    INSTRUMENTAION= SENSE ORGANS

    CONTROL= NERVOUS SYSTEM

  • 8/7/2019 CONTROL & INSTRUMENTAION

    2/18

    MEARURSEING INSTRUMENTSy PRESSURE : GAUGE, TRANSMITTERS

    y TEMPERATURE: RTD, THERMOCOUPLE,INFRARED SENSEOR

    y FLOW: ORIFICE, CORIOLIS,ULTRASONIC FLOW METER ETC

    y LEVEL: TRANSMITTESR, SONARPROBES.

    y SWITCHES: PRESSURE, TEMP, FLOW etc.

    y SPEED: HALL PROBE

    y VIBRATION: VIBRATION PICKUPS

    y

    AXIAL SHIFT: LVDTy THERMAL EXPANSION: LVDT

    y ANALYSERS:CONDUCTIVITY, HYDROGEN PURITY, pH, O2, SOX,NOX, CO ETC

  • 8/7/2019 CONTROL & INSTRUMENTAION

    3/18

    Pressure and temp gauge RTD and Thermocouple Flow switches

    Level transmitters

    SWAS Analyzers

    Transmitters

    Turbovisory equipments

  • 8/7/2019 CONTROL & INSTRUMENTAION

    4/18

    POPULATION PER UNITy TRANSMITTERS : PRESSURE,FLOW,LEVEL,TEMP200

    y

    SWITCHES:P

    RESSURE,FLOW,TEMP,LEVEL ETC 200

    y THERMO COUPLES: 275

    y RTDS: 400

    y

    ANALYSERS: 25y ACTUATORS : PENUMATIC200

    y DRIVE OF ELECTRICAL ACTUATORS 250

  • 8/7/2019 CONTROL & INSTRUMENTAION

    5/18

    BEST O&M PRACTICESy Preventive maintenance

    The care and servicing by personnel for the purpose of maintaining

    equipment and facilities in satisfactory operating condition byproviding for systematic inspection, detection, and correction ofincipient failures either before they occur or before they develop intomajor defects. Check list has been prepared and PM is being done in 2ways

    1. In running condition: checking of instruments exte

    rnally, cleaning,terminal tightening, arresting leakages, replacement of damaged

    equipments, checking of alarm fasciaetc.

    2. In shutdown condition: isolation of instruments, calibration,replacement of defective parts, checking of interlock protection.

  • 8/7/2019 CONTROL & INSTRUMENTAION

    6/18

    BEST O&M PRACTICESy Tune up ofrunning auto loops: as and

    when required

    y Tools : Equip O&M staff with state-of-the-artdiagnostic tools. These tools allow O&M staff andmanagers to troubleshoot and detect malfunctions.

    y Documentation: Useing effective documentation tomaintain continuity and reduce trouble-shooting costs.

  • 8/7/2019 CONTROL & INSTRUMENTAION

    7/18

    DATA ACQUSITON SYSTEM

    yWSPOSE BY BHELy PROCESS 1000 ANALOG AND 2000 BINARY

    SIGNAL APPROXIMATLY AND DISPLAY IN USERFRENDLY FORMATE FOR OPERATION WINGSUCH AS TREND, GROUP DATA, PROFILE,

    ALARM LOG, SHIFT LOG, DAY LOG,RETRIVALOF OLD DATA ON REQUEST ETC.

  • 8/7/2019 CONTROL & INSTRUMENTAION

    8/18

    DAS

    Schematic diagramTrendsAlarm logs

  • 8/7/2019 CONTROL & INSTRUMENTAION

    9/18

    CONTROLy FURNACE SAFEGAURD SUPERVISORY SYSTEM

    implement logics by NFPA for protection of furnace.

    consists logic ofboiler MFR, Mill and PA interlock andprotection, flame scanners etc.

    y ELECTRONIC AUTOMATION OF STEAM TURBINE

    Takes care of protection of turbine, rolling to the speed

    of 3000 rpm, synchronization, load control,Turbovisory parameters, coasting down in case oftripping and many more functions

  • 8/7/2019 CONTROL & INSTRUMENTAION

    10/18

    CONTROLy DISTRIBUTED DIGITALCONTROLS

    Heart of C&I system. It acquires various process

    parameters , do signal conditioning and control thedesired parameters automatically.

    Example: Furnace pressure control, drum level controlsand hundreds of other parameters.

    Present system: Procontrol P-13At least 25 years old system & almost in obseletion stage

  • 8/7/2019 CONTROL & INSTRUMENTAION

    11/18

    MODERANISATION: SWITCH OVER TO maxDNA

    y HPBP and APRDS system of unit # 2 in 2005.

    y Order For HPBP and APRDS system of unit # 1

    already given and will be implemented in capital overhaul.y Complete changeover of EAST in one unit. PO placed

    y Replacement of DDC and FSSS of one unit to maxDNA:enquiry placed to BHEL.

    yPbased variable frequency Feeder control systeminstalled in U#2

    y Same to be done in U#1 indent raised.

    y Revival of SWAS in unit#1 to be carried out.

  • 8/7/2019 CONTROL & INSTRUMENTAION

    12/18

    DDC

    DDC panel

  • 8/7/2019 CONTROL & INSTRUMENTAION

    13/18

    DDC

  • 8/7/2019 CONTROL & INSTRUMENTAION

    14/18

  • 8/7/2019 CONTROL & INSTRUMENTAION

    15/18

    maxDNA

  • 8/7/2019 CONTROL & INSTRUMENTAION

    16/18

    TRENDS ANDDISPLAY IN maxDNA

  • 8/7/2019 CONTROL & INSTRUMENTAION

    17/18

    WORK FORCE

    ESE C&I

    EEE(C&I)-I SR. Engr-I

    Engineer- 05

    Technician- 07

    Helper-10

    EEE(C&I)II SR. Engr-II

    Engineer - 01

    Technician- 07

    Helper-10

  • 8/7/2019 CONTROL & INSTRUMENTAION

    18/18

    THANK YOU