conversation with … luciana burdi, massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000....

46
Conversation with … Luciana Burdi, Massport

Upload: others

Post on 24-Jul-2020

22 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

Conversation with … Luciana Burdi, Massport

Page 2: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

PROPOSED FY16-20 CAPITAL PROGRAM

Element Value

Total Projects 364

Total Program $1,737M

Private Funds $933M

Total and Private Funds $2,670M

Contingent on Funding Source (CFS) $211M

Unfunded $859M

Page 3: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

ECONOMIC IMPACT BY YEAR

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

FY16 FY17 FY18 FY19 FY20

PrivateInducedIndirectDirect

Estimated Job Creation (FTEs): Total 29,743

5,993

8,729 8,359

3,199 3,463

Page 4: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

CAPITAL PROGRAM BY FACILITY Project FY16-20 Current Program %

Logan Airport Total $1,284,585 73.95% Hanscom Airport Total $54,013 3.11%

Worcester Airport Total $60,987 3.51%

Maritime Total $261,091 15.04%

Agency Wide Total $76,275 4.39%

Grand Total $1,736,951 100.00%

Logan Airport, $1,284,585 , 74%

Hanscom Airport, $54,013 ,

3%

Worcester Airport, $60,987 ,

4%

Maritime , $261,091 , 15%

Agency Wide, $76,275 , 4%

Page 5: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

FY16-20 CAPITAL PROGRAM CHALLENGES

– Largest 5-Year Capital Program in MPA History – New Strategic Plan Large Scale Projects:

• Terminal B – Airline Consolidation and Enhancement – $180M • Parking Capacity (Partial Funding) - $129.5M out of $251.5M • Terminal E Modernization – Phase 1(Partial Funding) - $115.0M out of $500M • Terminal C Roadways (Partial Funding) - $31.25M out of $50M • New Berth 10 and Crane at Coastal (Design & Permitting only) – $9.5M

– Maximized the amount of Renewal Projects to Maintain Commitment to State of Good Repairs

– Funding for this Program will Require Numerous Large Scale Bond and PFC Issuances

Page 6: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

STRETEGIC PLAN - PROJECTS Logan

– Terminal E Renovations and Enhancement (A380) – Terminal Connections:

• Terminal C to E • Terminal B to Gates 37/38

– Terminal B – Airline Consolidation and Enhancement (AA & US Airways) – 2050 Parking Spaces – Parking Capacity – HOV Improvements – Silver Line Rehab

– Ground Transportation Improvements - Terminal C Roadways – Terminal E Modernization – Phase 1 – Joint Operation Center – Digital Customer Service Initiatives – Resiliency Program

Page 7: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

STRETEGIC PLAN - PROJECTS Maritime

• Seaport Waterfront Transportation Center • Harbor Deepening • Backland Improvements • New Berth 10 and Crane at Coastal (Permitting and Design only) • Conley Terminal Dedicated Freight Corridor • Berth 11 and 12 Strengthening and Deepening • Cruise Terminal Exterior Enhancement

Hanscom • Permanent ARFF and CBP Facility

Worcester

• CAT III and T/W Improvements

Page 8: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

LANDSIDE PROGRAM FY16-20

Page 9: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

AIRSIDE PROGRAM FY16-20

Page 10: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

PROJECT INTEGRATION

Page 11: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

PARKING CHALLENGE

Page 12: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

CONLEY TERMINAL PROGRAM FY16-20

Page 13: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

MAJOR DEPARTMENTAL INITIATIVES

• Lean Construction principles and BIM as part of daily business • BIM and LC Integration • BIM Term Contracts SOW • 4D and 5D • Laser Scanning • As-Built and Record • GIS Update & Virtual Campus • MIBA (Massachusetts Integrated BIM Approach)

• Sustainability and Resiliency • New Program, Projects and Document Management System • Design Excellence

Page 14: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

MASSPORT BIM HISTORY

• Review of existing Massport standards • Determine FM data requirements • Identify and develop Massport BIM Uses • Integrate disparate industry standards • Develop process and BIM guidelines • Develop templates

BIM Guide Development

Re-Write Contracts Manuals Projects

Page 15: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

MASSPORT BIM HISTORY

• Review existing contracts and laws • Determine BIM requirements • Review industry options (AIA, AGC, WBDG) • Re-write Massport contract documents • BIM Exhibit – BIM becomes Contract Document

BIM Guide Development

Re-Write Contracts Manuals Projects

Page 16: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

MASSPORT BIM HISTORY

BIM Guide Development

Re-Write Contracts Manuals Projects

Page 17: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

BIM & LEAN INTEGRATION

Lean Collaboration Tools BIM

Technology & Process

Together BIM and Lean provide a structure to maximize BIM and project execution.

