Control Number : 42221
Item Number : 2
Addendum StartPage : 0
12` 42STANDARD APPLICATION FOR A CERTIFICATE OF :
CONVENIENCE AND NECESSITY FOR A PROPOSED
TRANSMISSION LINE
AND
APPLICATION FOR A CERTIFICATE OF CONVENIENCE
AND NECESSITY FOR A PROPOSED TRANSMISSION
LINE PURSUANT TO P.U.C. SUBST. R. 25.174
DOCKET NO. 42221
Submit seven (7) copies of the application and all attachments supporting the
application. If the application is being filed pursuant to P. iT. C. SUBST R
25.101(b)(3)(D) or P.U.C. Subst. R 25.174, include in the application all direct
testimony. The application and other necessary documents shall be submitted to:
Public Utility Commission of Texas
Attn: Filing Clerk
1701 N. Congress Ave.
Austin, Texas 78711-3326
1
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
Note: As used herein, the term "joint application" refers to an application for proposedtransmission facilities for which ownership will be divided. All applications for suchfacilities should be filed jointly by the proposed owners of the facilities.
1. Applicant (Utility) Name:
For joint applications, provide all information for each application.
Applicant (Utility) Name: Oncor Electric Delivery Company LLC
("Oncor" or "Company")
Certificate Number: 30158
Street Address: 1616 Woodall Rodgers Freeway
Dallas, Texas 75202
Mailing Address: 1616 Woodall Rodgers Freeway
Dallas, Texas 75202-1234
2. Please identify all entities that will hold an ownership interest or an investment
interest in the proposed project but which are not subject to the Commission's
jurisdiction.
Oncor will hold the sole ownership interest in the Proposed Transmission Line.
3. Person to Contact: April Pinkston
Title/Position: Regulatory Project Manager
Phone Number: (214) 486-4917
Mailing Address: 1616 Woodall Rodgers Fwy, Suite 6A-012
Dallas, Texas 75202-1234
Email Address: [email protected]
Alternate Contact:
Title/Position:
Phone Number:
Mailing Address:
Email Address:
Robert Holt
Regulatory Manager
(214) 486-4955
1616 Woodall Rodgers Fwy, Suite 6B-005
Dallas, Texas 75202-1234
Robert. Holt(w'oncor.com
2 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
Legal Counsel: Matthew C. HenryTab R. UrbantkeJaren A. Taylor
Phone Number: (214) 220-7754
Mailing Address: Vinson & Elkins LLP
Trammell Crow Center
2001 Ross Avenue, Suite 3700
4.
Dallas, Texas 75201
Email Address: jarentaylort"a,velaw.com
Please contact Jaren Taylor with any inquiries regarding the Proposed Transmission
Line Project.
Project Description:
Provide a general description of the project, including the design voltage rating(kV), the operating voltage (kV), the CREZ Zone(s) (if any) where the project is
located (all or in part), any substations and/or substation reactive compensationconstructed as part of the project, and any series elements such as sectionalizingswitching devices, series line compensation, etc. For HVDC transmission lines,the converter stations should be considered to be project components and shouldbe addressed in the project description.
If the project will be owned by more than one party, briefly explain theownership arrangements between the parties and provide a description of the
portion(s) that will be owned by each party. Provide a description of the
responsibilities of each party for implementing the project (design, Right-Of-
Way acquisition, material procurement, construction, etc.).
If applicable, identify and explain any deviation in transmission project
components from the original transmission specifications as previously approved
by the Commission or recommended by a PURA §39.151 organization.
Name or Designation of Project:
Design Voltage Raging (kV):Operating Voltage Rating (kV):Normal Operating Current (A):
Benedum (LCRA) - Centralia 138 kVTransmission Line Project138 kV138 kV1649 A
3 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
3
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
The Project will include construction of a new 138 kV double-circuit transmission
line between the Lower Colorado River Authority's ("LCRA")'s new Benedum
Switching Station and Oncor's new Centralia Substation ("Proposed Transmission
Line Project"). The new transmission line will connect into LCRA's existing
Midkiff to Crane 138 kV transmission line at the Benedum Switching Station and
extend 138 kV transmission facilities to serve new load near Oncor's new Centralia
Substation. Oncor will construct the Proposed Transmission Line Project and the
Centralia Substation. LCRA will construct the Benedum Switching Station.. Atlas
Pipeline Mid-Continent WestTex LLC ("Atlas") is involved in the Right-of-Way
("ROW') acquisition for the Proposed Transmission Line Project (see Question 6
below).
The Benedum Switching Station is located approximately 5 miles south of Ranch-to-Market (RM) 2401 and 0.5 mile east of County Road 112 along LCRA's existingMidkiff to Crane 138 kV transmission line. Oncor's Centralia Substation will belocated approximately 8.5 miles east of State Highway ("SH") 349, just north of theAtlas Edward Gas Processing Facility ("Edward Gas Processing Facility") in Upton
County, Texas.
Associated with the Proposed Transmission Line Project will be the necessaryendpoints for the line. This work will include the equipment necessary to terminatethe proposed project at both ends. These improvements can include station dead-end structures, other structures, bus work, transformers and other equipment,grading, and fences.
The length of the Proposed Transmission Line Project route is approximately 9.9miles as proposed.
5. Conductor and Structures:Conductor Size and Type: 959.6 kemil ACSS/TW
Number of conductors per phase: 1Continuous Summer Static Current Rating (A): 1649 A
Continuous Summer Static Line Capacity
at Operating Voltage (MVA): 394 MVA
Continuous Summer Static Line Capacity
at Design Voltage (MVA): 394 MVA
4 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R 25.174
Type and composition of Structures: Double-Circuit Steel or
Concrete Monopole
Height of Typical Structures: 85 feet*
* This number reflects the approximate visible height of the structure from ground
to structure top. Please see the dimensional drawing of a typical structure in Figure
1-2 (page 1-5) of the Environmental Assessment for Oncor Electric Delivery
Company LLC's Proposed Benedum (LCRA) to Centralia 138 kV Transmission
Line Project in Upton County, Texas (Environmental Assessment), prepared by
URS included in Attachment No. 1.
Explain why these structures were selected; include such factors as landownerpreference, engineering considerations, and costs comparisons to alternate
structures that were considered.
For joint applications, provide and separately identify the above-requiredinformation regarding structures for the portion(s) of the project owned by
each applicant.
Oncor's current standard for new single- and double-circuit 138 kV construction is
concrete or steel monopoles. The Proposed Transmission Line Project's study area
contains numerous factors included in the Environmental Assessment. These
factors, including ROW limitations, structure footprint, and impact to affected
landowners were all considered when affirming the use of these structures for the
Proposed Transmission Line Project.
Provide dimensional drawings of the typical structures to be used in theproject.
A dimensional drawing of the typical structure to be used in the project is includedin Figure 1-2 (page 1-5) of the Environmental Assessment included as Attachment
No. 1.
6. Right-of-way:Miles of Right-of-Way: Approximately 9.9 miles
Miles of Circuit:
Width of Right-of-Way:
Approximately 19.8 miles
80 feet
5 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
5
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
Percent of Right-of-Way Acquired: 100%
All necessary ROW for the project is acquired. Given Atlas' familiarity with thearea and existing relationship with the landowners, Atlas acquired the ROW for theproject.
For joint applications, provide and separately identify the above-requiredinformation for each route for the portion(s) of the project owned by eachapplicant.
Provide a brief description of the area traversed by the transmission line.Include a description of the general land uses in the area and the type of
terrain crossed by the line.
The project area is located in Upton County, Texas. This area is rural and mostlyundeveloped. The route crosses lands utilized for different uses including oil/gasdevelopment; rural residential; and agricultural uses such as cropland, pastureland,and ranchland. The topography of the area is level. The vegetation is mostlyscrubland with cropland and prairies.
Transportation mainly consists of ranch-to-market and county roads. There is onerailroad in Upton County, but it is not impacted by the Proposed Transmission LineProject. There are no airfields or heliports identified in the vicinity of the ProposedTransmission Line Project.
Specific discussion regarding natural, human and cultural resources in the projectarea is set forth in Chapter 3 of the Environmental Assessment, pages 3-1 through3-39, included as Attachment No. 1.
7. Substations or Switching Stations:List the name of all existing HVDC converter stations, substations or switchingstations that will be associated with the new transmission line. Providedocumentation showing that the owner(s) of the existing HVDC converter
stations, substations and/or switching stations have agreed to the installation ofthe required project facilities.
No existing substations or switching stations will be associated with the Proposed
Transmission Line Project.
6 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
6
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
List the name of all new HVDC converter stations, substations or switchingstations that will be associated with the new transmission line. Providedocumentation showing that the owner(s) of the new HVDC converter stations,substations and/or switching stations have agreed to the installation of therequired project facilities.
LCRA's new Benedum Switching Station (See Attachment No. 2).
