7/30/2019 Copy of FQP -Fuel Handling System
1/21
ID NO.:
FIELD QUALITY PLAN
FOR
FUEL HANDLING SYSTEM
FOR
SHREE MEGA POWER(2x150MW)
CETHAR VESSELS LIMITEDTIRUCHIRAPPALLI
FIELD QUALITY ASSURANCE DEPARTMENT
DOC. No: QPE-FHS-001REV. No : R00 / Oct-2010
FRT-FQP-001-REV 00
-
7/30/2019 Copy of FQP -Fuel Handling System
2/21
FIELD QUALITY PLAN
FOR
BOILER STRUCTURES
FOR
SHREE MEGA POWER
PREPARED BY(P.Vijayaragavan, Engineer / QA)
REVIEWED BY(N.Narayanasamy,VP /UB& UPP )
APPROVED BY(V. Kandhsamy, Chief / FQA)
DOCUMENT No. QPE-FHS-002
R00 / OCT-2010
ID No. DATE OF ISSUE
COPY No:CONTROLLED /INFORMATION
COPY
NO. OFPAGES:
30
ISSUED BY
ISSUED TO:
CETHAR VESSELS LIMITEDTIRUCHIRAPPALLI
FIELD QUALITY ASSURANCE DEPARTMENT
FRT-FQA-002-REV 00
-
7/30/2019 Copy of FQP -Fuel Handling System
3/21
CONTENTS
DOC. NO. : QPE-FHS-001
REV. NO. : R00
SHEET: 1 / 1
Sl. No DESCRIPTION NO. OF SHEETS
1 STATUS OF AMENDMENTS 1
2.AUTHORISATION FOR DIFFERENT CATEGORIES OFCHECKS
1
3. STATEMENT OF CHECKS 9
4. DOCUMENTS REFERRED IN QUALITY PLAN 1
5. LOGSHEETS : L-00 TO L-04 5
6 FEEDBACK ON FIELD QUALITY PLAN 1
FRT-FQP-003-REV 00
-
7/30/2019 Copy of FQP -Fuel Handling System
4/21
STATUS OF AMENDMENTS
DOC. NO. : QPE-FHS-001
REV. NO. : RO0
SHEET : 1 / 1
SL.NO.
REFERENCEOF SHEETSAMENDED
AMENDMENT NO.& DATE
REMARKS
NIL
FRT-FQP-004-REV 00
-
7/30/2019 Copy of FQP -Fuel Handling System
5/21
AUTHORISATION FOR DIFFERENTCATEGORIES OF CHECKS
DOC. NO. : QPE-FHS-001
REV. NO. : RO0
SHEET : 1 / 1
CLASSIFICATION OFCHECKS
CHECKING / WITNESSING AUTHORITYACCEPTINGAUTHORITY
A CRITICAL
CVL QAE HEAD/FQA
SCL CONSTRUCTION SCL
B MAJOR
CVL ERECTION QAE
SCL CONSTRUCTION SCL
C MINOR
CVL ERECTION HOS
SCL --- SCL
LEGNDS: QAE -QUALITY ASSURANCE ENGINEER
HOS-HEAD OF SECTION
NOTE
1.QAE shall witness 'A' category checks. He is also authorised to carry outsurveillance in any of B and C category of checks at his discretion.
2. In case of non-conformity, accepting authority shall ensure disposition beforeaccepting and the dis-positioning shall be reflected on log sheets / protocols.
3. QAE shall ensure that only calibrated instruments are used for all measurements.
FRT-FQP-005-REV 00
-
7/30/2019 Copy of FQP -Fuel Handling System
6/21
STATEMENT OF CHECKS
DOC. NO. : QPE-FHS-001
REV. NO. : RO0
SHEET: 01 / 09
Capacity / Type: : 2 X 150MW
System: : BOILER
Sub-system: : FUEL HANDLING SYSTEM
Area: : ERECTION
NOTES:
1. For checks where log sheets are not called for, suitable records should be maintained in theform of log book / protocols.
2. As an evidence of having carried out the work satisfactorily, a general purpose log sheet,L-00 shall be maintained for all the checks.