Page 18: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

Visible Decision Making Process

Develop and produce well Coordinated Documents

12 external and 11 internal

CoS What adds value

to a project

Value Mapping Defines

Conditions of Satisfaction (CoS)

© 2014 Luciana Burdi

BIM Execution Plan (BIMxP) Contents

Understand Ex. Conditions

Constraints Prevents an activity

from starting, advancing, or completing as

planned.

Use of A3s

Trade Modeling

BIM Uses Support CoS

Execution

Lean Tools Support CoS

Execution

Laser Scanning

Modeling Ex Cond.

Use of Pull Plan

Tracking Progress PPC

Align BIM Uses and Lean Tools To Supports CoS

Clash Avoidance

BIM to support Decision Making

PROJECT SUCCESS PLAN

Page 19: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

BIM TERM CONTRACTS • Skanska

• BIMxP Refinement • Simplification of existing BIMxP to better align with the

way MPA Projects are run • Dashboard Development • Online Platform Discussion

• Revit Template Development • Standardized graphics, browser organization, title

blocks, cover sheet, and object parameters to align with Maximo requirements and MPA Standards

• JMT • Finalizing BIM Roadmap

• Technologies and Skills Matrix and Training Recommendations

• TAA BIM Requirements Development • A guideline for BIM Use on TAA projects • Summer workshops with Massport Stakeholders

Page 20: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

BIM USE: 4D AND 5D

Page 21: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

LESSONS LEARNED: 4D AND 5D • Parameters must be built into design models – early coordination among

Design and Construction team • Discussion of how Owner wants to see the schedule/cost animation (different

areas of the building, interior, exterior, underground work) • Standardized template will help future projects • Determine how often updates occur (weekly, monthly, quarterly) • Decide how it will be used and at what meetings it will be presented

Page 22: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

BIM USE: LASER SCANNING

Page 23: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

BIM USE: LASER SCANNING

Page 24: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

BIM USE: LASER SCANNING

Page 25: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

BIM USE: LASER SCANNING

Page 26: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

BIM USE: LASER SCANNING

Terminal C Roadways

Page 27: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

1. Laser Scanning is a technique to capture and document As-Built Architectural, Structural and MEP/FP conditions

2. Laser Scanning aids in preparing more accurate base design models which will produce higher coordinated final construction documents

3. Laser Scanning is to be used with, not replace, physical field surveying of existing conditions and will aid in filling the gap between relying on historical As-Built documents and physical field surveying

LESSONS LEARNED: LASER SCANNING

Page 28: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

LESSONS LEARNED: LASER SCANNING

4. Use a local firm with a licensed survey crew as part of their team

5. Engage the assistance of a licensed contractor to provide the lift equipment, an operator and a carpenter to work with the scanning team

6. Arrange for access to locked areas such as mechanical rooms in advance

Page 29: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

CM/GC A/E

Architectural +

+

MPA

Contractor As-Builts

PDF, DWG, or RVT overlaid with Contractor As-Builts

FINAL RECORD

PDF, DWG, or RVT

LEGEND Contractor Files

Design Files

CURRENT AS-BUILT AND RECORD DOCUMENT PROCESS

Record Architectural

As Designed MEP/FP and

Structural MEP/FP

Civil

Structural +

PDF or DWG Redlines

Contractor As-Builts

+ Record

MEP/FP and Structural

Record Civil

+

+

Page 30: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

FINAL RECORD

FUTURE AS-BUILT AND RECORD DOCUMENT PROCESS

CM/GC

Federated Model

Point Cloud

A/E

Revit Architectural

MEP/FP

Civil

Structural

+

+

Point Cloud

+ Point Cloud is Linked to Revit File by Architect

+ As-Built

Federated Model

Trades/Subs Native Files

+

MPA

As Designed MEP/FP and

Structural

Minimum Requirements for Civil, MEP/FP, and Arch to be defined in BIMxP

LEGEND Navisworks

Native File Format

Point Cloud

Revit

• May be linked to Revit as reference to as-built conditions

• Engineer to review and sign-off

Trades/Subs Native Files

Record Revit Architectural

As-Built Conditions Point Cloud

+

+ Record

Federated Model

+

As Designed MEP/FP and

Structural +

Trades/Subs Native Files

Page 31: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

GIS UPDATE

CP GIS Needs Assessment

CP Document Management Needs Assessment

Hire CAD/GIS Temporary Help

Mobile GIS Platform

MPA GIS Needs Assessment

Civil/GIS Standards Development

GIS/BIM Integration

Document Management Platform Implementation

2016 2018

Page 32: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

VIRTUAL CAMPUS

• Seeking to gain better understanding of a comprehensive platform for 3D viewing and accessing of information about Massport infrastructure including, architecture, structure, MEP/FP systems, and underground utilities.

• This increased visualization will:

o aid in planning for future work, o management of current assets, o allow for a better overall

understanding of relationships between buildings and systems

Page 33: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

MASSACHUSETTS INTEGRATED BIM APPROACH (MIBA)

The purpose of the MIBA is to bring together multiple State agencies to share their experiences, goals, and implementation strategies with BIM technologies to date.