Oncor's new Centralia Substation
8. Estimated Schedule:
Estimated Dates of: Start* Completion*
Right-of-way and Land Acquisition Jun. 2014 Jul. 2014
Engineering and Design Nov. 2013 Jun. 2014
Material and Equipment
Procurement
Apr. 2014 Jul. 2014
Construction of Facilities Jul. 2014 Oct. 2014
Energize Facilities Oct. 2014 Oct. 2014
*Estimated schedule assumes administrative approval of CCN and numerous other factors. The
estimated construction schedule should not in any way be considered a representation, promise, or
guarantee.
9. Counties:
For each route, list all counties in which the route is to be constructed.
Upton County
10. Municipalities:
For each route, list all municipalities in which the route is to be constructed.
The proposed route will not traverse any municipality.
For each applicant, attach a copy of the franchise, permit or other evidence
of the city's consent held by the utility, if necessary or applicable. If
franchise, permit, or other evidence of the city's consent has been previously
7 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
7
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
filed, provide only the docket number of the application in which the consent
was filed. Each applicant should provide this information only for the
portion(s) of the project which will be owned by the applicant.
Not Applicable.
11. Affected Utilities:Identify any other electric utility served by or connected to facilities in thisapplication.
The Proposed Transmission Line Project will be connected to the LCRA's new
Benedum Switching Station.
Describe how any other electric utility will be affected and the extent of theother utilities' involvement in the construction of this project. Include any
other electric utilities whose existing facilities will be utilized for the project(vacant circuit positions, ROW, substation sites and/or equipment, etc.) andprovide documentation showing that the owner(s) of the existing facilities haveagreed to the installation of the required project facilities.
Oncor will construct the Proposed Transmission Line Project to connect to LCRA's
new Benedum Switching Station. The Benedum Switching Station will be
connected to LCRA's Midkiff to Crane 138 kV transmission line. See Attachment
No. 2.
12. Financing:Describe the method of financing this project. For each applicant that is to be
reimbursed for all or a portion of this project, identify the source and amountof the reimbursement (actual amount if known, estimated amount otherwise)
and the portion(s) of the project for which the reimbursement will be made.
Oncor proposes to finance the facilities included in the Proposed Transmission LineProject with a combination of debt and equity in compliance with its authorized
capital structure, which is similar to the means used for previous construction
projects. Oncor plans to utilize internally generated funds (equity) and proceedsreceived from the issuance of securities. The Company will typically obtain short-
term borrowings as needed for interim financing of its construction expenditures inexcess of funds generated internally. These borrowings are then repaid through the
8 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
8
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
issuance of long-term debt securities, the type and amount of which are as yet
determined.
13. Estimated Costs: Provide cost estimates for each route of the proposed
project using the following table. Provide a breakdown of "Other"
costs by major cost category and amount. Provide the information for
each route in an attachment to this application.
Transmission SubstationFacilities Facilities*
Right-of-way and Land Acquisition $102,000 $5,000
Engineering and Design (Utility) $441,000 0
Engineering and Design (Contract) $597,000 $300,000
Procurement of Material and Equipment(including stores)
$3,799,000 $2,850,000
Construction of Facilities (Utility) '$0 $195,000
Construction of Facilities (Contract) $4,392,000 $1,150,000
Other (all costs not included in the above
categories)
$0 $0
Estimated Total Cost $9,331,000 $4,500,000*
*These estimated costs are to establish the new Centralia Substation toaccommodate the Proposed Transmission Line Project. The estimated costs
associated with construction of and line termination at the proposed BenedumSwitching Station are $5.5 million. These facilities will be constructed by LCRA
and are not included in the project cost.
For joint applications, provide and separately identify the above-required
information for the portion(s) of the project owned by each applicant.
Not Applicable.
14. Need for the Proposed Project:For a standard application, describe the need for the construction and state
how the proposed project will address the need. Describe the existing
transmission system and conditions addressed by this application. For
9 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
V
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
projects that are planned to accommodate load growth, provide historical load
data and load projections for at least five years. For projects to accommodate
load growth or to address reliability issues, provide a description of the steady
state load flow analysis that justifies the project. For interconnection projects,
provide any documentation from a transmission service customer, generator,
transmission service provider, or other entity to establish that the proposed
facilities are needed. For projects related to a Competitive Renewable Energy
Zone, the foregoing requirements are not necessary; the applicant need only
provide a specific reference to the pertinent portion(s) of an appropriate
commission order specifying that the facilities are needed. For all projects,
provide any documentation of the review and recommendation of a PURA
§39.151 organization.
The Proposed Transmission Line Project is located in an area where (a) rapid loadgrowth, primarily attributable to oil and natural gas load, is occurring and (b)existing transmission and distribution facilities are being utilized at or nearmaximum capacity. In particular, Atlas is installing new gas processing facilities,the Edward Gas Processing Facility, in Upton County. The Proposed TransmissionLine Project is needed to provide safe and reliable electric service to the EdwardGas Processing Facility and other future facilities in the area. Oncor's forecastedloads (summer and winter peaks) for the proposed Centralia Substation are asfollows:
Summer Peaks by Year in MW*BANK NAME 2014 2015 2016 2017 2018 2019
Centralia #1 0.0 22.0 23.1 24.3 25.5 26.7Centralia #2 0.0 22.0 23.1 24.3 25.5 26.7Total Substation 44.0 46.2 48.6 51.0 53.4
Winter Peaks by Year in MW*BANK NAME 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20
Centralia #1 22.0 22.9 24.0 25.2 26.5 27.8Centralia #2 22.0 23.9 25.1 26.4 27.7 29.1Total Substation 44.0 46.8 49.1 51.6 54.2 56.9
* Future load forecasting and not historical load data is provided because the immediate load growthis primarily associated with a single large facility currently under construction that will dramaticallyalter historical load in the area.
Oncor's existing Upton Substation is the closest existing substation to the newEdward Gas Processing Facility at approximately 10 miles away. However, due toprimary distribution voltage and distance, adequate voltage levels cannot be
10 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
10
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
maintained for service of the new plant. Additionally, distribution service from theexisting Upton Station cannot satisfy the motor starting requirements of the newplant. (See below for more detail on the distribution alternative) Therefore, theProposed Transmission Line Project is needed to provide 138 kV service to theproposed Centralia Substation which will serve the Edward Gas Processing Facilityand other existing and future load in the area.
15. Alternatives to Project:
For a standard application, describe alternatives to the construction of this
project (not routing options). Include an analysis of distribution alternatives,
upgrading voltage or bundling of conductors of existing facilities, adding
transformers, and for utilities that have not unbundled, distributed generation
as alternatives to the project. Explain how the project overcomes the
insufficiencies of the other options that were considered.
Alternate #1
Oncor examined the feasibility of serving the Edward Gas Processing Facility fromthe Upton Substation which is the closest existing substation. To meet the servicerequirements of the Edward Gas Processing Facility, Oncor determined that UptonSubstation would have to be expanded to accommodate two new 138-21.6 kVtransformers, and two approximately twelve-mile distribution feeders, twoapproximately fifteen-mile distribution feeders, twenty-two 1200 kvar capacitorbanks, and twelve 300 Ampere voltage regulators (See Figure -1). The distributioncost, excluding substation expansion would be approximately $6,000,000.However, a distribution alternative was insufficient from a service and reliabilityperspective.
Studies of this alternate project indicated an excessive and unacceptable voltagedrop of 28 percent at the Edward Gas Processing Facility would occur when a 3,500horsepower motor starts. This is well in excess of the acceptable 6 percent voltagedrop allowed on distribution feeders per IEEE Standard 141-1993. The voltage dipat Upton Substation would also be 3.5 times the acceptable level of 3 percent perIEEE Standard 141-1993. This is primarily due to the long distance between theEdward Gas Processing Facility and the Upton Substation. The Edward GasProcessing Facility is planned to have twelve 3,500 horsepower motors.
Even if the motors could be started, these long distribution feeders (12 miles to 15miles in length) would not provide service as reliable as the proposed CentraliaSubstation and the Proposed Transmission Line Project because of the potential foroutages of these feeders. Another advantage to the Proposed Transmission LineProject is that Centralia Substation will be located approximately half a mile awayfrom the Edward Gas Processing Facility thus reducing or eliminating voltage drop
11 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
11
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
concerns, as well as providing a new substation in the area for other future andexisting load.
- - - uptm Stbstebon. '" Instal 2-47 MVA 13B-21.5 k4!