3. The above sub-system covers Foundation and erection of structures, truck tippler,gantry,lconveyors, transfer tower,vibrating feeder,vibrating screen & Crushers with house,metaldetectors, magnetic separators and belt weigher
FRT-FQP-006-REV 00
-
7/30/2019 Copy of FQP -Fuel Handling System
7/21
SUPPLIERS NAME& ADDRESS
Cethar Vessels Limited4,Dindigul Road,
Tiruchirappalli-620 001
FIELD QUALITY PLAN CUSTOMER: M/S.SHREE CEMENT LTD.PROJECT: SHREE MEGA POWER
2X150MW
PACKAGE: EPC
CONTRACT No.: EBJ 072 & 087
SYSTEM: BOILER
Sub system: Fuel handling system
FQP No. : QPE-FHS-001REV. No. : R00PAGE No.: 02 / 09
SL.NO
CHARACTERISTICS/ITEMTYPE
OFCHECK
INSTRUMENT CLASS
REFERENCEDOCUMENT/
ACCEPTANCESTANDARD
QUANTUM/FREQUENCY
OF CHECK
FORMATOF
RECORD
REMARKS/HOLD POINTS (H)
1.0 FOUNDATION
1.1 Availability of identified & protected permanent benchmark V B 100%
1.2 Elevation of top of foundation pedestals with referenceto permanent bench mark
MDumpy level /Water level /
TapeB
Drawing /erectionmanual
100% L - 01
1.3 Disposition of foundation pedestals with reference tolongitudinal axis of boiler and reference axis M
Tape A -do- 100% L - 01
1.4 Spacing between the foundation pedestals M Tape B -do- 100% L - 01
1.5 Diagonals of the main column foundation pedestals M Tape B -do- 100% L - 011.6 Pitch distance of foundation pedestal bolts on both the
axes and its diagonalsM Tape C -do- 100% L - 01
2.0 STRUCTURES
2.1 Material Receipt Verification &Identification CheckV Nil B
Transport/packing Doc.
100%
2.2 Check for cleanliness of structures before erection.V Nil B Nil 100%
2.3Pre-assembly of columns before erection , whereverapplicable. V/M
Tape /Piano wire /Water level
B
Drawing 100%
LEGEND: CLASS : A - CRITICAL, B - MAJOR, C - MINOR;A SHALL BE WITNESSED BY QA E OF CVL & CUSTOMER,B SHALL BE WITNESSED BY ERECTION OF CVL & CUSTOMER ANDC SHALL BE WITNESSED BY ERECTION OF CVL.TYPE : V- VISUAL, R- RECORD VERIFICATION, M- MEASUREMENT, P- PHYSICAL & T- TEST.
FOR CUSTOMER USE
MAIN SUPPLIER :CVL
SIGNATURE REVIEWED BY APPROVED BY APPROVAL SEAL
FRT-FQP-007-REV 00
-
7/30/2019 Copy of FQP -Fuel Handling System
8/21
SUPPLIERS NAME& ADDRESS
Cethar Vessels Limited4,Dindigul Road,
Tiruchirappalli-620 001
FIELD QUALITY PLAN CUSTOMER: M/S.SHREE CEMENT LTD.PROJECT: SHREE MEGA POWER
2X150MW
PACKAGE: EPC
CONTRACT No.: EBJ 072 & 073
SYSTEM: BOILER
Sub system: Fuel handling system
FQP No. : QPE-FHS-001REV. No. : R00PAGE No.: 03 / 09
SL.NO
CHARACTERISTICSTYPE
OFCHECK
INSTRUMENT CLASS
REFERENCEDOCUMENT/
ACCEPTANCESTANDARD
QUANTUM/FREQUENCY
OF CHECK
FORMATOF
RECORD
REMARKS/HOLD POINTS (H)
2.4 Individual column piece camber and sweep(Tolerance :1mm/M : 10 mm max.).
M-do- B
Drawing /erectionmanual
100%
2.5 Camber and sweep for assembled columns(Tolerance :1mm/M ; 18 mm max.).
M -do- B -do- 100%
2.6 Total length of column before erection(Tolerance : 15 mm max.).
M Tape B -do- 100%
2.7 Orientation of columns. Check for match mark,elevationmark, Column No.,splice size etc.
V B -do- 100%
2.8 Ensure matching of center line of base plate with pedestalaxes.
V B -do- 100%
2.9 Elevation of column at 1 meter level with reference tobenchmark (Tolerance : 5 mm).
MWater level /
TapeB
Drawing /erectionmanual
100%
2.10 Alignment of first piece of column with horizontal beamsand vertical bracings (Tolerance :Position w.r.t. referenceaxis : 5mm; elevation: 5 mm).
