![Page 1: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/1.jpg)
Route 52 Causeway Replacement & Circle Elimination Project
Route 52 Causeway Replacement & Route 52 Causeway Replacement & Circle Elimination ProjectCircle Elimination ProjectEngineering & Energy
Somers Point Atlantic County
Ocean City Cape May County
Contractor’s Information Meeting
Contract A1
March 10, 2006
PRELIMINARY NOT FOR CONSTRUCTION
![Page 2: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/2.jpg)
2
Engineering & EnergyProject Overview
![Page 3: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/3.jpg)
3
Engineering & EnergyContracts A1 & B: Project Limits and Timeline
Contract A1: 45 MONTHS
Contract B: Estimated at 36 MONTHS
![Page 4: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/4.jpg)
4
Engineering & EnergyAnticipated Schedule
Notice to Proceed: July 2006
Project Completion: May 2010
Advertisement: April 2006
Bid Date: June 2006
Award Date: June 2006
![Page 5: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/5.jpg)
5
Engineering & EnergyMajor Design Changes
Incorporation of an alternate superstructure design of PrestressedI-Girders and associated substructure modifications.
Elimination of about 1800 feet of bridge structure over Rainbow Island by lowering the profile at the island and replacing it with a roadway section.
Elimination of the ramps that provide access to the fishing piers and parking lot at Rainbow Island; therefore, eliminating complex variable geometry of the bridge.
Shifting of the horizontal alignment slightly over Rainbow Island.
![Page 6: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/6.jpg)
6
Engineering & EnergyMajor Design Changes
The addition of a parking lot and associated driveway at the northern side of Rainbow Island. Relocation of proposed car top boat ramp.
Elimination of the following items from Contract A1, to be performed in subsequent contracts:
Channel Dredging
Shoreline Stabilization
Fishing piers/ some bulkheads/ boat ramp/ portions of access driveway
Construction on Malibu Beach
Easing of some of the environmental timing restrictions.
![Page 7: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/7.jpg)
7
Engineering & EnergySpecial Project Prequalification Categories
Contract Value in Excess of $100M
Work Type #39 – Precast Segmental Bridge Construction
Work Type #39 requirement is waived if the I-Girder alternate is selected.
“This work shall consist of construction of a precast segmental box girder superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span construction methods. The contractor must demonstrate experience in having constructed at least one segmental bridge within the last fifteen years or have on their payroll or have a letter of intent to employ, two individuals with the following requirements :
· Project Manager or Assistant Project Manager who has constructed segmental box superstructure in the past fifteen years.
AND
· Erection Superintendent or Assistant Erection Superintendent who has erected a precast segmental box superstructure in the past fifteen years.”
![Page 8: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/8.jpg)
8
Engineering & EnergyBridge Limits
Route 52 Causeway: 3800 LF of Segmental Concrete or Prestressed I-Girder Construction
4 Retaining Walls
1 Steel Bulkhead
2 Temporary Ramps
2 Variable Message Signs
Contract A1 Structure
Contract A1 Structure
![Page 9: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/9.jpg)
9
Engineering & EnergySuperstructure Types and Variations
Superstructure Types and Variations
![Page 10: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/10.jpg)
10
Engineering & EnergyPrecast Segmental Concrete Alternate
(NORTH BOUND)
(SOUTH BOUND)
![Page 11: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/11.jpg)
11
Engineering & EnergyPrecast Segmental Concrete Alternate
![Page 12: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/12.jpg)
12
Engineering & EnergyPrestressed I-Girder Concrete Alternate
93.5” Bulb-T Girder
f’c = 8000 psi
52 – 0.6” diameter strands
![Page 13: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/13.jpg)
13
Engineering & EnergyPrestressed I-Girder Concrete Alternate
![Page 14: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/14.jpg)
14
Engineering & EnergySubstructures and Foundations
Substructures and Foundations
![Page 15: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/15.jpg)
15
Engineering & EnergyPile Types
Two complete pile alternative designs for Route 52 Causeway
Concrete pile alternative: 30” square prestressedconcrete piles
Steel pile alternative: 30” (low scour) and 36” (high scour) diameter concrete filled steel pipe piles
The pile alternatives are identical for both superstructure alternates.
