Control Plan Definition
Control Plan - (n) a Process Management tool
used to identify and monitor the activities required
to control the critical inputs and key outputs for a
process, so the process will continually meet itsproduct or service goals.
Source: MSB Global Quality
-
7/29/2019 Control Plans.ppt
3/12
Element 4: Control Plans
10 Key Elements1. Risk Management
2. Supplier Evaluation & Selection
3. Contracts & Agreements4. Control Plan Methodology
5. Product Acceptance Activities
6. Supplier Performance & Monitoring
7. Supplier Development
8. Supplier Certification
9. Change Control10.Supplier Corrective & Preventative Action
-
7/29/2019 Control Plans.ppt
4/12
Control Plan Attributes1. Process sequence
2. Inputs/Outputs monitor
3. Control limits for the process
4. Method of monitoring/control
5. Frequency of control
6. Method of reaction to problems
7. Validation/Qualification information
-
7/29/2019 Control Plans.ppt
5/12
Control Plan Attributes
1. Process sequence List all steps used during the manufacturing process
List all machines or tools used
-
7/29/2019 Control Plans.ppt
6/12
-
7/29/2019 Control Plans.ppt
7/12
Control Plan Attributes
3. Control limits for the process List all critical features for the product being manufactured and thetolerance that is allowed for these features
List acceptable ranges for process controls
-
7/29/2019 Control Plans.ppt
8/12
Control Plan Attributes
4. Method of monitoring/control Define how the feature will be checked and how these checks arecontrolled (SPC, Validation, visual, etc)
G R&R or MSAs for inspection equipment can be listed here as well
-
7/29/2019 Control Plans.ppt
9/12
Control Plan Attributes
5. Frequency of control How often will this dimension be inspected
Capability must be established for a sampling plan to be in place
The level of inspection should be related to the level of risk that is
associated with the process or product characteristic
-
7/29/2019 Control Plans.ppt
10/12
Control Plan Attributes
6. Method of reaction to problems Who is responsible for monitoring Procedure to follow if a defect is found
MCDR, QC SOP#, segregate and reprocess, adjust tool, etc
-
7/29/2019 Control Plans.ppt
11/12
Control Plan Attributes
7. Validation/Qualification information Actual protocol or document #s for:
All special processes must be validated
-
7/29/2019 Control Plans.ppt