Page 1: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

Major Hazard Facilities

Control Measures and Adequacy

Page 2: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

2

Overview

The seminar has been developed to provide:

• Context with MHF Regulations

• An overview of what is required

• An overview of the steps required

• Examples of control measures and their adequacy

Page 3: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

3

Some Abbreviations and Terms

• AFAP - As far as (reasonably) practicable

• DG - Dangerous goods

• Employer - Employer who has management control of the facility

• ER or ERP - Emergency response or Emergency response plan

• Facility - any building or structure at which Schedule 9 materials are present or likely to be present for any purpose

• HAZID - Hazard identification

• HAZOP - Hazard and operability study

• HSR - Health and safety representative

• LOC - Loss of containment

• LOPA - Layers of protection analysis

Page 4: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

4

Some Abbreviations and Terms

• MHF - Major hazard facility

• MA - Major accident

• OHS - Occupational health & safety

• PFD - Probability of failure on demand

• PSV – Pressure safety valve

• SMS - Safety management system

Page 5: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

5

Topics Covered In This Presentation

• Regulations

• Introduction

• Regulatory requirements

• What does this mean?

• Identify all control measures

• Development of assessment

• Control category and examples

• Hierarchy of controls

• AFAP

Page 6: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

6

Topics Covered In This Presentation

• Effectiveness of control measures

• Control types

• Opportunities available to reduce risk

• Assessment and adequacy

• Sources of additional information

• Review and revision

Page 7: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

7

• Hazard identification (R9.43)

• Risk assessment (R9.44)

• Risk control (i.e. control measures) (R9.45, S9A 210)

• Safety Management System (R9.46)

• Safety report (R9.47, S9A 212, 213)

• Emergency plan (R9.53)

• Consultation

Basic outline

Regulations

Page 8: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

8

Hazards causing

an MA

The controls preventing or

mitigating consequences of

an MA

The controls in place and

assess their effectiveness

and adequacy

In order to deliver safe operation the

Employer needs to understand the

relationship between

Introduction

Page 9: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

9

Controls DO fail and the consequences can be devastating

(Skikda, Algiers, 20 January, 2004)

• At least 23 workers

were killed

• 74 were injured

• $800,000,000 (U.S.)

estimated property

damage

Introduction

Page 10: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

10

• Control measures are the features of a facility that:

- Eliminate

- Prevent

- Reduce

- Mitigate

. . . the risks associated with potential MAs

• They are the means by which the Employer ensures the operation satisfies the Regulations and the AFAP requirement

• A number of control options maybe considered and applied individually or in combination

Introduction

Page 11: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

11

• In undertaking control measure identification and assessment, the Employer should seek to attain an understanding of:

- The processes involved in control measure identification/selection and assessment

- The control measures used to reduce the risk of potential major accidents to AFAP

Introduction

Page 12: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

12

• At the end of the controls and adequacy evaluation process, the Employer should know:

- The identity of all existing and potential control measures

- The relationships between the hazards, control measures, MAs and outcomes

- The effectiveness of control measures in managing risk

- The opportunities that are available to reduce risk

- The monitoring regime necessary to ensure the ongoing effectiveness of the control measures

Introduction

Page 13: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

13

• After the HAZID and Risk Assessment evaluations, the Employer will have identified all of the hazards that can lead to MAs and the controls in place, including independence, reliability, effectiveness, robustness and applicability

• A determination of the adequacy of the controls in managing the hazards then needs to be undertaken

Regulation Requirements

Page 14: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

14

• The opportunities present that are available to reduce risk need to be assessed, including additional or alternative controls

• The monitoring regime necessary to ensure the ongoing effectiveness of the control measures for managing the hazards need to be assessed

• Control measures and adequacy assessment will need to be revised as necessary, using performance monitoring results and other relevant new information

What Does This Mean?

Page 15: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

15

0

5

10

15

20

25

30

35

40

45

50

ChemicalExposure

EnvironRelease

Explosion Fire LOC First Aid

Offsite

First Aid

Onsite

No

of

Incid

en

ts

Petroleum

Utilities

Logistics

Chemicals & Plastics

Reported incidents by results involving Schedule 9 materials in Victoria (from

VWA)

What Does This Mean?

Page 16: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

16

• This accident happened during the filling of a 2000 m3 LPG sphere

• Its legs collapsed.

• One person was killed and one seriously injured

What Does This Mean?