MTheodolite /
Tape /Plumb bob
B -do- 100%
LEGEND: CLASS : A - CRITICAL, B - MAJOR, C - MINOR;A SHALL BE WITNESSED BY QAE OF CVL & CUSTOMER,B SHALL BE WITNESSED BY ERECTION OF CVL & CUSTOMER ANDC SHALL BE WITNESSED BY ERECTION OF CVL.TYPE : V- VISUAL, R- RECORD VERIFICATION, M- MEASUREMENT, P- PHYSICAL & T- TEST.
FOR CUSTOMER USE
MAIN SUPPLIER :CVL
SIGNATUREREVIEWED BY APPROVED BY APPROVAL SEAL
FRT-FQP-007-REV 00
-
7/30/2019 Copy of FQP -Fuel Handling System
9/21
SUPPLIERS NAME& ADDRESS
Cethar Vessels Limited4,Dindigul Road,
Tiruchirappalli-620 001
FIELD QUALITY PLAN CUSTOMER: M/S.SHREE CEMENT LTD.PROJECT: SHREE MEGA POWER
2X150MW
PACKAGE: EPC
CONTRACT No.: EBJ 072 & 073
SYSTEM: BOILER
Sub system: Fuel handling system
FQP No. : QPE-FHS-001REV. No. : R00PAGE No.: 04 / 09
SL.NO
CHARACTERISTICSTYPE
OFCHECK
INSTRUMENT CLASS
REFERENCEDOCUMENT/
ACCEPTANCESTANDARD
QUANTUM/FREQUENCY
OF CHECK
FORMATOF
RECORD
REMARKS/HOLD POINTS (H)
2.11 Completion of boxes with main brace level members ( MBL). V B -do- 100%
2.12 Grouting gap below the column base(Min. 20mm ; max. 70 mm). M Tape B Drawing 100%
2.13 Verification of test certificates and batch certificates of groutmaterial.
V AProcedure for
grouting100%
2.14 Grouting of column bases. V/R ADrawing / Groutmanufactures
Recommendation100% L - 04
2.16 Alignment of columns at every stage of erection. MTheodolite /
Tape /Plumb bob
ADrawing / erection
manual100% L - 05
LEGEND: CLASS : A - CRITICAL, B - MAJOR, C - MINOR;A SHALL BE WITNESSED BY QAE OF CVL & CUSTOMER,B SHALL BE WITNESSED BY ERECTIONOF CVL & CUSTOMER ANDC SHALL BE WITNESSED BY ERECTION OF CVL.TYPE : V- VISUAL, R- RECORD VERIFICATION, M- MEASUREMENT, P- PHYSICAL & T- TEST.
FOR CUSTOMER USE
MAIN SUPPLIER :CVL
SIGNATUREREVIEWED BY APPROVED BY APPROVAL SEAL
FRT-FQP-007-REV 00
-
7/30/2019 Copy of FQP -Fuel Handling System
10/21
SUPPLIERS NAME& ADDRESS
Cethar Vessels Limited4,Dindigul Road,
Tiruchirappalli-620 001
FIELD QUALITY PLAN CUSTOMER: M/S.SHREE CEMENT LTD.PROJECT: SHREE MEGA POWER
2X150MW
PACKAGE: EPC
CONTRACT No.: EBJ 072 & 073
SYSTEM: BOILER
Sub system: Fuel handling system
FQP No. : QPE-FHS-001REV. No. : R00PAGE No.: 05/ 09
SL.NO
CHARACTERISTICSTYPE
OFCHECK
INSTRUMENT CLASSREFERENCE DOCUMENT/ACCEPTANCE STANDARD
QUANTUM/FREQUENCY
OF CHECK
FORMATOF
RECORD
REMARKS/HOLD POINTS (H)
4 WELDING
4.1 Qualification of welders V / R AProcedure for structural
welder / welding operatorqualification at site
100%
4.2Availability of approved WPS , Heat TreatmentSchedule,Erection Manual, Calibration testcertificates of instruments used.
