    Name of Contractor : SHRI VAARI ELECTRICALS PVT.LTD., Chennai.

    AGT.NO.: 12/PMCS/EC/EE(E)/07-08

    Description of Item Nos

    Agreement no:12

    item no: 1.12.1.1

    Floor Lighting Panel

    INCOMER

    2 set Red/Green ON/OFF indicating lamps

    2 set of three White phase indicating lamps

    BUS BAR

    1set of 80A TP & N Al Bus Bar

    OUTGOING

    5 nos, 32A TPN MCB with 32A backup fuse 5 Nos

    2 nos, 20A TPN MCB with 20A backup fuse 2 Nos

    1 no, 25A TPN MCB with 25A backup fuse 1 No.

    1 no, 40A TPN MCB with 40A backup fuse 1 No.

    FLOOR I 1X1

    Agreement no:13

    item no: 1.12.1.2

    Floor Emergency Lighting

    INCOMER

    32A, TPN MCB 1 No

    2 set Red/Green ON/OFF indicating lamps2 set of three White phase indicating lamps

    BUS BAR

    1 set of 32A TP & N Al Bus Bar

    OUTGOING

    20A DP MCB 4 Nos.

    25A DP MCB 4 Nos.

    FLOOR I 1X1

    Agreement no:14

    item no: 1.12.1.3

    Floor Power Panel

    Name of work : Internal Electrical works of College Blockof Perunthalaivar Ka

    Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-511-1 and specification attached

    1 no. 80A, TP& N fixed type MCCB of 25A rating with over current and short circuitreleases 1 No

    Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-511-1 and specification attached

  • 8/8/2019 Copy of Measurement Book 20.7

    2/76

    INCOMER

    40A, TPN MCB with 40A fuse backup 1 No.

    2 set Red/Green ON/OFF indicating lamps

    2 set of three White phase indicating lamps

    BUS BAR

    1 set of 40A TP & N Al Bus Bar

    OUTGOING

    32A DP MCB with 32A Fuse backup 6 Nos.

    FLOOR I 1X1

    Agreement no:15

    item no: 1.12.1.4

    UPS Power Panel

    INCOMER

    1no, 50A, TPN MCB with 50A fuse backup 1 No.

    2 set Red/Green ON/OFF indicating lamps

    2 set of three White phase indicating lamps

    BUS BAR

    1 set of 50A TP & N Al Bus BarOUTGOING

    4nos, 32A DP MCB with 32A Fuse backup 4 Nos

    2nos, 40A DP MCB with 40A Fuse backup 2 Nos

    FLOOR I 1X1

    Agreement no:16

    item no: 1.12.1.5

    Floor AHU Panel

    INCOMER

    2 set Red/Green ON/OFF indicating lamps

    2 set of three White phase indicating lamps

    BUS BAR

    1 set of 100A TP & N Al Bus Bar

    OUTGOING

    32A, TPN MCB with 32A fuse backup. 6 Nos.

    Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-511-3 and specification attached

    Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-511-3 and specification attached

    Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-502 and specification attached

    100A, TP& N fixed type MCCB of 25A rating with over current and short circuitreleases 1 No.

    63A, TP& N fixed type MCCB of 25A rating with over current and short circuitreleases 1 No.

  • 8/8/2019 Copy of Measurement Book 20.7

    3/76

    25A, TPN MCB with 25A fuse backup. 1 No.

    FLOOR I 1X1

    Agreement no:17

    item no: 1.12.1.6

    LIBRARY AHU PANEL

    INCOMER

    50A, TPN MCB 1 No.

    2 set Red/Green ON/OFF indicating lamps

    2 set of three White phase indicating lamps

    BUS BAR

    1 set of 50A TP & N Al Bus Bar

    OUTGOING

    32A, TPN MCB with 32A fuse backup. 6 Nos.

    FLOOR I 1X1

    Agreement no:18

    item no: 1.12.2.1

    Floor Lighting Panel

    INCOMER50A TPN MCB with 50A backup fuse 1 No

    2 set Red/Green ON/OFF indicating lamps

    2 set of three White phase indicating lamps

    BUS BAR

    1set of 50A TP & N Al Bus Bar

    OUTGOING

    25A TPN MCB with 25A backup fuse 5 Nos

    FLOOR I 1X1

    Agreement no:19

    item no: 1.12.2.2Floor Emergency Lighting

    INCOMER

    25A, TPN MCB 1 No.

    2 set Red/Green ON/OFF indicating lamps

    2 set of three White phase indicating lamps

    BUS BAR

    1 set of 25A TP & N Al Bus Bar

    Supply, Installation, Testing and Commissioning of Medium Voltage Floor mounting

    panel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-502 and specification attached

    Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-512-1 and specification attached

    Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-512-1 and specification attached

  • 8/8/2019 Copy of Measurement Book 20.7

    4/76

    16A DP MCB 4 Nos.

    20A DP MCB 1 No.

    FLOOR II 1X1

    Agreement no:20

    item no: 1.12.2.3

    Floor Power Panel

    INCOMER

    1no, 40A, TPN MCB with 40A fuse backup 1 No.

    2 set Red/Green ON/OFF indicating lamps

    2 set of three White phase indicating lamps

    BUS BAR

    1 set of 40A TP & N Al Bus Bar

    OUTGOING

    25A DP MCB with 25A Fuse backup 4 Nos.

    32A TPN MCB with 32A Fuse backup 2 Nos.

    FLOOR II 1X1

    Agreement no:21

    item no: 1.12.2.4

    UPS Power Panel

    INCOMER

    1no, 40A, TPN MCB with 40A fuse backup 1 No.

    2 set Red/Green ON/OFF indicating lamps

    2 set of three White phase indicating lamps

    BUS BAR

    1 set of 40A TP & N Al Bus Bar

    OUTGOING

    25A DP MCB with 25A fuse backup 4 Nos.

    32A TPN MCB with 32A fuse backup 2 Nos.FLOOR II 1X1

    Agreement no:22

    item no: 1.12.2.5

    Floor AHU Panel

    INCOMER

    2 set Red/Green ON/OFF indicating lamps

    Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-512-3 and specification attached

    Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-512-3 and specification attached

    Supply, Installation, Testing and Commissioning of Medium Voltage Floor mountingpanel sutiable for 415V, 3 phase, 50Hz power distribution system with the followingmounting complete as per drawing no. L206-E-502 and specification attached

    1 no. 63A, TP& N fixed type MCCB of 25A rating with over current and short circuitreleases 1 No.

  • 8/8/2019 Copy of Measurement Book 20.7

    5/76

    2 set of three White phase indicating lamps

    BUS BAR

    1 set of 63A TP & N Al Bus Bar

    OUTGOING

    32A, TPN MCB with 32A fuse backup. 6 Nos.

    25A, TPN MCB with 25A fuse backup. 1 No.

    FLOOR II 1X1DISTRIBUTION BOARDS

    Various distribution boards as given below:

    Agreement no:39

    Item no:1.1

    INCOMER1# 32A TPN MCB 1 No.

    25 DP ELMCB (30mA) 3 Nos.

    Supply, installation, testing & commissioning of front operated front access cubicaltype indoor duty dead front wall / recess/ surface mounting, totally enclosed dustand vermin proof ( minimum protection IP 54 ) panels with foamed-in neoprenegasketted hinged doors, fabricated from 2 mm thick CRCA with powder coatedfinish suitable for 415 V, 3-phase, 4 wire, 50 Hz system including suitably ratedinsulated copper busbars, interconnections, neutral bar assembly, phasesegregating barriers, LED indicating lamps for incoming and outgoing feeders,15%spare space for future expansion, knockouts and gland plates for entry of cablesand conduits, all internal wiring using high temperature FRLS wires, independant

    terminals for each phase, earthing terminals and including the cost of providingMaster key lock on the door and pad locking facility on door as well as at incomer ,bonding to earth etc. complete as per specification, drawings as required and asunder:

    MCBs shall conform to IEC898/IS 8828-1996 and , with breaking capacity 9/10kA,powerloss 40-70% of the stipulated value and suitable for magnetic releases

    operating between 1 to 5 In for normal power distribution application and 5 to 10 Infor motor application duty with minimum Electrical endurance of the order of 20000operation cycles

    Residual current circuit breaker (RCCB) conforming to IS 12640 / IEC 601008-1shall be provided with 30 mA sensitivity and electrically connected rated currentcapacity MCB for short circuit and over load protection as required

    All incomer MCBs of boards /panels shall be provided with NO/NC contacts asspecified in specifications and drawings

    All the contactors shall be provided with potential free contacts for remotemonitoring.

