cooling and ventilation in the tunnel
DESCRIPTION
CLIC WORKSHOP - 2008. COOLING AND VENTILATION IN THE TUNNEL. J. Inigo-Golfin - C. Martel CERN TS/CV Wednesday 15 th October 2008. CLIC WORKSHOP - 2008. This is a preliminary study. Some concepts are presented based on estimated values to be confirmed. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/1.jpg)
COOLING AND VENTILATION
IN THE TUNNEL
J. Inigo-Golfin - C. MartelCERN TS/CV
Wednesday 15th October 2008
CLIC WORKSHOP - 2008
![Page 2: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/2.jpg)
- Ventilation functions- Heat load levels- HVAC principle - Tunnel section- Safety - Equipment - Perspectives
Ventilation
- Water cooling requirements- Fluid circuits - Cooling principle - Main cooling station- Tunnel section. Piping- Equipment - Perspectives
Cooling
This is a preliminary study. Some concepts are presented based on estimated values to be confirmed.
The confirmation of rate air/water is still standing.
CLIC WORKSHOP - 2008
![Page 3: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/3.jpg)
- Fresh air for people and ventilation (obligation).- Requested ambient conditions (T°C and humidity).- Remove heat loads in the air.- Prevent from any air stratification, condensation. - Purge before access.- Smoke or gas extraction (obligation).- Overpressure control linked to radiation (obligation).
Tunnel ventilation functions
CLIC WORKSHOP - Ventilation
![Page 4: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/4.jpg)
INJ ECTORLINACS
MAIN BEAMS
DRIVE BEAMS
5 3 1
PHASE 1
90 kW
250 kW
200 kW
Heat loads in the air
Heat loads in the tunnel:250 kW / DB sector1250 kW between two shafts
CLIC WORKSHOP – Ventilation
Drive Beam sector = 250 kWUTRA cavern = 200 kWLoop = 90 kW
Heat loads in the Loops & UTRA:290 kW / DB sector1450 kW between two shafts
LOOP
UTRA
![Page 5: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/5.jpg)
CLIC WORKSHOP - Ventilation
200 kW
90 kW
UTRA
Loop
Local coolingproduction
HVAC of underground areas
Three systems:• Tunnel • UTRAs• LOOPs
![Page 6: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/6.jpg)
Tunnel Air flow rate considerations
250 kW
1250 kW
500 kW
DB sector
Intershafts
Heat loadsin the tunnel
75 000 m3/h
370 000 m3/h
150 000 m3/h
Air flow rate
1.73 m2
8.56 m2
3.3 m2
Air duct section
1.48 m
3.3 m
2 m
Air duct Diameter
Intershafts
Basic data: Delta Temperature (Extraction – Supply) = 28 – 18 = 10°C
CLIC WORKSHOP - Ventilation
To be Optimised …
Tunnel section = 20 m2
DB sector volume =17 000 m3
Inter shaft volume = 90 000 m3
Input data
Proposal
![Page 7: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/7.jpg)
INJ ECTORLINACS
MAIN BEAMS
DRIVE BEAMS
5 3 1
PHASE 1
Tunnel Air handling from the surface
Air supply
Extraction
Air supply
Extraction
HVAC equipment in surface buildings
CLIC WORKSHOP - Ventilation
![Page 8: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/8.jpg)
Semi transversal ventilation in tunnel
SHAFTPOINT
Extraction
Air supply
NEXTSHAFTPOINT
Extraction
Air supply
Optimisation of the air flow rate.Low air speed in the tunnel < 0.1 m/s.Optimisation of the temperature gradient.Recycling of the tunnel air possible.Reversible operation possible.Energy recovery possible.
CLIC WORKSHOP - Ventilation
![Page 9: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/9.jpg)
SHAFTPOINT
Extraction
Air supply
NEXTSHAFTPOINT
Extraction
Air supply
1 Smoke extraction trapper sector
1 supply and 1 extraction grillesper 30 m
Minimum maintenanceSealed, modulated
Fire resistantCompressed air control
Possible fire resistant sectors, with 2 emergency exits per sector
Semi transversal ventilation in tunnel
CLIC WORKSHOP - Ventilation
![Page 10: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/10.jpg)
Safety considerations
SHAFTPOINT
Extraction
Air supply
Extraction
Air supply
• Control of the pressure from both ends of a sector.• Control of the pressure (overpressure or underpressure in each area).• Fire detection per sector compatible to fire fighting via water mist.
