Pradesh, India

Dhenu Hydropvt.Ltd., Hyderabad

2x3.8=7.60MW 3996 4.00 No.DG/DHPL/01/09 dated26.08.2009 and No.34 dated5.10.2009 Assignment

completed

Page 72: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Completed Projects69

15 Detailed Project Report forBellary Solar Power Project,Bellary, Karnataka

M/s VishruthaPower Private Ltd.,No.72, CrescentRoad, Bangalore 560001

5x1=5.00MW 600 4.00 During the year 2009

Assignmentcompleted

16 Detailed Project Report forNimishamba Hydro ElecrtricProject, SriranganapattanaTaluk, Mandya District,Karnataka

NimishambaEngineer IndiaPvt.Ltd., Bangalore

2x1.50 =3.00MW 1751 4.00 No.NEIPL/DG/NMHP/01/09-10 dated 14.10.2009

Assignmentcompleted

17 Detailed Project Report forKodekal Basaveshwara MHSNear Yadgir District,Karnataka.

M/s. KodekalBasaveshwaraPower GenerationPvt Ltd., Bangalore

2 x 5=10.00MW 4500 4.50 --

Assignmentcompleted

18 Detailed Project Report forCauvery SHEP(Right Bankj)-Downstream of BarachukkiFalls, Malavalli Taluk, MandyaDistrict, Karnataka

M/s Vijaya GreenPower Private Ltd.,Bangalore

2x12=24MW 11703 3.37 No.VGPPL/CSHP/Dated8.8.2008

Assignmentcompleted

19 Detailed Project Report forCauvery SHEP(Left Bank)-Down stream of BarachukkiFalls, Malavalli Taluk, MandyaDistrict, Karnataka

M/s Vijaya GreenPower Private Ltd.,Bangalore

2x12=24MW 11703 3.37 No.VGPPL/CSHP/Dated8.8.2008

Assignmentcompleted

Page 73: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Completed Projects70

20 Detailed Project Report forPerudoor MHS across RiverMadisal Hole, Perdur village,Udupi taluk, Udupi district,Karnataka, India

M/s. Dishaa PowerCorporation PvtLtd., Bangalore

2x2=4.00MW 2400 5.05 No.DPCPL/DG/64/2007-08dated 3.07.2007

Assignmentcompleted

21 Detailed Feasibility Report (i.e.DPR)for Trishuli Galchhi HEPin Nepal.

M/s. SiddhakaliPower Pvt Ltd.,Nepal

3x37.50=75MW NepaleseRs. 99231

US$1,00,000

Dated 20.10.2008Assignmentcompleted

22 Detailed Project Report forDabevadi MHS UttaraKannada District, Karnataka.

M/s. DabevadiHydel Power Pvt.Ltd., UttaraKannada Karnataka.

3 x 4=12.00MW 6271 4.00 During the year 2008

Assignmentcompleted

23 Detailed Project Report forHosamatha MHS acrossGundia Hole near HosamathaVillage Puttur Taluk ofDakshina Kannada District,Karnataka

M/s. Dishaa PowerCorporation PvtLtd., Bangalore

3x1.20= 3.60MW 18005 3.75 No.DPCPL/DG/052/2006-07Dated 06.03.2007

Assignmentcompleted

24 Detailed Project Report forJoldadgi MHS across BhimaRiver in Yadagiri Taluk ofGulbarga District, KarnatakaState

M/s. Sai TejaEnergies Pvt Ltd.,Hyderabad.

4x4=16MW 8000 5.33 No.Nil dated 2.5.2007

Assignmentcompleted

25 Detailed Project Report forKurkamane MHS, near PatlaBetta, Sakaleshapura Taluk,Hassan district, Karnataka,India

M/S.TrimurthiPower Pvt Ltd.,Bangalore

2x12=24MW 9600 4.49 No.TPPL/DG/16/GM-A/2007-08 Dated 25.05.2007

Assignmentcompleted

Page 74: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Completed Projects71

26 DPR for Kunchikal Mini HydelScheme - near Hosangadi inKundapura Taluk, UdupiDistrict in Karnataka.

M/s. South CanaraElectric Co. Pvt Ltd.,No. 2680/A, 11thMain, D Block, 2ndFloor, 2nd Stage,Rajajinagar,bangalore - 560 010.

2x2.5=5.00MW -- 4.408 --

Assignmentcompleted

27 Detailed Project Report forAddhole MHS, NearBisle/Kulkunda village,Sakaleshapura Taluk, Hassandistrict, Karnataka, India

M/S.TrimurthiPower Pvt Ltd.,Bangalore

3x8=24MW 106873 4.49 No.TPPL/DG/15/GM-A/2007-08 Dated 25.05.2007

Assignmentcompleted

28 Detailed Design engineeringServices for Varahi Mini HydelScheme

M/.s South CanaraElectric Co. Pvt. Ltd.,No,. 2680/A, I11thMain, D Block, 2ndFloor, 2nd Stage,RajajinagarBangalore - 560 010.

2 x 4.50= 9 MW -- -- DG/SCECPL/09/06, dtd:24.07.2006

Assignmentcompleted

29 Detailed Project Report forHuvinahedagi MHS, nearDeodurga, Shahapur taluk, ,Yadgir District, Karnataka.

M/s. XS HydroEnergy Pvt LtdHyderabad.

4 x 6=24.00MW 12000 8.00 No.XSHP/HHMHS/1/2006dated 28.08.2006

Assignmentcompleted

30 Detailed Project Report for AdiShakti Maramma MHS inKarnataka, Mandya district,Karnataka

M/s. Pioneer GencoLtd., Hyderabad

3x8.25=24.75MW 9997 5.61 No.PGL/ASMMHS/WO/001 Dated27.10.2006 Assignment

completed

Page 75: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Completed Projects72

31 DPR for Sorang HEP in SorangDogri/Barakhamba village,Nichar Tehsil, Kinnaur district,Himachal Pradesh, India

M/s. HimachalSorang Power PvtLtd., Shimla,Himachala Pradesh,India

2 x 50 MW 345000 32.00 No.HSPPL/Sorang/General/2006-07/060A Dated 04.08.2006 Assignment

completed

32 DPR for Chikka Small HydelScheme near Dhanaguru inMandya District, Karnataka -Reg.

M/s. Venika GreenPower Pvt Ltd.,No.953/A, 1st Floor,IV Block, II Main,RajajinagarEntrance, Bangalore- 560 010.

4 x 4.50=18 MW -- 5.612 DG/VGPPL/01/06, dated16.8.2006

Assignmentcompleted

33 DPR for IBC (Yatnur) MiniHydel Scheme

The Director, M/s.SKN Hydro Zenergy(P) Ltd., No. S-70,3rd Cross, 1stgMain, KEC HousingColony,Basaweshwaranagar,Bangalore - 560 079.

2x2.5=5.00MW -- 2.093 DG/SKN-HEPL/02/05, dtd:27.01.2005

Assignmentcompleted

34 Detailed Project Report forHandihalla MHS, MandyaDistrict, Karnataka.

M/s. Penna CementIndustries (P) Ltd.,Bangalore

3 x 8.25=24.75MW

12000 6.00 PCIL/DG/001 dated27.10.2006 Assignment

completed

35 Detailed Project Report for 18MW Kollya Mini HydelScheme, Dakshina KannadaDistrict, Karnataka, India

M/sShankaranarayanaConstruction PrivateLtd., Bangalore

24.00MW 13610 4.00 No.SNC/BNG/2005-06/001dated 14.09.2005

Assignmentcompleted

Page 76: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Completed Projects73

36 Detailed Project Report forMallalli MHS-II acrossKumaradhara river inSomvarpet Taluk, CoorgDistrict, Karnataka.

M/s. Nandini PowerCo (Bangalore) PvtLtd., Bangalore

3x8.30=24.90MW 10441 5.00 No.NPC/CONSUL/2005-06Dated 30.11.2005

Assignmentcompleted

37 Detailed Project Report forDoddahalla Mini HydelScheme, Chikkamagalurdistrict, Karnataka.

Mr. Srinivas Rao,Managing Director,M/s.LimbavaliPower Pvt. Ltd., No.1161, 26th "A' Main,32nd "G" Cross, 4th"T', Block, Jayanagar,Bnagalore - 560041.

2x10=20MW -- 5.51 DG/DHMHS/01/05, dtd: 18-10-2005

Assignmentcompleted

38 Detailed Project Report forDodda Betta MHS acrossKumaradhara river inSomvarpet Taluk, CoorgDistrict, Karnataka.

M/s. Sanjivini PowerPvt Ltd., Bangalore

3x7.00=21.00MW

6863 5.51 No.SPPL/CONSUL/2004-05Dated 30.11.2005

Assignmentcompleted

39 Detailed Project Report forAkkihebbal MHS, MandyaDistrict, Karnataka.

M/s. Cauvery HydroEnergy LtdBangalore

2 x 1.25=4.50MW 700 4.00 Work done in the year 2002Assignmentcompleted

40 Kadamane Mini Hydel PowerProject Scheme-1, nearMarnahalli village,Sakaleshapur Taluk, Hassandistrict, Karnataka, India

M/s PaschimHolding Pvt.Ltd.,Hyderabad

2x4.5=9.00MW -- -- LOI/PHPC/KMHS/0003dated 1.3.2001

Assignmentcompleted

Page 77: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Completed Projects74

41 Detailed Project Report forKadamane MHP Scheme-2near Maranahalli Village,Shakleshpur Taluk of HassanDistrict in Karnataka

M/s. NagarjunaHoldings Pvt Ltd.,Hyderabad

2x4.50= 9.00MW 5200 4.50 No.LOI/NHPL/KMHS/00003 Dated 01.03.2001

Assignmentcompleted

42 Detailed Project Report forRemodeling of Shiva PowerChannel at Shivanasamudram,Mandya District, Karnataka

M/s. VisvesvarayaVidyut NigamaLimited (NowKPCL), Bangalore.

Power Project 1000 20.00 Agreement dated 18.8.1999

Assignmentcompleted

43 Detailed Project Report forDinnekere MHS, Mandyadistrict, Karnataka

M/s. Jasper EnergyPvt Ltd., Bangalore

2x0.5=1.00MW 500 3.14 No.JEPL/DG/DMHS/01/14Dated 30.10.2004 Assignment

completed

44 Preparation and submission ofDPR for Astalakshmi MiniHydel Scheme - Reg

M/s.ShankaranarayanaPower EnterprisesPvt. Ltd., 12th Floor,SN Towers, 25/2,MG Road, Bangalore- 560 001.

2x3.50=7.00MW -- 3.073 SNPEPL/MHS/BNG/04-05/002, dtd: 05.06.2004

Assignmentcompleted

45 DPR for Mullibettu MHPacross Gurupur River inDakshina Kannada District,Karnataka.

M/s. Mount KailashPower Projects PvtLtd., Bangalore

-- -- 23.00 Dated 26.05.2003

Assignmentcompleted

Page 78: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Completed Projects75

8Detailed Project Reportincluding pre-selection oftechnology for electrification ofun-electrified Habitations(Hamlet/jc/db/tc/Thandas) andBPL households throughdecentralised distributedgeneration (DDG) underRGGVY Scheme in Mangalorejurisdiction, Karnataka

M/s.KarnatakaRenewable EnergyDevelopmentLimited, Bangalore

Varies from1KW to 55KW

Rs.7307.00 14.50 Kredl/07/sog/ddg/2012/3373 dt 12.12.2012

Assignmentcompleted

9 Detailed Project Report forChikkodi Windmill project9x1.6 MW-Toranahalli village8x1.6MW- Jainapur village,3x1.6 MW Chinchini village,Chikkodi taluk, Belgaumdistrict, Karnataka, India

Doddanavar GlobalEnergyPvt.Ltd.,Chikkodi,Belgaum district,Karnataka

20x1.60=32.00MW

-- 1.00 DGEPL/WM/10-11/01 dt16.11.2011

Assignmentcompleted

10 Detailed Project Report forKomaram Bheem Mini HydroElectric Project at AdilabadDistrict, Andhra Pradesh, India

M/s.Rohit EnergyPower Private Ltd.,Hyderabad

1x3=3MW -- 1726.00 REPPL/Engg/2011/001dated 21.12.2011 Assignment

completed

11 Detailed Project Report forDananahalli MHS, MandyaDistrict, Karnataka

M/s. Punam powerPvt Ltd, Bangalore.

2 x 3=6.00MW 4750 5.00 During the year 2011Assignmentcompleted

12Detailed Project Report forAugmentation of Water SupplyScheme at Hutti Gold MinesRaichur District, Karnataka

M/s. Hutti GoldMines Co Ltd.Bangalore

Water Supply -- -- During the year 2010

Assignmentcompleted

Page 79: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Completed Projects76

13Detailed Project Report onMHS Reports on Idigan,Karnataka

M/s. Punam Powers(P) Ltd., No.228, 1stMain, 5th phase, 60ft. Road, WOC Road,Shivanagar,Bangalore - 560 010.