    Lighting distribution board - LDB-5/Floor-1, LDB-1/ Floor - 2 as perspecification and as per following details.

    One lighting distribution board (LDB) unit with respective incoming TPN MCBs, DPRCCBs and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :

  • 8/8/2019 Copy of Measurement Book 20.7

    6/76

    1 set of (ON) indicating lamps.

    OUTGOINGS

    6A SPMCB arranged in three rows and each feeder (ON) indication lamps. 36 Nos

    FLOOR II

    PART PLAN-I 1X1

    PART PLAN-IV 1X1Agreement no:40

    Item no:1.2

    INCOMER

    25A TPN MCB 1 No

    20A DP ELMCB (30mA) 3 No1 set of (ON) indicating lamps.

    OUTGOINGS

    FLOOR II

    PART PLAN-I 1X1

    Agreement no:45

    Item no:1.7

    INCOMER

    25A TPN MCB 1 No

    16A DP ELMCB (30mA) 3 Nos

    1 set of (ON) indicating lamps.

    OUTGOINGS

    6A SPMCB arranged in three rows and with feeder (ON) indication lamps. 24 Nos

    FLOOR I

    PART PLAN-III 1X1

    Agreement no:48

    Item no:1.10

    INCOMER

    Lighting distribution boards East (LDB) LDB-1 / floor - 3 as per specificationand as per following details.

    One lighting distribution board (LDB) unit with respective incoming TPN MCBs, DPRCCB and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :

    36 Nos of 6A SPMCB arranged in three rows and each row controlled by one no.20A DP ELMCB with feeder (ON) indication lamps. 36 Nos.

    Lighting distribution board - (LDB) as per specification and as per followingdetails.

    One lighting distribution board (LDB) unit with respective incoming TPN MCBs, DPRCCBs and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :

    Lighting distribution boards - (LDB) LDB-3/Floor-2, LDB-6/ Floor - 1 as perspecification and as per following details.

    One lighting distribution board (LDB) unit with respective incoming TPN MCBs, DPRCCBs and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :

  • 8/8/2019 Copy of Measurement Book 20.7

    7/76

    20A TPN MCB 1 No

    16A DP ELMCB (30mA) 3 Nos

    1 set of (ON) indicating lamps.

    OUTGOINGS

    6A SPMCB arranged in three rows and feeder (ON) indication lamps. 18 Nos

    FLOOR IIPART PLAN-III 1X1

    Agreement no:49

    Item no:1.11

    INCOMER

    20A TPN MCB 1 No16A DP ELMCB (30mA) 3 Nos

    1 set of (ON) indicating lamps. 1 No

    OUTGOINGS

    6A SPMCB arranged in three rows and with feeder (ON) indication lamps. 12 Nos

    FLOOR I

    LIBRARY 1X1

    FLOOR II

    PART PLAN-III 1X1

    Agreement no:56Item no:1.18

    INCOMER

    16A DP ELMCB (30mA) 1 No

    1 set of (ON) indicating lamps.OUTGOINGS

    6A SPMCB with feeder (ON) indication lamps. 6 Nos

    FLOOR I

    PART PLAN-III 1X1

    FLOOR II

    PART PLAN-II 1X1

    Agreement no:57

    Item no:1.19

    Lighting distribution boards - (LDB) LDB-4/Floor-4 as per specification andas per following details.

    One lighting distribution board (LDB) unit with respective incoming TPN MCBs, DPRCCBs and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :

    Emergency Lighting distribution boards - (ELDB) ELDB-3/Floor- 1as perspecification and as per following details.

    One Emergency lighting distribution board (ELDB) unit with respective incoming DPRCCBs and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :

    Emergency Lighting distribution boards - (ELDB) ELDB-4/Floor- 1, ELDB-1/Floor-2, ELDB-3/Floor -3, ELDC-1/ Floor - 4 as per specification and as perfollowing details.

  • 8/8/2019 Copy of Measurement Book 20.7

    8/76

    INCOMER

    10A DP ELCB 1 No

    1 set of (ON) indicating lamps.

    OUTGOINGS

    6A SPMCB with feeder (ON) indication lamps. 6 Nos

    FLOOR I

    PART PLAN-IV 1X1

    FLOOR II

    PART PLAN-I 1X1

    Agreement no:58

    Item no:1.20

    INCOMER

    25A TPN MCB 1 No

    20A DP ELMCB (30mA) 3 Nos

    1 set of (ON) indicating lamps.

    OUTGOINGS

    16A SPMCB arranged in three rows and with feeder (ON) indication lamps 18 Nos

    FLOOR I

    PART PLAN-IV 1X1

    Agreement no:63

    Item no:1.25

    INCOMER

    20A DP ELMCB (30mA) 1 No

    1 set of (ON) indicating lamps.

    OUTGOINGS

    16A SPMCB with feeder (ON) indication lamps 6 Nos

    FLOOR I

    PART PLAN-II 1X1

    PART PLAN-III 1X1

    Agreement no:64

    Item no:1.26

    One Emergency Lighting distribution board (ELDB) unit with respective incoming DPRCCBs and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :

    Power distribution boards - (PDB) PDB-2/Floor- 2, PDB-2/Floor -4, as perspecification and as per following details.

    One Power distribution board (PDB) unit with respective incoming TPN MCBs, DPRCCB and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :

    Power distribution boards - (PDB) PDB-3/Floor- 2, PDB-3 / Floor -2, PDB-1/Floor- 3, PDB-4/Floor-3, PDB-1/Floor-4, PDB-3/Floor-4, PDB-1/Floor-5 as perspecification and as per following details.

    One Power distribution board (PDB) unit with respective incoming DP RCCB andoutgoing SP MCBs each having indications for incoming & outgoing feeder status asper specifications and as under :

  • 8/8/2019 Copy of Measurement Book 20.7

    9/76

    INCOMER

    25A TPN MCB 1 No

    20A DP ELMCB (30mA) 1 NO

    1 set of (ON) indicating lamps.

    OUTGOINGS

    16A SPMCB arranged in three rows with feeder (ON) indication lamps. 24 Nos

    FLOOR I

    PART PLAN-III 1X1

    FLOOR II

    PART PLAN-III 1X1

    Agreement no:67Item no:1.29

    INCOMER

    32A TPN MCB 1 No

    20A DP ELMBC (30mA) 3 Nos

    1 set of (ON) indicating lamps.

    OUTGOINGS

    16A SPMCB arranged in three rows with feeder (ON) indication lamps. 12 Nos

    FLOOR I

    PART PLAN-I 1X1

    FLOOR II

    PART PLAN-I 1X1

    Agreement no:68

    Item no:1.30

    INCOMER

    25A TPN MCB 1 NO

    20A DP ELMBC (30mA) 3 Nos

    1 set of (ON) indicating lamps.

    OUTGOINGS

    16A SPMCB arranged in three rows with feeder (ON) indication lamps. 12 Nos

    FLOOR II

    UPS Power distribution boards - (UPDB) UPDB-2/Floor- 1 as per specificationand as per following details.

    One Power distribution board (UPDB) unit with respective incoming TPN MCBs, DPRCCB and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :

    UPS Power distribution boards - (UPDB) as per specification and as perfollowing details.

    One Power distribution board (UPDB) unit with respective incoming TPN MCBs, DPRCCB and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :

    UPS Power distribution boards - (UPDB) UPDB-1/ Floor -3 as per specificationand as per following details.