R A 100%
4.3 Adoption of correct procedure , approvedelectrodes and methods.
V/R A
Drawings / Procedure forreceipt inspection and
control of weldingconsumable at site / Heat
Treatment Parameters
100%
4.4 Pre heating and interpass temperature. V/R
Timetemperatur
eRecorder /ThermalChalk
A
Drawing / Guidelines for
Erection / Heat TreatmentParameters
As per
ReferenceDocument
LEGEND: CLASS : A - CRITICAL, B - MAJOR, C - MINOR;A SHALL BE WITNESSED BY QAE OF CVL & CUSTOMER,B SHALL BE WITNESSED BY ERECTIONOF CVL & CUSTOMER ANDC SHALL BE WITNESSED BY ERECTION OF CVL.TYPE : V- VISUAL, R- RECORD VERIFICATION, M- MEASUREMENT, P- PHYSICAL & T- TEST.
FOR CUSTOMER USE
MAIN SUPPLIER :CVL
SIGNATUREREVIEWED BY APPROVED BY APPROVAL SEAL
FRT-FQP-007-REV 00
-
7/30/2019 Copy of FQP -Fuel Handling System
11/21
SUPPLIERS NAME& ADDRESS
Cethar Vessels Limited4,Dindigul Road,
Tiruchirappalli-620 001
FIELD QUALITY PLAN CUSTOMER: M/S.SHREE CEMENT LTD.PROJECT: SHREE MEGA POWER
2X150MW
PACKAGE: EPC
CONTRACT No.: EBJ 072 & 073
SYSTEM: BOILER
Sub system: Fuel handling system
FQP No. : QPE-FHS-001REV. No. : R00PAGE No.: 06 / 09
SL.NO
CHARACTERISTICSTYPE
OFCHECK
INSTRUMENT CLASS
REFERENCEDOCUMENT/
ACCEPTANCESTANDARD
QUANTUM/FREQUENCY
OF CHECK
FORMATOF
RECORD
REMARKS/HOLD POINTS
(H)
5.0 NDE
a) Edge preparationi .MPI for new edges prepared at site after flame cutting /trimming of respective member where t 38mm.
V ACVL/PR/014 Rev.04CVL/PR/006 Rev.03
100%
ii . MPI/LPI for all gas cut edges for t 20mm and below38mm.
-do- 10%
iii . MPI/LPI for all bevel edges for t 20mm prior towelding
-do- 100%
b) Butt weldsi. MPI/ LPI on all back gouged / ground grooves
prior to welding from second side.V B
CVL/PR/014 Rev.04CVL/PR/006 Rev.03
100%
ii. RT for t 32mm. V A CVL/PR/095 Rev.00 100%
Iii. MPI/LPI on finished welds for t > 25mm to t < 32 mm. V BCVL/PR/014 Rev.04CVL/PR/006 Rev.03
100%
Iv. MPI/LPI on finished welds up to 25 mm thick. V B -do- 10.00%LEGEND: CLASS : A - CRITICAL, B - MAJOR, C - MINOR;A SHALL BE WITNESSED BY QAE OF CVL & CUSTOMER,
B SHALL BE WITNESSED BY ERECTION OF CVL & CUSTOMER ANDC SHALL BE WITNESSED BY ERECTION OF CVL.
TYPE : V- VISUAL, R- RECORD VERIFICATION, M- MEASUREMENT, P-PHYSICAL & T- TEST.