Transformers and 4 21.5 kv feeder breakers
F1We -f-
^. ^^^' ^ ^ Ir,stan zcrcuns '8-795 kcrnl Aac^ 63,OM feet
h - ttnste115-tzrD KVnnc^racitareen►3^,aurefet3ooarp
Instal 2[5rcuits ' ^^,...vdtaqK repdaton on fceders
3-796 kcmd AAC#s & 71a
80,507 (eatInstal 7500 KVA21,6-12.5KVAaubotransforrner
m -""-° tr t ^^-r'
t l t^., Transfer 4.0MW from
Remove Recbser ^---+uF-^ -^ lJtiat ffi21 to Upton
Instal 900 amp qg,S, Feeder A4
lostall fi-7200 K4M ceP$t'Jtcr • ti P- N,Q.8ards ard atc [et 300 amp . . . . - ,.,. ^ ^'L-^ W ._^....--- ^._--Yakage reP+lctaa an Fecdeas
DISTRIBUTION PLANNINGOFF-SITE REGOhCNIENDATION
Atlas Gas Processing
1 5x dltdjed 44,IXD M Sin
rlotnr s,TerLIrK,} RtatrttlavB: .- -' Feedars xA, +r2. Y1 and t gA[t'1Bd 44,00] kW Wm
M^.-rraari S:attp C^lp - 7.7CU kYh T 5MI go dsectly to Atlastkf rrraitwncre rfptq ,tatip a a tr.^ . Gas Plent Mfcland Service Color
M1kl rr.xa ita3itNC 5tart5 rer rcxF, DCOx5-30-Z019
Alternate #2
Oncor examined the feasibility of serving the Edward Gas Processing Facility froma proposed new substation approximately 6 miles to the northeast of the EdwardGas Processing Facility connected to a Sharyland Utilities (Sharyland) 138 kVTransmission Line. While distribution feeders would have been shorter, similarproblems were found to exist with voltage drop when starting the 3,500 horsepowermotors. (See Figure -2.) Additionally, Sharyland informed Oncor that it did nothave sufficient capacity to serve the Edward Gas Processing Facility load from its138 kV transmission line. Due to the voltage drop, lack of motor starting capacity,and insufficient transmission capacity this option was not feasible.
12 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
12
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
Alternate #3
Oncor also examined building a 138 kV transmission line from the existingSharyland 138 kV transmission line to the Centralia Substation. However, as statedabove, Sharyland did not have the transmission capacity to serve the Edward GasProcessing Facility from its existing 138 kV transmission line, making thistransmission alternative infeasible.
Figure - 2
Not toScale
Reagan Co. West 9• bstationTnsta4 2A7 MVA 133-21.8 kV
Trans(armers and 4 21b kV feader breakers
Instal 3 CircuitsU}Y:aiSrbstaticn 37%^ C
3^^̂,^7 ^^^----"-.
pru'--
Tnstal 1 Circuit „„,,,...^-•r ^^^.... ^ 3 ?^ kUN aAC
Instal 1-1800 WAR^ .^ capacitor banks
lnstaq 7500 WA 1 ,21.&72.5KVAaumtransfume ^} ^Yt "' ^ •^
Instal 6-18t70 KVAR capxRorkianks aW one set 3W an
0 t ^ Voltage regulators PB2 Clrttdt
Instal 900 .1 ABSP-M0,
Instal 90 am ASSP - N,C.
Transw 40MWhomDISTRIBUTION PLANNING
Upton 0721 to ^ sane Draw J3̂y, .,,, ,,.^Y. OFF-SITE RECCW-1ENDATI4N-^_._.._"_•--__-----_-_-'-`-
^ Atstled^pO ^A k 9xn
-°} See dravrg 2 AAleri 44p00 kW win
^Fe^rs t1, Q, arx! #3 Mdand Service Cater
^ WN go dvactiy W AdaS ^07^ Gas Plant 5-22•2D73
There are no other practical alternatives to the Proposed Transmission Line Project.
For the reasons discussed above, the Proposed Transmission Line Project is the bestoption to meet the Edward Gas Processing Facility's needs based on considerationsof efficiency, reliability, costs, and benefits.
16. Schematic or Diagram:For a standard application, provide a schematic or diagram of the applicant's
transmission system in the proximate area of the project. Show the locationand voltage of existing transmission lines and substations, and the location of
13 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
13
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
the construction. Locate any taps, ties, meter points, or other facilitiesinvolving other utilities on the system schematic.
A schematic of the transmission system in the proximate area of the ProposedTransmission Line is shown on Attachment No. 3. The location and voltage ofexisting transmission lines, substations, taps, ties, meter points or other facilitiesinvolving other utilities in relation to the Proposed Transmission Line Project areincluded.
17. Routing Study:
Provide a brief summary of the routing study that includes a description of the
process of selecting the study area, identifying routing constraints, selecting
potential line segments, and the selection of the routes. Provide a copy of the
complete routing study conducted by the utility or consultant. State which
route the applicant believes best addresses the requirements of PURA and
P.U.C. Substantive Rules.
Oncor retained URS Corporation, Inc. ("URS") to prepare the EnvironmentalAssessment for Oncor Electric Delivery Company LLC's Proposed Benedum(LCRA) to Centralia 138 kV Transmission Line Project in Upton, County, Texas("Environmental Assessment"). The objective of the Environmental Assessmentwas to provide information in support of this Application and address therequirements of Section 37.056 of the Texas Utilities Code, the Public UtilityCommission of Texas (PUCT or Commission) CCN Application form and PUCTSubstantive Rule 25.101 as these apply to the Proposed Transmission Line Project.By means of examination of existing environmental conditions, including thehuman and natural resources that are located in the project area, the EnvironmentalAssessment appraises the environmental effects that could result from theconstruction, operation, and maintenance of the Proposed Transmission LineProject, i.e., construction of the double-circuit 138 kV transmission line between theproposed LCRA Benedum Switching Station and the proposed Oncor CentraliaSubstation. The Environmental Assessment may also be used in support of anyadditional local, state, or federal permitting activities that may be required for theProposed Transmission Line Project.
To assist URS in its evaluation, Oncor provided information regarding the projectendpoints, the need for the project, engineering and design requirements,construction practices, the proposed route, and ROW requirements for the ProposedTransmission Line Project.
Specific discussion regarding selection of a study area, identification of constraints,and assessment of the proposed route is set forth in the Environmental Assessment.See Attachment No. 1.
14 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
14
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
18. Public Meeting or Public Open House:
Provide the date and location for each public meeting or public open housethat was held in accordance with P.U.C. PROC. R. 22.52. Provide a summaryof each public meeting or public open house including the approximatenumber of attendants, and a copy of any survey provided to attendants and asummary of the responses received. For each public meeting or public openhouse provide a description of the method of notice, a copy of any notices, andthe number of notices that were mailed and/or published.
The single Public Participation Meeting was hosted by Oncor and attended byCompany and URS personnel, as well as personnel from ML&M Realty Advisors,LLC ("ML&M") and Universal Field Services, Inc. ("UFS") and Atlas. The OncorPublic Participation Meeting was held on January 21, 2014, from 4:00 p.m. to 7:00p.m. at the Rankin Park Building in Rankin, Texas.
Oncor mailed 57 individual written notices of the meetings to all owners of propertywithin 300 feet of the centerline of the proposed route. Also, local officials andvarious state/federal regulatory agencies were mailed or delivered individual writtennotice of the meetings. In addition, a public notice was placed in the local UptonCounty newspaper, Crane News (The McCamey News section) on January 21, 2014announcing the location, time, and purpose of the meeting.
The meeting was designed to solicit comments and input from residents,landowners, public officials, and other interested parties concerning the ProposedTransmission Line Project. The objectives included promoting an understanding ofthe Proposed Transmission Line Project including the purpose, need, and potentialbenefits and impacts; informing and educating the public with regard to the routeand schedule; and gathering information about the values and concerns of the publicand community leaders. The meeting was configured in an informal informationstation format rather than a formal speaker/audience format with each stationassigned to a particular aspect of the project, or routing process, and staffed witheither Company personnel/representatives and/or URS, UFS or ML&M staff. Eachstation had exhibits, maps, illustrations, aerial photography, or other informationdescribing certain project aspects and subject matter information. Persons inattendance were encouraged at the meeting initiation to visit each station in order,so the entire process could be explained in the general sequence of projectdevelopment. Oncor has found this meeting format valuable due to its informalityand because it allows attendees the opportunity to gather information mostimportant to them and to spend as much time as necessary with those particularproject aspects. Most important, individual discussions allow for and encouragemore interaction from attendees who otherwise might be hesitant to participate in amore formal setting.
15 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
15
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
A total of 6 individuals signed in as attending the Public Participation Meeting inRankin with none of the attendees submitting written comments.
Additional discussion concerning the public involvement program and specificinformation regarding the Public Participation Meeting may be found in theEnvironmental Assessment, Section 4.0, page 4-1. A representative copy of thenotice that was provided to property owners and a copy of the comment pageprovided to meeting attendees are included in Appendix B of Attachment No. 1.
19. Routing Maps:
Base maps should be a full scale (one inch = not more than one mile ) highway
map of the county or counties involved, or other maps of comparable scale
denoting sufficient cultural and natural features to permit location of all routes
in the field. Provide a. map (or maps) showing the study area, routing
constraints, and all routes or line segments that were considered prior to the
selection of the routes. Identify the routes and any existing facilities to be
interconnected or coordinated with the project. Identify any taps, ties, meter
points, or other facilities involving other utilities on the routing map. Show all
existing transmission facilities located in the study area. Include the locations
of radio transmitters and other electronic installations, airstrips, irrigated
pasture or cropland, parks and recreational areas, historical and archeological
sites (subject to the instructions in Question 27), and any environmentally
sensitive areas (subject to the instructions in Question 29).