    One Power distribution board (UPDB) unit with respective incoming TPN MCBs, DPRCCB and outgoing SP MCBs each having indications for incoming & outgoingfeeder status as per specifications and as under :

  • 8/8/2019 Copy of Measurement Book 20.7

    10/76

    PART PLAN-I 1X1

    PART PLAN-II 1X1

    PART PLAN-III 1X1

    Agreement no:71

    Item no:1.33

    INCOMER

    25A DP ELMCB (30mA) 1 NO

    1 set of (ON) indicating lamps.

    OUTGOINGS

    16A SPMCB arranged with feeder (ON) indication lamps. 8 Nos

    FLOOR IIPART PLAN-IV 1X1

    MV CABLING : E.03

    Cable Laying Item:1.1

    Agreement no:78

    Item no:1.1

    3 core 6 sq mm CU Conductor

    FLOOR-I

    PART PLAN I

    ELDB to floor -1 Emergency panel 126x1

    PART PLAN II

    ELDB to floor -1 Emergency panel 81x1PART PLAN III

    ELDB to floor -1 Emergency panel 20x1

    PART PLAN IV

    ELDB to floor -1 Emergency panel 53x1

    FLOOR-II

    PART PLAN I

    ELDB to floor -2 Emergency panel 70x1

    Agreement no:79

    Item no:1.1

    3 core 10 sq mm CU ConductorFLOOR-I

    PART PLAN I

    UPS Power distribution boards - (UPDB) as per specification and as per

    following details.One Power distribution board (UPDB) unit with respective incoming DP RCCB andoutgoing SP MCBs each having indications for incoming & outgoing feeder status asper specifications and as under :

    Supply, laying testing and commissioning of 1100 V grade, armoured, FRLS, PVC,aluminium(AL.)/ Copper (CU) conductor cables on existing trays/walls/columns/indoor/ trenches including the cost of supports with suitable clamps, saddles, hooks,bolts etc. and including the cost of proper dressing of cables, markers providingidentification tags,earthing of glands armouring etc. complete as per specifications,as required and as below. (Note: All cables 16sqmm and above are AL conductorunless specified otherwise.

  • 8/8/2019 Copy of Measurement Book 20.7

    11/76

    PDB to floor-1 power panel 125x1

    PART PLAN II

    PDB to floor-1 power panel 80x1

    PART PLAN III

    PDB to floor-1 power panel 20x1

    FLOOR-II

    PART PLAN IIPDB to floor-2 power panel 117x1

    Agreement no:80

    Item no:1.1

    3 core 16 sq mm CU Conductor

    FLOOR-II

    PART PLAN IV

    UPDB to floor -2 ups power panel 22x1

    Agreement no:84

    Item no:1.1

    4 core 10 sq mm CU Conductor

    FLOOR-I

    PART PLAN I

    UPBD to floor-1 ups power panel 151x1

    PDB to floor-1 power panel 95x1

    PART PLAN II

    LDB to floor -1 lighting power panel 101x1

    UPBD to floor-1 ups power panel 117x1

    PART PLAN III

    LDB to floor -1 lighting power panel 45x1

    LIBRARY

    LDB to floor -1 lighting power panel 82x1

    FLOOR-II

    PART PLAN II

    PDB to floor-2 power panel 116x1

    PART PLAN III

    ELDB to floor-2 emergency power panel 54x1

    Agreement no:85

    Item no:1.1

    4 core 16 sq mm CU Conductor

    FLOOR-I

    PART PLAN I

    LDB to floor -1 lighting power panel 143x1

    PART PLAN III

    UPBD to floor-1 ups power panel 53x1

    PDB to floor -1 power panel 22x1

    PART PLAN IV

    LDB to floor -1 lighting power panel 17x1

    PDB to floor -1 power panel 52x1

    UPBD to floor-1 ups power panel 22x1

    FLOOR-II

    PART PLAN I

  • 8/8/2019 Copy of Measurement Book 20.7

    12/76

    LDB to floor-2 lighting panel 62x1

    PDB to floor -2 power panel 63x1

    UPBD to floor-2 ups power panel 77x1

    PDB to floor -2 power panel 86x1

    PART PLAN III

    LDB to floor -2 lighting power panel 47x1

    PDB to floor -2 power panel 46x1UPBD to floor-2 ups power panel 54x1

    PART PLAN IV

    LDB to floor -2 lighting power panel 21x1

    CABLE TERMINATION Item:1.2

    Agreement no:97

    Item no:1.2

    3 core 6 sq mm CU Conductor

    FLOOR-I

    PART PLAN I

    ELDB to floor -1 Emergency panel 2X1

    PART PLAN II

    ELDB to floor -1 Emergency panel 2X1

    PART PLAN III

    ELDB to floor -1 Emergency panel 2X1PART PLAN IV

    ELDB to floor -1 Emergency panel 2X1

    FLOOR-II

    PART PLAN I

    ELDB to floor -2 Emergency panel 2X1

    Agreement no:98

    Item no:1.2

    3 core 10 sq mm CU Conductor

    FLOOR-I

    PART PLAN IPDB to floor-1 power panel 2X1

    PART PLAN II

    PDB to floor-1 power panel 2X1

    PART PLAN III

    PDB to floor-1 power panel 2X1

    FLOOR-II

    PART PLAN II

    PDB to floor-2 power panel 2X1

    Agreement no:99

    Item no:1.23 core 16 sq mm CU Conductor

    FLOOR-II

    Cable termination of cables as per item no. 1.1 above including the cost of supplyingand fixing crimping lugs, double compression brass glands, insulation tape etc.complete as per specifications, as required and as below.

  • 8/8/2019 Copy of Measurement Book 20.7

    13/76

    PART PLAN IV

    UPDB to floor -2 ups power panel 2X1

    Agreement no:103

    Item no:1.2

    4 core 10 sq mm CU Conductor

    FLOOR-I

    PART PLAN IUPBD to floor-1 ups power panel 2X1

    PDB to floor-1 power panel 2X1

    PART PLAN II

    LDB to floor -1 lighting power panel 2X1

    UPBD to floor-1 ups power panel 2X1

    PART PLAN III

    LDB to floor -1 lighting power panel 2X1

    LIBRARY

    LDB to floor -1 lighting power panel 2X1

    FLOOR-IIPART PLAN II

    PDB to floor-2 power panel 2X1

    PART PLAN III

    ELDB to floor-2 emergency power panel 2X1

    Agreement no:104

    Item no:1.2

    4 core 16 sq mm CU Conductor

    FLOOR-I

    PART PLAN I

    LDB to floor -1 lighting power panel 2X1

    PART PLAN III

    UPBD to floor-1 ups power panel 2X1

    PDB to floor -1 power panel 2X1

    PART PLAN IV

    LDB to floor -1 lighting power panel 2X1

    PDB to floor -1 power panel 2X1

    UPBD to floor-1 ups power panel 2X1

    FLOOR-II

    PART PLAN I

    LDB to floor-2 lighting panel 2X1

    PDB to floor -2 power panel 2X1

    UPBD to floor-2 ups power panel 2X1

    PDB to floor -2 power panel 2X1

    PART PLAN III

    LDB to floor -2 lighting power panel 2X1

    PDB to floor -2 power panel 2X1

    UPBD to floor-2 ups power panel 2X1

    PART PLAN IV

    LDB to floor -2 lighting power panel 2X1

    Cable Trays

    Item no:2.1

  • 8/8/2019 Copy of Measurement Book 20.7

    14/76

    Agreement no:115

    Item no:2.1

    300 mm x 50 mm x 1.6mm

    FLOOR I 222x1

    FLOOR II 216X1

    CONDUIT WIRING

    SIS to Agreement No:1

    a) First point controlled by one 5A switch / 6A MCB

    Supply, fabrication & installation of perforated hot dipped galvanised double bendedcable trays from 2 mm thick GI sheets continuously connected including horizontaland vertical bends, reducers, tees, and other accessories and duly suspended fromthe ceiling with 12 mm dia vertical GI rods supported by 40mm x 40 mm 5 mm GIangle etc. complete as per specifications, as required and as below.