6MW -- 4.500 Punam/IMHS/2010-11/01,dtd:- 18.09.2010

Assignmentcompleted

14Detailed Project Report forTokapur Mini Hydel Scheme,Shahapur Taluk, YadgirDistrict, Karnataka, India

M/s. Adarsh EnergyPvt Ltd, Shahapur

1x1.40=1.40MW 936 4.00W.O. SEPL/DG/2008-09/106dated 11.3.2009 Assignment

completed

15 Detailed Project Report forMagundi Mini Hydel Schemeacross river Bhadra nearMagundi village,Chikkamagalur district,Karnataka, India

M/s. ShakuntalamPower Pvt Ltd.,Bangalore

2x4.50=9.00MW 4962 2.50

No.SPPL/DG/JUNE/2009-2010/001 Dated 30.06.2009

Assignmentcompleted

16 Detailed Project Report ofAnusha Mini Hydel SchemeNear Jurreu and Kunduconfluence in Kurnool district,Andhra Pradesh, India

Dhenu Hydropvt.Ltd.,Hyderabad

2x1.90= 3.80MW 2778 4.00 No.DG/DHPL/01/09 dated26.08.2009 and No.34 dated5.10.2009 Assignment

completed

17 Detailed Project Report forRamya Mini Hydel Scheme ond/s of Nandyal bridge nearChapirevula village, Kurnooldistrict, Andhra Pradesh, India

Kurnool EnergiesPrivate Ltd.,hyderabad

2x2MW=4MW 2900 4.00 No.DG/DHPL/01/09 dated26.08.2009 and No.34 dated5.10.2009 Assignment

completed

Page 80: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Completed Projects77

18 Detailed Project Report forNavya Mini Hydel Scheme inbetween Santhajuturu anicutand Bandi Atmakuru village,Kurnool district, AndhraPradesh, India

Mitra EnergyPvt.Ltd., Hyderabad

2x1.3=2.60MW 2281 4.00 No.DG/DHPL/01/09 dated26.08.2009 and No.34 dated5.10.2009 Assignment

completed

19 Detailed Project Report ofKoilakuntla Mini HydelScheme Near Koilakuntlavillage, Kurnool district,Andhra Pradesh, India

Dhenu Hydropvt.Ltd., Hyderabad

2x3.8=7.60MW 3996 4.00 No.DG/DHPL/01/09 dated26.08.2009 and No.34 dated5.10.2009 Assignment

completed

20 Detailed Project Report forBellary Solar Power Project,Bellary, Karnataka

M/s VishruthaPower Private Ltd.,No.72, CrescentRoad, Bangalore 560001

5x1=5.00MW 600 4.00 During the year 2009

Assignmentcompleted

21 Detailed Project Report forNimishamba Hydro ElecrtricProject, SriranganapattanaTaluk, Mandya District,Karnataka

NimishambaEngineer IndiaPvt.Ltd., Bangalore

2x1.50 =3.00MW 1751 4.00 No.NEIPL/DG/NMHP/01/09-10 dated 14.10.2009

Assignmentcompleted

22 Detailed Project Report forKodekal Basaveshwara MHSNear Yadgir District,Karnataka.

M/s. KodekalBasaveshwaraPower GenerationPvt Ltd., Bangalore

2 x 5=10.00MW 4500 4.50 --

Assignmentcompleted

Page 81: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Completed Projects78

23 Detailed Project Report forCauvery SHEP(Right Bankj)-Downstream of BarachukkiFalls, Malavalli Taluk, MandyaDistrict, Karnataka

M/s Vijaya GreenPower Private Ltd.,Bangalore

2x12=24MW 11703 3.37 No.VGPPL/CSHP/Dated8.8.2008

Assignmentcompleted

24 Detailed Project Report forCauvery SHEP(Left Bank)-Down stream of BarachukkiFalls, Malavalli Taluk, MandyaDistrict, Karnataka

M/s Vijaya GreenPower Private Ltd.,Bangalore

2x12=24MW 11703 3.37 No.VGPPL/CSHP/Dated8.8.2008

Assignmentcompleted

25 Detailed Project Report forPerudoor MHS across RiverMadisal Hole, Perdur village,Udupi taluk, Udupi district,Karnataka, India

M/s. Dishaa PowerCorporation PvtLtd., Bangalore

2x2=4.00MW 2400 5.05 No.DPCPL/DG/64/2007-08dated 3.07.2007

Assignmentcompleted

26 Detailed Feasibility Report (i.e.DPR)for Trishuli Galchhi HEPin Nepal.

M/s. SiddhakaliPower Pvt Ltd.,Nepal

3x37.50=75MW NepaleseRs. 99231

US$1,00,000

Dated 20.10.2008Assignmentcompleted

27 Detailed Project Report forDabevadi MHS UttaraKannada District, Karnataka.

M/s. DabevadiHydel Power Pvt.Ltd., UttaraKannada Karnataka.

3 x 4=12.00MW 6271 4.00 During the year 2008

Assignmentcompleted

Page 82: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Completed Projects79

28 Detailed Project Report forHosamatha MHS acrossGundia Hole near HosamathaVillage Puttur Taluk ofDakshina Kannada District,Karnataka

M/s. Dishaa PowerCorporation PvtLtd., Bangalore

3x1.20= 3.60MW 18005 3.75 No.DPCPL/DG/052/2006-07Dated 06.03.2007

Assignmentcompleted

29 Detailed Project Report forJoldadgi MHS across BhimaRiver in Yadagiri Taluk ofGulbarga District, KarnatakaState

M/s. Sai TejaEnergies Pvt Ltd.,Hyderabad.

4x4=16MW 8000 5.33 No.Nil dated 2.5.2007

Assignmentcompleted

30 Detailed Project Report forKurkamane MHS, near PatlaBetta, Sakaleshapura Taluk,Hassan district, Karnataka,India

M/S.TrimurthiPower Pvt Ltd.,Bangalore

2x12=24MW 9600 4.49 No.TPPL/DG/16/GM-A/2007-08 Dated 25.05.2007

Assignmentcompleted

31 DPR for Kunchikal Mini HydelScheme - near Hosangadi inKundapura Taluk, UdupiDistrict in Karnataka.

M/s. South CanaraElectric Co. Pvt Ltd.,No. 2680/A, 11thMain, D Block, 2ndFloor, 2nd Stage,Rajajinagar,bangalore - 560 010.

2x2.5=5.00MW -- 4.408 --

Assignmentcompleted

32 Detailed Project Report forAddhole MHS, NearBisle/Kulkunda village,Sakaleshapura Taluk, Hassandistrict, Karnataka, India

M/S.TrimurthiPower Pvt Ltd.,Bangalore

3x8=24MW 106873 4.49 No.TPPL/DG/15/GM-A/2007-08 Dated 25.05.2007

Assignmentcompleted

Page 83: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Completed Projects80

33 Detailed Design engineeringServices for Varahi Mini HydelScheme

M/.s South CanaraElectric Co. Pvt. Ltd.,No,. 2680/A, I11thMain, D Block, 2ndFloor, 2nd Stage,RajajinagarBangalore - 560 010.

2 x 4.50= 9 MW -- -- DG/SCECPL/09/06, dtd:24.07.2006

Assignmentcompleted

34 Detailed Project Report forHuvinahedagi MHS, nearDeodurga, Shahapur taluk, ,Yadgir District, Karnataka.

M/s. XS HydroEnergy Pvt LtdHyderabad.

4 x 6=24.00MW 12000 8.00 No.XSHP/HHMHS/1/2006dated 28.08.2006

Assignmentcompleted

35 Detailed Project Report for AdiShakti Maramma MHS inKarnataka, Mandya district,Karnataka

M/s. Pioneer GencoLtd., Hyderabad

3x8.25=24.75MW 9997 5.61 No.PGL/ASMMHS/WO/001 Dated27.10.2006 Assignment

completed

36 DPR for Sorang HEP in SorangDogri/Barakhamba village,Nichar Tehsil, Kinnaur district,Himachal Pradesh, India

M/s. HimachalSorang Power PvtLtd., Shimla,Himachala Pradesh,India

2 x 50 MW 345000 32.00 No.HSPPL/Sorang/General/2006-07/060A Dated 04.08.2006 Assignment

completed

37 DPR for Chikka Small HydelScheme near Dhanaguru inMandya District, Karnataka -Reg.

M/s. Venika GreenPower Pvt Ltd.,No.953/A, 1st Floor,IV Block, II Main,RajajinagarEntrance, Bangalore- 560 010.

4 x 4.50=18 MW -- 5.612 DG/VGPPL/01/06, dated16.8.2006

Assignmentcompleted

Page 84: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Completed Projects81

38 DPR for IBC (Yatnur) MiniHydel Scheme

The Director, M/s.SKN Hydro Zenergy(P) Ltd., No. S-70,3rd Cross, 1stgMain, KEC HousingColony,Basaweshwaranagar,Bangalore - 560 079.

2x2.5=5.00MW -- 2.093 DG/SKN-HEPL/02/05, dtd:27.01.2005

Assignmentcompleted

39 Detailed Project Report forHandihalla MHS, MandyaDistrict, Karnataka.

M/s. Penna CementIndustries (P) Ltd.,Bangalore

3 x 8.25=24.75MW

12000 6.00 PCIL/DG/001 dated27.10.2006 Assignment

completed

40 Detailed Project Report for 18MW Kollya Mini HydelScheme, Dakshina KannadaDistrict, Karnataka, India

M/sShankaranarayanaConstruction PrivateLtd., Bangalore

24.00MW 13610 4.00 No.SNC/BNG/2005-06/001dated 14.09.2005

Assignmentcompleted

41 Detailed Project Report forMallalli MHS-II acrossKumaradhara river inSomvarpet Taluk, CoorgDistrict, Karnataka.

M/s. Nandini PowerCo (Bangalore) PvtLtd., Bangalore

3x8.30=24.90MW 10441 5.00 No.NPC/CONSUL/2005-06Dated 30.11.2005

Assignmentcompleted

42 Detailed Project Report forDoddahalla Mini HydelScheme, Chikkamagalurdistrict, Karnataka.

Mr. Srinivas Rao,Managing Director,M/s.LimbavaliPower Pvt. Ltd., No.1161, 26th "A' Main,32nd "G" Cross, 4th"T', Block, Jayanagar,Bnagalore - 560041.

2x10=20MW -- 5.51 DG/DHMHS/01/05, dtd: 18-10-2005

Assignmentcompleted

Page 85: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Completed Projects82

43 Detailed Project Report forDodda Betta MHS acrossKumaradhara river inSomvarpet Taluk, CoorgDistrict, Karnataka.

M/s. Sanjivini PowerPvt Ltd., Bangalore

3x7.00=21.00MW

6863 5.51 No.SPPL/CONSUL/2004-05Dated 30.11.2005

Assignmentcompleted

44 Detailed Project Report forAkkihebbal MHS, MandyaDistrict, Karnataka.

M/s. Cauvery HydroEnergy LtdBangalore

2 x 1.25=4.50MW 700 4.00 Work done in the year 2002Assignmentcompleted

45 Kadamane Mini Hydel PowerProject Scheme-1, nearMarnahalli village,Sakaleshapur Taluk, Hassandistrict, Karnataka, India

M/s PaschimHolding Pvt.Ltd.,Hyderabad

2x4.5=9.00MW -- -- LOI/PHPC/KMHS/0003dated 1.3.2001

Assignmentcompleted

46 Detailed Project Report forKadamane MHP Scheme-2near Maranahalli Village,Shakleshpur Taluk of HassanDistrict in Karnataka

M/s. NagarjunaHoldings Pvt Ltd.,Hyderabad

2x4.50= 9.00MW 5200 4.50 No.LOI/NHPL/KMHS/00003 Dated 01.03.2001

Assignmentcompleted

47 Detailed Project Report forRemodeling of Shiva PowerChannel at Shivanasamudram,Mandya District, Karnataka

M/s. VisvesvarayaVidyut NigamaLimited (NowKPCL), Bangalore.

Power Project 1000 20.00 Agreement dated 18.8.1999

Assignmentcompleted

48 Detailed Project Report forDinnekere MHS, Mandyadistrict, Karnataka

M/s. Jasper EnergyPvt Ltd., Bangalore

2x0.5=1.00MW 500 3.14 No.JEPL/DG/DMHS/01/14Dated 30.10.2004 Assignment

completed

Page 86: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Completed Projects83

49 Preparation and submission ofDPR for Astalakshmi MiniHydel Scheme - Reg

M/s.ShankaranarayanaPower EnterprisesPvt. Ltd., 12th Floor,SN Towers, 25/2,MG Road, Bangalore- 560 001.

2x3.50=7.00MW -- 3.073 SNPEPL/MHS/BNG/04-05/002, dtd: 05.06.2004

Assignmentcompleted

50 DPR for Mullibettu MHPacross Gurupur River inDakshina Kannada District,Karnataka.

M/s. Mount KailashPower Projects PvtLtd., Bangalore

-- -- 23.00 Dated 26.05.2003 Assignmentcompleted

51 DPR for 2nd phase WindPower Plant includingpreparation of Detailed ProjectReport at Girgaon, BelgaumDistrict

M/s DoddanavarGlobal Energy Pvt.Ltd.,Belgaum,Kakrnataka

32 MW 192 2.81 DGEPL/WM/13-14/02dt.6.05.2013

Assignmentcompleted

Page 87: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Due Deligence Report84

14. PPREPARATION OF DUE DILIGENCE REPORT – ASSIGNMENT COMPLETED

Sl.No.