CLIC WORKSHOP - Ventilation
![Page 11: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/11.jpg)
Tunnel section
Circuit D : compressed air
Circuit C : Fire Fighting
Circuit A : Module cooling
Circuit B : general cooling
EXTRACTION DUCTSUPPLY DUCT
This cross section is for study purposes only
Approved CLIC tunnel Diameter is currently 4.5m
CLIC WORKSHOP - Ventilation
![Page 12: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/12.jpg)
Equipment issuesNot standard industrial fans
High pressure fansAdapted products
Not standard equipment
CLIC WORKSHOP - Ventilation
![Page 13: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/13.jpg)
Fan in specific concrete section Concrete air ductsDirect driven fans (no belts)Fan in specific concrete section Concrete sound attenuation
Extraction unit
Supply unit
6000
Equipment issuesSpecial design
CLIC WORKSHOP - Ventilation
![Page 14: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/14.jpg)
Perspectives
- Heat loads in tunnel air to optimize- Heat loads in Exp. caverns, Klystrons to be defined?- Radiation levels in the various areas to be defined- Integration of ventilation ducts in the tunnel section to finalize
CLIC WORKSHOP - Ventilation
![Page 15: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/15.jpg)
Cooling
- Water cooling requirements- Fluid circuits - Cooling production - Main cooling station- Tunnel section. Piping- Equipment considerations- Perspectives
CLIC WORKSHOP - Cooling
![Page 16: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/16.jpg)
INJ ECTORLINACS
MAIN BEAMS
DRIVE BEAMS
5 3 1
878 878 878 878 878 878 878
1756
4390 m
PHASE 1
7911
4390 m4390 m4390 m
CLIC WORKSHOP - Cooling
Modules total power: 70 MWRequired flow-rate: 3215 m3/hDelta temperature: 20 KTemp. Supply: 25 °C
Water cooling requirements
Modules cooling (circuit A)
![Page 17: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/17.jpg)
CLIC WORKSHOP - Cooling
1000 kW
1000 kW0 kW ?
1000 kW
1000 kW
0 kW ?
UTRAUTRC
Dump Dump
LoopLoop
Water cooling requirements
General cooling (circuit B)
Modules total power: 15 MWRequired flow-rate: 1612 m3/hDelta temperature: 8 KTemp. Supply: 27 C
![Page 18: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/18.jpg)
• CIRCUIT A : MODULES COOLING – 70 MW Demineralised water, 25/45°C, 2 pipes Ø600
Accelerator structure, Loads, PETS, Quadripoles
• CIRCUIT B : GENERAL COOLING – 15 MW Demineralised water, 27/35°C, 2 pipes Ø300 UTRA, UTRC, Loop, Vacuum, Beam Dump
• CIRCUIT C : FIRE FIGHTING - Water mist – Ø80
• CIRCUIT D : REGULATION Compressed Air – 760 m3/h, Ø150, 8 bars
- For solids (dust): class 1 with max. 0.1 mg/m3
- For water : class 2 with -40°C dew point - For oil : class 1 with max. 0.01 mg/m3
CLIC WORKSHOP - Cooling
Fluid circuits per side
![Page 19: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/19.jpg)
INJ ECTORLINACS
MAIN BEAMS
DRIVE BEAMS
5 3 1
878 878 878 878 878 878 878
1756
4390 m
PHASE 1
7911
4390 m4390 m4390 m
CLIC WORKSHOP - CoolingRaising circuits
Raising pumps
Drain
Tunnel section
![Page 20: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/20.jpg)
CLIC WORKSHOP - Cooling
Pumpingstation
CoolingProduction
![Page 21: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/21.jpg)
CLIC WORKSHOP - Cooling
Main Cooling stationINJ ECTOR
LINACSMAIN BEAMS
DRIVE BEAMS
5 3 1
878 878 878 878 878 878 878
1756
4390 m
PHASE 1
7911
4390 m4390 m4390 m
Back to lake
WATER MISTCIRCUIT ACIRCUIT B
10 MW
Fromlake
N+1 M~
? MW ? MW
MainLinac Z.E.
2 m?
11 EXCHANGERS
![Page 22: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/22.jpg)
CLIC WORKSHOP - Cooling
Tunnel section. Piping
Circuit D : compressed air
Circuit C : Fire Fighting
Circuit A : Module cooling
Circuit B : general cooling
This cross section is for study purposes only
Approved CLIC tunnel Diameter is currently 4.5m
![Page 23: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/23.jpg)
CLIC WORKSHOP - Cooling
Equipment considerations
- Out of standard pipe diameters- Special tooling, welding process- On request manufacturing, PN an issue?- Extra large heat exchangers
1.2 m1.8 m
3.2 m
6 MWHeat
Exchanger
![Page 24: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/24.jpg)
CLIC WORKSHOP - Cooling
Missing items affecting main cooling station
- Cooling power for experimental cavern ?- Cooling power for Main dumps- HVAC and cooling for klystrons- Confirmation about the rate air/water
Other items to be considered:- Fire-fighting flow-rates- Infiltration water, raising pumps, slopes
![Page 25: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/25.jpg)
![Page 26: COOLING AND VENTILATION IN THE TUNNEL](https://reader035.vdocuments.net/reader035/viewer/2022081416/56813b95550346895da4c6b7/html5/thumbnails/26.jpg)
Longitudinal principle
SHAFTPOINT
Air supply
NEXTSHAFTPOINT
Extraction
Large air flow rateHigh speedTemperature gradient
CLIC WORKSHOP - 2008
Base:150 000 m3/h1250 kWDelta T°C = 24 = (41-17)Air speed = 2 m/s