    Supply and laying of conduit wiring for the following / ceiling fan / exhaust fan /bracket fan point with 3 X 2.5 sq.mm 1000V grade PVC insulator FRLS copperconductor wires in heavy gauge GI conduit surface run with GI saddles / concelledin wall below false ceiling with 25mm heavy guage PVC conduits including chases

    and complete with other accessories etc. including insulated protectivity earth (PE)conductor adn earthing of switch boxes excluding the cost of switches / sockets adnswitch boxes. All walldrops should be concealed with heavy guage PVC conduitpipes, as specified and as under

  • 8/8/2019 Copy of Measurement Book 20.7

    15/76

  • 8/8/2019 Copy of Measurement Book 20.7

    16/76

    SIS to Agreement No: 2

  • 8/8/2019 Copy of Measurement Book 20.7

    17/76

    Secondary or looping points

    wiring as specified in 1.1 above

    using 3x2.5 copper (P+N+PE) wires

    in 25 dia GI conduit for lights,

    fans, socket outletsincluding

    providing terminal block, ceiling rose

    & other accessories etc as required

    (exlcuding the cost of switches,

    sockets and switch boxes) as per

    specifications and drawings as required.

    SIS to Agreement No:3

    First socket outlet point controlled by one 15A switch / 16A MCB

    SIS to Agreement No:4

    SIS to Agreement No:5

    aFirst socket outlet point controlled by one 15A / 16A MCBswitch / 16A MCB.

    Supply & laying of conduit and wiring for the following 5 /15A socket outlet pointwith 3 x 2.5 sq. mm , 1100 Volt grade PVC insulated FRLS copper condutor wires inheavy gauge GI conduit surface run with GI saddles / concealled in walls belowfalse ceiling with 25mm heavy guage PVC conduits including chases and complete

    with other accessories etc. including insulated protective earth (PE) conductor andearthing of switch boxes excluding the cost of switches / sockets and switch boxes.All wa;ll drops should be concealed with heavy guage PVC conduits pipes asspecified and as under

    Secondary or looping 5 / 15A socket outlet points wiring as specified in 1.5 aboveusing 3 x 2.5 sq. mm copper (P+N+PE) wires in 25 dia GI conduit in ceiling andconcelled in walls below false ceiling with 25mm heavy guage PVC conduits forsocket outlets including providing terminal block, ceiling rose and other accessoriesetc as required (excluding the cost of switches, sockets and switch boxes) as perspecifications and drawings as required

    Supply & laying of conduit and wiring for the following 5 /15A socket outlet pointwith 3 x 2.5 sq. mm, 1100 Volt grade PVC insulated FRLS copper condutor wires inheavy gauge GI conduit surface run with GI saddles / concelled in walls below falseceiling with 25mm heavy guage PVC conduits including chases and complete withother accessories etc. including insulated protective earth (PE) conductor andearthing of switch bozes exluding the cost of switches / sockets and switch boxes.All wall drops should be concealled with heavy guarge PVC conduits pipes asspecified and as under

  • 8/8/2019 Copy of Measurement Book 20.7

    18/76

    SIS to Agreement No:6

    Item No:2.0

    Agreement no:122

    Item no:2.1

    1 # 5A modular switch

    Agreement no:123

    Item no:2.2

    1# 5A switch & 1 # 5A socket

    Agreement no:124

    Item no:2.3

    5/15 Amp Universal socket with 15 amp modular switch

    Agreement no:125

    Item no:2.4

    5/15A Socket with switch control (UPS)

    Agreement no:126

    Item no:2.5

    Agreement no:127

    Item no:2.6

    3# 5A socket with switch control, neon indication lamp, surge protector.

    INDOOR LIGHTING AND FANS :E.05

    Item no:1.0

    Secondary or looping socket outlet points wiring as specified in 1.5 above using 2 x2.5 (Pipe) + 1 x 4(N) ) sq. mm copper (P+N+PE) wires in 25 dia GI conduit withceiling and concelled in walls below false ceiling with 25mm heavy guage PVCconduits for sockets outlet including providing terminal block, ceiling rose and otheraccessories etc. as required (excluding the cost of switches / socket and switch

    boxes as specifications and drawings as required

    Supply& installation of following modular grid plat mounted switch/es and socket/setc. on a suitable size mild steel electrogalvanised switch boxes complete in singleor combination on prorata basis complete with the connections, earthing and testingas per specifications and as required:(NOte the grid plate and MS BOX shall beselected suitably as per the requirement to fix the switches and sockets.

    3# 5A socket with switch control, neon indication lamp, surge protector & 16A DPELCB (primary point)

  • 8/8/2019 Copy of Measurement Book 20.7

    19/76

    Agreement no:129

    Item no:1.2

    Agreement no:130

    Item no:1.3

    Agreement no:131

    Item no:1.4

    Item no:2.0

    BRACKET FANS

    Agreement no:137

    Item no:2.2

    Exhaust Fan - 300dia, 1200cmh

    PROTECTIVE EARTHING E.06

    Item no:1.0

    Item no:2.0

    Supply, installation, testing & commissioning of light fittings including all accessoriese.g. ballast, HPF condensors, lamps, holders, surface/recess mountingarrangement etc. including necessary supports, accessories and hardware as perspecifications & as required at site and as below:

    2x36 watt recess mounted fluorescent mirror optic luminaries with digital dimminghigh frequency ballast of specification as mentioned in note below, Philips(Cat. No.WCP 10236 dsi) or equivalent with 36W Trulite / lumilux fluorescent lamps and otheraccessories etc. as required.

    1X36 watt surface mounted fluorescent tube mirror optic Luminaire with Philips /Wipro(Cat. No. WVF 41136 dsi)/ Keselec-Schreder(Cat. No. C-T Lux 136 HFD) orequivalent with 36W Trulite / lumilux fluorescent lamps and other accessories etc. as

    required.

    1 X36 watt fluorescent tube, wall mounting Luminaire with digital dimming highfrequency ballast of specification as mentioned in note below and opal/clear acrylicdiffuser, Philips(Cat. No. TCS 19/136) / Wipro(Cat. No. WRF 21136 dsi)/ Keselec-Schreder(KDF 136 HFD) or equivalent with 36W Trulite / lumilux fluorescent lampsand other accessories etc. as required.

    Providing and making pipe earthing station including the cost of 50dia heavy classG.I 3m long with 10mm perforation, CI funnel with wiremesh charcoal/coke , salt, allearth work, masonry enclosure with frame, hinged cover plate having lockingarrangement, Disconnecting links, complete as per IS 3043:1987 for earthing.

  • 8/8/2019 Copy of Measurement Book 20.7

    20/76

    Agreement no:142

    Item no:2.4

    35 mm x 4 mm Cu strip

    Agreement no:151

    Item no:2.13

    12mm x 12mm Cu strip

    Supply and laying,Testing and commissioning of copper/GI Strips/wire forinterconnecting the earthing stations ,panels,DBs etc. of the following sizes in builtup trenches /surface/wall/ground complete with holes & fixing,jointing / terminatingaccessories as per specifications & drawing as required. (Quantity shall be paid asper the approved drawings as executed, however direct measurement shall notexcced the quantity indicated in drawing approved .

    Note :- In case of non availability of any of the sizes mentioned above, next higher

    size available in market shall be provided at the same rate.