Assignment Client Installed CapacityCost ofproject

Rs. In lakhs

Cost ofassignmentRs. In lakhs

Work Order No. andDate

Remarks

1 Review of DPR and designs andDrawings of Sirivada SHP andJeypore SHP in Odisha

M/s.WAPCOS, New Delhi Sirivada=3x8.25=24.75MW Jeypur-4.50-MW

Sirivada SHPRs.18695.00Jepore SHP

10.00 WAP/WRD/DG/ODISHA/SHP/2013/482 Dt

3.01.2013

Assignmentcompleted

2 Sarju I Small Hydro ElectricProject, Munar/Saung village,Kapkot Tehsil, Bageswaradistrict, Uttarkhand state, India

M/s Hemavathi Power andLight Private Ltd.,Bangalore

7.50MW 3750 3.00 HPLPL/09-10 dated22.09.2009

Assignmentcompleted

3 Sarju II Small Hydro ElectricProject, near Kapkot, KapkotTehsil , Bageswara district,Uttarkhand state, India

M/s Hemavathi Power andLight Private Ltd.,Bangalore

15.00MW 9000 3.00 HPLPL/09-10 dated22.09.2009

Assignmentcompleted

4 Sarju III Small Hydro ElectricProject, Parmati/Kanyuti village,Kapkot tehsil, BageswaraDistrict, Uttarkhand state, India

M/s Hemavathi Power andLight Private Ltd.,Bangalore

7.50MW -- 3.00 HPLPL/09-10 dated22.09.2009

Assignmentcompleted

5 Chunchi Doddi MHS, BangaloreRural District, Karnataka

M/s Greenko Energies Pvt.Ltd., Hyderabad

3x3.559MW 4800 2.00 No.GEPL/WO110/2009-10/15 dated

15.02.2010

Assignmentcompleted

Page 88: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Due Deligence Report85

6 Bhadra Left Bank Canal MHS,Shimoga District, Karnataka

M/s Shree MathaVaishanavi Infra-Build Pvt.Ltd., Mysore

1x1.50MW 1051 2.00 During the year 2010 Assignmentcompleted

7 Palar I Small Hydro Project,Palor, Sirmur district, HimachalaPradesh

M/s Tulaja Bhavani EnergyProjects Pvt.Ltd.,

3.00MW 1800 6.00 During the year 2009 Assignmentcompleted

8 Somavathi MHS, Chikkamagalurdistrict, Karnataka

M/s Velankini RenewableEnergy Pvt Ltd., Bangalore

2x3MW 2964 5.00 No.VRE/Hyd/SRM/0002/WO dated 23.09.2010

Assignmentcompleted

9 Hemavathi Left Bank CanalPower House, Gorur,Arakalagud Taluk, Hassandistrict, Karnataka

M/s Greenko Energies Pvt.Ltd., Hyderabad

4x4=16MW -- 4.00 -- Assignmentcompleted

10 Hemavathi River Bed l PowerHouse, Gorur, ArakalagudTaluk, Hassan district,Karnataka

M/s Greenko Energies Pvt.Ltd., Hyderabad

2x4=8MW -- 5.00 -- Assignmentcompleted

11 Dikhu hydro electric projectTechno - Economic viabilityStudy - Reg

Himurja Infra Pvt Ltd -- -- 1.00 Lakhs Dikhu HEP/2010-2011-01

Assignmentcompleted

12 Techno Economical ValuationReport for Sonnathi SHEP

M/s.Sugnaneshwara HydelPower Pvt Ltd., Bangalore

3 x 4.5 MW 4.5 WO.SH001-187 Dated19.02.2014

Assignmentcompleted

Page 89: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Feasibility Report86

15. PREPARATION OF FEASIBILITY REPORT - ASSIGNMENT COMPLETED BY DGPCPL

Sl.No.

Assignment Client InstalledCapacity in MW

Cost ofcompletionof project

Rs. In lakhs

Cost ofassignmentRs. In lakhs

Work Order No.and Date

Remarks

1 Feasibility Report based on toposheetfor bringing 10 tmc of raw water fromSakaleshapura (west) (KeepingYettinahole and Kerihole as source) toChikkaballapur and KolarDistrict(east)

M/s.Larsen and TubroLimited, Bangalore

Water SupplyScheme

-- 10.48 WO No. E199 dated1.12.2011

Assignmentcompleted

2 Pre-feasibility report for SHP on SouthBank of KRS near Srirangapatna,Mandya District, Karnataka state, India

M/s. Cauvery hydroEnergy Limited, 67,Lavina Courts, 1stFloor, 102, 8th Main,7th Cross, R.M.V.Extn, Bangalore - 560080.

6MW 41000 0.9927 CHEL/ASHP/85/2009-10,

dtd:12/03/2010

Assignmentcompleted

3 Feasibility Report for Ropum,Arunachala pradesh, India

M/s. Rajaratna MetalIndustries Ltd.,Mumbai.

40 MW 32000 10.00 W.O. No. NS1-Design Group/01dated 26.3.2010

Assignmentcompleted

4 Feasibility Report for KangtangshiriHydel Project, Arunachala pradesh,India

M/s. Rajaratna MetalIndustries Ltd.,Mumbai.

35 MW 26000 10.00 W.O. No. NS1-Design Group/01dated 26.3.2009

Assignmentcompleted

5 Feasibility Report for Barpu Hydelproject, Arunachala pradesh, India

M/s. Rajaratna MetalIndustries Ltd.,

70 MW 111645 10.00 W.O. No. NS1-Design Group/01

Assignmentcompleted

Page 90: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Feasibility Report87

Mumbai. dated 26.3.2008

6 Feasibility Report for Dardu and ParHEPs in Arunachal Pradesh

M/s. Maytas Infra Limited, Hyderabad 27.00 No.MIL/DG/HEP-AP/2007-08/1 Dated

03.03.2008.

Assignmentcompleted

7 Feasibility Report for Kepjog MiniHydel Scheme, near Gerusoppavillage, Honnavar Taluk, North Canaradistrict, Karnataka, India

M/s Trident PowerSystems Limited, 4thFloor, Bhaskar Plaza,Road No.1, BanjaraHills, Hyderabad

10MW -- 3.00 No.224 dated4/5.12.2008

Assignmentcompleted

8 Pre-feasibility Report for Talthare MHSin Coorg District - Reg

M/s. GM Property Developers Pvt. Ltd., # 4/5,1, 2 nd Cross, CrescentRoad, High Grounds,Bangalore - 560 001.

-- -- 5.612 DG/GMPDPL/TMHS/01/2007 Dtd:-

30.03.2007

Assignmentcompleted

9 Feasibility Report for HosakambiMHS, Ankola Taluk, Uttara KannadaDistrict, Karnataka

M/s. MysoreMercantile Co., Ltd.,Bangalore.

2x2.5=5MW 2000 4.00 No.MMCL/MAR/043/0

6-07, Dated16.03.2007

Assignmentcompleted

10 Feasibility Report for Panasuguli atYellapur Taluk, UttarakannadaDistrict, Karnataka

M/s. MysoreMercantile Co., Ltd.,Bangalore.

2x2.5=5MW 2000 4.00 No.MMCL/MAR/043/0

6-07, Dated16.03.2007

Assignmentcompleted

11 Feasibility Report for MHSDugganabail at Yellapur Taluk,Uttarakannada District, Karnataka

M/s. MysoreMercantile Co., Ltd.,Bangalore.

2x2.50=5.00MW 2000 4.00 No.MMCL/MAR/043/0

6-07, Dated16.03.2007

Assignmentcompleted

Page 91: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Feasibility Report88

12 Feasibility Report for MHSBairekoppa at Ankola Taluk,Uttarakannada District, Karnataka

M/s. MysoreMercantile Co., Ltd.,Bangalore.

2x2.50=5.00MW 2000 4.00 No.MMCL/MAR/043/0

6-07, Dated16.03.2007

Assignmentcompleted

13 Feasibility Report for Kelasi MHSacross river Bedthi in Karnataka

M/s. Abletech ElectroEngineers (P) Ltd.,Bangalore

2x2.50=5.00MW 2000 4.00 No.AEEPL/DG/1213/2006-07 Dated

06.03.2007

Assignmentcompleted

14 Detailed Project Report forNanniruhalla Mini Hydel Scheme,near Geripal village, Honnavar Taluk,North Canara district, Karnataka, India

M/s Trident PowerSystems Limited, 4thFloor, Bhaskar Plaza,Road No.1, BanjaraHills, Hyderabad

10MW -- 6.00 No.10 dated25.05.2007

Preparation ofFeasibility report

completed.

15 Feasibility report of ChapparahallaMini Hydel Scheme Phase 1 & 2

M/s. Akasha GangaEnergy Pvt. Ltd., F103, No.148, AkshayMansion, 4th Main,Govindarajanagar,Bangalore - 560 040.

14MW, 3MW -- 1.102 DG/AGEPL/01/05,dtd: 04.01.2005

Assignmentcompleted

16 Feasibility Report for Identification ofSite Providing Study of Hydrology,Potential at Site Rough Cost estmateand financial analysis Estimate &Financial Analysis

M/s. AsterInfrastructure Pvt Ltd,Secunderabad

-- -- 4.00 No.AIPL/HYDAL/DG/

001/04-05

Assignmentcompleted

17 Feasibility Report for Abilbiru MHS,Chikkamagalur District, Karnataka.

M/s.South-WestHydro Power Pvt Ltd.,Bangalore

2x2.25=4.50MW 18000 3.00 Dated 01.12.2003 Assignmentcompleted

Page 92: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Miscellaneous Assignment89

16. MISCELLANEOUS ASSIGNMENTS COMPLETED

Sl.No.

Assignment ClientInstalled

Capacity inMW

Cost ofproject

Rs. In lakhs

Cost ofassignment

Rs. Inlakhs

Work Order No. and Date Remarks

1 Local Load Analysis of 12nos. Nozzles ranging from 1"ND to 30"NB, Moracco,Africa

M/s. Tenova-Delkor Pvt.Ltd.,Bangalore

-- -- 2.81 DTIPL/ADI/12.1210/29382dt15.01.2013

Assignmentcompleted

2 Calibration of Caverns byVolume computation forISPRL, Vizag Project, -PhaseIi, Andhra Pradesh

M/s.IOTInfrastructure &Energy ServicesLimited

-- -- 5.06 PO No.120 00061-1/201202241 dt6.2.2013

Assignmentcompleted

3 Discharge measurements andestimation of conveyanceefficiency of NLBC system,Karnataka,India

ThroughM/s.WAPCOS,New Delhi

-- -- 80.90 WAP/Bang/WRD/KBJNL/NLBC/ERM/WO/ConvEff/130 dt 22.03.2013

Assignmentcompleted

4 Investigation of waterleakages-unit-No. 2 in theexisting ChunchanakatteMini Hydel Project, Mandyadistrict, Karnataka

M/s.Graphite IndiaLimited, Bangalore

-- -- 0.20 DOM/4500133228 dt 25.3.2013 Assignmentcompleted

5 Pre-tender services forDesign, drawings andestimation of quantities forTaksang Chhu RiverDiversion for trench weir

M/s.AFCONSInfrastructureLimited, Mumbai

-- -- 0.50 No.Hydro/SGP/343 dt 23.04.2012 Assignmentcompleted

Page 93: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Miscellaneous Assignment90

construction, ArunachalPradesh

6 Providing Pre-Tender Servicefor NJC Hydro Project,Arunachal Pradesh

M/s.SimplexProjects Limited,New Delhi

-- -- 1.00 No.SPL/DG/NJC/001 dt 28.05.2013 Assignmentcompleted

7 Calibration of PetroleumStorage Caverns by Volumecomputation for ISPRL, VizagProject-Phase I, AndhraPradesh

M/s.Centre of PlantEngineeringServices,Hyderabad

-- -- 3.68 COPES/PES/603 dt.20.07.2013 Assignmentcompleted

8 Pre-tender services forDetailed Engineering for civilworks for intake well, jackwell cum Pump House, RCCfoot bridge, 19MLD WTP andpure water pump houseunder improvement to watersupply scheme to GangavathiTown with Tunga BhadraRiver as source project,Bellary, Karnataka

M/s.SEWInfrastructure Ltd.,Hyderabad

19MLDWTP

-- 5.39 SEW/IWSS/Gangavathi/2012/WO/13dt 21.09.2013

Assignmentcompleted

9 Pre-tender consultancysercvices for various work of960 MW Indira SagarPolavaram project on EPCbasis, Polavaram, AndhraPradesh, India

ThroughM/s.IL&FSEngineeringServices, Gurgaon

960 -- 2.53 No.IECC/POLVR/002 dated16.05.2012

Assignmentcompleted

Page 94: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Miscellaneous Assignment91

10 Pre-tender services forPreparation and submission,Hydraulic design andCivil/Electronic Mechanicalworks and BOQ in respect of74 MLD WTP along withassociated civil works.

M/s.Gammon IndiaLimited, Mumbai

74MLDWTP

-- 4.80 WO/WIV/EDMS/410 dated 21.05.2012 Assignmentcompleted

11 Consultancy services forpreparing extra claims forriver water intake system for2x270MW Goindwal SahibThermal Power Plant, Punjab.