Page 17: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

17

Identity of All Control Measures

• All of the MAs should be documented in an appropriate format that clearly identifies:

- The MA (the release modes and the consequences of the release)

- All hazards that, if realised, can cause an MA

- The controls in place to manage the hazard and any recommended controls as a result of the HAZID process

Page 18: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

18

Identity of All Control Measures

Hazard: • Release of chlorine from chlorine storage drum

Incident: • Forklift tynes impact on chlorine storage drum

Consequence: • Release of chlorine liquid into storage drum bund resulting in personnel exposure to chlorine liquid/vapour

• Potential for serious injury/fatality

Example, consider a chlorine drum handling operation

Page 19: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

19

Identity of All Control Measures

Preventative Controls (Incident Prevention)

Mitigation Controls (Incident Mitigation)

Design of chlorine storage drum and fork lift lifting mechanisms prevent tynes puncturing cylinder (in accordance with an appropriate standard) and inspected regularly

Spill containment bunds (reduces the consequences)

Traffic management system/forklift or pedestrian exclusion zones

Spill containment procedure, chlorine gas detection & alarms (reduces time for intervention thereby reducing consequences) – procedure inspected and found to be satisfactory

Forklift driver training – training is held at the prescribed intervals and records inspected are satisfactory

PPE including breathing apparatus (reduces the likelihood of exposure to chlorine) – PPE training is held at prescribed intervals and records validated

Page 20: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

20

• Control measures are not only physical equipment, but may include:

- Engineered devices (physical barriers such as impact protection bollards) or systems (high integrity trip systems)

- High-level procedures or detailed operating instructions

- Information systems (incident reporting systems)

- Personnel training (i.e. the actions people should take in an emergency)

Identity of All Control Measures

Page 21: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

21

Development of Assessment

• It is important to understand how controls are arranged in a manner that eliminate or minimise the hazards leading to an MA occurring, and any interdependence

• Control measures may be pro-active, in that they eliminate, prevent or reduce the likelihood of incidents

• They may be reactive, in that they reduce or mitigate the consequences of an MA

Page 22: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

22

• Control measures may be considered as “barriers” and are located between the intrinsic hazards that could lead to an MA

• Control measures can also reduce the harm that may be caused to people and property in the event of an MA

• Hazards can result in an MA harming people or property only if controls have failed to function as intended, or have been bypassed/defeated

Development of Assessment

Page 23: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

23

Development of Assessment

1st barrier2nd barrier

3rd barrier

Page 24: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

24

• There are methods for the control assessment process

• The size, complexity and knowledge of the MHF could determine which approach to use

• Several methods can be used, e.g.:

- LOPA

- Fault tree and event tree

- Risk matrix

Development of Assessment

Page 25: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

25

Increasing Reliability

Decreasing Reliability

The hierarchy of controls & effectiveness guidelines

Control type

100%Eliminate Hazard

90%Minimize hazard

Physical controls

50%Procedures

30%Personnel Skills &

Training

EffectivenessEffectiveness

Control Measure Hierarchy

Page 26: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

26

• Elimination/substitution controls

• Prevention controls

• Reduction controls

• Mitigation controls

Control Measure Hierarchy

Page 27: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

27

Control Category Control Example

Elimination controls • Equipment removal

• Physical barriers such as mounding of LPG sphere

• Decommissioning

• Facility layout – increasing separation distances

• Plant design procedures

Control Measure Hierarchy

Page 28: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

28

Control Category Control Example

Substitution controls • Replacement of a hazardous material with a non-hazardous substitute (E.g. Replace chlorine with sodium hypochlorite)

• Systems to prevent incompatible materials on the site at the same time

Control Measure Hierarchy

Page 29: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

29

Control Category Control Example

Prevention • Process alarms and notification systems

• Independent flow/level/pressure/temperature indicators with a defined response

• Engineering standards

• Safety process systems (safety integrity systems), pressure relief valves

Control Measure Hierarchy

Page 30: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

30

Control Category Control Example

Prevention • Operating procedures and instructions

• Personnel skill, training and competency

• Plant inspection

• Equipment testing and repair

• Change management process

• Maintenance procedures

• Quality specifications

• Permit to work

Control Measure Hierarchy

Page 31: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

31

Control Category Control Example

Reduction • Separation distances

• Shutdown and isolation systems

• Gas detection with leak isolation action

• Bunding and other containment systems

• Drainage

Control Measure Hierarchy

Page 32: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

32

Control Category Control Example

Mitigation • Fire fighting systems

• Emergency response plans

• Plant evacuation alarms

• Passive fire protection (thermal insulation on bullets, spheres)

Control Measure Hierarchy

Page 33: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

33

• It is the risk assessment that provides the information necessary to test this requirement, and this information must be included in the safety report