  • 8/8/2019 Copy of Measurement Book 20.7

    21/76

  • 8/8/2019 Copy of Measurement Book 20.7

    22/76

    CONTENTS AREA OR VOLUME REMARKS AG NO

    12 F-I

    12 F-I

    12 F-I

    12 F-I

    12 F-I

    12 F-I

    12 F-I

    12 F-I

    12 F-I

    12 F-I

    12 F-I

    12 F-I

    12 F-I

    12 F-I

    12 F-I

    1 No 12 F-I

    13 F-I

    13 F-I

    13 F-I

    13 F-I

    13 F-I

    13 F-I

    13 F-I13 F-I

    13 F-I

    13 F-I

    13 F-I

    13 F-I

    13 F-I

    1 No 13 F-I

    14 F-I

    14 F-I

    14 F-I

    araj Medical College at Kadhirkamam, Puducherry

  • 8/8/2019 Copy of Measurement Book 20.7

    23/76

    14 F-I

    14 F-I

    14 F-I

    14 F-I

    14 F-I

    14 F-I

    14 F-I

    14 F-I

    14 F-I

    1 No 14 F-I

    15 F-I

    15 F-I

    15 F-I

    15 F-I

    15 F-I

    15 F-I

    15 F-I

    15 F-I

    15 F-I

    15 F-I15 F-I

    15 F-I

    15 F-I

    1 No 15 F-I

    16 F-I

    16 F-I

    16 F-I

    16 F-I

    16 F-I

    16 F-I

    16 F-I

    16 F-I

    16 F-I

    16 F-I

    16 F-I

    16 F-I

    16 F-I

  • 8/8/2019 Copy of Measurement Book 20.7

    24/76

    16 F-I

    1 No 16 F-I

    17 F-I

    17 F-I

    17 F-I

    17 F-I

    17 F-I

    17 F-I

    17 F-I

    17 F-I

    17 F-I

    17 F-I

    17 F-I

    17 F-I

    1 No 17 F-I

    18 F-II

    18 F-II

    18 F-II

    18 F-II

    18 F-II18 F-II

    18 F-II

    18 F-II

    18 F-II

    18 F-II

    18 F-II

    18 F-II

    1 No 18 F-II

    19 F-II

    19 F-II19 F-II

    19 F-II

    19 F-II

    19 F-II

    19 F-II

    19 F-II

    19 F-II19 F-II

    19

  • 8/8/2019 Copy of Measurement Book 20.7

    25/76

    19 F-II

    19 F-II

    1 No 19 F-II

    20 F-II

    20 F-II

    20 F-II

    20 F-II

    20 F-II

    20 F-II

    20 F-II

    20 F-II

    20 F-II

    20 F-II

    20 F-II

    20 F-II

    20 F-II

    1 No 20 F-II

    21 F-II

    21 F-II

    21 F-II

    21 F-II

    21 F-II

    21 F-II

    21 F-II

    21 F-II

    21 F-II

    21 F-II

    21 F-II

    21 F-II

    21 F-II1 No 21 F-II

    22 F-II

    22 F-II

    22 F-II

    22 F-II

    22 F-II

    22 F-II

    22 F II

  • 8/8/2019 Copy of Measurement Book 20.7

    26/76

    22 F-II

    22 F-II

    22 F-II

    22 F-II

    22 F-II

    22 F-II

    1 No 22 F-II23 LDB

    23 LDB

    23 LDB

    23 LDB

    23 LDB

    23 LDB

    23 LDB

    23 LDB

    23 LDB

    39 LDB

    39 LDB

    39 LDB

    39 LDB

    39 LDB39 LDB

    39 LDB

  • 8/8/2019 Copy of Measurement Book 20.7

    27/76

    39 LDB

    39 LDB

    39 LDB

    39 LDB

    1 No 39 LDB

    1 No 39 LDB40 LDB

    40 LDB

    40 LDB

    40 LDB

    40 LDB

    40 LDB

    40 LDB40 LDB

    40 LDB

    40 LDB

    40 LDB

    1 No 40 LDB

    45 LDB

    45 LDB

    45 LDB

    45 LDB

    45 LDB

    45 LDB

    45 LDB

    45 LDB

    45 LDB

    45 LDB

    45 LDB

    1 No 45 LDB

    48 LDB

    48 LDB

    48 LDB

    48 LDB

    48 LDB

  • 8/8/2019 Copy of Measurement Book 20.7

    28/76

    48 LDB

    48 LDB

    48 LDB

    48 LDB

    48 LDB

    1 No 48 LDB

    49 LDB

    49 LDB

    49 LDB

    49 LDB

    49 LDB

    49 LDB49 LDB

    49 LDB

    49 LDB

    49 LDB

    49 LDB

    1 No 49 LDB

    49 LDB

    1 No 49 LDB

    56 ELDB56 ELDB

    56 ELDB

    56 ELDB

    56 ELDB

    56 ELDB

    56 ELDB56 ELDB

    56 ELDB

    56 ELDB

    1 No 56 ELDB

    56 ELDB

    1 No 56 ELDB

    57 ELDB

    57 ELDB

    57 ELDB

  • 8/8/2019 Copy of Measurement Book 20.7

    29/76

    57 ELDB

    57 ELDB

    57 ELDB

    57 ELDB

    57 ELDB

    57 ELDB

    57 ELDB

    1 No 57 ELDB

    57 ELDB

    1 No 57 ELDB

    58 PDB

    58 PDB

    58 PDB

    58 PDB

    58 PDB

    58 PDB

    58 PDB

    58 PDB

    58 PDB

    58 PDB

    58 PDB

    1 No 58 PDB

    63 PDB

    63 PDB

    63 PDB

    63 PDB

    63 PDB

    63 PDB

    63 PDB

    63 PDB

    63 PDB

    63 PDB

    1 No 63 PDB

    1 No 63 PDB

    64 UPDB

    64 UPDB

  • 8/8/2019 Copy of Measurement Book 20.7

    30/76

    64 UPDB

    64 UPDB

    64 UPDB

    64 UPDB

    64 UPDB

    64 UPDB

    64 UPDB

    64 UPDB

    64 UPDB

    1 No 64 UPDB

    64 UPDB

    1 No 64 UPDB

    67 UPDB67 UPDB

    67 UPDB

    67 UPDB

    67 UPDB

    67 UPDB

    67 UPDB

    67 UPDB67 UPDB

    67 UPDB

    67 UPDB

    1 No 67 UPDB

    67 UPDB

    1 No 67 UPDB

    68 UPDB

    68 UPDB

    68 UPDB

    68 UPDB

    68 UPDB

    68 UPDB

    68 UPDB

    68 UPDB

    68 UPDB

    68 UPDB

    68 UPDB

  • 8/8/2019 Copy of Measurement Book 20.7

    31/76

    1 No 68 UPDB

    1 No 68 UPDB

    1 No 68 UPDB

    71 UPDB

    71 UPDB

    71 UPDB

    71 UPDB

    71 UPDB

    71 UPDB

    71 UPDB

    71 UPDB

    71 UPDB

    71 UPDB1 No 71 UPDB

    74

    74

    74

    78

    78

    78

    78

    78

    126 mtrs 78

    78

    81 mtrs 7878

    20 mtrs 78

    78

    53 mtrs 78

    78

    78

    70 mtrs 78

    79

    79

    7979

    79

  • 8/8/2019 Copy of Measurement Book 20.7

    32/76

    125 mtrs 79

    79

    80 mtrs 79

    79

    20 mtrs 79

    79

    79117 mtrs 79

    80

    80

    80

    80

    80

    22 mtrs 80

    84

    84

    8484

    84

    151 mtrs 84

    95 mtrs 84

    84

    101 mtrs 84

    117 mtrs 84

    84

    45 mtrs 84

    84

    82 mtrs 84

    84

    84

    116 mtrs 84

    84

    54 mtrs 84

    85

    85

    85

    85

    85

    143 mtrs 85

    85

    53 mtrs 85

    22 mtrs 85

    85

    17 mtrs 85

    52 mtrs 85

    22 mtrs 85

    85

    85

  • 8/8/2019 Copy of Measurement Book 20.7

    33/76

    62 mtrs 85

    63 mtrs 85

    77 mtrs 85

    86 mtrs 85

    85

    47 mtrs 85

    46 mtrs 8554 mtrs 85

    85

    21 mtrs 85

    85

    85

    86

    8697 3X6

    97 3X6

    97 3X6

    97 3X6

    97 3X6

    2 Nos 97 3X6

    97 3X6

    2 Nos 97 3X6

    97 3X6

    2 Nos 97 3X697 3X6

    2 Nos 97 3X6

    97 3X6

    97 3X6

    2 Nos 97 3X6

    98 3X10

    98 3X10

    98 3X10

    98 3X10

    98 3X102 Nos 98 3X10

    98 3X10

    2 Nos 98 3X10

    98 3X10

    2 Nos 98 3X10

    98 3X10

    98 3X10

    2 Nos 98 3X10

    99 3x16

    99 3x1699 3x16

    99 3x16

  • 8/8/2019 Copy of Measurement Book 20.7

    34/76

    99 3x16

    2 Nos 99 3x16

    103 4X10

    103 4X10

    103 4X10

    103 4X10

    103 4X102 Nos 103 4X10