M/s.Punj LloydLimited, Gurgaon

-- -- 2.25 PJNo1/365652 dt 15.11.2012 F1(B)-1110107-po(2012)-116 DT 27.07.2012

Assignmentcompleted

12 Preparation of TechnicalReport of Power EvacuationSystem of Kudathini Plant,Bellary district, Karnataka.

M/s.SathavahanaIspat Limited,Bellary

-- -- 0.50 SIL/BLY/RM&ADMN/2012-13/257DT 6.11.2012

Assignmentcompleted

13 Pre-bid consultancy servicesfor Pernai Hydro ElectricProject, J&K

ThroughM/s.WAPCOS,New Delhi

-- -- 6.00 WAP/HYDRO/DG/12 Assignmentcompleted

14 Pre tender services for RewaCanal project, HimachalaPradesh

AssociatedEngineeringConsultanats &Analysts Pvt.Ltd.,Mumbai

-- -- 2.50 A-191/92/D-72/STR/2 dt 23.2.2011 Assignmentcompleted

15Pre-tender services forDagmnara HEP, SupaulDistrict, Bihar

Through WAPCOS,New Delhi

25X5=125MW

-- 12.57 WAP/DG/Dagmara HEP/TenderDoc/2011/848 dated 4.3.2011

Assignmentcompleted

Page 95: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Miscellaneous Assignment92

16 Pre-tender services for 3 no.of Small Hydro ElectricProject ie Balgad, Khutani,Seraghat in Uttarakhand

SimplexInfrastructureLimited, Mumbai

-- -- 2.21 021/VP/TENDER/VOL.1750102 DT17.03.2011

Assignmentcompleted

17 Preparation of designdrawings and Draft TenderPapers(DTP)for constructionof Diversion weir acrossVarada River near Halsurvillage in Savanur Taluk,Karnataka

KarnatakaNeeravari NigamaLimite, Bangalore

-- -- 4.41 Kaninini:mabada-4:dibi:Tendara:10-11/3381 dt 18.2.2011

Assignmentcompleted

18 Consultancy services forupdating of financials of DPRfor Magundi Mini HydroScheme, ChikkamagalurDistrict

Continental EnergyServices PrivateLimited,Hyderabad

2 x 3=6MW -- 0.69 CESPL/DG/MHS/D.No.1/2011 Dt25.03.2011

Assignmentcompleted

19 Pre-tender services forElectro-MechanicalEquipment for DumajarhiSmall Hydro Electric Project,Orissa, India

MegawinSwitchcgear-P-Limited, Chennai

2x7.5=15MW -- 1.10 Proj/SEPL/DG/2010-11 dated26.03.2011

Assignmentcompleted

20 Pre-tender services for theproposed Agra Water SupplyProject in Agra.

Gammon IndiaLimited, Mumbai

-- -- 2.85 TMS/WIV/428 DT 15.06.2011 Assignmentcompleted

21 Preparation of Technicalapprisal of 6 number of MiniHydel Schemes in WesternGhats, Karnataka

Greenko EnergiesPvt.Ltd.,Hyderabad

-- -- -- -- Assignmentcompleted

Page 96: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Miscellaneous Assignment93

a) Venkatswara Swamy MHS -do- 6MW 2600 0.50 GEPL/WO/2011/12/014 DATED7.7.2011

Assignmentcompleted

b) Shiragola MHS -do- 6MW 1455 0.50 GEPL/WO/2011/12/014 DATED7.7.2011

Assignmentcompleted

c)Jaladurga MHS -do- 3MW 1255 0.50 GEPL/WO/2011/12/014 DATED7.7.2011

Assignmentcompleted

d)Kanthamangala MHS -do- 2MW 1670 0.50 GEPL/WO/2011/12/014 DATED7.7.2011

Assignmentcompleted

e)Narasimhaswamy -do- 5MW 1700 0.50 GEPL/WO/2011/12/014 DATED7.7.2011

Assignmentcompleted

f)Ranganathaswamy MHS -do- 10MW 3459 0.50 GEPL/WO/2011/12/014 DATED7.7.2011

Assignmentcompleted

22 Pre-tender services for UpperNarmada Irrigation Project inMadhya Pradesh

Gammon IndiaLimited, Mumbai

-- -- 6.50 EDMS/WIV/636 dated 14.10.2011 Assignmentcompleted

23 Review Services Stage I uptoDPR preparation(Review ofDPRs for Umjaut(69MW) andUmduna-Mawphu StageI(90MW) Hydro ElectricProject, Meghalaya

M/s.ETA StarInfrastructure Ltd.,Mumbai

Umjaut-69MW ,Umduna-MawphuStage I-90MW

127200 25.00 ESIL/OB/2011 dated 14.11.2011 Underexecution

Page 97: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Miscellaneous Assignment94

24 Vishnugad Piaplkoti HEP inUttarkhand State - Civil &Hydro Mechanical Worksincluding Penstock steelLiners - Report onConstruction Methodology

M/s. RithwikProjects PrivateLtd., Plot No. 37 &39, NavodayaColony, Road No.2, Banjara Hills,Hyderabad - 500034.

-- -- 0.75 RPPL/DG/2010-11/02 dtd: 20,01.2010 Assignmentcompleted

25 Pre Tender Services for EPCBids at Ghataprabha DamSite floated by KPCl , nearGokak, Belgaum district,Karnatak, India

M/s. MegawinSwitchgear PvtLtd., Sai Kiran, IIFloor 2B, No.4, 1Main Road,Kasturibai Nagar,Adyar, Chennai -600 020.

2 x 10 MW 220600 -- Proj/KPCL/Ghataprabha/DG/2010-11,dtd: 23/07/2010

Assignmentcompleted

26 Pre-tender services for theproposed circulating coolingwater system for EMCOThermal Power Plant,Warora, Maharastra

Gammon IndiaLtd., Mumbai

2x300=600MW

-- 3.58 TNS/WIV/129 dt 02.03.2010 Assignmentcompleted

27 Pre-Tender Servicces for SeaWater Intake forKrishnapatnam UMPP.AP

Gammon IndiaLtd., Mumbai

6x660=3960MW

-- 3.03 TNS/WIV/570 dt 14.09.2010 Assignmentcompleted

28 Pre-tender services forUJVNL Projects in the state ofUttaranchala, India

M/s. R.R.Constructions &Infrastructure IndiaPvt Ltd.,Hyderabad.

-- -- 1.43 Dated 07.02.2009 Assignmentcompleted

Page 98: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Miscellaneous Assignment95

29 Preparation of Pre-tenderDesign & EngineeringServices, Kalisindh DamProject, Rajasthan

M/s. SimplexInfrastructures Limited, Mumbai

-- -- 3.50 No.021/BD/DesignGroup/Kalisindh/001/Vol-1/50288 DATED 22.09.2009.

Assignmentcompleted

30 Pretender Service for TenderRammam Stage-III HEP

M/s. GammonIndia Ltd., Mumbai

3 X 40=120 MW

-- 5.00 No.MKTG/G/Tender/RammamDated 30.01.2008

Assignmentcompleted

31 Preparation of Pre-tenderServices for Water SupplyScheme to JSW Ltd.,Torangallu, Bellary district,Karnataka, India

M/s. GammonIndia Ltd., Mumbai

-- -- 3.37 No.GIL/ENVIRONMENT/1629 Dated15.11.2007

Assignmentcompleted

32 Identification & ObtainingSurvey & GenerationLicenses for Arkhet Bazar,Uiya, Philim, Jaleswar &Amras HEPs in Nepal

M/s. Maytas InfraLimited,Hyderabad

-- -- 665.45 No.MIL/07-08/DG/HEP-NEPAL/002Dated 04.12.2007

Assignmentcompleted

33 Pre-tender Services forPackage-II Upper Bhadra LISProject, Karnataka

M/s. GammonIndia Ltd., Mumbai

-- -- 2.25 No.MKTG Dated 4.8.2007 Assignmentcompleted

34 Marking of Enabling Workson Survey Drawings forDodda Betta MHS

M/s.SanjiviniPower Private Ltd.,Bangalore

-- 2x10=20MW 0.50 No.SPPL/DG/2007-08 Assignmentcompleted

35 Studies of Techno EconomicViability for Bajoli Holi HEP M/s.Simplex

InfrastructuresLtd., Mumbai

180 MW -- 2.00 No.021/BD/HEP/001/VOL-I/51833Dated 31.05.2006.

Assignmentcompleted

Page 99: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Miscellaneous Assignment96

36 Preparation of Report onhydrology and power studiesfor Handihalla MHS inKarnataka

M/s. Penna CementIndustries td.,Hyderabad

3x8.25=24.75MW

-- 2.00 No.PCIL/DG/001 Dated 27.10.2006 Assignmentcompleted

37 Consultancy for WaterProofing, ChunchanakatteMHS, Mandya district,Karnataka.

M/s. Graphite IndiaLtd., VisveswarayaIndl Area,Whitefield Road,Bangalore - 560 048.

-- -- -- DOM/4500044759, dtd: 30-04-2008 Assignmentcompleted

38 Project Appraisal forBiomass Based Power Plantin Andhra Pradesh

M/s. Alpha EnergySystems Ltd.,Chennai

40 MW 1200 2.16 No.ALPHA/DG/PROJ/APPRSL/ORDER/2004 Dated 05.04.2004

Assignmentcompleted

39 Pre tender Services forPulichintala Project,Balance Reservoir HeadWorks.

M/s. GammonIndia Ltd.,Gammon House,Veer SavarkarMarg, Post Box No.9129, Prabhadevi,Mumbai - 400 025.

-- -- 1.25 DG/GIL./24/04, dtd: 11.05.2004 Assignmentcompleted

40 Pre tender services forBheema Lift Irrigation ProejctLift 1 - Stage 1 & 2 And Lift -II stage 1 & 2,. PebbainMandal, Mehabubnagardist5rict, Andhra Pradesh

M/s. GammonIndia Ltd.,Gammon House,Veer SavarkarMarg, Post Box No.9129, Prabhadevi,Mumbai - 400 025.

-- -- 0.025 MKTG:G:623/23.09.2004 Assignmentcompleted

Page 100: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Miscellaneous Assignment97

41 Tender Preparation for Make-up Water System for TripuraGas Based Power Project

M/s. JohnsonEastern PowerIndustries,Zuangtui IndlEstate, P.O. BoxNo. 40 (AIZAWL),Zuangtul

-- -- 1 JEP/04-05/627,dtd: 12.01.2005 Assignmentcompleted

42 Pre tender Services forKoilsagar Lift IrrigationScheme Stage 1 & 2 Package22 & 23 in MahaboobnagarDistrict of A.P

M/s. NagarjunaConstructionCompany Ltd.,Uma Enclave, IvthFloor, Road No. 9,Banjarahilla,Hyderabad - 500034.

-- -- 1.049 NCC/Koilsagar/I & CAD/2005, dtd:02/02/2005

Assignmentcompleted

43 Consultancy Services forSurvey, Investigation, designpreparation of estimates, DTPetc for FIC works inGhataprabha RightBankCanal under GhataprabhaProject- Reg

M/s. KarnatakaNeeravari NigamaNiyamitha, 4thFloor, Coffee BoardBldg, No.1, Dr. BRAmbedkar Veedhi,Bangalore - 560 001.

-- -- -- KNN/244/FIC/GRBC/2003/5350, dtd:29.03.2005

Assignmentcompleted

44 Owners Engineer Services forAlakananda Hydro ElectricProjects in Uttaranchal

M/s. GMR EnergyLtd., Skip House,25/1, MuseumRoad, Bangalore -560025.

140 MW 1.5 GEL/Alaknanda/DG/329/05-16.08.2005

Assignmentcompleted

45 Preparation of Canal Gauging& Computation of dischargesin various Power Channels ofShiva HEP atShivasamudram, Karnataka,

M/s. VisvesvarayaVidyuth NigamaLtd., Bangalore

-- -- 2.70 No.VVNL/EE/Shiva-Works/2259-12/2004-05 Dated 14.07.2004

Assignmentcompleted

Page 101: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Miscellaneous Assignment98

India

46 Velocity measurement inLink Canal at variousLocations by Current Meter,Srirangapattana Taluk,Mandya district, Karnataka,India

M/s. Graphite IndiaLtd., VisveswarayaIndl. Area,Whitefield Road,Bangalore - 560 048.

-- -- 0.025 BBU004, dtd: 11/10/2004 Assignmentcompleted

47 Review and Preparation ofDPR for Mannapitlu MHPacross Gurupur River inDakshina Kannada District.

M/s. Bobba PowerProjects, Bangalore

3x5.00=15.00MW

6503 24.00 Dated 06.02.2003 Assignmentcompleted

48 Construction of Bridge overSpillway of Upper TungaDam Across River Tunganear Gajanur Village,Shimoga district, Karnataka.

M/s. The MysoreConstruction Co.,Bangalore

-- -- 0.30 No.MCC/1428/2003 Dated 09.06.2003 Assignmentcompleted

49 Preparation & Submission ofGA drawings for 110Kvtransmission line atVarahi Tail Race MHS,Hosangadi, Udupi District,Karnataka

M/s.VA TechEscher Wyss FlovelLtd., Faridabad,Haryana (India)

-- -- 0.25 PO.NO. 4500004619 Dated 14.08.2003 Assignmentcompleted

50 Pre-tendering work forKarimasuti Lift IIIrd StageUnder Halyal Lift IrrigationScheme, Dharwad district,Karnataka

M/s. The MysoreConstruction Co.,Bangalore

-- -- 0.30 No.MCC/B/899/2003 Dated01.12.2003

Assignmentcompleted

Page 102: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Miscellaneous Assignment99

51 Preparation of EquipmentLayout, verifying Submittalsetc. at GE power controls,Bangalore

M/s. GE PowerControls, Bangalore

-- -- 3.50 No.40870/SED/03 Dated 31.05.2002 Assignmentcompleted

52 Development of aSpreadsheet for Computationof Load Coming on theSaddle Supports & AnchorBlocks of a Penstock steelpipeline for birkapalli HEP inTurkey

M/s. QualityEngineering &SoftwareTechnologies PvtLtd., Bangalore

- -- 0.86 PO.No. Q-I/VM/040/02-03 Dated08.07.2002

Assignmentcompleted

53 Preparation of as built DPRas per actual site condition,including hydrulic study, etc.,

M/s. Graphite IndiaLtd., Bangalore

-- -- 2.40 PO.No. BBL-022 Dated 17.09.2002 Assignmentcompleted

54 Design Service for 132 kVSwitchyard, Capacitor Bank& Transformer Feeder,Hindalco, Renukoot,Rajasthan

M/s. Bharat HeavyElectricals Ltd.,New Delhi

-- -- 0.99 No.IS-1-02-2002-DG-36 Dated03.10.2002

Assignmentcompleted

55 Submission of Drawing forAuxiliary Trash RackArrangement for HydroElectric Project,

M/s. Graphite IndiaLtd., Bangalore

-- -- 2.00 PO.No. BBL-043 Dated 31.12.2002 Assignmentcompleted

Page 103: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Miscellaneous Assignment100

56 Quality Control and ThirdParty Inspection

M/s. VisveswarayaVidyuth NigamaLimited, Office ofthe Director(Technical), VVNL,No.16, 1st MainRoad, JayamahalExtension,Bangalore - 560046.