For Customer UseMain Supplier: CVL
Signature Reviewed By Approved By Approval Seal
-
7/30/2019 Copy of FQP -Fuel Handling System
12/21
SUPPLIERS NAME& ADDRESS
Cethar Vessels Limited4,Dindigul Road,
Tiruchirappalli-620 001
FIELD QUALITY PLAN CUSTOMER: M/S.SHREE CEMENT LTD.PROJECT: SHREE MEGA POWER
2X150MW
PACKAGE: EPC
CONTRACT No.: EBJ 072 & 073
SYSTEM: BOILER
Sub system: Fuel handling system
FQP No. : QPE-FHS-001REV. No. : R00PAGE No.: 07 / 09
SL.NO
CHARACTERISTICSTYPE
OFCHECK
INSTRUMENT CLASSREFERENCE DOCUMENT/ACCEPTANCE STANDARD
QUANTUM/FREQUENCY
OF CHECK
FORMATOF
RECORD
REMARKS/HOLD POINTS (H)
d) Fillet welds
I.)LPI/MPI For welds between flange and web andbearing stiffeners.
V BCVL/PR/006 Rev.03CVL/PR/014 Rev.04
100%
ii.) LPI/MPI For other welds joining plate members inwhich both plate members are over 25 mm thick.
V B -do- 100%
iii.) LPI for All other welds V B CVL/PR/006 Rev.0310% of
weld length
6.0 Gantry construction
i) Provision of Stool Support V
ii) Provision of Deck sheet at fuel point Viii) Idlers location & alignment M Tape A Drawing 100%iv) Provision of mounting bracketv) Provision of floor grills
V B Do--
vi) Individual piece Dimension, holes location, bend &twist
Vii) Gantry assembly dimension, holes location , bend &Twist .
M Tape A Do--
7 Head End & Tail End with pulleys Stringer arrangement M Do--
i) Alignment
ii) Centre to Centre Distance8 Drive Arrangement
i) Alignment ( Axial & radial) MDialMicrometer
A Drawing 100.00%
LEGEND: CLASS : A - CRITICAL, B - MAJOR, C - MINOR;A SHALL BE WITNESSED BY QAE OF CVL & CUSTOMER,B SHALL BE WITNESSED BY ERECTION OF CVL & CUSTOMER ANDC SHALL BE WITNESSED BY ERECTION OF CVL.TYPE : V- VISUAL, R- RECORD VERIFICATION, M- MEASUREMENT, P- PHYSICAL & T- TEST.
FOR CUSTOMER USE
MAIN SUPPLIER :CVL
SIGNATUREREVIEWED BY APPROVED BY APPROVAL SEAL
FRT-FQP-007-REV 00
-
7/30/2019 Copy of FQP -Fuel Handling System
13/21
SUPPLIERS NAME& ADDRESS
Cethar Vessels Limited4,Dindigul Road,
Tiruchirappalli-620 001
FIELD QUALITY PLAN CUSTOMER: M/S.SHREE CEMENT LTD.PROJECT: SHREE MEGA POWER
2X150MW
PACKAGE: EPC
CONTRACT No.: EBJ 072 & 073
SYSTEM: BOILER
Sub system: Fuel handling system
FQP No. : QPE-FHS-001REV. No. : R00PAGE No.: 08 / 09
SL.NO
CHARACTERISTICSTYPE
OFCHECK
INSTRUMENT CLASSREFERENCE DOCUMENT/ACCEPTANCE STANDARD
QUANTUM/FREQUENCY
OF CHECK
FORMATOF
RECORD
REMARKS/HOLD POINTS (H)
9 Skirt Board arragement at Fuel feeding point V B Drawing 100.00%
10 Grizzly hopper with Vibrating feederI) Hopper orientation , dimensions & Alignment M Tape A Drawing 100.00%ii) Vibratory feeder location & Alignment M -Do- A Drawing 100.00%
11 Crusher , Screen & Vibrating feeder
I) Orientation
ii) Location M Tape A Drawing 100%
iii)Alignment
12 Inter connecting Chute
I) Dimension , M Tape A Drawing 100%
ii) Welding Soundness Visual B
iii) location M Tape A
Drawing 100.00%
13 Laying of Belt V
I) Splicing V B Drawing 100%
14 ii) Hardness at the joint M Hardnesstester
A 70 5 DegShore A
100%
15 Provision of Scrapper V A Drawing 100.00%
LEGEND: CLASS : A - CRITICAL, B - MAJOR, C - MINOR;A SHALL BE WITNESSED BY QAE OF CVL & CUSTOMER,B SHALL BE WITNESSED BY ERECTION OF CVL & CUSTOMER ANDC SHALL BE WITNESSED BY ERECTION OF CVL.TYPE : V- VISUAL, R- RECORD VERIFICATION, M- MEASUREMENT, P- PHYSICAL & T- TEST.