A one inch = 1,000 feet map (Figure 3-1) is included in the map pocket of
Attachment No. 1. This base map includes sufficient cultural and natural features topermit location of the route in the field. This figure delineates the study area andproposed route for the Proposed Transmission Line Project. There are no radio'transmitters, or other electronic installations, airstrips, irrigated pasture, parks andrecreational areas, known historical and archeological sites in the area, andtherefore these are not shown on the map. Cropland, environmentally sensitiveareas, habitable structures, and other features are also shown on the map.
Provide aerial photographs of the study area displaying the date that the
photographs were taken or maps that show (1) the location of each route with
each route segment identified, (2) the locations of all major public roads
including, as a minimum, all federal and state roadways, (3) the locations of all
known habitable structures or groups of habitable structures (see Question 19
below) on properties directly affected by any route, and (4) the boundaries
16 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
16
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
(approximate or estimated according to best available information if required)of all properties directly affected by any route .
Figure 3-1 depicts on an aerial photograph: (1) the location of the proposed route;(2) the locations of all major public roads including all federal and state roadways;(3) the locations of all known habitable structures or groups of habitable structureson properties directly affected by the route; and (4) the boundaries (approximate orestimated according to best available information) of all properties directly affected
by the route. In addition, the locations of radio transmitters and other electronicinstallations, airstrips, heliports, irrigated pasture or cropland, parks and recreational
areas, known historical and archeological sites, and any environmentally sensitiveareas are depicted, if any.
For each route, cross-reference each habitable structure (or group of habitable
structures) and directly affected property identified on the maps or
photographs with a list of corresponding landowner names and addresses and
indicate which route segment affects each structure/group or property.
Attachment No. 4 is a table that identifies each directly affected property shown onFigure 3-1. The cross-reference table includes corresponding landowner names andaddresses that are directly affected by the proposed route. There are no habitablestructures or group of habitable structures directly affected by the proposed route.
20. Permits:
List any and all permits and/or approvals required by other governmentalagencies for the construction of the proposed project. Indicate whether each
permit has been obtained.
The following permits/approvals will be obtained after PUCT approval of theCCN and prior to beginning construction, if necessary:1. Texas Department of Transportation ("TxDOT") permit(s) for crossing a state
maintained roadway.2. A Storm Water Pollution Prevention Plan ("SWPPP") will be prepared and a
Notice of Intent will be submitted to the Texas Commission on EnvironmentalQuality under the TPDES program.
3. A cultural resources survey plan will be developed with the Texas HistoricalCommission ("THC") for the proposed project.
4. Consultation with the U.S. Army Corps of Engineers will occur following theCommission's approval of this Application to determine appropriaterequirements under Section 404/Section 10 Permit criteria.
17 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
17
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
21. Habitable structures:
For each route list all single-family and multi-family dwellings and relatedstructures, mobile homes, apartment buildings, commercial structures,
industrial structures, business structures, churches, hospitals, nursing homes,
schools, or other structures normally inhabited by humans or intended to be
inhabited by humans on a daily or regular basis within 300 feet of thecenterline if the proposed project will be constructed for operation at 230kVor less, or within 500 feet of the centerline if the proposed project will beconstructed for operation at greater than 230kV. Provide a generaldescription of each habitable structure and its distance from the centerline of
the route. In cities, towns or rural subdivisions, houses can be identified in
groups. Provide the number of habitable structures in each group and list thedistance from the centerline of the route to the closest and the farthesthabitable structure in the group. Locate all listed habitable structures orgroups of structures on the routing map.
There are no habitable structures located within 300 feet of the proposed route.
22. Electronic Installations:
For each route, list all commercial AM radio transmitters located within
10,000 feet of the center line of the route, and all FM radio transmitters,
microwave relay stations, or other similar electronic installations located
within 2,000 of the center line of the route. Provide a general description of
each installation and its distance from the center line of the route. Locate all
listed installations on a routing map.
There are no known AM radio transmitters located within 10,000 feet of the centerline of the proposed route.
There are no known FM radio transmitters or communication towers (microwaverelay stations or other similar electronic installations) within 2,000 feet of the centerline of the proposed route.
23. Airstrips:
For each route, list all known private airstrips within 10,000 feet of the centerline of the project. List all airports registered with the Federal AviationAdministration (FAA) with at least one runway more than 3,200 feet in lengththat are located within 20,000 feet of the center line of any route. For eachsuch airport, indicate whether any transmission structures will exceed a 100:1horizontal slope (one foot in height for each 100 feet in distance) from the
18 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
18
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
closest point of the closest runway. List all listed airports registered with the
FAA having no runway more than 3,200 feet in length that are located within
10,000 feet of the center line of any route. For each such airport, indicate
whether any transmission structures will exceed a 50:1 horizontal slope from
the closest point of the closest runway. List all heliports located within 5,000
feet of the center line of any route. For each such heliport, indicate whether
any transmission structures will exceed a 25:1 horizontal slope from the closest
point of the closest landing and takeoff area of the heliport. Provide a general
description of each listed private airstrip, registered airport, and heliport; and
state the distance of each from the center line of each route. Locate andidentify all listed airstrips, airports, and heliports on a routing map.
URS conducted a review of federal and state aviation/airport maps and directories,aerial photo interpretation, reconnaissance surveys, and information received from
the TxDOT Aviation Division and did not identify any airstrips or airports within20,000 feet of the center line of the proposed route with at least one runway ofgreater than 3,200 ft in length. No airstrips with runways of less than 3,200 ft inlength were identified within 10,000 ft of the proposed route. Also, no heliportswere identified within 5,000 ft of the proposed route.
24. Irrigation Systems:
For each route identify any pasture or cropland irrigated by traveling
irrigation systems (rolling or pivot type) that will be traversed by the.route.
Provide a description of the irrigated land and state how it will be affected by
each route (number and type of structures etc.). Locate any such irrigated
pasture or cropland on a routing map.
No pasture or cropland irrigated by traveling irrigation systems were identified thatwould be traversed by the proposed route.
25. Notice:Notice is to be provided in accordance with P.U.C. P1toC. R. 22.52.
A. Provide a copy of the written direct notice to owners of directlyaffected land. Attach a list of the names and addresses of the ownersof directly affected land receiving notice.
A list of the names and addresses of those owners of directly-affected landto whom notice will be mailed by first-class mail is attached asAttachment No. 4. A copy of the written direct notice, with attached map,
19 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
19
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
that will be provided to owners of directly-affected land is included asAttachment No. 5.
B. Provide a copy of the written notice to utilities that are located withinfive miles of the routes.
A copy of the written notice to utilities, with attached map provided to theutilities providing electric service within a five-mile radius of the proposed
route of the Proposed Transmission Line Project is attached as AttachmentNo. 6. The following utilities will be provided the requisite notice on orbefore the filing date as required by Public Utility Commission rules:
Sharyland UtilitiesAEP North Texas
Southwest Texas Electric Cooperative
C. Provide a copy of the written notice to county and municipalauthorities.
A representative copy of the written notice, with attached map, that will beprovided to county and municipal authorities is attached as AttachmentNo. 6. The following county agencies will be provided the requisite noticeon or before the filing date as required by Public Utility Commissionrules:
Upton County, County Judge
The governing body of the following municipal agencies will beprovided the requisite notice on or before the filing date as requiredby Public Utility Commission rules:
Not Applicable.
D. Provide a copy of the notice that is to be published in newspapers ofgeneral circulation in the counties in which the facilities are to beconstructed. Attach a list of the newspapers that will publish thenotice for this application. After the notice is published, provide thepublisher's affidavits and tear sheets.
Notice for this Application will be published in the Crane News (TheMcCamey News section), a newspaper of general circulation in Upton
20 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
20
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R 25.174
County. A representative copy of the general Public Notice to bepublished is attached as Attachment No. 7.
For a CREZ application, in addition to the requirements of P.U.C. PROC. R.22.52 the applicant shall, not less than twenty-one (21) days before the filing ofthe application, submit to the Commission staff a "generic" copy of each typeof alternative published and written notice for review. Staff 's comments, ifany, regarding the alternative notices will be provided to the applicant not
later than seven days after receipt by Staff of the alternative notices,Applicant may take into consideration any comments made by Commission
staff before the notices are published or sent by mail.
Not applicable.
26. Parks and Recreation Areas:
For each route, list all parks and recreational areas owned by a governmental
body or an organized group, club, or church and located within 1,000 feet of
the center line of the route. Provide a general description of each area and its
distance from the center line. Identify the owner of the park or recreational
area (public agency, church, club, etc.). List the sources used to identify the
parks and recreational areas. Locate the listed sites on a routing map.
There are no parks or recreational areas owned by a government body or an
organized group, club, or church were identified to be located within 1,000 feet ofthe center line of the proposed route.