-- -- -- VVNL/D(T)/DGM(T)/Coun©))/310/2001-02,dtd: 11-05-2001

Assignmentcompleted

57 Providing Expoxy TimerResin Surface Lining to scrollcase for Generators 1, 2, & 3,at Munirabad.

M/s. VisveswarayaVidyuth NigamaLimited, Office ofthe Director(Technical), VVNL,No.16, 1st MainRoad, JayamahalExtension,Bangalore - 560046.

-- -- -- VVNL/D (T)/DGM(T)/307/2001-02,dtd: 10-05-2001

Assignmentcompleted

58 i) Pre-bid services for projectsat Sanna, Taiz, Hydhadheand Aden (ii)Designengineering services for BOPof all the four power plants toincoude architectural,structural, electrical,mechanical works, etc.,including external servicswithin the battery limits,Yemen

at Sanna 4x5 MW,at Taiz 2x5MW,at Hydhadhe2x5MW andat Aden 2x5MW

M/s.NationalTrading Co.,Ltd., Sanna,Yemen ArabRepublic

US$750Million

US $ 12000 DG/NTCL/01/01dated 4.7.2001 Assignmentcompleted

Page 104: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Miscellaneous Assignment101

59 Remodeling of Shiva PowerChannel atShivanasamudram, MandyaDistrict, Karnataka

M/s. KarnatakaPowerTransmissionCorporation Ltd.,Bangalore.

PowerProject

1000 1998 Assignmentcompleted

60 Design and preparation ofVaccum Chamber for theRobotic & Manual TIGWelding System&7mx5mx3.05m)

M/s Hind HighVaccum CompanyPvt.Ltd.,, Penya,Bangalore

-- - 8.00 No.HPL/5/SL/4434dated 6.2.2010 Assignmentcompleted

61 Review Report on DPR ofKallur-B MHS, Hirekallurvillage, Jeevargi taluk,Gulbarga district, Karnatka,India.

M/s. Jasper EnergyPvt Ltd, Bangalore.

4x4=16MW 6250 5.33 -- Assignmentcompleted

62 Nozzle Load Analysis as perASME SEC VIII Code &Equipment Drawings & inputLoads.

M/s.Tenova DelkorIndia, Bangalore

1.57 WO.DTIPL/ADI/13.1481/33780 Dated4.2.14

Underexecution

63 Pretender Service for Hydro-mechanical works, forKopasingha, DistrictSundargarh

M/s.IL&FSEngineeringServices,Hyderabad

5.00 WO.IECCL/ORISSA/BARRAGE/KOPISINGA/01 Dated 26.02.2014

UnderExecution

64 Pretender Service for Hydro-mechanical works, forDeogaon District Jharsuguda

M/s.IL&FSEngineeringServices,Hyderabad

5.00 WO.IECCL/ORISSA/BARRAGE/DEOGAON/01 Dated 26.02.2014

UnderExecution

Page 105: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Panel of Advisors102

17. ORGANISATION STRUCTUREPANEL OF ADVISORS

Sl. No. Name & Qualification Designation1. Sri C.S. Hebli

Director Technical (Retd),Karnataka Power Corporation Ltd.Bangalore.

Chairman &Chief Consultant.

2. Sri H.V. EswaraiahDirector Technical (Retd),Karnataka Power Corporation Ltd.,Bangalore.

Consultant –Hydro CivilDesigns.

3. Sri G.N. Yoganarasimhan,Director (Retd),WRTD, Rourke,Bangalore.

Advisor-Hydrology.

4. Sri. P.R. Balasubramanian,CMD (Retd), FACT,Triavancore, Kerala.Bangalore.

Advisor- Gas Based PowerPlant.

5. Dr. D.N. Seshagiri, PhD Harvard, USA.Director (Retd),Engineering Geology,Geological Survey of India.

Advisor – Engineering Geology.

6. Sri.Vishwanath Balachandran,Director General, GIS (Retd).Chennai.

Advisor- EngineeringGeology.

7. Sri. Shankar NesargiManaging Director (Retd.)VVNL, Bangalore.

Advisor -Wind Energy

8. Sri. C. R. VenkateshExecutive Director (Retd.)NHPC Ltd., New Delhi,Bangalore.

Advisor -Hydro PowerProjects.

9. Sri. M.C. Rangarajan, B.Sc, B.E.Executive Director(Retd),KPCL, Bangalore.

Advisor / Consultant Hydro-electrical Components of Projects& electrical Systems.

Page 106: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Panel of Advisors103

Sl. No. Name & Qualification Designation

10. Sri B.V. Ramakrishnaiah,Bangalore.

Advisor – Gates.

11. Sri Srinath Anekal, ME (Civil), MS (Environment)USA.

Advisor-Environment.

12. Sri. M. M. Kamath,Chief Engineer (Retd),NMPT, Mangalore.

Advisor – Marine Engineering.

13. Sanker Prasad, M.Tech (Roorkee),New Delhi.

Consultant- Geology.

14. Sri. ThippeswamyChief Engineer (Retd.)BWSSB, Bangalore.

Advisor –Water and Waste WaterSystem.

15. Sri. V. Suresh Kumar, M.Tech (Khargpur),Bangalore.

Advisor – GIS

16. Sri V. Narayanan,General Manager, SAE (I) Ltd (Retd),Bangalore.

Advisor – TransmissionLines.

17. Dr. Y. Lingaraju. Advisor - Ground Water

18. Sri. Umashankara , B.E. (Civil)Ex-Mecon. Advisor -Steel Structures.

19. Sri. G. Rajagopalan,Director (Retd),Engineering Geology,Geological Survey of India, Chennai.

Consultant – EngineeringGeology

20. Sri. Krishnappa,Financial Controller(Retd),KPCL, Bangalore.

Advisor – Finance.

21. Sri. Sridhar Prabhu – Legal Adviser Advisor –PPA

22. Sri. Venkateshwar RaoNew Delhi.

Consultant (Liaison)

23. Sri T.S. Somanathan, B.E. (Mech).Foremerly NLPC Ltd.,

Advisor –Welding.

24. Sri. C. Chennakeshava Computer Aided MathematicalModdling

Page 107: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Advisor104

Brief Profile of Advisors

Dr. G. N. Yoganarasimha, Hydrology & Irrigation

Dr. G.N. Yoganarasimhan after a brilliant Academical qualification, joined as Assistant

Professor in BITS Pilani, the renowned Technical Education Institution in India. He has

worked as a Professor in LukE University, after obtaining Ph.D. degree in Hydrology.

Subsequently, he was elevated for the post of Director WRTDC Roorkee Institute, India

run under UNDP funds, teaching on hand training in Water Resources subjects to

participants, drawn from all over the world.

He was a visiting faculty at Asian Institute of Technology, Bangkok and visiting faculty

MIT, USA. He was Full Bright fellow at East West Centre Honolulu, Hawaai. Member

of various professional Institutions around the world. He has to his credit more than

two dozen technical papers published in International Journals. After his retirement, he

had a brief stint at M/s. Synotech Engineers, Consultants, and PT, Wiratman &

Associates, Jakarta, Indonesia, and Consultant to CES / WAPCOS, New Delhi. He was

consultant to World Bank, on various assignments.

Presently, he is a Freelance Advisor and acknowledged expert in Hydrology and Water

Resources projects .

Page 108: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Advisor105

Mr. H.V. Eswaraiah, Advisors Hydro Projects

Mr. H.V. Eswaraiah, after retiring from Karnataka Power Corporation Limited as

Director Technical, is working as freelance Consultant for large Hydro Power Projects.

Design Group is availing of his technical expertise in implementation of Hydro Power

Projects as related to contracts, QAC, PMC etc.

Mr. H.V. Eswaraiah, after his Masters degree in Engineering from the renowned Indian

Institute of Science, Bangalore had brief stint as lecturer in engineering college and

worked in Karnataka State Public Works Department, before joining Karnataka Power

Corporation Limited, as Assistant Executive Engineer in the year 1971, and retiring as

Technical Director in the year 1997. He has extensively dealt with all aspects of

implementation of Hydro Power Projects, starting from field investigation, preparation

of PFR, DPRs, Bid preparation, technical evaluation, award of work, as Executive

Engineer. He was in charge of construction of a 100m high Supa Concrete gravity Dam

of Kalinadi Hydro Electrric Project, and managed to achieve production level of 1000

cumecs per day of concrete production and laying in the body of the dam. Working at

corporate level, he was in charge of long term Power Project Planning, advising

Managing Director, KPCL, on settlements of dispute and claims of contracts,

Implementation monitoring of all Projects under construction, procurement and

movement of Coal, Cement and Steel. In his tenure with KPC Ltd he has handled

implementation of 15 Hydro Power Projects, a Thermal and Wind Projects. He has wide

experience in dealing with implementation of World Bank Funded Projects.

After his retirement, he was appointed by NTPC as an Advisor for implementation of

KOL dam (800 MW) HEP. He is also assisting various Commercial Banks as Lender’s

Engineer monitoring various Mini Hydel Scheme funded by these Commercial Banks.

Page 109: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Advisor106

Mr. Shankar V. Nesargi – Advisor Wind Energy Projects.

Mr. Shankar V. Nesargi, B.E. (Mech), ME (WR), joined Karnataka Power Corporation

Limited, as an Engineer in the year 1973 and retired in the year 2005 as Managing

Director of VVNL, a subsidiary Company of KPCL. As an Assistant Engineer he

handled detailed investigation works of Kali Hydro Electric Project (6 x 135 MW)

including putting in drifts for investigation of foundation rock of Supa Dam. From being

an Executive Engineer in-charge for construction of various components, O&M of 4 x

210 MW Raichur Thermal Power Plant, he had extensive exposure to construction of

Coal Handling Plant, Railway siding, WTP, Boilers, Turbines etc. During this period, he

was elevated to posts of, as Superintending / Chief Engineer to handle these areas of coal

based thermal power plant. In the year 2003, he was appointed as Executive Director to

be totally incharge of Planning Infrastructure works of the proposed 4 x 350 MW, Bidadi

Gas Based Power Plant, near Bidadi, Bangalore. Subsequently, he was appointed, as

Managing Director, Vishveswaraiah Vidyuth Nigama Ltd., to be incharge of O&M, of 6

Hydro Power Projects including - R & M works and O&M of a Diesel based Thermal

Power Project. During his tenure in KPCL, he has attended several National and

International Seminars and has travelled worldwide.

After retirement he was a freelance consultant to various foreign Companies in Uganda,

Spain etc., and has traveled extensively in these countries as technical consultant on

many hydro and thermal power projects.

Presently, he works as the Managing Director of DB Global Energy Limited, a Company

dedicated to Wind Power Generation as an IPP and executing the 100 MW of Windfarm

near Chikodi in Belgaum district of Karnataka.

Page 110: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Advisor107

Mr. P.R. Balasubramanian – Advisor Gas based Power Plant.

Mr. P.R. Balasubramanian, after obtaining a Bachelor’s degree in Mechanical

Engineering, had one year training in Nuclear and Allied subjects at Bhabha Automic

Research Centre, Bombay. Thereafter, he was absorbed in the Atomic Energy

Department and worked for a decade in various departments of BARC, before joining

Engineers India Limited, New Delhi in the year 1978. Thereafter he joined Gas

Authority of India Limited and worked there till 1990. He was selected, as Director of

Neyveli Lignite Corporation Ltd, in 1997. He was Chairman / Managing Director of

Fertiliser and chemicals, Travancore from the year 2000 up to his retirement in the year

2002.

He is a freelance consultant and presently is an independent Director of REC India, and

Rare Earth Ltd., (Department of Atomic Energy).

His areas of expertise are Overall Corporate Management of Large Organisations,

Development of Engineering Expertise in the Organisation, Conceptualising of Turn

Around strategies, over view of the implementation of the Projects from Concept to

Commissioning, preparation of quality Project Reports, Proper appraising of the Project

Reports, Resolving Arbitration Issues etc., by applying his expertise and experience in

managing various projects in Nuclear Chemicals, Fine Chemicals, Petrochemicals,

Hydrocarbons, Gas Processing Plants, Cross Country Pipelines, Thermal power plants,

Fertilizer Complexes etc.

Page 111: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Advisor108

Mr. B.V. Ramakrishnaiah – Advisor Hydraulic Gates & Structures

Sri. B.V. Ramakrishnaiah was ranked 4th in his Bachelor of Engineering Degree

Examination, and passed M.E. in distinction from India’s premier Institution namely

Indian Institute of Science, Bangalore, in the year 1964. He joined CW& PC, New Delhi

and worked mainly on design and drawing of Hydraulic Gates for Irrigation and Hydro

Power Projects. In the year 1966 he joined M/s. Triveni Structurals Ltd., Naini,

Allahabad, and served for over 13 years in the organization, as Gates and Penstock

design specialist. During his tenure, he has designed Cylinderical Gates for

Ramanaganga Project, which is only one of its kind in the country, and which are

operated by 70 tonnes capacity Hydraulic hoists. High Pressure slide gates operated by

650 tonnes capacity Hydraulic hoist is designed, for Baggi control works of Beas-Sutlej

Link HEP Sundernagar, Himachal Pradesh. High Pressure fixed wheel Penstock

emergency gate was designed for Beas Project, Punjab for a clear vent size of 10 feet x 21

feet, for a design head of 110m. This gate carries a total load of 2160 tonnes which is

transferred to concrete through 12 fixed wheels. 150 tonnes capacity hydraulic hoist

operates the gate. Radial crest gates for Itezhitezhi Dam, Zambia, has been designed by

him and was vetted by SWECC Swedan. Similarly, Batten outlet radial gates have been

designed for Great Reeha Power Project Tanzania.

