    A CASE STUDY OFA CASE STUDY OF

    CONTINGENCY ANALYSISCONTINGENCY ANALYSISON WRLDCON WRLDC

    RATHORE SUMIT K.RATHORE SUMIT K.

    M.E-1M.E-1stst -POWER SYSTEM-POWER SYSTEM

    B.V.M VVNAGARB.V.M VVNAGAR

  • 7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref

    2/18

    SYSTEM SECURITYSYSTEM SECURITY

    System Monitoring.

    Security constrained optimal power flow.

    Contingency Analysis.

  • 7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref

    3/18

    OPERATING STATE OF POWER SYSTEMOPERATING STATE OF POWER SYSTEM

    NORMAL STSTE

    RESTORATIVE STATE EMERGENCY STATE

  • 7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref

    4/18

    CONTINGENCY????CONTINGENCY????

  • 7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref

    5/18

    CONSTRAINED IN SYSTEMCONSTRAINED IN SYSTEM

    maxmin ViViVi

    maxkiki

    Line flow (Branch flow)

  • 7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref

    6/18

    APPLICATION IN FIELDAPPLICATION IN FIELD

    WRLDC (Western Regional Load Dispatch Centre)

    successful implemented POWER NETWORKANALYSIS(PNA) sub system of ENERGY

    MANAGEMENT SYSTEM(EMS) after proper

    tuning of STATE ESTIMATOR(SE).

  • 7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref

    7/18

    About WRLDC (Western Regional Load Dispatch Centre)

    Comprises states of GUJARAT, MAHARASTRA, MP,

    CHHATTISGARH, GOA, DADRA AND NAGAR

    HAVELI, DAMAN AND DIU.(WESTERN REGION40944 MW).

    Private central sector of NTPC at KORBA,VINDHYACHAL, KAWAS & GANDHAR and nuclear.

    (EASTERN REGION)

  • 7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref

    8/18

    MAP OF WESTERN REGIONMAP OF WESTERN REGION

  • 7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref

    9/18

    HV LINES LOACATION

    400kV Chandrapur-Parli 1458MW-21degree-limit 25degree

    400kV Koradi-Bhusawal 1011MW-21degree-23degree

    400kV Itarsi-Khandwa-Dhule 1101MW-18degree-21degree

    On MAY-08 western region catering a demand of 25000MW at

    11:30hrs.

    ER-WR-1200MW

    NR-WR-1400MW

    WR-SR-750MW

  • 7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref

    10/18

    Information ObtainedInformation Obtained

  • 7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref

    11/18

  • 7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref

    12/18

    EMS database for western region

    591 buses

    230 generators

    603 loads 623 lines (Up to 132kV level)

    10486 breakers

  • 7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref

    13/18

    PREDEFINED CASE LIST AT WRLDC

    400kV Chandrapur-Parli S/C outage

    400kV Chandrapur-Parli D/C outage

    400kV Koradi-Bhusawal S/C outage

    400kV Koradi-Bhusawal D/C outage

    400kV Itarsi-Khandwa S/C outage

    400kV Itarsi-Khandwa D/C outage

  • 7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref

    14/18

    CONTINGENCY CASESCONTINGENCY CASES

    Acceptable cases.

    Cases with overload, over voltage etc.

    Not Converged case. Islanded cases.

    Multiple contingency cases.

  • 7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref

    15/18

  • 7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref

    16/18

  • 7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref

    17/18

  • 7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref

    18/18

    THANK YOU