Contractual Issues of Underground Works The case of complex and uncertain geotechnical conditions. Limitations of the Portuguese law and the implementation of the new EU public procurement directives Gonçalo Diniz Vieira Civil Eng., MSc Geotechnics, LisbonMBA Animateur of WG2 from CPT [email protected] geogdv.wordpress.com 4th CPT International Seminar: Tunnels. From Operation Back to Design

Upload: others

Post on 18-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

Contractual Issues of Underground Works

The case of complex and uncertain geotechnical conditions.

Limitations of the Portuguese law and the implementation of the new EU public procurement directives

Gonçalo Diniz VieiraCivil Eng., MSc Geotechnics, LisbonMBA

Animateur of WG2 from CPT

[email protected]

geogdv.wordpress.com

4th CPT International Seminar:Tunnels. From Operation Back to Design

Page 2: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

AGENDA

• Why?

• Particularities of the underground works

• Modification of public contracts. Additional works: Portuguese law (PCC) and case law from Court of Auditors

• Transposition of the new public procurement directives. New legal framework: Special Modified Works?

• Resume

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016 2

4th CPT International Seminar:Tunnels. From Operation Back to Design

Page 3: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

3

WHY?

• Legislation and contractual conditions are a very important tool that all

geotechnical engineers should “know by heart”, specially if they are facing some difficult situation in the front face of a tunnel

• GT2 of CPT “Engineering & Law: Contractual Practices”

• Contribution to the revision of the Portuguese Public Contracts Code,

within the transposition to the national legislation of the New EU Directive on Public Procurement (2014/23, 2014/24 and 2014/25/EU)

• … so that there is a new legislative solution that (i) meets the objectives of the

new European Directives on Public Procurement; that (ii) is tailored to the best construction practices of this type of underground works with high complexity and

uncertainty; and thus (iii) allows better risk management (in particular, the

geotechnical risk) and that (iv) will probably lead to best value for money and increased safety of these complex geotechnical public works.

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016

Page 4: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

4

Revision of the Portuguese Public Contracts Code within the Transposition of the New EU Public

Procurement Directives

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016

Page 5: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

5

PARTICULARITIES OF THE UNDERGROUND WORKS

• Dependence on the behaviour of the ground materials, that cannot be

precisely known in the design phase

• Uncertainty, resulting from several causes with highlight to the geotechnical, due

to the nature of the subsurface soil conditions, geological and hydro-geological conditions, heterogeneity, previous conditions of over consolidation, depth and extent of the work, …

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016

Page 6: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

6

PARTICULARITIES OF THE UNDERGROUND WORKS

• Tunnel design is more than a determination of the structural adequacy of component

parts - it must meet practical construction requirements to secure economy and safety in a range of ground conditions

• When an underground structure is built a redistribution of the natural initial stresses takes place. Due to this redistribution, the underground structure will be

subjected to a certain level of stresses and hence loads that influences adjacent structures

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016

Lumachelas

Page 7: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

• Best contractual practices in countries with great tradition in this type of complex

geotechnical works promote the adequacy of the construction methods initially planned to the real ground conditions and behaviour found at tunnel

face

• For instance, by using the observational method (as set out in Chapter 2.7 of the

Eurocode 7: Geotechnical design) in which the design is reviewed during construction

• Therefore, it’s recommended the use of flexible legislative solutions adapted to

this reality, which follow the best construction practices, and allow a better management of the geotechnical risk allocation

7

PARTICULARITIES OF THE UNDERGROUND WORKS

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016

Page 8: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

• ITA has already prepared guidelines and recommendations on contractual aspects of conventional tunnelling (WG19) and contractual framework checklist for subsurface

construction contracts (WG3), that resumes the state of art for contractual purposes on sub-surface projects

• It’s clear that the project should take into account the most probable conditions and also

other unfavourable conditions that might occur during construction. Therefore, the

design should be done for different scenarios and design options should

be modified to be adapted to the real soil conditions

• A fast response to real ground conditions is only possible if allowed by the contract, that should include such provisions