After leaving M/s. Triveni Structurals Ltd., in the year 1979, he started his own

consultancy firm, and has designed over 100 gates of various shapes and sizes. To name

a few, he has designed 18.288m x 17.145m spillway radial gates for Srisailam Hydro

Electric Project in Andhra Pradesh. In this case for the first time spherical plain bearings

were used for the Trunion instead of normal bronze bushes. He has designed one of the

tallest Penstock gate of size 6.75m x 15.75m in the country, for Lower Mettur Hydel

Project at Mettur dam in Tamil Nadu.

He has designed Penstock, Pipes, of 2.743m dia for a static head of 405m for Kaufe

Gorge HEP in Zambia Africa, and has designed penstock pipe of 4.88m dia to withstand

static head of 51.2m for Bowatena Power Project in Sri Lanka. He has the distinction of

designing very large size gates and penstocks of large diameter in India. He is rated as a

top class designer in India for various type of gates for water resources projects.

Page 112: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Advisor109

Mr. V. Balachandran - Geology

Mr. V. Balachandran, is a retired, Deputy Director General and HOD GSI, Southern

Region. He is presently a freelance consulting Geologist advising Design Group on

various aspects of Engineering Geology for Large Hydro and Irrigation Projects in India

and Abroad. Presently he is also pursuing his doctoral thesis in Osmania University.

Mr. V. Balachandran, after a Masters’ degree in Geology, joined the Geology Survey of

India in the year 1971, as Junior Geologist and retired, as the Deputy Director General

and HOD, GIS, Southern Region. Out of the total 36 years of experience in the field of

Geology, 30 years he has spent in Engineering Geology, and was involved in conducting

Preliminary Investigation and construction stage activities. His services spreads to many

projects all over India, including Supervision and guidance to Project Authorities during

execution . A few Projects where he was directly involved are: Chibro-Khodri Hydro

Power Project which has a tunnel across two regional thrusts. Facilitated smooth

negotiation of twin tunnels of Khan Hydel Scheme, upto upper Siwalik incoherent sand

rock with plethora of problems such as seepage, collapse and daylighting of the tunnel;

Selection of Dam site for 230m high rockfill dam project on upper reaches of Yamuna

river which was under investigation for a protracted period (40 years). Identifying the

source of seepage at Kadampari Pumped storage scheme and its stoppage so that, the

energy generation was substantially enhanced; Adopted hydraulic jacking of upper

Kodayan tunnel and suggested other remedial measure; Extensive Geological

investigation at MAPS Kalpakkam and Kundankulam for Nuclear Power Corporation

Ltd; Extensive field investigations were carried out with special reference to

Seismological studies which led to clearance for Kundankulam Atomic Power Plant;

Initiated studies on Korada Atomic Power Plant; studies on Plutonium Fast Breeder

Reactor Project under Madras Nuclear Power Plant leading to clearance to the Project;

Carried out Mega thrust Tsunami Hazard studies in South India; Attended several

National and International seminars, and presented several technical papers; Travelled

World Wide, including undergoing training in Harza Engineering, USA and National

Resources (Canada) and Geological Survey of Canada at Vancouver Calgary and

Ottawa, Canada.

Page 113: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Advisor110

Mr. C.R. Venkatesh B.E. (Civil), M.E. (Str), – Advisor Hydel Projects

Mr. C.R. Venkatesh obtained a first class with distinction at the Masters’ degree exam ,

from the renowned Indian Institute of Science, Bangalore. He worked, as a lecturer in

Engineering Colleges, as an Assistant Residential Officer, CWPRS, Poona and as a

Scientist, Cement Research Institute of India, New Delhi, before joining National Hydro

Power Corporation Ltd., in the year 1981 as Manager and working there till his

retirement in the year 2004. During his tenure in NHPC Ltd., he rose from the post of

Manager upto that of Executive Director. As a Chief Engineer, he was in charge of

implementation of Dulhasti Hydro Power Project (3 x 130 MW). As an Executive

Director, Contract Division, he managed all procurement activities and managing Civil

E & M Works Contracts. Under R & D wing, he has evolved cost analysis of complicated

works, suggested various means for cost cutting. He was trained in Canada in detailed

structural analysis of Chamera Concrete Dam; In Sweden, he underwent training at the

Advanced International Hydro Power Develop Project; In Germany / Netherland he

attended Advanced Management Development Training.

In India, he has undergone specialized technical training in Reflection Photo elasticity

and strain gauge technique, Dam Safety, Geotechnical instrumentation etc. He has

visited a number of Foreign Countries; was deputed to Pakistan, to participate in

technical discussions, on Indus Water Treaty issues. Had interaction with Arbitrators in

connection with Internal Arbitration Tribunal on Chamera HEP Contract disputes. He

has 44 technical papers to his credit. His research paper on De-silting basin, won a

special Certificate of merit by the Central Board of Irrigation and Power, New Delhi.

Since, his retirement, his services, as freelance consultant is being used by major Civil

Contract agencies for dispute redressal and Arbitration.

Page 114: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Advisor111

Mr. M.C. Rangarajan – Electrical Engineering Projects

Mr. M.C. Rangarajan, is presently a free lance Electrical Engineering Consultant for

various organisation including M/s. Design Group Project Consultants Pvt Ltd.

Mr. M.C. Rangarajan, after obtaining a Bachelor of Engineering degree from the Indian

Institute of Science, in the year 1969, joined Karnataka Power Corporation as an

Electrical Engineer, and retired as Executive Director in the year 2005, after acquiring 36

years of rich experience in Hydro Power generation. Important assignments during his

tenure were Design and Layout of Hydro and Thermal Projects sizing of units, firming

up of technical specification, bid documents, bid processing, contract management,

project monitoring, inspection of components at Vendors Plant. He was involved in

construction of the following Hydro Projects, Nagjhani (6 x 135 MW) Supa Dam Power

House (2 x 50 MW), Gerusoppa Dam Power House (4 x 60 MW), Kadra Dam Power

House (3 x 50 MW), and Kodasalli Dam Power House (3 x 40 MW). In addition he has

looked after O & M of Sharavathy HEP (1035 MW), Varahi underground Power House

(230 MW), R & M works etc.

As a senior executive Chairman of the Core group for Q & AC of EPC Contract for

implementation of the 500 MW Bellary Thermal Power Plant, he handled the Power

Purchase agreement with State level distribution Companies. He has presented several

technical papers in National and International Conferences; Visited different types of

Power Houses and manufacturer units in India and Abroad.

Page 115: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Advisor112

Mr. Umashankar

Mr. Umashankar has large experience on design and drawings for large span roof

trusses used in Power Plants, and complicated heavily loaded structural steel works.

Presently he is an advisor to Design Group.

Mr. Umashankar joined MECON Ltd., in the year 1973, as structural engineer and

retired in the year 2009, as Deputy General Manager. As a steel structural designer, he

was actively involved in design of Steel Plants of large capacity in India, such as Bokaro

Steel Plant (expansion) Bhilai steel plant (expansion, Titanium – Dioxide pigment plant

in Kerala, Defence Project – NSTL at Vizag A.P., Kudremukh Iron Ore Project, Essar

Steel Plant, at Hazira. Jindal Vijayanagar Steel Plant at Toranagallu, Karnataka, external

Coal handling system for TNEB at Chennai, Birla Copper expansion phase II. HGPL –

Expansion at Vizag A.P. Defence Project – Sea bird project at Karwar on the West Coast

of Karnataka, Essar Integrated Steel Plant at Hazira. More than half million tones of

Structural Steel design and fabrication work has been done under his guidance. He has

been deputed to foreign countries by MECON for inspection and fabrication works in

Countries like China, Germany, Korea, He has also attended several workshops in the

structural steel field conducted in India and Abroad.

Page 116: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Advisor113

Mr. V. Narayanan – Advisor Transmission line Projects

Mr. V. Narayanan, is an expert in transmission line design and construction and is an

Advisor to Design Group as and when required on assignments pertaining to planning

and implementation of transmission line projects.

After his Bachelor degree in Civil Engineering, he obtained the Masters degree in Civil

and Hydraulic Engineering from the Indian Institute of Science, Bangalore, in the year

1963. Soon after, he joined M/s. SAE (India) Ltd., as Design Engineer for transmission

line tower, Civil Foundation and other allied works. He has been involved in the designs

and fabrication drawings of Transmission lines for various voltages from 66 kV to 220

kV for many Electricity Boards in India.

From year 1973 onwards, he assumed the charge of Production Manager at the M/s. SAE

Factory at Jabalpur. He was deputed to M/s. SAE, Milano, for being trained in their

works at Lecco, on production engineering, design and drawings, Testing Stations. In

the year 1978 he was sent to Australia to acquaint himself with the working of a Testing

Station. At Jabalpur Plant, he was responsible for the commercially viable Testing

Station on par with International Testing Station. He was responsible for increasing the

production capacity of the plant to 30,000 MT per annum from the original 8000 MT. As

the General Manager he was responsible for design and testing of many 400 kV and 500

kV DC lines. After his retirement he has worked in several International Companies,

such as Zamul Steels, Daman, TNB Malaysia, Kulalanpur etc. He has vast technical

knowledge in implementing Transmission line projects from concept to commissioning.

Page 117: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Advisor114

Mr. C. Channakeshava – Advisor Development of Design Software

Mr. C. Channakeshava, Ph.D, is an advisor to Design Group on Computer aided

Mathematical modeling for 3D complicated structures for carrying out precision

analysis and design of Dams etc.

Mr. C. Channakeshava, after his post graduation in M.E., from Indian Institute of

Science, Bangalore, obtain his Ph.D in the same Institution in the year 1988. He was Post

Doctral Research Associate in University of Cincinnati Ohio, USA, Louisiana State

University, USA, and has extensively worked on Finite Element Method applied to Civil

Engineering works. He has an illustrious academic background, being a topper in

Universities in India and Abroad.

In Bangalore, he joined a reputed EMRC Software Company (USA) team to develop

world class NISA Software tool used extensively for Non-linear analysis. His field of

interests are computational mechanics, Finite Element Analysis, Boundary Element

Analysis, Analysis and Design of RCC & Steel Structurals, Roads and Bridges, Computer

Aided Design.

Page 118: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Advisor115

Mr. Shridhar Prabhu

Mr. Shridhar Prabhu, is a freelance Solicitor who specializes in Energy Law Audit and

Regulatory Affairs and Compliance. Design Group is availing his services for handling

issues in PPA related matters.

Mr. Shridhar Prabhu, after obtaining a degree in law, started practicing in the High

Court of Karnataka, enrolled himself in Delhi Bar Council. As a specialist in Regulatory

Appraisals related to Energy, he was nominated, as Vice Chairman, Energy Committee

of the Federation of Karnataka Chamber of Commerce and Industries, He is an Advisor

to India Wind Turbine Manufacturers Association. An Advisor to Renewable Energy

Developer Association, Karnataka (REDAK) and was a Former State Council Member –

IWPA. In addition during his practice, he has represented India’s Wind Energy Sector,

before the Supreme Court; was the only representative of the Wind Energy Sector to

represent before the Central Electricity Regulatory Commission (CERC), New Delhi.

Represented, on several occasions, on behalf of IPP’s, and has argued before REC’S on

fixation of Tariff, standardization of PPA’s, Renewable Power Purchase obligations for

Wind Project.

Envisaged a theme paper and chalked out action plans for NASDAQ listed IT Services

Company with a market capitalization of over US$ 30 Billion for Green Power

procurements in Southern States. Engaged for advisory and tariff filing by first ever

electric cooperative society and distribution license in Karnataka.

Page 119: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Advisor116

Mr. Srinath N. Anekal – Advisor Environment

Mr. Srinath N. Anekal, is a free lance advisor to various organizations, IPP’s developers

on environmental and sustainable Development Areas including climate change and

CDM aspects etc., Design Group seeks his advice on specific fields like Environmental

impact assessment of projects, CDM due diligence of Environmental Protection aspects

Report.

Mr. Srinath N. Anekal after obtaining Bachelor / Master degrees in Civil Engineering

from Bangalore University pursued higher studies in University of Florida, Gainsville,

USA, and was awarded Master degrees in Environmental Engineering Science in the

year 1993. Has under gone, short term course in Finance for Non-finance Managers at

IIM Bangalore, ISO 14000 Environmental Management System CII India, hazardous

waste management operational practice, USA. He has traveled widely in USA, Inida,

Banglaesh, Maruitius and Mozambique, where he has worked extensively in the field of

Environment, Energy and Water. He was demonstrated vast experience in

conceptualizing, design, promoting and implementing innovative projects in the area of

waste minimization, clean Technologies, Environmental protection, Urban Water Supply

and sanitation, Renewable Energy and clean Development Mechanism. He was with

executing Agencies for implementing reform oriented projects funded by World Bank,

DflD, KfW, European Commission and Danida. He has contributed to the development

of country level strategies; especially on mainstream new development concepts,

through conduct and participation in seminars and workshops and effective interaction

with all stake holders in Government, Non-Governmental Organization and Private

Sectors.