27. Historical and Archeological Sites:
For each route, list all historical and archeological sites known to be within
1,000 feet of the center line of the route. Include a description of each site andits distance from the center line. List the sources (national, state or local
commission or societies) used to identify the sites. Locate all historical sites on
a routing map. For the protection of the sites, archeological sites need not be
shown on maps.
There are no known historical or archeological sites within 1,000 feet of the centerline of the proposed route.
28. Coastal Management Program:
For each route, indicate whether the route is located, either in whole or in part,within the coastal management program boundary as defined in 31 T.A.C.
21 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
21
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R 25.174
§503.1. If any route is, either in whole or in part, within the coastalmanagement program boundary, indicate whether any part of the route isseaward of the Coastal Facilities Designation Line as defined in 31 T.A.C.§19.2(a)(21). Using the designations in 31 T.A.C. §501.3(b), identify the type(s)of Coastal Natural Resource Area(s) impacted by any part of the route and/orfacilities.
The Proposed Transmission Line Project is not located, either in whole or in part,
within the Coastal Management Program boundary as defined in 31 T.A.C. §503.1.
29. Environmental Impact:
Provide copies of any and all environmental impact studies and/or assessments
of the project. If no formal study was conducted for this project, explain how
the routing and construction of this project will impact the environment. List
the sources used to identify the existence or absence of sensitive environmentalareas. Locate any environmentally sensitive areas on a routing map. In some
instances, the location of the environmentally sensitive areas or the location of
protected or endangered species should not be included on maps to ensurepreservation of the areas or species.
The Environmental Assessment for Oncor Electric Delivery Company LLC s
Proposed Benedum (LCRA) to Centralia 138 kV Transmission Line Project in
Upton County, Texas prepared by URS Corporation, Inc. is included as AttachmentNo. 1.
Within seven days after filing the application for the project, provide a copy ofeach environmental impact study and/or assessment to the Texas Parks and
Wildlife Department (TPWD) for its review at the address below. Include withthis application a copy of the letter of transmittal with which thestudies/assessments were or will be sent to the TPWD.
Wildlife Habitat Assessment ProgramWildlife Division
Texas Parks and Wildlife Department4200 Smith School RoadAustin, Texas 78744
The applicant shall file an affidavit confirming that the letter of transmittaland studies/assessments were sent to TPWD.
22 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
22
Standard Application for a Certificate of Convenience and Necessity for aProposed Transmission Line
andApplication For A Certificate of Convenience and Necessity For A Proposed Transmission Line
Pursuant To P.U.C. Subst. R. 25.174
A copy of the Environmental Assessment will be provided to the Texas Parks andWildlife Department for review within seven days following the filing of the
Application for the Proposed Transmission Line Project. See Attachment No. 9 fora copy of the letter of transmittal with which the Environmental Assessment will besent to the TPWD.
30. AffidavitAttach a sworn affidavit from a qualified individual authorized by the applicant to verify and affirm that, tothe best oftheir knowledge, all information provided, statements made, and matters set forth in thisapplication and attachments are true and correct.
31. List of Attachments to the CCN Application
Attachment 1: Environmental Assessment for Oncor Electric Delivery CompanyLLC's Proposed Benedurn (LCRA) to Centralia 138 kV TransmissionLine Project in Upton County, Texas,
Attachment 2: LCRA's TSC Interconnection Agreement Amendment
Attachment 3: Transmission System Schematic
Attachment 4: List of directly affected landowners
Attachment 5: Representative copy of written notice to directly affected landowners
Attachment 6: Representative copy of written notice to utilities, counties andmunicipalities
Attachment 7: Representative copy of the general Public Notice to be published
Attachment 8: Representative copy of written notice to pipeline owners/operators
Attachment 9: Copy of the letter of transmittal with which the EnvironmentalAssessment will be sent to the TPWD
Attachment 10 Copy of the letter of transmittal with which the Application will besent to the OPUC
Attachment 11: Affidavit of affirmation
23 Oncor Electric Delivery Company LLCBenedum-Centralia CCN
23
ENVIRONMENTAL ASSESSMENT FOR ONCOR ELECTRIC DELIVERY COMPANY LLC'S
PROPOSED BENEDUM (LCRA) TO CENTRALIA 138 KV TRANSMISSION LINE PROJECT
IN UPTON COUNTY, TEXAS
Submitted to Oncor Electric Delivery Company LLC
6ONC R®
Submitted by URS Corporation, Inc.
February 2014
C
c
ENVIRONMENTAL ASSESSMENT FORONCOR ELECTRIC DELIVERY COMPANY LLC'S
PROPOSED BENEDUM (LCRA) TOCENTRALIA
138 KV TRANSMISSION LINE PROJECTIN UPTON COUNTY, TEXAS
Prepared for:
Oncor Electric Delivery Company LLC1616 Woodall Rodgers Freeway
Dallas, Texas 75202-1234
Prepared by:
URS Corporation, Inc.9400 Amberglen Boulevard
Austin, Texas 78729
February 2014
25
Benedum (LCRA) to Centralia 138 kV Transmission Line ProjectContents
Contents
1.0 DESCRIPTION OF THE PROPOSED PROJECT ........ ................................................. 1-11.1 SCOPE OF THE PROJECT ............................................................................... ............................1-1
1.2 PURPOSE OF AND NEED FOR THE PROJECT .............................................. ............................1-1
1.3 DESCRIPTION OF PROPOSED CONSTRUCTION ........................................... ...........................1-1
1.3.1 Transmission Line Design .................................................................... ............................1-1
1.3.2 Right-of-Way Requirements ........... ...................................................... ............................1-2
1.3.3 Clearing Requirements ......................................................................... ............................1-2
1.3.4 Monopole Structure Assembly and Erection ............. ........................... ............................1-2
1.3.5 Conductor Stringing .............................................................................. ............................1-7
2.0 ROUTE EVALUATION METHODOLOGY ................................................ ......................2-1
2.1 STUDY AREA DELINEATION ............................................................................ ............................2-1
2.2 DATA COLLECTION . ......................................................................................... ............................2-5
2.2.1 Solicitation of Information from Local, State, and Federal Officials and Agencies............2-5
2.2.2 Reconnaissance Surveys ..................................................................... ............................2-7
2.3 CONSTRAINTS MAPPING ............. ................................................................... ............................2-7
2.4 EVALUATION OF THE PROPOSED TRANSMISSION LINE ROUTE ............... ............................2-7
3.0 ENVIRONMENTAL SETTING OF THE STUDY AREA ............................ ......................3-13.1 STUDY AREA BOUNDARY ............ ................................................................... ............................3-1
3.2 CONSTRAINTS MAPPING ........................ ........................................................ ............................3-1
3.3 PHYSIOGRAPHY AND GEOLOGY ...... ............................................................. ............................3-1
3.4 SOILS ... .............................................................................................................. ............................3-5
3.4.1 Soil Associations ......... ......................................................................... ............................3-5
3.4.2 Prime Farmland .................................................................................... ............................3-6
3.5 WATER RESOURCES ............... ........................................................................ ............................3-6
3.5.1 Surface Water/Floodplains ............... .................................................... ............................3-6
3.5.2 Groundwater/Aquifer . ........................................................................... ............................3-7
3.6 ECOLOGY .......................................................................................................... ............................3-7
3.6.1 Vegetation ...................... ...................................................................... ............................3-7
3.6.1.1 Terrestrial ...... ......................................................................... ..........................3-12
3.6.1.2 Aquatic ................................................................................... ..........................3-12
3.6.1.3 Commercially or Recreationally Important Plant Species ...... ..... .....................3-12
3.6.1.4 Endangered and Threatened Plant Species .... ...................... ..........................3-15
3.6.2 Fish and Wildlife ................................................................................... ..........................3-15
3.6.2.1 Terrestrial .............. ................................................................. ..........................3-15
3.6.2.2 Aquatic ................................................................................... ..........................3-24
3.6.2.3 Commercially or Recreationally Important Animal Species .... ..........................3-25
3.6.2.4 Endangered and Threatened Animal Species ........................ ..........................3-25
^ RFebruary 2014.