FOR CUSTOMER USE
MAIN SUPPLIER :CVL REVIEWED BY APPROVED BY APPROVAL SEAL
-
7/30/2019 Copy of FQP -Fuel Handling System
14/21
SUPPLIERS NAME& ADDRESS
Cethar Vessels Limited4,Dindigul Road,
Tiruchirappalli-620 001
FIELD QUALITY PLAN CUSTOMER: M/S.SHREE CEMENT LTD.PROJECT: SHREE MEGA POWER
2X150MW
PACKAGE: EPC
CONTRACT No.: EBJ 072 & 073
SYSTEM: BOILER
Sub system: Fuel handling system
FQP No. : QPE-FHS-001REV. No. : R00PAGE No.: 09/ 09
SL.NO
CHARACTERISTICSTYPE
OFCHECK
INSTRUMENT CLASSREFERENCE DOCUMENT/ACCEPTANCE STANDARD
QUANTUM/FREQUENCY
OF CHECK
FORMATOF
RECORD
REMARKS/HOLD POINTS (H)
16 Trial run with all Safety accessories
i) Provision of pull chord Switches V ADrawing /Equipment
manual100%
ii) Smooth operation
iii) Vibration & Noise level of Drives
17 Provision of Guard
18 Provision of Fire fighting system V A Drawing 100%
19 Assembly of Conveyor hood V A Drawing 100%
20Erection of Dust extraction system , Dust suppressionsystem & Ducting
V A Drawing 100%
21 Cladding V B Drawing 100%
LEGEND: CLASS : A - CRITICAL, B - MAJOR, C - MINOR;A SHALL BE WITNESSED BY QAE OF CVL & CUSTOMER,B SHALL BE WITNESSED BY ERECTION OF CVL & CUSTOMER ANDC SHALL BE WITNESSED BY ERECTION OF CVL.TYPE : V- VISUAL, R- RECORD VERIFICATION, M- MEASUREMENT, P- PHYSICAL & T- TEST.
FOR CUSTOMER USE
REVIEWED BY APPROVED BYAPPROVAL
SEALMAIN SUPPLIER :CVL
-
7/30/2019 Copy of FQP -Fuel Handling System
15/21
DOCUMENTS REFERRED INQUALITY PLAN
DOC. NO. : QPE--002
REV. NO.: RO0
SHEET : 1 / 1
SL.NO Reference Document
Document /Procedure No Issuing Authority
1Erection Manual-Boiler supportingstructures
SMP/Erec/002 Construction
2 Quality Plan - Structural BI079/012 Q A & C
3 Procedure for Liquid PenetrentExamination
CVL/PR/006 Q A & C
4 Procedure for Radiographic Examination CVL/PR/095 Q A & C
5Procedure for Magnetic ParticlesExamination
CVL/PR/014 Q A & C
6 Procedure for Post Weld Heat treatment CVL/PR/002A Q A & C
7 Procedure for grouting CVL/FQA/PR/003 FQA
8 Procedure for visual inspection CVL/PR/029 Q A & C
9Procedure for Structural welder / weldingoperator qualification at site
CVL/FQA/PR/002 FQA
10 Welding Consumable Selection Chart BGS-2-24 to BSG-2-027 Engineering
11 List of Approved Welding Consumables CVL/AWCL/001 Q A & C
Notes:
QA&C Quality Assurance & control
FQA Field Quality Assurance
FRT-FQP-009-REV 00
-
7/30/2019 Copy of FQP -Fuel Handling System
16/21
RECORD OF QUALITY CHECKS
SHEETNO. OF. FQP
CHECKNO.
RESULTSACHIEVED OK /
NOT OK
DRAWING /DOCUMENTREFERENCE
FORMAT OFRECORD
INSPECTED BYSIGN. & DATE
CLEAREDBY SIGN.& DATE
REMARKS
Note: Any protocol made is to be numbered & mentioned in Format of Record column.