![Page 16: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/16.jpg)
16
Engineering & EnergyPier Types (I-Girder Concrete Alternate)
![Page 17: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/17.jpg)
17
Engineering & EnergyPreloading and VCC Construction
Preloading and VCC Construction
![Page 18: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/18.jpg)
18
Engineering & EnergyPreloading and VCC Construction
High Level Embankment with VCC Construction
![Page 19: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/19.jpg)
19
Engineering & EnergyPreloading and VCC Construction
Low Level Embankment with Wick Drains
![Page 20: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/20.jpg)
20
Engineering & EnergyBid Alternates and Estimated Quantities
Bid Alternates and Estimated Quantities
![Page 21: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/21.jpg)
21
Engineering & EnergyBid Alternates
General and Common Pay Items
Low Scour Zone Foundation:30” P/S Concrete Pile
OR30” Concrete Filled SteelPipe Pile
Pier Column Types:
Cast-In-Place Pier Columns
OR
Precast Pier Columns
High Scour Zone Foundation:30” P/S Concrete Pile
OR36” Concrete Filled SteelPipe Pile
Superstructure Types:
Precast Segmental
OR
Prestressed I-Girder
![Page 22: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/22.jpg)
22
Engineering & EnergyEstimated Quantities
Common Pay Items
Vibro Concrete Columns 130,000 LF
Prestressed Concrete Piles 57,000 LF
OR
Concrete Filled Steel Pipe Piles 38,000 LF
Concrete in Footings 9,000 CY
![Page 23: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/23.jpg)
23
Engineering & EnergyEstimated Quantities
Segmental Alternate
Concrete in Pier Columns & Caps 2,500 CY
Precast Superstructure 26,000 CY
Reinforcement Steel Coated 6.5 Million LBS
Post-Tensioning Steel (Longitudinal) 120,000 LBS
Post-Tensioning Steel (Transverse) 500,000 LBS
Post-Tensioning Steel Bars 60,000 LBS
![Page 24: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/24.jpg)
24
Engineering & EnergyEstimated Quantities
I-Beam Alternate
Concrete in Pier Columns & Caps 8,000 CY
Concrete in Deck Slabs 11,000 CY
Reinforcement Steel Coated 4.3 Million LBSPrestressed Concrete Beams 33,000 LF(243 Beams)Prestressed Concrete Deck Panels 175,000 SF
![Page 25: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/25.jpg)
25
Engineering & EnergyTouchdown at Rainbow Island
Touchdown at Rainbow Island
![Page 26: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/26.jpg)
26
Engineering & EnergyTouchdown at Rainbow Island
Revised Contract A1 Profile
![Page 27: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/27.jpg)
27
Engineering & EnergyTouchdown at Rainbow Island
Roadway Typical Section
![Page 28: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/28.jpg)
28
Engineering & EnergyTouchdown at Rainbow Island
Rainbow Island – Fill Section
![Page 29: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/29.jpg)
29
Engineering & EnergyRainbow Island – North End
![Page 30: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/30.jpg)
30
Engineering & EnergyRainbow Island – Driveway Entrance
![Page 31: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/31.jpg)
31
Engineering & EnergyRainbow Island South
![Page 32: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/32.jpg)
32
Engineering & EnergyStorm Water Drainage
Water Quality Basin Detail
![Page 33: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/33.jpg)
33
Engineering & EnergyEstimated Roadway Quantities
Excavation
Roadway Excavation 33,000 C.Y.
Wet Excavation 8,000 C.Y.
Embankment
Borrow Excavation, Zone 3 20,000 C.Y.
Borrow Excavation, Zone 2 3,000 C.Y.
![Page 34: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/34.jpg)
34
Engineering & EnergyEnvironmental Permitting Restrictions
Environmental Permitting Restrictions
![Page 35: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/35.jpg)
35
Engineering & EnergyAnticipated Restrictions on Construction Activities
![Page 36: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/36.jpg)
36
Engineering & EnergyConstruction Timing Restrictions
April 1 to June 30 - Anadromous Fish Restrictions
Vibratory hammer driving allowed / Impact Hammer driving allowed in cofferdam
Pile driving allowed / Wet excavation allowed in cofferdam or turbidity barrier
![Page 37: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/37.jpg)
37
Engineering & EnergyConstruction Timing Restrictions
Pile Driving Prohibited
April 1 to June 30
Pile Driving Prohibited
April 1 to August 15
April 1 to August 15 – Heron Rookery Restrictions
Pile driving Prohibited
April 1 to June 30 - Anadromous Fish Restrictions
Vibratory hammer driving allowed / Impact Hammer driving allowed in cofferdam
Pile driving allowed / Wet excavation allowed in cofferdam or turbidity barrier
Pile driving Prohibited
![Page 38: Contractor’s Information Meeting Contract A1 March 10 ... · superstructure and associated bridge work. The construction shall be performed by cantilever construction and/or span-by-span](https://reader033.vdocuments.net/reader033/viewer/2022041702/5e41f4903c705a1d5e6ad94e/html5/thumbnails/38.jpg)
Route 52 Causeway Replacement & Circle Elimination Project
Route 52 Causeway Replacement & Route 52 Causeway Replacement & Circle Elimination ProjectCircle Elimination ProjectEngineering & Energy
Somers Point Atlantic County
Ocean City Cape May County
Contractor’s Information Meeting
Contract A1
March 10, 2006
PRELIMINARY NOT FOR CONSTRUCTION