control of material
TRANSCRIPT
![Page 1: Control Of Material](https://reader036.vdocuments.net/reader036/viewer/2022062503/58efad7e1a28abc67d8b45ed/html5/thumbnails/1.jpg)
material control
![Page 2: Control Of Material](https://reader036.vdocuments.net/reader036/viewer/2022062503/58efad7e1a28abc67d8b45ed/html5/thumbnails/2.jpg)
What is the Purpose of this Picture???
![Page 3: Control Of Material](https://reader036.vdocuments.net/reader036/viewer/2022062503/58efad7e1a28abc67d8b45ed/html5/thumbnails/3.jpg)
Materials Controls
Physical Control Investment Control
![Page 4: Control Of Material](https://reader036.vdocuments.net/reader036/viewer/2022062503/58efad7e1a28abc67d8b45ed/html5/thumbnails/4.jpg)
Physical Control • Limited Access• Segregation of Duties • Accuracy in Recording
![Page 5: Control Of Material](https://reader036.vdocuments.net/reader036/viewer/2022062503/58efad7e1a28abc67d8b45ed/html5/thumbnails/5.jpg)
Material Control
• Order points • Economic Order Quantity (EOQ)
![Page 6: Control Of Material](https://reader036.vdocuments.net/reader036/viewer/2022062503/58efad7e1a28abc67d8b45ed/html5/thumbnails/6.jpg)
Only Authorized Personnel should have access to materials storage areas
Physical Control
![Page 7: Control Of Material](https://reader036.vdocuments.net/reader036/viewer/2022062503/58efad7e1a28abc67d8b45ed/html5/thumbnails/7.jpg)
Segregation of Duties
• Purchasing • Receiving • Storage • Use• Recording
![Page 8: Control Of Material](https://reader036.vdocuments.net/reader036/viewer/2022062503/58efad7e1a28abc67d8b45ed/html5/thumbnails/8.jpg)
Accuracy in Recording
• An effective materials control system requires the accurate recording of the purchase and issuance of materials
![Page 9: Control Of Material](https://reader036.vdocuments.net/reader036/viewer/2022062503/58efad7e1a28abc67d8b45ed/html5/thumbnails/9.jpg)
Controlling the investment in Materials
• Order Point • Economic order Quantity
![Page 10: Control Of Material](https://reader036.vdocuments.net/reader036/viewer/2022062503/58efad7e1a28abc67d8b45ed/html5/thumbnails/10.jpg)
Order Point
The Point at which an item should be ordered called the order point
• Usage: the anticipated rate at which the material will be used.
• Lead Time: the estimated time interval between the placement of an order and the receipt of the material
• Safety Stock: the estimated minimum level of inventory needed to protect against stock outs
•
![Page 11: Control Of Material](https://reader036.vdocuments.net/reader036/viewer/2022062503/58efad7e1a28abc67d8b45ed/html5/thumbnails/11.jpg)
![Page 12: Control Of Material](https://reader036.vdocuments.net/reader036/viewer/2022062503/58efad7e1a28abc67d8b45ed/html5/thumbnails/12.jpg)
Example
• Daily Usage 100 kg• Lead Time 5 Days • Safety Stock 1000 kg • Order Point…………………… (1500 kg )
![Page 13: Control Of Material](https://reader036.vdocuments.net/reader036/viewer/2022062503/58efad7e1a28abc67d8b45ed/html5/thumbnails/13.jpg)
Economic Order Quantity
• The order quantity (EOQ) is the quantity of inventory that minimize the cost of inventory management.
• The most important categories of inventory costs are ordering costs and carrying cost.
![Page 14: Control Of Material](https://reader036.vdocuments.net/reader036/viewer/2022062503/58efad7e1a28abc67d8b45ed/html5/thumbnails/14.jpg)
EOQ
2* Cost of order* numbers of units required annually• Carrying cost per units
![Page 15: Control Of Material](https://reader036.vdocuments.net/reader036/viewer/2022062503/58efad7e1a28abc67d8b45ed/html5/thumbnails/15.jpg)
![Page 16: Control Of Material](https://reader036.vdocuments.net/reader036/viewer/2022062503/58efad7e1a28abc67d8b45ed/html5/thumbnails/16.jpg)