Copyright © BPH Migas 2014, All Rights Reserved
Copyright © BPH Migas 2014, All Rights Reserved 2
INDONESIA GAS RESERVES
PAPUA
NATUNA
MALUKU
TERBUKTI = 101,54 TSCF
POTENSIAL = 48,85 TSCF
TOTAL = 150,39 TSCF
NAD
SUMATERA UTARA
SUMATERA TENGAH
SUMATERA SELATAN
JAWA TIMUR
JAWA BARATSULAWESI
KALIMANTAN
CADANGAN GAS BUMI ( TSCF )
6,93
1,22
8,06
18,30
50,48
3,18
5,89
14,63
2,58
15,21
23,90
Proven : 101.54 TSCF
Potential : 48.85 TSCF
TOTAL : 150.39 TSCF 2
Copyright © BPH Migas 2014, All Rights Reserved
NATURAL GAS PRODUCTION AND UTILIZATION
MMSCFD (%)
FERTILIZER 618.2 7.6
REFINERY 94.1 1.2
PETROCHEMICAL 62.4 0.8
CONDENSATE 12.3 0.2
LPG 73.0 0.9
PGN 694.3 8.5
PLN 830.0 10.2
KRAKATAU STEEL 43.9 0.5
OTHER INDUSTRIES* 682.9 8.4
CITY GAS 0.20 0.0
DOMESTIC LNG 160.60 2.0
SPBG/BBG 3.00 0.0
OWN USED 595.7 7.3
SUB TOTAL DOMESTIC 3,870.6 47.6
LNG REFINERY FEED 2,691.5 33.1
LPG - 0.0
PIPELINE GAS 918.3 11.3
SUB TOTAL EXPORT 3,609.7 44.4
LOSSES 650.1 8.0
T O T A L 8,130.4 100
DOMESTIC
EXPORT
PE
RTA
MIN
A
1.0
31
BS
CF
D
PROD 8.130 BSCFD
DOMESTIC
47.6 %
EXPORT
44.4 %
KPS
7.099 BSCFD
*) KKKS distribution to industries in addition to PGN’s conumers
**) Status up to 2013
3
Copyright © BPH Migas 2014, All Rights Reserved
Copyright © BPH Migas 2014, All Rights Reserved 5
DOWNSTREAM GAS BUSINESS STRUCTURE
PRE DEREGULATION “Monopoly Era”
POST DEREGULATION “Clear, Transparent and Competitive”
Government
Regulator / Player
Government
Pertamina
P G N
Business Deregulation
PLAYERS
REGULATOR
POLICY MAKER
BPH Migas
Player A
Pertamina
Player B
PGN
Player C
Copyright © BPH Migas 2014, All Rights Reserved 6
BPH MIGAS’S REGULATIONS
1 Ensuring the availability of natural gas in Indonesia;
2 Setting Transportation Tariffs for Natural Gas which is transported through Pipelines;
3 Setting the price of Natural Gas for Households and for Small Scale Customers;
4 Conducting tenders to decide which companies will be awarded Special Rights to construct and operate both transmission and distribution gas pipelines;
5 Ensuring there is Open Access in gas transportation pipelines.
Copyright © BPH Migas 2014, All Rights Reserved 7
Open Acces Documents
1 Access Arrangement :
Is a document which is made by Transporter, containing the term and conditions that must be followed in joint utilization of pipeline controled and operated by Transporter, which shall effectively bind Transporter and Shippers after having been approved and legalized by BPH Migas
2 GTA (Gas Transportation Agreement)
Copyright © BPH Migas 2014, All Rights Reserved 8
Access Arrangement Document
1 Rights and Obligations of Transporter & Shippers : - Right to use pipeline, pay & recieve toll fee
2
Gas Management System (GMS) : - Gas stock, allocation, atribution, transfer swap, reporting
3 Rules Related to Technical Aspects : - PVT, Access Capacity Compositions & Specification
4 Rules Related to Legals aspect :
- arbitrations, force majeure, etc
Copyright © BPH Migas 2014, All Rights Reserved 9
Copyright © BPH Migas 2014, All Rights Reserved
Copyright © BPH Migas 2014, All Rights Reserved
KKA
PIM
POINT B
AAF
Peta Ruas Transmisi NAD
14”- 6 km, T= 0.04
8”- 13.5 km T= 0.14
14”- 2 km, T= 0.02
