8/9/2019 Copy of Rigger Work Update
1/24
Site ID: CR0029Longitude 8.34928Site AddressTower Height 35m
Sector 1 2Antenna Height 32m 32
Azimuth on Field 120 240
NPM Recemended
Site ID: CR002Longitude 8.32!59Site AddressTower Height 45m
Sector 1 2
Antenna Height 26m 26Azimuth on Field 0 150NPM Recemended
-
8/9/2019 Copy of Rigger Work Update
2/24
Site ID: CR00"4Longitude 8.33 5!Site AddressTower Height 45m
Sector 1 2Antenna Height 32m 32
Azimuth on Field 0 0NPM Recemended
Site ID: CR002Longitude 8.32!59Site AddressTower Height 45m
Sector 1 2Antenna Height 26m 26
Azimuth on Field 0 150NPM Recemended
Site ID: CR002Longitude 8.32!59Site Address
-
8/9/2019 Copy of Rigger Work Update
3/24
Tower Height 45mSector 1 2
Antenna Height 26m 26Azimuth on Field 0 150NPM Recemended
Site ID: CR0029Longitude 8.34928
Site AddressTower Height 35mSector 1 2
Antenna Height 32m 32Azimuth on Field 120 240NPM Recemended
Site ID: CR0028
LongitudeSite AddressTower Height 35m
Sector 1 2Antenna Height
Azimuth on FieldNPM Recemended
-
8/9/2019 Copy of Rigger Work Update
4/24
Site ID: CR000"Longitude 4.99"!"Site AddressTower Height 45m
Sector 1 2
Antenna Height 2!m 2!Azimuth on Field 0 150NPM Recemended
-
8/9/2019 Copy of Rigger Work Update
5/24
Checklis
Site "#me:L#titude
3 Sector32m #lect$ical %ilt on Field210 Mechnical %ilt on Field
NPM $ecemended #lect$ical %iltNPM $ecemended Mechnical %ilt
Checklis
Site "#me:L#titude
3 Sector
26m #lect$ical %ilt on Field2$0 Mechnical %ilt on FieldNPM $ecemended #lect$ical %iltNPM $ecemended Mechnical %ilt
Checklis
-
8/9/2019 Copy of Rigger Work Update
6/24
Site "#me:L#titude
3 Sector32m #lect$ical %ilt on Field210 Mechnical %ilt on Field
NPM $ecemended #lect$ical %iltNPM $ecemended Mechnical %ilt
Re-visit to CR0027 for transcop customer
Site "#me:L#titude
3 Sector26m #lect$ical %ilt on Field2$0 Mechnical %ilt on Field
NPM $ecemended #lect$ical %iltNPM $ecemended Mechnical %ilt
Re-visit to CR0027 for stadium drive and cal
Site "#me:L#titude
-
8/9/2019 Copy of Rigger Work Update
7/24
3 Sector26m #lect$ical %ilt on Field2$0 Mechnical %ilt on Field
NPM $ecemended #lect$ical %iltNPM $ecemended Mechnical %ilt
Site "#me:L#titude
3 Sector32m #lect$ical %ilt on Field210 Mechnical %ilt on Field
NPM $ecemended #lect$ical %iltNPM $ecemended Mechnical %ilt
Checkli
Site "#me:
L#titude
3 Sector#lect$ical %ilt on FieldMechnical %ilt on Field
NPM $ecemended #lect$ical %iltNPM $ecemended Mechnical %ilt
-
8/9/2019 Copy of Rigger Work Update
8/24
-
8/9/2019 Copy of Rigger Work Update
9/24
t: 24/11/2014
3G
CR00295.03394
1 2 33 2 43 3 3
n Field 2 2 2on Field 1 1 1
t: 25/11/2014
3G
CR0024.9 022
1 2 3
4 4 23 4 0n Field
on Field
t: 25/11/2014
3G
Dri%e twent d