• The risk assessment must address hazards and risk both individually and cumulatively

• Consequently the demonstration that risks are eliminated or reduced to AFAP may need to be made for control measures individually, in groups and as a whole

AFAP

Page 34: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

34

• The AFAP approach is not simply about satisfying a single criterion of whether the risk of an MA is less than a specific number or position on a risk matrix

• It is about evaluation of all controls, their proportionality for controlling the risk of an MA occurring and if additional controls can reasonably have an effect on reducing the risk of an MA further

AFAP

Page 35: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

35

• The likelihood of the hazard or risk actually occurring

- That is, the probability that someone could be injured or harmed through the work being done

• The degree of harm that would result if the hazard or risk occurred

- For example fatality, multiple injuries, medical or first aid treatment, long or short term health effects

• The availability and suitability of ways to eliminate or reduce the hazard or risk

AFAP

Page 36: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

36

• What is known, or ought reasonably be known, about the hazard or risk and any ways of eliminating or reducing it

• The cost of eliminating or reducing the hazard or risk

- That is, control measures should be implemented unless the risk is insignificant compared with the cost of implementing the measures

AFAP

Page 37: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

37

• The balance between benefits in terms of reduced risk and the costs of further control measures will play a part in achieving and demonstrating AFAP

• Every safety report will need to develop an approach as to how the AFAP argument is to be applied to the facility

• The AFAP approach then needs to be applied consistently to every MA in order for demonstration of adequacy to be satisfied

AFAP

Page 38: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

38

AFAP – Cost/Benefit & Rejecting Controls

Low

High

Benefit

(Risk Reduction)

Low

Should be implemented.

Little analysis required

unless rejected.

More detailed

justification required to

reject

More detailed

justification required to

reject (lower priority)

Simple justification to

reject

High

Sacrifice (cost, time, effort and

inconvenience)

Page 39: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

39

• There are controls and safeguards

• A control is considered to be a device, system, or action that is capable of preventing a cause from proceeding to its undesired consequence, independent of the initiating event or the action of any other layer of protection associated with the scenario

• A safeguard is any device, system or action that would likely interrupt the chain of events following an initiating event

Effectiveness of Control Measures

Page 40: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

40

Effective For the initiating event

IndependentOf the components of any other control

already claimed for the same scenario

Reliable The reliability, effectiveness and independence

of a control must be auditable

ApplicablePreventing the consequences

when it functions as designed

To be considered a control, it must be:

Effectiveness of Control Measures

Page 41: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

41

• As an example, consider an employee action to read a level gauge and a pressure gauge - both taken off the same tapping point

• Is a single tapping point for two different information streams applicable, independent and reliable?

• Will the employee reliably report the correct information?

Effectiveness of Control Measures

Page 42: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

42

These have been built into a system - but are they:

Effective

Independent

Reliable

Applicable

The answer - NO

Effectiveness of Control Measures

Page 43: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

43

• Every designer, Employer and manager desires to have controls that are:

- Robust

- Reliable

- Can survive harsh environments

- Not dependent upon rigorous inspection and testing regimes that involve manpower and cost

• Unfortunately this is not reality

Effectiveness of Control Measures

Page 44: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

44

Controls do fail and accidents occur as a result

Result of a fire at a bulk storage facility – was there adequate separation and fire protection?

Effectiveness of Control Measures

Page 45: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

45

Impact on:• Environment• People• Business

interruption• Cost of

inventory• Reputation• Legal cost

Effectiveness of Control Measures

Page 46: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

46

A good management system

Effectiveness of Control Measures

Page 47: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

47

With adequate risk control measures

Effectiveness of Control Measures

Page 48: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

48

Reduces the risk of loss

Effectiveness of Control Measures

Page 49: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

49

• These controls are important to analyse in a structured manner so that their effectiveness can be assessed

• For this to occur the Employer needs to know:

- What type

- How many

- How reliable are the controls

- Are there sufficient to reduce MA risk to AFAP?

• Each control needs to be fit for purpose and designed into the system as independent

Effectiveness of Control Measures

Page 50: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

50

• In each evaluation the type of service being evaluated needs to be taken into consideration critically to ensure the control type is effective and will perform its intended duty

• For example consider an instrumented level gauge with high level and high high level independent alarms for controlling the level in a process tower

• The alarms are not tested and the high high level is known to be in fault mode

- Is this control reliable, effective and applicable?

