    Control Plan Definition

    Control Plan - (n) a Process Management tool

    used to identify and monitor the activities required

    to control the critical inputs and key outputs for a

    process, so the process will continually meet itsproduct or service goals.

    Source: MSB Global Quality

  • 7/29/2019 Control Plans.ppt

    3/12

    Element 4: Control Plans

    10 Key Elements1. Risk Management

    2. Supplier Evaluation & Selection

    3. Contracts & Agreements4. Control Plan Methodology

    5. Product Acceptance Activities

    6. Supplier Performance & Monitoring

    7. Supplier Development

    8. Supplier Certification

    9. Change Control10.Supplier Corrective & Preventative Action

  • 7/29/2019 Control Plans.ppt

    4/12

    Control Plan Attributes1. Process sequence

    2. Inputs/Outputs monitor

    3. Control limits for the process

    4. Method of monitoring/control

    5. Frequency of control

    6. Method of reaction to problems

    7. Validation/Qualification information

  • 7/29/2019 Control Plans.ppt

    5/12

    Control Plan Attributes

    1. Process sequence List all steps used during the manufacturing process

    List all machines or tools used

  • 7/29/2019 Control Plans.ppt

    6/12

  • 7/29/2019 Control Plans.ppt

    7/12

    Control Plan Attributes

    3. Control limits for the process List all critical features for the product being manufactured and thetolerance that is allowed for these features

    List acceptable ranges for process controls

  • 7/29/2019 Control Plans.ppt

    8/12

    Control Plan Attributes

    4. Method of monitoring/control Define how the feature will be checked and how these checks arecontrolled (SPC, Validation, visual, etc)

    G R&R or MSAs for inspection equipment can be listed here as well

  • 7/29/2019 Control Plans.ppt

    9/12

    Control Plan Attributes

    5. Frequency of control How often will this dimension be inspected

    Capability must be established for a sampling plan to be in place

    The level of inspection should be related to the level of risk that is

    associated with the process or product characteristic

  • 7/29/2019 Control Plans.ppt

    10/12

    Control Plan Attributes

    6. Method of reaction to problems Who is responsible for monitoring Procedure to follow if a defect is found

    MCDR, QC SOP#, segregate and reprocess, adjust tool, etc

  • 7/29/2019 Control Plans.ppt

    11/12

    Control Plan Attributes

    7. Validation/Qualification information Actual protocol or document #s for:

    All special processes must be validated