26
Benedum (LCRA) to Centralia 138 kV Transmission Line ProjectContents
3.7 COMMUNITY VALUES AND COMMUNITY RESOURCES .. .................................... ...................3-29
3.8 LAND USE ................................................................................................................. ...................3-29
3.8.1 Urban/Residential Areas . ............................................................................ ...................3-29
3.8.2 Recreational Areas ...................................................................................... ...................3-30
3.8.3 Agriculture ...................... ............................................................................. ...................3-30
3.8.4 Aesthetics .................................................................................................... ...................3-30
3.8.5 Transportation/Aviation .... ........................................................................... ...................3-31
3.8.6 Communication Towers ............................................................................... ...................3-32
3.8.7 Oil Wells .................... .................................................................................. ...................3-32
3.9 CULTURAL RESOURCES . ....................................................................................... ...................3-33
3.9.1 Cultural Background .................................................................................... ...................3-34
3.9.1.1 Paleoindian Period (12,000 - 8,000 B.P.) ..................................... ...................3-34
3.9.1.2 Archaic Period (8,000 - 2,000 B.P.) .............................................. ...................3-35
3.9.1.3 Late Prehistoric (2,000 - 300 B.P.) ............................................... ...................3-36
3.9.1.4 Historic Period (post 300 B.P.) ...................................................... ...................3-37
3.9.2 Previous Investigations .. ............................................................................. ...................3-38
3.9.3 Historic Records Review ............................................................................. ...................3-38
4.0 PUBLIC INVOLVEMENT PROGRAM ............................................................................4-1
5.0 EVALUATION OF THE ROUTE .....................................................................................5-1
5.1 IMPACTS ON PHYSIOGRAPHY/GEOLOGY ............................................................ .....................5-1
5.2 IMPACT ON SOILS ...... ............................................................................................. .....................5-1
5.3 IMPACT ON WATER RESOURCES ......................................................................... .....................5-2
5.3.1 Surface Water .............................. ............................................................... .....................5-2
5.3.2 Groundwater . .............................................................................................. .....................5-3
5.4 IMPACT ON ECOSYSTEMS ..................................................................................... .....................5-4
5.4.1 Vegetation .. ................................................................................................. .....................5-4
5.4.1.1 Commercially or Recreationally Important Plant Species .. ........... .....................5-5
5.4.1.2 Endangered and Threatened Plant Species ....... .......................... .....................5-5
5.4.2 Wildlife ......................................................................................................... .....................5-5
5.4.2.1 Terrestrial ... ................................................................................... .....................5-5
5.4.2.2 Aquatic ................................. ......................................................... .....................5-8
5.4.2.3 Commercially or Recreationally Important Animal Species ........... ...................5-10
5.4.2.4 Endangered and Threatened Animal Species ............................... ...................5-10
5.5 SUMMARY OF NATURAL RESOURCES IMPACTS ................................................ ...................5-11
5.6 IMPACTS ON COMMUNITY VALUES AND COMMUNITY RESOURCES ............... ...................5-11
5.7 LAND USE IMPACTS ................................................................................................ ...................5-12
5.7.1 Urban/Residential Areas ............................... .............................................. ...................5-12
5.7.2 Recreational Areas ................. ..................................................................... ...................5-13
5.7.3 Agriculture .................................................... ............................................... ...................5-13
T^^^iii
^ RPFebruary 2014.
27
Benedum (LCRA) to Centralia 1 38 kV Transmission Line ProjectContents
5.7.4 Aesthetics ....................................................... ................................................................5-13
5.7.5 Transportation/Aviation .................................. ................................................................5-14
5.7.6 Communication Towers .................................. ................................................................5-16
5.7.7 Oil Wells ......................................................... ................................................................5-16
5.8 IMPACTS ON CULTURAL RESOURCES .................... ................................................................5-16
5.8.1 Historical Summary ........................................ ................................................................5-17
5.8.2 Archaeological Summary ............................... ................................................................5-18
6.0 LIST OF PREPARERS .......... ........................................................................................6-1
7.0 REFERENCES ...............................................................................................................7-1
APPENDICES
A. Agency Correspondence
B. Public Involvement
C. Environmental Data for Route Evaluation
m^February 2014
iv
JR.
28
Benedum (LCRA) to Centralia 1 38 kV Transmission Line ProjectContents
Figures1-1 Project Area Location Map .............................................................................................................1-3
1-2 Typical 138 kV Tangent Double-Circuit Monopole ..........................................................................1-5
2-1 Study Area Map ..............................................................................................................................2-3
3-1 Environmental and Land Use Constraints Map ........................................................................ Pocket
3-2 Physiographic Regions of Texas ....................................................................................................3-3
3-3 Water Resources Map ....................................................................................................................3-9
3-4 Vegetation Map ............................................................................................................................3-13
Tables3-1 Geologic Units within the Study Area .......................................................................... ...................3-23-2 Salientia (Anuran) Species with Potential to Inhabit the Study Area ............................ .................3-16
3-3 Testudine (Turtle) Species with Potential to Inhabit the Study Area ............................ .................3-16
3-4 Lizard Species with Potential to Inhabit the Study Area .............................................. .................3-16
3-5 Snake Species with Potential to Inhabit the Study Area .............................................. .................3-17
3-6 Mammalian Species with Potential to Inhabit the Study Area ....................................... ................3-183-7 Avian Species with Potential to Inhabit the Study Area ................................................ ................3-193-8 Endangered, Threatened and Rare Wildlife of Potential Occurrence in Upton County . ................3-26
3-9 Previous Archaeological Investigations within 1,000 m of the Study Area .................... ................3-384-1 Public Participation Meeting Statistics .......................................................................... ..................4-1
5-1 Environmental Data for the Route Evaluation of the Benedum (LCRA) to Centralia138 kV Transmission Line Project ................................................................................ .... Appendix C
UV C7NC R.February 2014
29
Benedum (LCRA) to Centralia 1 38 kV Transmission Line Projectontents
Acronyms and Abbreviations
APLIC Avian Powerline Interaction Committee
AM Amplitude Modulation
B. P. Before Present
BEG Bureau of Economic Geology
BMP Best Management Practices
CCN Certificate of Convenience and Necessity
CFR Code of Federal Regulations
CR County Road
DoD United States Department of Defense
EA Environmental Assessment
EPA United States Environmental Protection Agency
ESA Endangered Species Act
et al and others
etc. et cetera
FAA Federal Aviation Administration
FCC Federal Communications Commission
FEMA Federal Emergency Management Agency
FIRM Flood Insurance Rate Maps
FM Frequency Modulation
ft foot/feet
GLO Texas General Land Office
HPA High Probability Area
HTC Historic Texas Cemeteries
i.e. id est (that is)
ISD Independent School District
Ks Segovia Formation
kV kilovolt
LCRA Lower Colorado River Authority
LPA Low Probability Area
M meter/meters
MBTA Migratory Bird Treaty Act
mi mile/miles
MPA Moderate Probability Area
msl mean sea level
NAIP National Agricultural Imagery Program
NASS National Agricultural Statistics Service
n.d. no date
NDD Natural Diversity Database
NESC National Electrical Safety Code
vi
February 2014 R.
30
Benedum (LCRA) to Centralia 1 38 kV Transmission Line Projectontents
NHD National Hydrography Dataset
NLCD National Land Cover Database
NPS National Park Service
NRCS Natural Resources Conservation Service
NRHP National Register of Historic Places
NWI National Wetland Inventory
Oncor Oncor Electric Delivery Company LLC
Panhandle Panhandle Region of Texas
PUCT Public Utility Commission of Texas
PURA Public Utility Regulatory Act
Qal Quaternary Alluvium
Qcs Quaternary Windblown Sand
RM Ranch-to-Market
ROW Right-of-Way
RCT Railroad Commission of Texas
RTHL Recorded Texas Historic Landmarks
SAL State Antiquities Landmark
SH State Highway
SWPPP Stormwater Pollution Prevention Plan
sq mi square mile/miles
TARL Texas Archaeological Research Laboratory
TASA Texas Archaeological Sites Atlas
THC Texas Historical Commission
THM Texas Historical Markers
THSA Texas Historic Sites Atlas
TPWD Texas Parks and Wildlife Department
TWDB Texas Water Development Board
TxDOT Texas Department of Transportation
URS URS Corporation, Inc.
US United States
USACE United States Army Corp of Engineers
USC United States Code
USDA United States Department of Agriculture
USFWS United States Fish and Wildlife Service
USGS United States Geological Survey
^^February 2a14
Vii
R.
31
Benedum (LCRA) to Centralia 138 kV Transmission Line Project1.0 Description of the Proposed Project
1.0 DESCRIPTION OF THE PROPOSED PROJECT
1.1 SCOPE OF THE PROJECT
Oncor Electric Delivery Company LLC (Oncor) proposes to design and construct a new
138 kilovolt (kV) double-circuit transmission line connecting the proposed Lower Colorado
River Authority (LCRA) Benedum Switching Station, located approximately 5 miles south of
Ranch-to-Market (RM) 2401, and the proposed Oncor Centralia Substation, located
approximately 8.5 miles east of State Highway (SH) 349, just north of the Edward Gas
Processing Facility of Atlas Pipeline Mid-Continent West Tex, LLC in Upton County, Texas
(Figure 1-1). The length of the proposed transmission line will be approximately 10 miles.
URS Corporation, Inc. (URS) was retained to study the area for the proposed Benedum (LCRA)
to Centralia 138 kV Transmission Line Project and prepare an Environmental Assessment (EA)
to support Oncor's application for a Certificate of Convenience and Necessity (CCN). This
document is intended to provide information and address the requirements of §37.056(c)(4)(A)-
(D) of the Public Utility Regulatory Act (PURA), the Public Utility Commission of Texas'
(PUCT's) application form and PUCT Substantive Rule §25.101. This document may also be
used in support of any additional local, state, or federal permitting activities that may be
required for Oncor's new project.