Page 120: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant117

CONSULTANTS

Mr. C.S. Hebli, B.E. (Hons),

After obtaining the Bachelor degree in Civil Engineering with

distinction, joined Bombay Public Works Department, in the year

1954, worked as Junior Engineer, Planning Minor Irrigation Projects

and Community Development Projects. After formation of Karnataka

state, his services were lent to Hydro Electrical Projects Department

in the year 1959. As Assistant Executive Engineer, he was involved in the investigation

and preparation of DPRs for Bedthi, Aghanashini, Mahadayi, and Kalinadi (910 MW)

Projects. When the dedicated power generation company namely Karnataka Power

Corporation Limited, a public sector undertaking, fully owned by Government of

Karnataka was formed in year 1970 to execute the Kalinadi HEP, his services were

transferred and absorbed in the KPC Ltd. In this Organisation he rose from the ranks of

Assistant Executive Engineer to that of the Technical Director of the Company. He

retired in the year 1990 with 30 years of rich experience in investigation, design,

implementation and administration of power projects. During his service, he was

actively involved in planning and implementation of Kalinadi HEP (910 mw),

Sharavathi HEP (835 MW), Varahi HEP (239 MW). Raichur TPS (6 X 210 MW) from

concept to completion. He was involved in long term planning of Power Projects for

Karnataka and the Hydro policy in the State etc. After retirement has worked with

Thapar Hydro Consult, as a consultant and dealt with several Hydro and Gas based

Power Plants aggregating over to 2000 MW. He joined as Chairman, Design Group

Project Consultants Pvt Ltd., Company in 1998, technically guiding the staff strength of

52 technocrats and has been effectively involved in technical advice to all Projects.

Policy decisions, Company affairs etc. undertaken by Design Group Project Consultants

Private Ltd.,

Page 121: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant118

Mr. B.L. Lakshminarasimha, B.Sc., B.E., M.E., M.I.E., F.I.V., M.A.S.C.E.,

After obtaining Master degree in Civil Engineering from Birla Institute

of Technology and Science, Pilani, a premier technical educational

Institution of India (collaboration with MIT., USA,) and after a short

stint with M/s. Gerame and Binny Limited, joined the Karnataka Power

Corporation Limited, as a Civil Engineer in the year 1975. Took Voluntary retirement

after 20 years of service, acquiring technical knowledge in drafting of bid documents

for large Hydro Power Projects, interpretation of Contract Clauses, resolving disputes,

formulating schedule of rates, design of Surface Power Houses, framed structure

through 3 D modeling etc. He was involved in Designing and construction of KPCL

Corporate office building, Assisted Company’s legal advisors in Arbitration

proceeding/Contract disputes, in the Court of Law etc. He is the Founder member of

Design Group Project Consultants Private Ltd, established in 1979. A company started to

be one man show in 1979 has grown into a large consultancy firm of repute in India and

Abroad. Over its 3 decades of existence, he was responsible for pooling together and

developing an exclusive team of dedicated consultants having years of experience in

implementation of Power and Irrigation Projects from concept to completion and

implementation of other infrastructure projects.

Recently he is responsible for developing a dedicated team of engineers to extend design

engineering services in Water and Waste Water Treatment Plants. He has successfully

steered the company in obtaining KEMA ISO Certification, He has managed the

company and has maintained consistent profitability over the decades. He is responsible

for the company executing a number of Joint Venture Partnership in India and Abroad,

such as CPRI, WAPCOS, ILF, for implementation of Large Projects successfully he , has

been responsible for obtaining few design engineering assignment contract in

neighbouring countries such as, Saudi Arabia, Dubai, Muscat, Ghana, Nepal, Sri Lanka.

Page 122: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant119

Mr. P.R. Mallikarjuna

After obtaining M.E., degree from the prestigious Indian Institute of

Science in the year 1969, he worked in various capacities in a Public

Sector / Private Companies, before joining Karnataka Power

Corporation in the year 1971, as a Group Engineer (AEE), and retired in

the year 2000 as the Technical Director, with an illustrious career spanning 30 years in

various cadres. After his retirement, he was a member of the Board of Directors of KPC

Limited, for over 7 years. During his tenure in the KPCL, he was the head of the Design

wing and handled all major Hydel Projects, Thermal Power Plants from concept to

commissioning. Over 1200 MW of Power Projects has been investigated under his

guidance and about 2000 MW of Power Projects has been designed and implemented.

Further, 900 MW of Power Projects have been implemented under his direct guidance.

He has attended several National and International seminars, and contributed dozens of

technical papers. After his retirement, he was involved in the preparation of revised

DPR for 12 X 80 MW Indira Sagar Polavaram Hydro Electric Project in Andhra Pradesh,

on behalf of Andhra Pradesh Irrigation Department, including obtaining clearances

from Central Electricity Authority, New Delhi. He was involved in detailed design

engineering of Nagarjuna Sagar Tail Pond dam Power House (2 x 25 MW) and Varahi

underground Power house – Stage II (2 x 115 MW).

From the year 2008 onwards, he heads the Civil Design wing of DGPCPL and is

responsible for all consultancy assignments of planning and design of Hydro Electric

Projects and Large Irrigation Projects.

Page 123: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant120

Mr. P.K. Rupangudi, M.E

After obtaining M.E., degree from the prestigious University College

of Engineering, Bangalore in the year 1971 worked in Karnataka State

Government Public Works Department, before joining Karnataka

Power Corporation in the year 1972 as an Engineer and retired in the

year 2004 as a Chief Engineer with an illustrateous carrer spanning 32

years in various cadres. During his tenure in the KPCL, he was head

of Design wing consisting of engineers of all disciplines and, handled all major Hydro,

Thermal Power Plants from concept to completion. Attended several National and

International seminars, and contributed several technical papers. He is member since

year 1996 of Gate Committee formed by the Government of Karnataka for design,

fabrication erection & commissioning of spillway Gates and hoists of the prestigious

Almatti Dam of Upper Krishna Irrigation Project. Even to date, he is in the panel for

inspection of Hydromechanical works of the State Govt. Organisations. He was a faculty

member on the continuing education to the Engineers of the State, organized by The

Director, KERS – Mysore. He is the main author for compilation of the History of

Lingamakki & Talalakalale dams, of Sharavati Hydel Scheme assigned to him by the

Karnataka Power Corporation Limited. After his retirement, he was involved in detailed

engineering of Nagarjuna Sagar Tail Pond Dam on Krishna River and Varahi

underground Power House – Stage II (2 x 115 MW) and a major weir for Lower Jurala

H.E.P on Krishna river of Andhra Pradesh Power Generation Company.

From the year 2010 onwards he is associated with DG and is responsible for

implementation of planning and design of assignments of Hydro Electric and Irrigation

Projects.

Page 124: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant121

Mr. Chikkaguddappa (C.G. Appa), joined Design Group Project

Consultants Pvt Ltd., in 2005, as a Director Hydro Power Project

Planning and river basin study. He has travelled to neighbouring

countries of Nepal & Srilanka, to advice IPP’s on Planning of Hydro

Power Projects.

Mr. Chikkaguddappa (C.G. Appa), joined Karnataka Power Corporation Limited in the

year 1973, as an Engineer, rose to higher levels and retired in the year 2005, after 32

years of long service. From the initial stages of service in KPCL, he was involved in

river basin development for power, identifying and Planning Hydro Power Projects for

all rivers of Karnataka state. Mostly dealt with Investigation of HEP’s like Shivana

Samudhra seasonal scheme ( 4 x 270 MW), revision of DPR for Bedti Stage I HEP. As a

Assistant Executive Engineer, he was involved in field data collection for Hydrology,

surface and sub-surface details for preparation of DPR for major HEP’s like MahadayI

(318 MW), Cauvery Scheme (270 MW), Tamankal (800 MW), Almati Dam Power House

(280 MW), (Mekedatu HEP (1400 MW), Kali stage – III (1200 MW) Bedti stage II (400

MW), Aghanashini (600 MW), Gundiya High head scheme (400 MW) conceived as a run

of the river scheme, study proposed for Pumped storage scheme at the existing

Sharavathy complex (1000 MW) and Kali Complex (1200 MW). He was one of the

Authors of river basin studies for Power Development in Karnataka. In addition, he has

identified and prepared DPR’s for many Mini Hydel Schemes of individual capacities of

less than 25 MW.

He joined Design Group Project Consultants Pvt Ltd., in the year 2005, and is

responsible for identifying and preparation of Desk Study Reports for Hydro Power

Projects in neighbouring Country Nepal aggregating to a total projected installed

capacities totaling to nearly 12000 MW.

Page 125: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant122

Mr. Raghavendra Rao H

After obtaining BE degree in Electrical Engineering from National

Institute of Engineering, Mysore in the year 1972, worked in Medium

Voltage Switch Gear industry as development and production

Engineer till 1977 before joining Karnataka Power Corporation Ltd,

which has the responsibility for carrying out design, construction, operation and

maintenance of power plants in the state of Karnataka,. He retired as Superintending

Engineer (Electrical) KPCL in the year 2006. During his tenure in KPCL he has worked in

the areas of design, construction, testing and commissioning and maintenance of Hydro

and Thermal power plants mainly in the areas of Electrical equipments and systems of

power plants. His tenure included working at both power plants and the corporate design

office.

His specialized areas of expertise are control and protection. He was a member of

Protection committee formed by Southern Regional Electricity Board.

After joining DG in 2008 he is in charge of assignments of Engineering of Electro

Mechanical systems of Hydro and thermal power plants. He is an accredited energy

auditor, certified by Bureau of Energy Efficiency, India.

Page 126: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant123

Mr. M.M. Reddy

Mr. M.M. Reddy is an expert in substation Layouts and Electrical systems

designs from 33 kV upto 400 kV. His services are being used by Design

Group in substation design segment of Electrical Engineering of Power

Project Consultancy assignments.

Mr. M.M. Reddy after obtaining Bachelors’ degree in Electrical Engineering from

Bangalore University, in the year 1968, worked in various capacities in various

organizations. He has worked in NGEF from 1968 to 1997 for 29 years and took

voluntary retirement in the year 1997, as Divisional Manager. During his tenure in

NGEF, he was head of Sub-station group and handled switchyard systems from 33 kV to

220 kV, from designing to commissioning of sub-stations on EPC basis. Under his

guidance, about 600 MW of aggregate total capacity, outdoor Switchyards from 33 kV to

220 kV have been designed and commissioned. He has undergone training in high

voltage outdoor yard sub-stations in AEG – Telefunken, Germany for 6 months.

In May 1997, he joined M/s. Design Group Project consultant Pvt Ltd., Since then he is

responsible for designing of out door yard substation and transmission lines for various

projects. He has designed and commissioned various switchyards and transmission line

for Hydro Power Projects, to name a few major Projects:

i) Varahi Tail Race HEP (37 MW – 110 kV ODY)

ii) Narayanpur Right Bank Canal HE Project Phase – I and II (18 MW - 66 kV ODY)

iii) Singatallur – Hulligudda HEP(18 MW – 110 kV ODY)

He has designed and commissioned balance of equipment for a 15 MW capacity

Windmill Project.

Page 127: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant124

Mr. S. Ramanan, B.E. (Civil), initially worked in Karnataka Power

Corporation Limited between year 1975 to year 1984. After a brief stinct,

as lecture in NIE Mysore. Joined NHPC, in the year 1985, and retired in

the year 2009, as General Manager.

He had exposure to various aspects of implementation of Hydro Power Project, from

Survey, Investigation, Preparation of PFRs and DPRs, bid documents, to detail civil

designs, and construction works. He was posted as GM Consulting and Bussiness

Development Division, where he dealt with Tidal Power Project, Infrastructure

development in Andaman and Nicobar Island, Varzab Power Plant in Tajikistan and

raising of the Dhankari dam in Port Blair, Andaman and Nicobar Island. Till his

retirement, he had handled works relating to project of over 5000 MW of Hydro Power

development in various capacities spread over 10 HEPS across the length and breadth of

India. He had a short stint in design and engineering of Power transmission line in

North East State. He is also freelance consultant advising various IPPs in

implementation of small Hydro Projects.

Page 128: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant125

Mr R. Vasudevan

Mr R. Vasudevan is a water utility management specialist with over 40

years of experience in Design Construction & Operation of Water

utility services from the source to the consumer. He is presently full

time consultant of Design Group for similar Project assignments.

He is a 1971Batch Graduate in Electrical Engineering from Bangalore University. Joining

Bangalore Water Supply and Sewerage Board in the same year, he worked in various

capacities and retired as the Chief Engineer during the year 2010. He was involved in all

the major Projects of BWSSB which was supplying 135 MLD water to 1.5 Million

residents of Bangalore in 1971, and has now become a giant utility supplying over 900

MLD water to over 8 Million residents.

He was associated in Cauvery water supply Scheme stage I to supply 135 MLD water

from River Cauvery, in establishing pipe fabrication and laying activities; Later was

involved in the stage II of the scheme supplying another 135 MLD. He was in charge of

Electrical system Design and Construction; In the III stage of Cauvery water supply

project which was a larger 270 MLD Project, he was in charge of complete Electrical and

Hydro-Mechanical components of the project from tendering to completion. In the

subsequent Stage IV-Phase I Project which was with external funding, He was

responsible for total cross-country steel pipeline of 1950mm Diameter and 90 Kilometers

long, and later in the installation of Sewerage pumping stations and the electrical Design

and Construction of Seven Sewage treatment plants. In the last 5 years of his service he

was responsible for Securing ODA loan of INR 34000 Million from JICA for Stage IV

Phase II project with a capacity to supply 500 MLD, selection of project consultants,

tendering selection and award of contracts for all water supply components.