PROJECT SYSTEM SUB - SYSTEM AREA DOC. NO. : QPE-FHS-001
UNIT NO. REV. NO. : RO0
RATINGLOG SHEET NO. : L - 00
SHEET : 1/1
FRT-FQP-010-REV 0
-
7/30/2019 Copy of FQP -Fuel Handling System
17/21
INSTRUMENT REGN.NO
DATE OF INSPECTION
DRAWING/DOCUMENT REF.
PITCH AND DIAGONAL DISTANCE OF FOUNDATION BOLTS
AS PER DRAWING
PEDESTAL DESIGNATION A B a1 a2 a3 a4 b1 b2 b3 b4 D1 D2
L
R
L
R
L
R
L
R
L
R
Tolerances: 1. Pitch Distances : 3mm 2. Diagonal Difference : 5mm max All dimension are in mm
NAMESIGN.&DATE
DOC. NO. : QPE-FHS-001
PROJECT INSPECTED BY REV. NO. : RO0
UNIT NO. CLEARED BY LOG SHEET NO. : L - 01
RATING CUSTOMER SHEET : 1 / 1
FRT-FQP-011-REV 00
-
7/30/2019 Copy of FQP -Fuel Handling System
18/21
INSTRUMENT REGN.NO
DATE OF INSPECTION
DRAWING/DOCUMENT REF.
GROUTING OF COLUMN BASES
1. Column number ( identification) :
2. Grout material Specification :
3. Ratio of proportion of grout mix :
4. Whether any additives added : Yes / No
If yes ,details :
5. Date of grouting :
6. Whether test cubes have been taken : Yes / No
If yes ,details :
7. Remarks :
The following column bases _____________________________ are cleared for further erectionafter _______days of curing.
NAMESIGN.&DATE
DOC. NO. : QPE-FHS-001
PROJECT INSPECTED BY REV. NO. : RO0
UNIT NO. CLEARED BY LOG SHEET NO. : L - 02
RATING CUSTOMER SHEET: 1 / 1
FRT-FQP-011-REV 00
-
7/30/2019 Copy of FQP -Fuel Handling System
19/21
INSTRUMENT REGN.NO
DATE OF INSPECTION
DRAWING/DOCUMENT REF.
VERTICALITY OF COLUMNS
ColumnNumber
Elevation inmetres
Inclined towards (mm)
East West North South
Tolerance : 1mm / M, 25 mm Max.
NAMESIGN.&DATE
DOC. NO. : QPE-FHS-001
PROJECT INSPECTED BY REV. NO. : RO0
UNIT NO. CLEARED BY LOG SHEET NO. : L - 03
RATING CUSTOMER SHEET 1 / 1
FRT-FQP-011-REV 00
-
7/30/2019 Copy of FQP -Fuel Handling System
20/21
INSTRUMENT REGN.NO
DATE OF INSPECTION
DRAWING/DOCUMENT REF.
JOINT INSPECTION PROTOCOL FOR COMPLETION OFSTRUCTURE AND EQUIPMENT
SI. NO ACTIVITY OBSERVATION
1
2
3
4
5
6
7
8
NAMESIGN.
&DATE
DOC. NO. : QPE-FHS-001
PROJECT INSPECTED BY REV. NO. : RO0
UNIT NO. CLEARED BY LOG SHEET NO. : L - 04
RATING CUSTOMER SHEET : 1 / 3
FRT-FQP-011-REV 00
-
7/30/2019 Copy of FQP -Fuel Handling System
21/21
FEEDBACK ON FIELD QUALITY PLAN
In the Field Quality Plan (FQP), for following Checks / Log sheets may be added / rewritten / deleted(cannot be carried out / not required) due to reasons as mentioned below:
Sheet No.Of FQP
Check No. /Log Sheet No.
Proposed Change / Reasons / Remarks
From To
Head/FQA,CVL,Tiruchirappalli.
PROJECT DOC. NO. : QPE-FHS-001
UNIT NO. REV. NO. : RO0
RATING SHEET : 1 / 1
FRT-FQP-013-REV 00