#nd ./
Dri%e t)#nor#
-
8/9/2019 Copy of Rigger Work Update
10/24
CR00"44.9 342
1 2 32 3 21 0 2
n Fieldon Field
complain and environs Checklist: 26/11/2014
3G
CR0024.9 022
1 2 34 4 23 4 0
n Fieldon Field
ar christmas to!n drive Checklist: 27/11/2014
3G
CR0024.9 022
Dri%e th#d de
Dri%e tright )#nor#
-
8/9/2019 Copy of Rigger Work Update
11/24
1 2 34 4 23 4 0
n Fieldon Field
CR00295.03394
1 2 33 2 43 3 3
n Field 4on Field 4
t: 2"/11/2014
3G
CR0028
1 2 3
n Fieldon Field
Dri%e t#nd th
*or theh#d to
Dri%e tthe co%issues+
Dri%e t7ees #rthe su)
-
8/9/2019 Copy of Rigger Work Update
12/24
t: 2"/11/2014
3G
CR000"8.34508
1 2 3
2 2 31 0 0
n Field 2on Field 2
Dri%e tut we
-
8/9/2019 Copy of Rigger Work Update
13/24
st &ngineer comment:t:'e didn(t do the )ost dri%e #s the siwn #t the commencement o* dri%e+ 'e )roceeded to ,-00
didn(t gr#nt #ccess #s he w#sn(t #round+
st &ngineer ,omment: The rigger w#s instructed to t# eic )ictures o* di**erent degrees+
-
8/9/2019 Copy of Rigger Work Update
14/24
st &ngineer ,omment: 'e didn(t im) ement #n ch#nges+# due to ./& coming to sites #te+
st &ngineer ,omment: 'e too coordin#tes o* the Hote .ro#c #nd e*t+ ,#r #r #nd rece)tion+ 'e were to d to ret#
ic )ictures o* the #re# #g#in+
-
8/9/2019 Copy of Rigger Work Update
15/24
st &ngineer ,omment: 'e too coordin#tes o* the Hote #g#st#dium+ 'e dro%e the entire #re# #nd we )roceeded to ,-
)ost dri%e which #*ter com) etion we su mitted og*i es #ndo other ch#nges #g#in+
st &ngineer ,omment: 'e redro%e the site #g#in to chec ter#ge is o # #nd we o eser%ed there w#s intr# *re uenc
hich #s een esc# ted to i #ng#+
st &ngineer ,omment: 'e didn(t do #n thing on the site duound the site #nd u) on the tower+ Issues h#%e een esc# te)ort engineer i #ng#+
-
8/9/2019 Copy of Rigger Work Update
16/24
st &ngineer ,omment: The Dri%e *or the #d s)ot commencdidn(t *inish to e continued+
-
8/9/2019 Copy of Rigger Work Update
17/24
te$
-
8/9/2019 Copy of Rigger Work Update
18/24
e
nte the
-
8/9/2019 Copy of Rigger Work Update
19/24
in002
we
e i*
toto
-
8/9/2019 Copy of Rigger Work Update
20/24
d
-
8/9/2019 Copy of Rigger Work Update
21/24
3G
CR0030
Longitude
35mSector 1 2
32m 32m
0 120
20 140
Checklist: 01/12/2014
Site ID:
Site ddress!o"er#eight
ntenn$#eight
%imuthon &ield
'()Recemended
-
8/9/2019 Copy of Rigger Work Update
22/24
L$titude
3 Sector
32m *lectric$l !ilt on &ield
240 )echnic$l !ilt on &ield
2+0 '() recemended *lectric$l !ilt on &ield'() recemended )echnic$l !ilt on &ield
Site '$me:
-
8/9/2019 Copy of Rigger Work Update
23/24
CR0030
1 2 3
Dri,e test *ngineer comment:t:-
2 2 3
1 1 2
2 2 30 0 2
-
8/9/2019 Copy of Rigger Work Update
24/24
dro,e CR0001 $nd CR0030 $.ter o timi%$tion is done