To assist URS in its evaluation of this new project, Oncor provided URS with information
regarding the need, construction practices, right-of-way (ROW) requirements, and the proposed
route for the new project to assist in the development of this report.
1.2 PURPOSE OF AND NEED FOR THE PROJECT
Oncor will provide support for the purpose and need for the project as a part of the CCN
application.
1.3 DESCRIPTION OF PROPOSED CONSTRUCTION
1.3.1 Transmission Line Design
For the Benedum (LCRA) to Centralia 138 kV Transmission Line Project, Oncor will use a self-
supporting, double-circuit steel or concrete pole (Figure 1-2). Design criteria will be in
compliance with applicable statutes, the appropriate edition of the National Electrical Safety
^E^
February 2014 JR.
32
Benedum (LCRA) to Centralia 138 kV Transmission Line Project1.0 Description of the Proposed Project
Code (NESC), and Oncor's standard design practices. The typical structure height will be
85 feet (ft), but could vary depending upon terrain. The results of site-specific geotechnical and
engineering studies will be used to determine the appropriate design and placement of the
monopole structures.
1.3.2 Right-of-Way Requirements
The ROW width for this project will be approximately 80 ft. The ROW typically extends an
equal distance on both sides of the transmission line centerline. Additional area may be
required at line angles and dead-ends.
1.3.3 Clearing Requirements
All trees, brush, and undergrowth within the ROW, except for low growing groundcover, will
be removed. For areas requiring hand clearing, vegetation will be cut level with the ground.
No stump exceeding two inches above the ground will remain. Any tree located in a fence line
having a diameter greater than four inches will be cut even with the top of the fence. In the
event that stumps are located on hillsides or uneven ground, stumps will be cut where a
mowing machine can pass over the ROW without striking any stumps, roots, or snags. Every
tree that overhangs any part of the ROW will be trimmed such that the ROW is clear of all
woody vegetation from the ground up.
1.3.4 Monopole Structure Assembly and Erection
Foundations for the monopole structures will be completed before erecting the structures. If the
monopole is to be directly embedded, then a single hole will be augured into the ground at each
structure location. Once the structure has been placed, the foundation will be filled with
concrete or native material to hold the structure securely in place.
If the pole is to have an anchor bolted foundation, a hole will be augured into the ground at
each structure location, an anchor bolt cage will be placed in addition to steel rebar to reinforce
the foundation and the hole will be filled with concrete. Depth and diameter of the foundation
will vary depending on the design of the structure specific to that location.
^u^February 2014
1-2
JR.
33
LAI,
Figure 1-1 ^'''•
Data Source uni[dd SYalas Geological Surveyi 100,OdQ Topographic Map Series Project Area Location Map ._.^Map Update, 7l1112014
Benedum (t,CFtA) to Centralia 138 W Transmission Une Project in^^'"in Upton County, Texas , 91-
34
Benedum (LCRA) to Centralia 138 kV Transmission Line Project1.0 Description of the Proposed Project
(This page intentionally blank)
Tins
February 2014
1-4
6 pR.
35
Figure 1-2 /1-N
Data Source; Oncor Typical 138 kV Tangent 61Map Update: 2/11/2014 Double-Circuit Monopole
Benedum (LGRA) to Centralia 138 IN Transmission Line ProjectInUpton County, Texas
36
Benedum (LCRA) to Centralia 138 kV Transmission Line Project1.0 Description of the Proposed Project
(This page intentionally blank)
V illl^l^i^
February 2014
1-b
C5 PR.
37
Benedum (LCRA) to Centralia 138 kV Transmission Line Project1.0 Description of the Proposed Project
1.3.5 Conductor Stringing
Once a series of structures have been erected along the transmission line centerline, the
conductor stringing phase can begin. Specialized equipment will be attached to insulators that
will properly support and protect the conductor during the pulling, tensioning, and sagging
operations. Once conductors and shield wire are in place and tension and sag have been
verified, suspension units are installed at each suspension point to maintain conductor position.
Conductor stringing continues until the transmission line construction is complete. All
construction equipment will be removed. All temporary culverts and environmental controls
previously installed will be removed.
vFebruary 2014
1-7
R.
38
Benedum (LCRA) to Centralia 138 kV Transmission Line Project1.0 Description of the Proposed Project
(This page intentionally blank)
UM1 - 8
February 2014 ""' R.
P
39
Benedum (LCRA) to Centralia 138 kV Transmission Line Project2.0 Route Evaluation Methodology
2.0 ROUTE EVALUATION METHODOLOGY
The objective of this study was to evaluate the proposed transmission line route for Oncor's
Benedum (LCRA) to Centralia 138 kV Transmission Line Project. Throughout this report, the
terms "environmental" or "environment" shall include the human environment as well as the
natural environment. Upon receipt of the proposed transmission line route from Oncor, URS
used a comprehensive transmission line evaluation methodology to evaluate the transmission
line route in accordance with § 37.056 (c)(4)(A)-(D) of the PURA, the PUCT's application form
and PUCT Substantive Rule § 25.101.
The following sections provide a description of the process, which consisted of study area
delineation, data collection, and constraints mapping.
2.1 STUDY AREA DELINEATION
The first step in the evaluation of the transmission line route was to select a study area. This
area needed to include an area large enough to adequately evaluate the proposed transmission
line project in support of Oncor's CCN Application.
Representatives of URS reviewed US Geological Survey (USGS) 1:24,000 topographic maps and
aerial photography (National Agriculture Imagery Program [NAIP], flown August 2012), as
well as conducted site reconnaissances to review the route for this project. URS representatives
identified major land use features in the project area such as the High Lonesome Draw, RM
1555, Benedum Oil Field, and other features. URS representatives then evaluated and reviewed
the maps and ultimately delineated and identified the study area boundary in November 2013
(Figure 2-1). The purpose of delineating a study area for the project was to establish boundaries
and limits for the information gathering process (i.e., identifying environmental and land use
constraints). The delineation of the study area also allowed the URS Project Team to focus their
evaluation on a specific area associated with the proposed project. The study area was
delineated within 1,000 ft of the proposed transmission line route based upon a preliminary
review of cultural and natural features, and in accordance with PUCT's CCN Application.
2 - 1
February 2014
6R.
^
40
Benedum (LCRA) to Centralia 1 38 kV Transmission Line Project2.0 Route Evaluation Methodology
(This page intentionally blank)
February 2014
2-2
ONCPR .
41
"! yI'4 7
,r ... ,, . .
^ '• ^' • ^ ,Proposed Benedum
Switching Station (LCRA)--s--^ ^'
. ., ,,.
^
^ .....r{ _ rti
K^...,.. ^ ..
,
co*
9
LCRA ^ ^ ^' <` • / t rx^" ^ j y ^ ^
....:..._-y t ^138kV
, ... 1 ^. ..., t /'
Approximate '^• ^ l^ 4-Square Mile
Stu dy Area j ^; ..
, ..._,.,► _..7
'
`..
; ^ ^.- ^ .^.3
........
•
--... ` . ^ ^ .. ^....,.,_ _.. . „ N / •1
^`^ i ,,r.- ° ^„^.,,- ^{^ -. ,^ ^• ^ t . l ^*^.''^
i^
Proposed Centralia04 fSubstation (Oncor)
155Fj .. ^`•
,...
O
..,.-.- ^4. -...-..,^.,.«,..,..... ,...._ . ^ . ......... ... ,_... M1 ^F .. ^ ^ ^^^w _. .. . ._\^ •Edward Gas. . , -^
Processing Facility
was CQ"W
^^` ^^^^ ,,, ^► .,^ '' ^^,..-
, . _.. ,..,^
`, .. -. . ^ , -• ^ , _•^ ,,: S., ^
Figure 2-1
Data Source VnftdS%te$ Geological Survey Study Area Map1100 ,000 Topographic Map BodesMap Ugdate Vttt2p54 Benedum (LCRA) to Centralia 139 kV Transmission Line Project
UMin Upton County, Texas , •R •^
42
Benedum (LCRA) to Centralia 138 kV Transmission Line Project2.0 Route Evaluation Methodology
(This page intentionally blank)
1^^►'i7^i2-4
February 2014 6 PRe
43
Benedum (LCRA) to Centralia 138 kV Transmission Line Project2.0 Route Evaluation Methodology
2.2 DATA COLLECTION
2.2.1 Solicitation of Information from Local, State, and Federal Officials and Agencies
Once the study area boundary was identified, the URS Project Team initiated a variety of data
collection activities. One of the first data collection activities was the development of a list of
officials to be mailed a consultation letter regarding the proposed project. The purpose of the
letter was to inform the various local officials and departments, and local, state, and federal
regulatory agencies of the proposed project and give them the opportunity to provide
information they may have regarding the project study area. URS utilized websites from Upton
County and various municipalities, as well as confirmation via telephone calls, to identify local
officials. State and/or federal agencies that may have potential permitting requirements for the
proposed project were also contacted. Copies of correspondence sent to and received from the
following local officials and departments, and state and federal regulatory agencies are
included in Appendix A.