    2 Nos 103 4X10

    103 4X10

    2 Nos 103 4X10

    2 Nos 103 4X10

    103 4X10

    2 Nos 103 4X10

    103 4X10

    2 Nos 103 4X10

    103 4X10

    103 4X10

    2 Nos 103 4X10

    103 4X10

    2 Nos 103 4X10

    104 4X16

    104 4X16

    104 4X16

    104 4X16

    104 4X16

    2 Nos 104 4X16

    104 4X16

    2 Nos 104 4X16

    2 Nos 104 4X16

    104 4X16

    2 Nos 104 4X16

    2 Nos 104 4X16

    2 Nos 104 4X16

    104 4X16

    104 4X16

    2 Nos 104 4X16

    2 Nos 104 4X16

    2 Nos 104 4X16

    2 Nos 104 4X16

    104 4X16

    2 Nos 104 4X16

    2 Nos 104 4X16

    2 Nos 104 4X16

    104 4X16

    2 Nos 104 4X16

    105

    105

  • 8/8/2019 Copy of Measurement Book 20.7

    35/76

    105

    115 300x50115 300x50

    115 300x50

    222 Mtrs 115 300x50

    216 Mtrs 115 300x50

    1 SIS

    1 SIS

    1 SIS

    1 SIS

  • 8/8/2019 Copy of Measurement Book 20.7

    36/76

  • 8/8/2019 Copy of Measurement Book 20.7

    37/76

    1 SIS

    1 SIS

    2 SIS

  • 8/8/2019 Copy of Measurement Book 20.7

    38/76

    2 SIS

    2 SIS

    2 SIS

    2 SIS

    2 SIS

    2 SIS

    2 SIS2 SIS

    2 SIS

    2 SIS

    2 SIS

    2 SIS

    3 SIS

    3 SIS

    3 SIS

    3 SIS

    3 SIS

    4 SIS

    4 SIS

    4 SIS

    4 SIS

    5 SIS

    5 SIS

    5 SIS5 SIS

    5 SIS

  • 8/8/2019 Copy of Measurement Book 20.7

    39/76

    5 SIS

    6 SIS

    6 SIS

    6 SIS

    6 SIS

    2

    2

    122 5A/SW

    122 5A/SW

    122 5A/SW

    122 5A/SW

    123 5A SW&SOC

    123 5A SW&SOC

    123 5A SW&SOC

    123 5A SW&SOC124

    124

    124

    124

    125

    125

    125

    125

    126

    126

    126

    126

    127

    127

    127

    127

    1

    1

    1

    15A SW&SOC RAW

    15A SW&SOC RAW

    15A SW&SOC RAW

    15A SW&SOC RAW

    15A SW&SOC UPS

    15A SW&SOC UPS

    15A SW&SOC UPS

    15A SW&SOC UPS

    SURGE PRI

    SURGE PRI

    SURGE PRI

    SURGE PRI

    SURGE SEC

    SURGE SEC

    SURGE SEC

    SURGE SEC

  • 8/8/2019 Copy of Measurement Book 20.7

    40/76

    1

    129 2X36 (SQUARE)

    129 2X36 (SQUARE)

    129 2X36 (SQUARE)

    129 2X36 (SQUARE)

    130 1X36(2 FEET)

    130 1X36(2 FEET)

    130 1X36(2 FEET)

    130 1X36(2 FEET)

    131 1X36(TOILET)

    131 1X36(TOILET)

    131 1X36(TOILET)131 1X36(TOILET)

    137

    137 EXHAUST FAN

    137 EXHAUST FAN

    137 EXHAUST FAN

    137 EXHAUST FAN

    FANS

    FANS

    FANS

    FANSEARTH ROD

    141 EARTH ROD

    EARTH ROD

    EARTH ROD

    COPPER PLATE

  • 8/8/2019 Copy of Measurement Book 20.7

    41/76

    COPPER PLATE142 COPPER PLATE

    142 COPPER PLATE

    142 COPPER PLATE

    142 COPPER PLATE

    151 COPPER PLATE

    151 COPPER PLATE

    151 COPPER PLATE

    151 COPPER PLATE

    151 COPPER PLATE

  • 8/8/2019 Copy of Measurement Book 20.7

    42/76

  • 8/8/2019 Copy of Measurement Book 20.7

    43/76

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANELPANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

  • 8/8/2019 Copy of Measurement Book 20.7

    44/76

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANELPANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

  • 8/8/2019 Copy of Measurement Book 20.7

    45/76

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANELPANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANELPANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

  • 8/8/2019 Copy of Measurement Book 20.7

    46/76

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANELPANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

  • 8/8/2019 Copy of Measurement Book 20.7

    47/76

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    PANEL

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DBDB

    DB

  • 8/8/2019 Copy of Measurement Book 20.7

    48/76

    DB

    DB

    DB

    DB

    DB

    DBDB

    DB

    DB

    DB

    DB

    DB

    DBDB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

  • 8/8/2019 Copy of Measurement Book 20.7

    49/76

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DBDB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DBDB

    DB

    DB

    DB

    DB

    DBDB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

  • 8/8/2019 Copy of Measurement Book 20.7

    50/76

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

  • 8/8/2019 Copy of Measurement Book 20.7

    51/76

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DBDB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

  • 8/8/2019 Copy of Measurement Book 20.7

    52/76

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DB

    DBDB

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYINGCABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYINGCABLE LAYING

    CABLE LAYING

  • 8/8/2019 Copy of Measurement Book 20.7

    53/76

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

  • 8/8/2019 Copy of Measurement Book 20.7

    54/76

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE LAYING

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATIONCABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATIONCABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATIONCABLE TERMINATION

    CABLE TERMINATION

  • 8/8/2019 Copy of Measurement Book 20.7

    55/76

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TERMINATION

    CABLE TRAY

    CABLE TRAY

  • 8/8/2019 Copy of Measurement Book 20.7

    56/76

    CABLE TRAY

    CABLE TRAY

    CABLE TRAY

    CABLE TRAY

    CABLE TRAY

    CABLE TRAY

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

  • 8/8/2019 Copy of Measurement Book 20.7

    57/76

  • 8/8/2019 Copy of Measurement Book 20.7

    58/76

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

  • 8/8/2019 Copy of Measurement Book 20.7

    59/76

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRINGCONDUIT WIRING

    CONDUIT WIRING

  • 8/8/2019 Copy of Measurement Book 20.7

    60/76

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    CONDUIT WIRING

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKETSWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    SWITCHES AND SOCKET

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

  • 8/8/2019 Copy of Measurement Book 20.7

    61/76

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANSINDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANS

    INDOOR LIGHTING & FANSPROTECTIVE EARTHING

    PROTECTIVE EARTHING

    PROTECTIVE EARTHING

    PROTECTIVE EARTHING

    PROTECTIVE EARTHING

  • 8/8/2019 Copy of Measurement Book 20.7

    62/76

    PROTECTIVE EARTHINGPROTECTIVE EARTHING

    PROTECTIVE EARTHING

    PROTECTIVE EARTHING

    PROTECTIVE EARTHING

    PROTECTIVE EARTHING

    PROTECTIVE EARTHING

    PROTECTIVE EARTHING

    PROTECTIVE EARTHING

    PROTECTIVE EARTHING

  • 8/8/2019 Copy of Measurement Book 20.7

    63/76

  • 8/8/2019 Copy of Measurement Book 20.7

    64/76

    FROM AGREEMENT VICE

    ITEM NO 1.1 PART PLAN-I LDB LDB FLOOR II 3P-12

    PART PLAN-IV LDB LDB FLOOR II 3P-12

    ITEM NO 1.2 PART PLAN-I LDB PDB FLOOR II 3P-12

    ITEM NO 1.7 PART PLAN-III LDB LDB FLOOR I 3P-8

    ITEM NO 1.10 PART PLAN-III LDB LDB FLOOR II 3P-6

    ITEM NO 1.11 LIBRARY LDB LDB FLOOR I 3P-4PART PLAN-III LDB ELDB FLOOR II 3P-4

    ITEM NO 1.18 PART PLAN-III ELDB ELDB FLOOR I 1P-6

    PART PLAN-II ELDB LDB FLOOR II 3P-4

    ITEM NO 1.19 PART PLAN-IV ELDB ELDB FLOOR I 1P-6

    PART PLAN-I ELDB ELDB FLOOR II 1P-6

    ITEM NO 1.20 PART PLAN-IV ELDB PDB FLOOR I 3P-6

    ITEM NO 1.25 PART PLAN-II PDB PDB FLOOR I 1P-6

    PART PLAN-III PDB PDB FLOOR I 1P-6

    ITEM NO 1.26 PART PLAN-III UPDB PDB FLOOR I 1P-6

    PART PLAN-III UPDB UPDB FLOOR II 3P-8ITEM NO 1.29 PART PLAN-I UPDB PDB FLOOR I 3p-4

    PART PLAN-I UPDB UPDB FLOOR II 3P-4

    ITEM NO 1.30 PART PLAN-I UPDB PDB FLOOR II 3p-4

    PART PLAN-II UPDB PDB FLOOR II 3p-4

    PART PLAN-III UPDB PDB FLOOR II 3p-4

    ITEM NO 1.35 PART PLAN-IV UPDB UPDB FLOOR II 1P-6

  • 8/8/2019 Copy of Measurement Book 20.7

    65/76

    SASI DONE

    SASI DONE

    SASI DONE

    SASI DONE

    SASI DONE

    SASI DONESASI DONE

    SASI DONE

    SASI DONE

    SASI DONE

    SASI DONE

    SASI DONE

    SASI DONE

    SASI DONE

    SASI DONE

    SASI DONESASI DONE

    SASI DONE

    SASI DONE

    SASI DONE

    SASI DONE

    SASI DONE

  • 8/8/2019 Copy of Measurement Book 20.7

    66/76

    4C-CU-16 LDB 143 FLOOR-I PART PLAN I

    3C-CU-6 ELDB 126 FLOOR-I PART PLAN I

    3C-CU-10 PDB 125 FLOOR-I PART PLAN I

    4C-CU-10 UPDB 151 FLOOR-I PART PLAN I

    4C-CU-10 PDB 95 FLOOR-I PART PLAN I

    4C-CU-10 LDB 101 FLOOR-I PART PLAN II3C-CU-6 ELDB 81 FLOOR-I PART PLAN II

    3C-CU-10 PDB 80 FLOOR-I PART PLAN II

    4C-CU-10 UPDB 117 FLOOR-I PART PLAN II

    4C-CU-10 LDB 45 FLOOR-I PART PLAN III

    3C-CU-6 ELDB 20 FLOOR-I PART PLAN III

    3C-CU-10 PDB 20 FLOOR-I PART PLAN III

    4C-CU-16 UPDB 53 FLOOR-I PART PLAN III

    4C-CU-16 PDB 22 FLOOR-I PART PLAN III

    4C-CU-16 LDB 17 FLOOR-I PART PLAN IV

    3C-CU-6 ELDB 53 FLOOR-I PART PLAN IV4C-CU-16 PDB 52 FLOOR-I PART PLAN IV

    4C-CU-16 UPDB 22 FLOOR-I PART PLAN IV

    4C-CU-10 LDB 82 FLOOR-I LIBRARY

    4C-CU-16 LDB 62 FLOOR-II PART PLAN I

    3C-CU-6 ELDB 70 FLOOR-II PART PLAN I

    4C-CU-16 PDB 63 FLOOR-II PART PLAN I

    4C-CU-16 UPDB 77 FLOOR-II PART PLAN I

    4C-CU-16 PDB 86 FLOOR-II PART PLAN I

    3C-CU-10 LDB 117 FLOOR-II PART PLAN II

    4C-CU-10 PDB 116 FLOOR-II PART PLAN II

    4C-CU-16 LDB 47 FLOOR-II PART PLAN III

    4C-CU-10 ELDB 54 FLOOR-II PART PLAN III

    4C-CU-16 PDB 46 FLOOR-II PART PLAN III

    4C-CU-16 UPDB 54 FLOOR-II PART PLAN III

    4C-CU-16 LDB 21 FLOOR-II PART PLAN IV

    3C-CU-16 UPDB 22 FLOOR-II PART PLAN IV

  • 8/8/2019 Copy of Measurement Book 20.7

    67/76

    LDB to floor -1 lighting power panel DONE

    ELDB to floor -1 Emergency panel DONE

    PDB to floor-1 power panel DONE

    UPBD to floor-1 ups power panel DONE

    PDB to floor-1 power panel DONE

    LDB to floor -1 lighting power panel DONEELDB to floor -1 Emergency panel DONE

    PDB to floor-1 power panel DONE

    UPBD to floor-1 ups power panel DONE

    LDB to floor -1 lighting power panel DONE

    ELDB to floor -1 Emergency panel DONE

    PDB to floor-1 power panel DONE

    UPBD to floor-1 ups power panel DONE

    PDB to floor -1 power panel DONE

    LDB to floor -1 lighting power panel DONE

    ELDB to floor -1 Emergency panel DONEPDB to floor -1 power panel DONE

    UPBD to floor-1 ups power panel DONE

    LDB to floor -1 lighting power panel DONE

    LDB to floor-2 lighting panel DONE

    ELDB to floor -2 Emergency panel DONE

    PDB to floor -2 power panel DONE

    UPBD to floor-2 ups power panel DONE

    PDB to floor -2 power panel DONE

    PDB to floor-2 power panel DONE

    PDB to floor-2 power panel DONE

    LDB to floor -2 lighting power panel DONE

    ELDB to floor-2 emergency power panel DONE

    PDB to floor -2 power panel DONE

    UPBD to floor-2 ups power panel DONE

    LDB to floor -2 lighting power panel DONE

    UPDB to floor -2 ups power panel DONE

  • 8/8/2019 Copy of Measurement Book 20.7

    68/76

    4C-CU-16 LDB 143 FLOOR-I PART PLAN I

    3C-CU-6 ELDB 126 FLOOR-I PART PLAN I

    3C-CU-10 PDB 125 FLOOR-I PART PLAN I

    4C-CU-10 UPDB 151 FLOOR-I PART PLAN I

    4C-CU-10 PDB 95 FLOOR-I PART PLAN I

    4C-CU-10 LDB 101 FLOOR-I PART PLAN II3C-CU-6 ELDB 81 FLOOR-I PART PLAN II

    3C-CU-10 PDB 80 FLOOR-I PART PLAN II

    4C-CU-10 UPDB 117 FLOOR-I PART PLAN II

    4C-CU-10 LDB 45 FLOOR-I PART PLAN III

    3C-CU-6 ELDB 20 FLOOR-I PART PLAN III

    3C-CU-10 PDB 20 FLOOR-I PART PLAN III

    4C-CU-16 UPDB 53 FLOOR-I PART PLAN III

    4C-CU-16 PDB 22 FLOOR-I PART PLAN III

    4C-CU-16 LDB 17 FLOOR-I PART PLAN IV

    3C-CU-6 ELDB 53 FLOOR-I PART PLAN IV4C-CU-16 PDB 52 FLOOR-I PART PLAN IV

    4C-CU-16 UPDB 22 FLOOR-I PART PLAN IV

    4C-CU-10 LDB 82 FLOOR-I LIBRARY