In the course of his long service he has participated in various workshops and seminars

on pumps , cavitation, cross-country pipeline design, water-hammer studies and control,

Page 129: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant126

water treatment, wastewater treatment and sludge disposal, project management,

international contracts, leakage reduction and distribution improvement of water

supply system , flow measurement, tariff structuring, urban planning , reuse and

conservation of water supply, etc.

He led the Technical team which presented ‘Innovative Practices in Revenue

Management’ initiative by BWSSB to the Department of Urban Development and

Secured the First Prize in National Urban Water Awards, 2009, presented by the Hon’ble

President of India, in August 2009.

Vasudevan has designed pumping systems for several lift irrigation pumping systems,

electrical substations and surge protection to pipeline for the Consultancy Centre of

BWSSB from 1995 to 2007. Many such projects have been commissioned in the last 10

years and are in operation.

He also handled an assignment on alternative methods of infrastructure finance by

Private Sector, Infrastructure Bonds, and developing Public-Private Partnerships’ in

2009.

He also secured an MBA from ICFAI Dehradun with Finance as optional subject. On

retirement from Service he joined Design Group as Water Supply Consultant in

September 2010.

Page 130: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant127

Mr. U.R. Raghotham

Mr. U.R. Raghotham after obtaining M.Tech from Mysore University in

the year 1974 worked as design engineer with the architects, M/s Karekar

and Sundaram for one year and then joined Karnataka Power

Corporation Ltd., in the year 1975.

During his service in KPC Ltd., he has worked in the design team for Supa Dam for 5

years and then worked as AEE (Construction) in Supa Dam for 7 years right from the

stages of foundation level of the spillway and power blocks to the stage of completion of

the Dam.

Thereafter he was in charge of construction of Ghataprabha Dam Power House. From

year 1989 onwards he worked in the design office of KPC Ltd., and handling the

planning and design of various Hydro Electric projects including Kadra dam of Kalinadi

HEP and Sharavathi Tailrace Project. Since year 2003, he is working as a independent

consultant and was involved in the design of Nagarjuna Sagar Tail Pond Dam Project,

Gandikota dam project, Lower Jurala hydel project of Andhra Pradesh, Varahi

Underground Power House (2x115MW) and many other projects. He was involved in

the preparation of DPR for Indira Sagar Polavaram Hydro Electric Project (960MW) and

in obtaining clearance from CWC and CEA. He is with DG since year 2010.

Page 131: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant128

Mr. G. Penchalaiah

Mr. G. Penchalaiah, after retirement from CWC/CEA works as a free

lance Consultants, for various investigation agencies in flow

monitoring of river regime, pre-construction Investigation works in

large Irrigation Projects. Design Group is utilizing his services for

overseeing, Fielding investigation works in large Irrigation and

Hydro Electric Projects in India and Abroad.

Mr. G. Penchalaiah after his graduation in Civil Engineering from Sri. Venkateshwara

University in 1970, joined Central Water Commission, Government of India as Civil

Engineer and retired in the year 2007, as Director. He has vast experience in Water

Resources Project Planning, especially large Irrigation Projects including investigation,

Hydrology, Computation of yield, Development of Irrigation dam and associated

Irrigation Networks, preparation of Detailed Project Report. He was posted to various

States in India, and is familiar with available yield in various river basins for Irrigation

utilization to improve the Agricultural Sector and Water Management. He was deputed

to CEA, New Delhi, and was responsible for design of structures and cost estimates for

Thermal Power Project. He had made topo map studies, interlinking river, water

balance study, etc. As a Senior Engineer worked on Indo-Nepal Joint Projects, namely

Pancheshwar Multipurpose Project and, head quartered at Kathmandu, Nepal and was

involved in preparation of DPR, cost estimates, preparation of Infrastructure Planning

for major Power / Multipurpose Projects, such as Poornagiri, Rupaligad etc.

Page 132: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant129

Mr. Suryanarayana, after his retirement as Deputy General Manager -

Geology from Karnataka Power Corporation Limited, works as

freelance Consultant on Geology. He is with Design Group and has

extensively lent his expertise in Engineering Geology aspects of in

various assignments undertaken, on job to job basis.

My. Suryanarayana, after obtaining Masters’ degree in Geological Science, joined

Karnataka Power Corporation Limited, as Junior Geologist and retired in the year 2007,

as Deputy General Manager – Geology. During his tenure, he was involved in most of

the Hydro Power Projects implemented by Karnataka Power Corporation Limited, to

name a few 80 meter high Chakra Rock-fill Dam: Varahi HEP (460 MW). Involved in

preparation of DPR for Gundiya Hydel Scheme (400 MW), Shivasamundram Seasonal

Scheme (270 MW), Mekedatu Multipurpose Project (360 MW). He is also involved in

ongoing Himagiri HEP (280 MW), Upper Tunga Irrigation Project involving 4 km of

tunneling etc. Apart from this, he has wide experience in advising developers / IPPs in

implementation of Mini Hydel Scheme of 25 MW and below all over India to name a

few, Ramman HEP 120 MW, Roleup HEP (60 MW), and Chakung cha HEP (60MW) – all

in Sikkim State.

Page 133: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant130

Mr. K.T. Sreedhara

Mr. K.T. Sreedhara, after obtaining B.E (Civil), degree from Vikram

University, Ujjain, in the year 1970. worked as design Engineer with

M/s. P.V. Raj & Co. Consulting Engineers Hyderabad from January 1971

to November 1973. The works dealt in this period are Designs of Bridges

and Industrial Structures and Buildings.

Then he joined Karnataka Power Corporation Ltd., a public sector undertaking of

Government of Karnataka, in year 1973 and worked upto the year 2006 i.e. for a period of

32 years, in various capacities and finally retired as I/C Chief Engineer. During his is

tenure in KPCL he has worked in the civil designs wing on the design of Gravity dam

(concrete), Earthen dams, water conducting System. In the construction wing he worked in

Precision survey works at Under Ground Power House at Varahi Schemes and in

Sharavathi Schemes as AEE. As Executive Engineer worked in the investigation of Power

Projects especially High Head Scheme and Mini Hydel Schemes. He has also worked in

designs wing in the designs of Sarpady Barrage Hydro Electric Project and consultancy

assignment of structures of Markandeya Dam Project, Kalasa & Bandurnala Projects for

KNNL.

Further, in construction wing of KPC he has worked as Executive Engineer (Safety) at

Raichur Thermal Power Station Shakthinagar He has worked with KPCL civil designs wing

and involved in the investigation work of Bridge cum Barrage Project across River Krishna

near Gugal. for KBJNL As Superintending Engineer and further I/C chief Engineer (civil) of

Raichur Thermal Power Station (7X210 MW Installed Capacity as on 2006) involved in the

civil maintenance works of the Thermal Power Generation Station. After retirement in the

year 2006 from KPCL after serving 32 years, he joined as an Consultant with M/s Subhadra

Consulting Engineers who were Associate Consultants to M/s STUP consultants Pvt Ltd.,

Bangalore and was involved in the Detailed Engineering of Nagarjunasagar Tail Pond dam

Page 134: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant131

, Gandikota Dam and Lower Jurala Hydro Electric Project which are under construction, He

was also involved in Preparation of revised DPR for Polavaram Hydro Electric Project with

12X80MW(960MW) Installed Capacity .

Currently he is working with Design Group Project Consultant Pvt Ltd., as Deputy Director

(designs) in the planning, design of Hydro Power Projects and Irrigation Project and other

Structure since year 2010.

He is an Active Member of the Professional Bodies like 1) Fellow of Institution of Engineer

(India) 2) Life Member of Indian Road Congress 3) Member of Indian Society for Hydraulics

Page 135: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant132

Mr. Achutha Narayana

Mr. Achutha Narayana, after obtaining M.Tech degree from the

Prestigious Indian Institute of Technology Kanpur in the year 1996, has

15 years of exclusive experience in design of various components of

hydroelectric Projects. He started his early career in Design Group

Project Consultants Pvt. Ltd., Bangalore as Design Engineer (Civil) and

was involved in design of Harangi HEP (2x4.5MW) in Karnataka. He later joined NHPC

ltd., A Govt. of India Enterprise in year the 1998 and was involved in Planning and

Construction stage Design of Dhauliganga HEP (4x70MW), Uttaranchal state and Chamera-

III HEP (3x77MW), Himachal Pradesh State. He was associated with the preparation of

DPR of Siyom HEP (1000MW), Arunachal Pradesh, Dhauliganga Intermediate HEP,

Uttaranchal, Tender stage Design Activities for Chamera-III HEP, Kishanganga HEP

(3x110MW), J&K and Chutak HEP (4x11MW), Kargil, J&K He was also involved in Pre-

feasibility reports of 7 projects in Arunachal Pradesh totaling to 2581 MW under “Prime

Minister’s 50000MW Initiative”. He was also associated with the consultancy project of

Katra – Laole KRCL Stretch of Prestigious Jammu-Kashmir Rail Link Project. He has also

presented few technical papers in various National Seminars. He is a member of Indian

Society of Rock Mechanics and Tunneling Technology (ISMRTT) and International Society

for Rock Mechanics (ISRM) and Indian Hydropower Association (INHA).

He joined Tata Consultancy Engineers, Bangalore in 2007-2008 and was associated with

projects of Augmentation of Bhira Power station and Gokak SHEP totaling to an aggregate

of 100 MW.

Since 2008, he is working as Deputy Director (Designs) in Design Group Project Consultants

Pvt. Ltd. and has been responsible for various construction stage design engineering of

Hydel Projects, DPR’s and Pre-tendering Services for various projects.

Page 136: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant133

Mr. T.S. Srinivasa

Mr. T.S. Srinivasa, after obtaining B.E. degree from National Institute of

Engineering College, Mysore, Karnataka in the year 1984 and M.E.,

degree from one of the noted Technical Institution PSG College of

Technology, Coimbatore, Tamilnadu in the year 1987 worked in various

capacities in Public Sector/Private companies. He has worked In the

Public sector Organisation Karnataka Urban Water Supply & Drainage Board (KUWS&DB)

from year 1986 to year 2006 for a period of 21 years. He took voluntary retirement from

KUWS & DB and worked in private organizations such as M/s. Secon as Manager and

M/s.Jurong Infrastructure Ltd., as Principal Engineer (Infrastructure).

He was head of Design Wing while working with KUWS&DB, and was involved in

preparation of many DPRs comprising of Planning, Design, Estimating, implementation of

number of water supply and sewerage schemes including Water treatment plants(WTPs)

and Sewage Treatment Plants(STPs)in urban areas of Karnataka State. He was involved

with water supply & sewerage scheme proposals for the second major city in the state vof

Karnataka viz., Hubli-Dharwar city under the World Bank Project. He was also involved

with National River Conservation Projects for prevention of river pollution in the State of

Karnataka.

While working with M/s. Secon, he was involved with water supply and sewerage projects

for different towns of the Country of Libya. While working with M/s. Jurong Infrastructure

Ltd., he was involved with Design and implementation of Infrastructure facilities such as

roads, water supply, sewerage, storm water drainage, Electrical & Communication facilities

to a number of town ship development projects including some of the SEZs.

From 2009 onwards he heads the Water Division of DGPCL and is responsible for

implementing water supply and sewerage projects assignments. Presently he is involved

Page 137: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant134

with detail Civil Engineering Design of component of Rafha gas based Power Plant Project

in Saudi Arabia and has handled of the assignment.

Page 138: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Consultant135

Mr. P Sudarshan Rao

Mr. P Sudarshan Rao, after obtaining B.E. (E&E) degree from Malnad College

of Engineering, Hassan (Mysore University) in 1987 worked in the same college

and Regional College of Education, Mysore as a Lecturer for a brief period

before joining KPCL in 1989.

He has more than 22 years of experience, as Assistant Executive Engineer in Karnataka Power

Corporation Limited, a State owned Public Sector Undertaking with dedication for Power

Generation to the State with ISO 9001 and ISO 14001 certification. He has experience in

Operation, Maintenance and Design wings of 210/250 MW coal based Thermal Power Plant.

He also has experience across domains like Inventory Management, Tendering, Tender

Evaluation, Study of various Control System drawings, Planning of Preventive and

Breakdown Maintenance of 210 MW Generator & Auxiliaries, Erection & Commissioning of

Power Transformers of capacities from 50MVA to 315 MVA, 6.6 kV & 415V Indoor Switchgear,

220kV & 400kV Outdoor Switchyard, and Station Battery System. He was also involved in

preparation of cable schedules, interconnection schedules and commissioning of 210 MW &

250MW coal fired thermal Units.

After joining DG in February 2011, he is the group leader of Electrical Design team carrying out

detail Engineering for gas based generating plants and hydro electric plants.

Page 139: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate136

19. Some of the Certificates for Completed Projects

Page 140: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate137

Page 141: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate138

Page 142: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate139

Page 143: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate140

Page 144: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate141

Page 145: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate142

Page 146: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate143

Page 147: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate144

Page 148: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate145

Page 149: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate146

Page 150: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate147

Page 151: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate148

Page 152: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate149

Page 153: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate150

Page 154: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate151

Page 155: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate152

Page 156: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate153

Page 157: Content - Design Group Content Sl. No. Description Page No. 1 Design Group–A Profile 1 2 ISO Certificate 6 3 MembershipCertificate of Consulting Engineers Association of India 7

Certificate154