FEDERAL AGENCIES:
• Federal Aviation Administration, Southwest Region (FAA)
• Federal Emergency Management Agency (FEMA)
• Natural Resources Conservation Service (NRCS)
• United States Army Corps of Engineers, Albuquerque and Fort Worth Districts (USACE)
• United States Department of Agriculture (USDA)
• United States Department of Defense (DoD)
• United States Environmental Protection Agency (EPA)
• United States Fish and Wildlife Service (USFWS)
STATE AGENCIES:
• Railroad Commission of Texas (RCT)
• Texas Department of Agriculture
• Texas Archeological Research Laboratory (TARL)
• Texas Department of Transportation (TxDOT) - Division of Aviation, Environmental
Affairs Division, Odessa District
• Texas Division of Emergency Management
February 2014
2-5
(6PR.
44
Benedum (LCRA) to Centralia 1 38 kV Transmission Line Project2.0 Route Evaluation Methodology
• Texas General Land Office (GLO)
• Texas Historical Commission (THC)
• Texas Parks and Wildlife Department (TPWD)
• Texas Water Development Board (TWDB)
• Texas Rural Water Association
REGIONAL AGENCIES:
• Colorado River Municipal Water District
• Midland County Fresh Water Supply District
• Permian Basin Regional Planning Commission
• Permian Historical Society
COUNTY AGENCIES:
• Upton County Officials (County Judge, County Commissioners, County Attorney,
County Clerk, County Sheriff, County Treasurer)
• Upton County - Rankin Airport
• Upton County Emergency Management Coordinator
• Upton County Water District
• Upton County Farm Bureau Office
• Upton County Historical Commission
CITY AGENCIES:
• Rankin Independent School District (ISD)
• Rankin Hospital District
In addition to solicitation from agencies, URS performed a local, state, and federal file and
records review, a review of published literature, and a review of a variety of maps including
recent aerial photography (NAIP, flown August 2012), USGS topographic maps, TxDOT county
highway maps, and National Wetland Inventory (NWI) maps.
February 2014
2-6
(6 PR.45
Benedum (LCRA) to Centralia 1 38 kV Transmission Line Project2.0 Route Evaluation Methodology
2.2.2 Reconnaissance Surveys
During the course of the above-mentioned data collection activities, URS personnel conducted
reconnaissance surveys of the study area to confirm the findings of research and data collection
activities and identify potential constraints that may not have been previously noted. The
reconnaissance surveys were conducted on November 19, 2013 by visual observations from
public roads and public ROW located within the study area. A second field visit was conducted
via helicopter on December 14, 2013 and a third field visit was conducted via public roadways
on January 20, 2014.
The data collection effort was an ongoing process. Results of the various data collection
activities (i.e., solicitation of information from local, state, and federal officials and agencies; file
and record review; visual reconnaissance surveys, etc.) are presented throughout Sections 3.0
and 4.0 of this report.
2.3 CONSTRAINTS MAPPING
The data and information gathered during the data collection activities were used to develop an
environmental and land use constraints map. The constraints map, public maps, aerial
photography, reconnaissance surveys, and other research materials were used to identify and
analyze the proposed project route within the study area. The geographic locations of exclusion
areas, avoidance areas, and opportunity areas within the study area were located and
considered during the impact analyses.
2.4 EVALUATION OF THE PROPOSED TRANSMISSION LINE ROUTE
URS initiated a detailed evaluation of the route. In evaluating the route, URS considered a
variety of environmental and land use criteria. Thirty-five environmental and land use criteria
were utilized (Appendix C).
The analysis of the route involved taking inventory and tabulating the number or quantity of
each environmental and land use criterion located along the centerline of the route (i.e., number
of stream crossings, the linear ft of agricultural land in proposed ROW, etc.). URS identified a
majority of these criteria within the study area during the reconnaissance surveys. The number
or quantity of each factor was primarily determined by reviewing recent aerial photography
and USGS topographic maps, obtaining digital pipeline and Platts Energy transmission line
URS2-7
February 2014 LJ^ R.^
46
Benedum (LCRA) to Centralia 138 kV Transmission Line Project2.0 Route Evaluation Methodology
data, and making visual observations, where possible. Potential environmental and land use
impacts of the route are addressed in Section 5.0 of this document.
URSFebruary 2014
2-8
ONC^R.
47
Benedum (LCRA) to Centralia 138 kV Transmission Line Project3.0 Environmental Setting of the Study Area
3.0 ENVIRONMENTAL SETTING OF THE STUDY AREA
3.1 STUDY AREA BOUNDARY
Prior to the collection of data and information on the environmental setting of the study area,
URS identified the study area boundary as previously described in Section 2.1. The study area
was selected to allow for sufficient area for the proposed Benedum (LCRA) to Centralia 138 kV
Transmission Line Project and encompass an area large enough for compliance with PUCT
CCN Application requirements.
The northernmost limits of the study area boundary were delineated to extend 1,000 ft from the
proposed LCRA Benedum Switching Station, approximately 5 miles south of RM 2401,
approximately 0.1 mile south of County Road (CR) 112, and approximately 0.7 mile west of RM
2594 in Upton County (Figure 2-1). The southernmost limits of the study area were delineated
to extend 1,000 ft south of the proposed Oncor Centralia Substation, which is located
approximately 8.5 miles to the east of SH 349, just north of the Edward Gas Processing Facility,
and approximately 0.3 mile south of the intersection of RM 1555 and RM 2594. The western and
eastern most limits of the study area boundary were delineated to extend 1,000 ft from the
centerline of the proposed transmission line. The area within the study area boundary is
approximately four square miles (sq mi).
3.2 CONSTRAINTS MAPPING
After the study area boundary was identified, URS initiated the information gathering process
and the identification of environmental and land use constraints within the study area. The
result of the information gathering process was a constraints map that plotted environmental
and land use constraints, and was used to evaluate the proposed route (Figure 3-1).
Information received and reviewed and the environmental and land use constraints depicted on
Figure 3-1 are described in detail in the following sections.
3.3 PHYSIOGRAPHY AND GEOLOGY
As shown on Figure 3-2, the study area is within the Southern High Plains physiographic region
of Texas (Bureau of Economic Geology, 1975). The topography of the Southern High Plains
forms flat plains with many playas. Local dune fields are also present in this region. The
February 2014
3-1
ONCPR .
48
Benedum (LCRA) to Centralia 1 38 kV Transmission Line Project3.0 Environmental Setting of the Study Area
Southern High Plains ranges in elevation from 2,200 to 3,800 ft above mean sea level (msl)
(Bureau of Economic Geology, 1975). Study area elevations range from approximately 2,655 to
2,705 ft above msl.
The study area is underlain with limestone bedrock, alluvial deposits, and windblown
materials. The limestone bedrock varies in thickness from approximately 3 feet to 30 feet. The
alluvial deposits consist of material reworked from older alluvium, recent material eroded and
transported from the Pecos River. Most of the study area is underlain with windblown
materials from ancient deposits (NRCS, 2013). Geologic units identified within the study area
are provided in Table 3-1 along with their descriptions and locations.
TABLE 3-1 GEOLOGIC UNITS WITHIN THE STUDY AREAGeologic Time Geologic Unit Description
Quaternary/ Alluvium (Qal) This geologic unit is located withinAreaThis geologic unit lies
Holocene Epoch floodplains and channel deposits and proximate to Highconsists of clay, silt, sand, and gravel. Other Lonesome Draw and itslocations for this geologic unit include minor tributary. This unit iscolluvium deposited on valley slopes present in the northerntangential to floodplains, close by eolian portion of the study area.dunes of sand and silt, lowest terracedeposits in the vicinity of floodplains, andwith bedrock in nearby stream channels.Total thickness of this alluvium is from zero to30 ft.
Cretaceous Segovia This geologic unit consists of cherty limestone This geologic unit lies onlyFormation (Ks) and dolomite; limestone, miliolid, shell on the north side of High
fragment, and rudistid-bearing, light gray; Lonesome Draw, in thedolomite, massive to thin bedded, porous, northern portion of themedium brownish gray; in lower part, study area.miliolid limestone and marl, and marlylimestone, light yellowish gray, with Exogyratexana and oxytropidocerid ammonites. Theuppermost beds include 1 or more thicklimestone units, each forming prominentledge or "caprock," with a maximumthickness of 300 ft.
Quaternary/ Windblown Sand This geologic unit consists of fine- to medium- This geologic unit coversHolocene Epoch (acs) grained quartz, silty, calcareous, caliche the majority of the study
nodules, massive, grayish red; distinct soil area.profile. It has a thickness of 15 ft andfeathers out locally (most Illinoian, mayinclude younger deposits).
5ource: bureau of Economic Ueology 1992
February 2014
3-2
(5 PR.
49