Control Types

Page 51: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

51

• For example, having a rupture disc in place where the inlet can foul – in this circumstance the correct pressure will not be seen by the rupture disc

- Such a control would not be suitable for the service

• Bund in service for flammable liquid storage tanks which has major penetrations

- This control would not be suitable as it cannot satisfy AS1940

Control Types

Controls need to be service and situation dependent in

order to be suitable

Page 52: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

52

• The following is an animated description of the US Chemical Safety Board, Animation of BP Texas City Refinery Accident, October 27, 2005

• This can be found at the following website

www.csb.gov

Control Types

Page 53: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

53

• Such controls involve reliance on employees to take action to prevent an undesirable consequence in response to alarms or following a routine check of the system

• Human performance is usually considered less reliable than engineering controls

• Not crediting human actions under well defined conditions is considered to be unduly penalising the Employer

Control Types – Human Controls

Page 54: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

54

Human controls should have the following requirements:

• The indication for action required by an employee must be detectable

• The action must always be:

- Available for the employee

- Clear to the employee even under emergency conditions

- Simple and straight forward to understand

- Repeatable by any similarly trained/competent employee

Control Types – Human Controls

Page 55: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

55

• The time available to take action must be adequate

• Employees should not be expected to perform other tasks at the same time – there needs to be clear priorities

• The employee is capable of taking the action required under all conditions expected to be reasonably present

• Training for the required action is performed regularly and is documented

• Indication and action should normally be independent of any other system already accredited

Control Types – Human Controls

Page 56: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

56

Human Control Comments

Human action with 10 minutes response time

Simple well documented action with clear and reliable indications that action is required

Human response to BPCS indication or alarm with 40 minutes response time

Simple well documented action with clear and reliable indications that action is required

Human action with 40 minutes response time

Simple well documented action with clear and reliable indications that the action is required

Examples of reduction (human) controls

Taken from “Layer of Protection Analysis, Simplified Process Risk

Assessment, Centre for Chemical Process Safety, American Institute

of Chemical Engineers, 2001”

Control Types – Human Controls

Page 57: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

57

• Each control, to be classified as a legitimate control against an MA (i.e. implemented, functional, independent, monitored and audited) must be evaluated in a structured format

• To ensure proper management of the MAs, each control must be fully independent of the other controls listed

- there must be no failure that can deactivate two or more controls (e.g. common cause failure)

The effectiveness of control measures in managing risk

Opportunities Available to Reduce Risk

Page 58: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

58

• The question people ask is, how many controls are required to reduce a MA to AFAP?

• This will depend on:

- The circumstances

- The process being analysed together with the mix of independent controls

• One approach used is to have a qualitative evaluation that requires three independent controls to be in place before AFAP can be achieved

Opportunities Available to Reduce Risk

Page 59: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

59

Risk is based on the following equation:

Risk = ∑(Fi x Ci) =(F1 x C1) + (F2 x C2) +.....(Fn x Cn)

WhereFi is the Frequency or likelihood of event i, andCi is the consequence of event i

• Risk reduction can be implemented by changing either the frequency of the MA occurring or the magnitude of the consequence of the MA

Opportunities Available to Reduce Risk

Page 60: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

60

• For evaluation of control measures, there are several issues that need to be considered

Existing MHF Facility

• During a risk evaluation process for an existing facility, it would be very unusual to achieve a reduction in the worst case consequences of an MA

• Reducing the frequency or likelihood of the event occurring is generally the only option available

Opportunities Available to Reduce Risk

Page 61: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

61

New MHF Facility

• For a new facility, both components of the risk equation can be reduced

• Several issues can be explored when designing a new facility

• The first point of examination is to focus on the hierarchy of controls

- Can we eliminate the hazard so it is not a problem?

• The second area to examine is substitution

- Use of alternative non Schedule 9 or DG materials

Opportunities Available to Reduce Risk

Page 62: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

62

• The effectiveness of an elimination control is considered to be100%

• The risk from an event occurring is reduced to zero• This is the optimal type of control• If an Employer cannot reduce the risk to an acceptable level,

the feasibility of shutting down plant equipment/processes,substituting non-hazardous substances for hazardoussubstances should be considered

Elimination Controls

Opportunities Available to Reduce Risk

Page 63: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

63

• The effectiveness of prevention controls is based on their Probability to Fail on Demand (PFD)

• PFDs can be determined from site specific maintenance/inspection data and incident data

• In the absence of site specific data, PFDs can be referenced from worldwide failure rate data publications such as OREDA, E&P Forum, etc

Prevention controls

Opportunities Available to Reduce Risk

Page 64: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

64

• Assessing the effectiveness of reduction controls is a lot more subjective than assessing the effectiveness of elimination or prevention controls

• There are many variables that affect the integrity/effectiveness of such controls