THE GOAL:

Page 34: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

MASSACHUSETTS INTEGRATED BIM APPROACH (MIBA) • Massachusetts Port Authority • Boston Society of Architects – BIM Roundtable • AGC of Massachusetts • CMAA New England • UMass Amherst • University of Massachusetts Building Authority • Massachusetts School Building Authority • Division of Capital Asset Management and Maintenance • Massachusetts State College Building Authority • Massachusetts Bay Transportation Authority

• AECOM • Dimeo Construction Company • SMMA

REPRESENTED AGENCIES:

Page 35: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

MASSACHUSETTS INTEGRATED BIM APPROACH (MIBA) AGENDA:

Page 36: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

WHY MIBA? • Talk about challenges • “Integrated” meaning • Shared information • “Political and legislative needs” • Legal framework • Resources/people • Define Issue/Mission • Decision Matrix • Lifecycle BIM • ROI • Being a Better Owner • Software Challenges • Industry Development (i.e., Tririga) • Entry Level Perspective • Checklist of Services

• Asset Management • Manual Grouping • Demand (Owner) • Standard of Care for BIM • Education and Training • MA GIS as example • “Building Code” Fundamentals • CMAA/AGC/BSA Involvement

Page 37: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

MIBA FOCUS TOPICS

1. Contracts a) Base, Fee, and Extras

2. Data Use a) BIM to FM

3. Cost of Implementation 4. Calculating ROI

a) Measurement of cost savings vs. cost avoidance

5. Risk/Level of Care Expectations a) Hand-off

6. Skillset/Education/Training a) Internal, External, Colleges/Universities

7. Reverse Engineering/Lessons Learned 8. Integration Roadmap 9. Procurement Opportunities/Limitations 10. Lean Tools/BIM

MOST INTEREST:

Page 38: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

MIBA FOCUS TOPICS

1. Feasibility of Process 2. The Basics 3. Private Sector Presentation 4. “Stamping” 5. “DTIG” like need 6. Social/Cultural 7. Where is BIM in comparison with other technologies and where is it going

a) Whitepaper(s) available on this topic

OTHER:

Page 39: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

MIBA NEXT STEPS 1. Each organization to assign an individual to represent

them as part of a working group

2. Follow up meeting for working group a) June 16, 2016 on Contract Language

3. Focus Topics for working group as voted on by MIBA

kick-off attendees

Additional Information: Massport BIM Information: https://www.massport.com/business-with-massport/capital-improvements/resource-center/ DCAMM Information: http://www.mass.gov/anf/property-mgmt-and-construction/design-and-construction-of-public-bldgs/guides-manuals-and-standards/

Page 40: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

SUSTAINABILITY AND RESILIENCY Resiliency Program: Began 2014 (Post Sandy)

“Resiliency is the ability of a system to withstand a major disruption within acceptable degradation parameters, recover within an acceptable time, and balance composite costs and risks.” • How to protect Massport facilities against long-term sea-level rise, storm surges,

intense storm events, other unplanned events and threats? • How to maintain and restore operational capabilities during and after disruptive

events? • How to implement a balanced composite cost and risk plan?

Page 41: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

SUSTAINABILITY AND RESILIENCY Program Accomplishments:

• Disaster Infrastructure Resiliency Study analyzed risks and vulnerabilities • Floodproofing Design Guidelines made • Temporary Flood Barriers Procured • Operational Flood Plans created for Logan

and Maritime facilities • Tabletop Exercises and Field Drills • Tier 1 assets at Logan and Maritime being

permanently hardened to flooding (7 total for 2016)

Page 42: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

SUSTAINABILITY AND RESILIENCY

Next Steps • Work with tenants at Logan and Maritime to share

operational preparedness plans

• Work with abutting communities in Charlestown, East and South Boston where Massport owns property to help them become more resilient to future climate change and flooding

• Constantly update plan

Page 43: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

PROGRAM, PROJECT MANAGEMENT SYSTEM Task # Task Description Timeframe

1 Gathering Needs from Various Units September/October 2015

2 Develop & Issue RFI for Software Vendors December 2015/February 2016

3 Presentations of Systems April 2016/June 2016

4 Shortlist 2-3 Systems June 2016

5 Issue RFQ for System Integrator July 2016

6 Select System Integrator October 2016

7 Commence Implementation of New PM System November 2016 Mind-i

Page 44: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

DESIGN EXCELLENCE

Page 45: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

DESIGN EXCELLENCE

Page 46: Conversation with … Luciana Burdi, Massport · 2000. 3000. 4000. 5000. 6000. 7000. 8000. 9000. 10000. FY16. FY17. FY18. FY19. FY20. Private. Induced. Indirect. Direct

THANK YOU!