8

PARTICULARITIES OF THE UNDERGROUND WORKS

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016

Page 9: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

• For the purpose of construction method modifications on site, the information gained during execution both on the ground properties and on the structural behaviour shall be introduced into the current process of design and execution

• Observation is therefore one of the fundamental principles of conventional tunnelling

construction method and the process of validation of the assumptions in the project must be one of the routine activities included in the project management plan

• The implementation of a formal risk management procedure in subsurface

projects is highly encouraged… All parties involved in the project should participate in this process to manage and mitigate identified risks (ITA Contractual Framework Checklist, 2011)

9

PARTICULARITIES OF THE UNDERGROUND WORKS

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016

Page 10: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

PORTUGUESE PUBLIC CONTRACTS LEGISLATION

10

MODIFICATION OF CONTRACTS. ADDITIONAL WORKS

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016

1986 1989 1992 1995 1998 2001 2004 2007 2010 2013 2016

4TH CPT Seminar

5/2/2016

DL 149/2012 -CCP/2012

12/7/2012

DL 18/2008 CCP/200829/1/2008

DL 59/99

2/3/1999

DL 405/93

10/12/1993

DL 235/86

18/8/1986

Additional Works

+ works

Errors and Omissions

• have become necessary, through unforeseen circumstances

a) Aspects or nonconforming data with reality ;

b) Technical conditions that are considered not feasible;

c) Strictly necessary for full implementation of the contract.

< 50% < 50%

Include additional works to the contract for complex geotechnical works , especially the construction of tunnels.

Page 11: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

0%

25%

50%

0 50 100

Flex

ibili

ty

Special characteristics of unpredictability

T+2008

11

EO 2008

EO 2008

T+2008

T+2012

EO 2012

EO 2012

Lim

it a

mo

un

t o

f o

rigi

nal

co

ntr

act

PORTUGUESE PUBLIC CONTRACTS LEGISLATION: EVOLUTION 2008 2012

MODIFICATION OF CONTRACTS. ADDITIONAL WORKS

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016

Page 12: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

12

JURISPRUDENCE FROM COURT OF AUDITORS

Is the high-court in Portugal responsible for reviewing the legal issues on public expenditure and delivering judgement on those accounts relating to general accounts of the State

• Assumption: the + work must be exceptional, due to unforeseen circumstances

• "... Hence it does not appear any unforeseeable circumstances, which excludes the subsumption of such additional work to article 370 (+ work), paragraph 1, of the CCP ...“ (from sentence n.º9 / 2012, 3rd Section, Case N. 6JRF / 2011)

• "Errors and omissions are always omissions, deficiencies or imperfections of

solution elements of the work for reasons attributable to the parties of the contract (for one or both parties); They assume, therefore, a causal link to one of the

parties of the contract or both ... “ (Case n.º2 / 2013, 3rd Section, Case N. 5JRF/2012)

MODIFICATION OF CONTRACTS. ADDITIONAL WORKS

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016

Page 13: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

13

0%

25%

50%

0 50 100

Special characteristics of unpredictability

EO 2008

T+2008

T+2012

EO 2012

Observational Method, An Error?

Lim

it a

mo

un

t o

f o

rigi

nal

co

ntr

act

MODIFICATION OF CONTRACTS. ADDITIONAL WORKS

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016

Page 14: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

14

When uncertainty is certain, what’s the right thing to do?

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016

MODIFICATION OF CONTRACTS. ADDITIONAL WORKS

Page 15: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

15

NEW LEGAL FRAMEWORK: SPECIAL MODIFIED WORKS?