• These cover

- Reliability of instrumentation

- Inspection and testing frequency requirements

- Effectiveness of testing programs and feedback on opportunities for improvement

- Frequency of training employees

Reduction controls

Opportunities Available to Reduce Risk

Page 65: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

65

• For example, an operating procedure can be a highly effective reduction control provided it is readily available, regularly referenced and frequently reviewed and there is independent verification of its output

• The same argument holds for a change management process

• Human factors evaluations should be used to determine the reliability of an operating procedure if it is critical to the activity

Reduction controls

Opportunities Available to Reduce Risk

Page 66: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

66

Training/competency controls

• The effectiveness of training controls is not easily assessed

• Training programs that are:

- Specific to the task at hand

- Competency assessed

- Revisited via re-fresher training courses

• Are likely to be highly effective with confirmation being available through human factors evaluations

Opportunities Available to Reduce Risk

Page 67: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

67

• Where elimination or substitution cannot be achieved then a combination of controls is preferred

- This provides a balance

- The failure of a single control should not lead to the MA occurring

Opportunities Available to Reduce Risk

Page 68: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

68

• There are a number of approaches that can be used to undertake an assessment of an MA’s controls to determine if the AFAP argument is satisfied

• These include

- LOPA

- Fault and event tree analysis

- Risk analysis using a matrix approach

• The approach to use will depend on the complexity of the MA and the culture of the organisation

Assessment and Adequacy

Page 69: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

69

• Less complex and smaller operations could use a risk matrix type approach

• A more complex operation such as a refinery or gas processing plant could use all three approaches

• When determining effectiveness of control measures, the following issues will also need to be considered:

- Independence

- Functionality

- Survivability

- Reliability

- Availability

Assessment and Adequacy

Page 70: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

70

• Cost benefit analyses can be undertaken to determine the viability of each proposed recommendation for further risk reduction

• This is a valid approach and at some point, depending on the circumstances involved, the cost of reducing risk further becomes costly compared to the benefit gained

• Controls that are rejected need to be documented including the reason why

• The definition of a “critical control” is hard to define as various interpretations can be provided

• This could, in some circumstances, skew thinking to the detriment of other controls

• For the purpose of MA controls and adequacy evaluation, allcontrols that prevent or minimise the potential for an MA to occur should be appropriately evaluated

Assessment and Adequacy

Page 71: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

71

• In essence there will have been a determination made on every MA covering:

- What controls are in place?

- What other controls are in place?

- Is there only one control in place or is there a proportionality of controls available to achieve AFAP?

- Is the risk adequately controlled?

- Are additional controls required?

Assessment and Adequacy

Page 72: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

72

• Are they effective?

• Would alternative controls be more suitable and effective for preventing or reducing the MA?

• What testing regime is required for maintaining the control performance?

• Is the testing regime adequate for every control?

- For example, if some controls are tested every 12 months, what improvement would there be if testing was undertaken every 3 months?

Assessment and Adequacy

Page 73: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

73

• Are the controls audited and their performance evaluated against appropriate criteria?

• How are failures reported?

• What is the corrective action process in place?

• Is there verification of the entire process?

Assessment and Adequacy

Page 74: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

74

• A safety management process will need to be developed for the facility (i.e. SMS)

• This will enable the performance of all control measures for every MA to be evaluated for effectiveness and opportunities for improvement identified

Assessment and Adequacy

Page 75: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

75

• Major Hazard Facility Guidance Material – Comcare website www.comcare.gov.au

• WorkSafe Victoria Guidance Material – WorkSafe website www.workcover.vic.gov.au

• Layer of Protection Analysis, Simplified Process Risk Assessment, Centre for Chemical Process Safety, American Institute of Chemical Engineers, 2001

• Hazard Identification and Risk Assessment, Geoff Wells, 1996

• Classification of Hazardous Locations, A.W. Cox, F.P. Lees and M.L. Ang, IChemE, 1993

Sources of Additional Information

Page 76: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

76

• Guidelines for Process Equipment Reliability Data, Center for Chemical Process Safety of the American Institute of Chemical Engineers, 1989

• Loss Prevention in the Process Industries , F. P. Lees, Appendix 14/5, 2nd Edition, Butterworth Heinemann

• IEC 61511-3 Ed. 1.0 E - 2003 - Functional safety - Safety instrumented systems for the process industry

Sources of Additional Information

Page 77: Control Measures and Adequacy - R4Riskr4risk.com.au/wp/wp-content/uploads/2016/09/6-Controls_Rel02.pdf · 2000 m3 LPG sphere • Its legs collapsed. • One person was killed and

77

Questions?