Copyright © BPH Migas 2014, All Rights Reserved
WAMPU
Peta Ruas Transmisi Sumatera Utara
MEDAN
PANGKALAN BATU
PANGKALAN BRANDAN
WAMPU
PANGKALAN SUSU
MEDAN
18”- 51.6 km, T= 0.61
14”- 6.5 km, T= 0.08
8”- 6.5 km, T= 0.07
12”- 51.6 km , T= 0.61
Copyright © BPH Migas 2014, All Rights Reserved
Peta Ruas Transmisi Sumatera Selatan
10” – 27.5 km, T= 0.15
12” – 8.13 km, T= 0.06
TERAS
BETUNG
LEMBAK
PALEMBANG
PULAU LAYANG
PUSRI
LIMAU TIMUR
BERINGIN
14” – 23 km, T= 0.06
16” – 20.20 km, T=0.05
12” – 10.10 km, T=0.11
14” – 50 km, T=0.14
14” – 58.31 km, T=0.22
24”-18.61 km, T=0.03
14” – 28.6 km , T=0.17
12” – 28.6 km, T=0.24
BENAKAT
BENUANG
PRABUMULIH
20” – 42.3 km, T=0.19
CAMBAI
24” – 10.10 km , T=0.11
RAMBUTAN
SIMPANG Y 20” – 58.31 km, T=0.20
20” – 58.31 km, T= 0.27
22” – 17.05 km, T=0.03
10” – 27.5 km ,T=0.15
12” – 8.3 km ,T=0.06
Copyright © BPH Migas 2014, All Rights Reserved
Peta Ruas Transmisi Jawa Barat
SUNYARAGI
CITARIK
BITUNG
DAWUAN
NAGRAK
CILAMAYA
TEGALGEDE
CILEGON
24” – 74 km, T=0.30
24” – 51 km, T=0.07
24” – 27 km, T=0.15
32” – 45 km, T=0.16
24” – 45 km, T=0.15
24” – 21 km, T=0.05
18” – 21 km, T=0.05
14” – 59 km, T=0.59
18” – 59 km, T=0.73
MUNDU
KHT
14” – 34 km T=0.39
12 “– 18 km 0.15
8 “– 32 km T=0.44
18” – 7 km, T=0.03
BALONGAN
Copyright © BPH Migas 2014, All Rights Reserved
PORONG GRESIK
PLN
PKG
GRESIK
PKG
SURABAYA
PAGERUNGAN ISLAND
28” – 369.7 km, T=0.59
28” – 52.63 km, T=0.20
24” – 3.42 km, T=0.02
10” – 4.65 km, T=0.05
Peta Ruas Transmisi Jawa Timur
Copyright © BPH Migas 2014, All Rights Reserved
TANJUNG SANTAN
KM 53 BONTANG
Peta Ruas Transmisi Kalimantan Timur
16” – 13 km , T = 0.05
16” – 39.7 km , T = 0.15
KM 29
20” – 13 km , T = 0.11
16” – 3.2 km ,T = 0.14
Copyright © BPH Migas 2014, All Rights Reserved
Section Length
(km)
Diameter
(inch) Developed by Description
Gundih – Semarang 140 20 PT Sumber Petrindo Perkasa On progress comissioning
Arun – Belawan – KEK Medan 480 24 PT Pertamina Gas On progress construction
Pemping - Batam 13.5 16 PT PLN Batam – PT UBE On progress construction
Porong - Grati 56 18 PT Pertamina Gas On progress construction
Kalija I 207 18 PT Kalimantan Jawa Gas Construction preparation
Kalija II 1200 36 PT Bakrie & Brothers Tbk Waiting for gas supply
Gresik – Semarang 260 28 PT Pertamina Gas Construction preparation
Cirebon – Semarang 230 28 PT Rekayasa Industri Waiting for gas supply
Duri – Dumai 130 24 PT PGN (Persero)Tbk On progress of land acquisition
Muara Karang – Muara Tawar – Tegal Gede 79 24 PT Pertamina Gas On progress of local
governemnt licensing
arrangements
TOTAL 2795.5
Natural Gas Pipeline on Process of Development
17
Copyright © BPH Migas 2014, All Rights Reserved
JAMBI
(1891 Km)
LAMPUNG
(2991 Km)
SEMARANG
(1317 Km) PASURUAN
(557 Km)
DISTRIBUTION AREA (OPEN ACCESS CATEGORY) POTENTIALLY TO BE TENDERED
18
Copyright © BPH Migas 2014, All Rights Reserved 19
Legal aspect : follow the rule & regulation.
Economical Aspect : Pricing negotiations, take alot of time, minimize time.
Permit Aspect; minimize permits.
Financing Projects : joint ventures.
Unpredictible aspect : political issues, sosials issues, etc, anticipated.
Conclution
Copyright © BPH Migas 2014, All Rights Reserved