• Article 72º 1.a) of New EU Directive 2014/24/UE

“ Where the modifications [of contracts during their term], irrespective of their

monetary value, have been provided for in the initial procurement documents in clear, precise and unequivocal review clauses, which may include price

revision clauses, or options [i.e. project by scenarios]. Such clauses shall state the

scope and nature of possible modifications or options as well as the conditions under which they may be used “

• Article 132º of existing Regulation 701-H/2008

Special Technical Assistance (STA) "In tunnels projects... the construction

phase should entail a special technical assistance to be provided by the designer... to make the analysis of the real geological conditions ... and the assessment of the results

provided by monitoring of the work ... to adapt the project to the real underground conditions. "

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016

TRANSPOSITION OF THE NEW DIRECTIVES

Page 16: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

16

OPPORTUNITY ! SPECIAL MODIFIED WORKS (SMW)?

• New rule for the revised Portuguese Public Contracts Code (PCC)

Special Modified Works (SMW) are obtained from modifications to the

construction method on site as a consequence of the information obtained during

excavation, for a different scenario, and can result in additional or less works

(considering the baseline construction plan which was based on the most probable scenario for the expected ground conditions)

• SMW should only be applied when the modifications are realized within a Special Technical Assistance provided to the owner of the works, according to the current

Portuguese Legislation (Regulation 701-H)

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016

TRANSPOSITION OF THE NEW DIRECTIVES

Page 17: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

17

OPPORTUNITY ! SPECIAL MODIFIED WORKS (SMW)?

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016

TRANSPOSITION OF THE NEW DIRECTIVES

Page 18: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

18

OPPORTUNITY ! SPECIAL MODIFIED WORKS (SMW)?

• More flexibility during construction requires accurate preparation:

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016

TRANSPOSITION OF THE NEW DIRECTIVES

Preparation of the tender Execution / Construction phase

Appropriate Site investigation

Design for several scenarios

Geotechnical Baseline Report

Revision by experts

Differing Site Conditions

Balanced risk allocation

Special Technical Assistance

Formal risk management procedures

Monitoring Site supervision specialists

Special Modified Works (SMW)

Dispute Resolution Board

Design – bid – build contracts

Page 19: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

• The current Portuguese legislation does not respond properly to the best construction methods for underground works, specially in complex geotechnical conditions with unforeseen circumstances

• The lack of flexibility of the legislation, and of the court of auditors, collides with the necessary flexibility of the observational method, that is founded on the adjustment of techniques according to the conditions encountered in the front face of excavation

• This leads to “defensive design procedures” that uses the worst case scenarios for the baseline project instead of the most probable scenario, and increase the cost of the project and the litigation associated

• Moreover, the owners may seek a “turnkey contract” solution with a fixed price and end date, which lead to an unfair allocation of risk, specially due to the uncertain geotechnical conditions, that will inevitably cause costly conflicts and disputes

19

RESUME

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016

Page 20: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

• BUT with a more rigorous preparation and high contractual flexibility,

using the state of art guidelines on contractual aspects for underground structures (in particular for tunnels) given by ITA recommendations and other standard contract conditions (FIDIC, SIA …)

• Balanced risk allocation and effective management of underground projects,

essential for the successful completion of the works, on the right schedule

and at a fair price

• This will only be possible if the legislator understands the particularities of the subsurface

environment and underground works and take the opportunity of the revision that is on course to introduce the necessary adjustments to the Portuguese Public Contract Law for this particular complex geotechnical structures (design for

different scenarios, Special Modified Works, Risk management procedures,…)

20

RESUME

Gonçalo Diniz Vieira_Contractual Issues of Underground Works_4th CPT International Seminar_Lisbon_Fev.2016

Page 21: Contractual Issues of Underground Works · 2016. 2. 12. · •Transposition of the new public procurement directives. New legal framework: Special Modified Works? •Resume Gonçalo

Contractual Issues of Underground Works

The case of complex and uncertain geotechnical conditions.

Limitations of the Portuguese law and the implementation of the new EU public procurement directives

Gonçalo Diniz VieiraCivil Eng., MSc Geotechnics, LisbonMBA

Animateur of WG2 from CPT

[email protected]

geogdv.wordpress.com

4th CPT International Seminar:Tunnels. From Operation Back to Design