    4C-CU-16 LDB 62 FLOOR-II PART PLAN I

    3C-CU-6 ELDB 70 FLOOR-II PART PLAN I

    4C-CU-16 PDB 63 FLOOR-II PART PLAN I

    4C-CU-16 UPDB 77 FLOOR-II PART PLAN I

    4C-CU-16 PDB 86 FLOOR-II PART PLAN I

    3C-CU-10 LDB 117 FLOOR-II PART PLAN II

    4C-CU-10 PDB 116 FLOOR-II PART PLAN II

    4C-CU-16 LDB 47 FLOOR-II PART PLAN III

    4C-CU-10 ELDB 54 FLOOR-II PART PLAN III

    4C-CU-16 PDB 46 FLOOR-II PART PLAN III

    4C-CU-16 UPDB 54 FLOOR-II PART PLAN III

    4C-CU-16 LDB 21 FLOOR-II PART PLAN IV

    3C-CU-16 UPDB 22 FLOOR-II PART PLAN IV

  • 8/8/2019 Copy of Measurement Book 20.7

    69/76

    LDB to floor -1 lighting power panel DONE

    ELDB to floor -1 Emergency panel DONE

    PDB to floor-1 power panel DONE

    UPBD to floor-1 ups power panel DONE

    PDB to floor-1 power panel DONE

    LDB to floor -1 lighting power panel DONEELDB to floor -1 Emergency panel DONE

    PDB to floor-1 power panel DONE

    UPBD to floor-1 ups power panel DONE

    LDB to floor -1 lighting power panel DONE

    ELDB to floor -1 Emergency panel DONE

    PDB to floor-1 power panel DONE

    UPBD to floor-1 ups power panel DONE

    PDB to floor -1 power panel DONE

    LDB to floor -1 lighting power panel DONE

    ELDB to floor -1 Emergency panel DONEPDB to floor -1 power panel DONE

    UPBD to floor-1 ups power panel DONE

    LDB to floor -1 lighting power panel DONE

    LDB to floor-2 lighting panel DONE

    ELDB to floor -2 Emergency panel DONE

    PDB to floor -2 power panel DONE

    UPBD to floor-2 ups power panel DONE

    PDB to floor -2 power panel DONE

    PDB to floor-2 power panel DONE

    PDB to floor-2 power panel DONE

    LDB to floor -2 lighting power panel DONE

    ELDB to floor-2 emergency power panel DONE

    PDB to floor -2 power panel DONE

    UPBD to floor-2 ups power panel DONE

    LDB to floor -2 lighting power panel DONE

    UPDB to floor -2 ups power panel DONE

  • 8/8/2019 Copy of Measurement Book 20.7

    70/76

    CABLET TRAY

    FLOOR I 222x1 222 Mtrs DONE

    FLOOR II 216X1 216 Mtrs DONE

  • 8/8/2019 Copy of Measurement Book 20.7

    71/76

    SL.NO ROOMS

    PART PLAN-I

    1 ANATOMY DEMO-I 10 9

    2 ANATOMY DEMO-II 10 9

    3 ANATOMY REASEARCH 10 9

    4 ANATOMY LIBRARY 5 4

    5 NON - TECH & CORRIDOR(NON- TECH) 2 2

    6 AIR HANDLING UNIT-(AHU) 2 2

    7 CORRIDOR 8 4

    8 READER-I 4 3

    9 READER-II 3 2

    10 READER-III 2 1

    11 WASH & TOILET 2 1

    12 ASST PROF /READER- CORRIDOR 2 2

    13 ANATOMY PROFESSOR & TOILET 3 2

    14 ANATOMY DEPT OFF 3 2

    15 LADIES TOILET 5 5

    16 GENTS TOILET 5 5

    17 ANATOMY ASST PROF / LECT 5 4

    18 ANATOMY MUSEUM 33 33

    19 STORE 4 4

    20 PREPARATION 4 4

    21 TUTORS 4 4

    22 ANATOMY HISTOLOGY 35 35

    23 ANATOMY HISTOLOGY PREPARATION

    PART PLAN - II

    1 ANATOMY DISSECTION HALL 68 68

    2 STORAGE TANK 1 1

    3 EMBALMING ROOM 4 4

    4 COLD STORAGE 7 7

    5 CORRIDOR 3 3

    6 LADIES TOILET

    7 GENTS TOILET8 LOBBY

    9 STAIR CASE

    PART PLAN-III

    1 ADMINISTRATION

    2 BIOCHEMISTRY LAB 43 43

    3 STORE

    TOTALPOINT

    TOTALNLPOINT

    PRIMARY

  • 8/8/2019 Copy of Measurement Book 20.7

    72/76

    4 ANTE ROOM FOR PREPARATION

    5 GENTS COMMON ROOM

    6 GENTS TOILET

    7 AIR HANDLING UNIT - AHU 1 1

    1 PART PLAN - IV

    CORRIDOR

    1 PART PLAN-V

    2 LECTURE HALL 57 57

    3 STAIR CASE

    4 PANEL / LV ROOM 3 3

    5 LADIES TOILET & LOBBY

    6 GENTS TOILET

    7 LADIES TOILET

    8 BIO CHEMISTRY DEPT OFF 4 3

    9 BIO CHEMISTRY PROFFESOT & TOILET 4 3

    10 CORRIDOR 8 4

    11 BIO CHEMISTRY RESEARCH 10 9

    12 BIO CHEMISTRY LIBRARY 2 1

    13 BIO CHEMISTRY NON TECH & CORRIDOR 5 5

    14 AIR HANDLING UNIT - AHU 4 4

    15 LIBRARY CORRIDOR & LOBBY

    16 STAIR CASE-I& AHU

    17 STAIR CASE-II &STORE

    18 LIBRARY CORRIDOR & LOBBY

    19 BOOK SORTING & TOILET

    20 BOOK BINDER

    21 LIBRARIAN AND OTHER STAFFS ROOM

    22 STAFF READING ROOM

    23 MICRO FILM READING ROOM

    24 JOURNAL ROOM

    25 COPYING FACILITY

    26 VIDEO & CASETTES ROOM

    PART PLAN -VI

    1 BIO CHEMISTRY DEMO -I 10 9

    2 BIO CHEMISTRY DEMO -II 10 9

    3 READER -I & TOILET 4 3

    4 READER -II & TOILET 4 3

    5 BIO CHEMISTRY TUTOR 8 8

    6 BIO CHEMISTRY ASST PROF

  • 8/8/2019 Copy of Measurement Book 20.7

    73/76

    7 BIO CHEMISTRY ASST PROF II

    8 MAIN LOBBY

    9 PORTICO

    10 STAIRCASE I&II

    TOTAL

  • 8/8/2019 Copy of Measurement Book 20.7

    74/76

    FLOOR

    I

    PART I I

    PART I I TOTAL CIRCUIT

    PART I I PART -I

    PART I I PART-II

    PART I I PART-III

    PART I I PART-IV

    PART I I PART-V

    PART I I

    PART I I

    PART I I

    PART I I

    PART I I

    PART I I

    PART I I

    PART I I

    PART I I

    PART I I

    PART I I

    PART I I

    PART I I

    PART I I

    PART I I

    PART I I

    PART I I

    I

    PART II I

    PART II I

    PART II I

    PART II I

    PART II I

    PART II I

    PART II I

    PART II IPART II I

    PART II I

    I

    PART III I

    PART III I

    PART III I

    PART III I

  • 8/8/2019 Copy of Measurement Book 20.7

    75/76

    PART III I

    PART III I

    PART III I

    PART III I

    I

    PART IV I

    PART IV I

    I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    PART V I

    IPART VI I

    PART VI I

    PART VI I

    PART VI I

    PART VI I

    PART VI I

    PART VI I

  • 8/8/2019 Copy of Measurement Book 20.7

    76/76

    PART VI I

    PART VI I

    PART VI I

    PART VI I

    TOTAL I