cordillera administrative region › images › transparencyseal...office/ unit: cordillera...

22
OFFICE/ UNIT: CORDILLERA ADMINISTRATIVE REGION MOOE Php 22,257,000.00 CAPITAL OUTLAY: Php 0 POC: Php 367,000.00 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) Travelling Expense 3,842,000.00 300,000.00 760,500.00 920,000.00 2,130,996.44 247,602.14 543,401.42 477,067.99 418,261.21 1,686,332.76 Training and Seminars 3,134,000.00 350,000.00 820,000.00 735,000.00 794,605.64 722,980.00 881,414.36 905,962.05 472,240.99 2,982,597.40 Supplies and Materials 2,555,000.00 175,079.31 933,896.70 189,919.48 1,181,068.65 338,378.39 845,633.48 628,734.50 661,718.67 2,474,465.04 Utilities 1,450,000.00 170,000.00 170,000.00 185,400.00 908,558.29 175,154.81 180,886.90 233,185.46 205,889.42 795,116.59 Communication 3,042,000.00 330,000.00 329,911.20 660,000.00 1,722,088.80 321,066.44 338,844.76 320,276.66 342,134.87 1,322,322.73 Confidential, Intelligence and Extraordinary Expenses 110,000.00 29,400.00 29,400.00 29,400.00 21,800.00 29,400.00 29,400.00 29,400.00 21,800.00 110,000.00 Professional Services 43,000.00 2,000.00 2,000.00 20,000.00 22,770.00 230.00 230.00 460.00 General Services 2,814,600.00 700,000.00 700,000.00 500,000.00 194,469.41 868,248.15 1,251,882.44 628,583.70 597,889.59 3,346,603.88 Repairs and Maintenance 3,525,000.00 317,700.00 800,000.00 800,000.00 1,953,747.54 343,399.51 427,852.95 466,715.04 350,928.08 1,588,895.58 Taxes, Insurance Premiums and Other Fees 893,900.00 100,000.00 560,000.00 125,000.00 21,558.48 101,396.26 645,945.26 112,536.86 78,549.64 938,428.02 Other MOOE 847,500.00 50,000.00 250,000.00 350,000.00 338,513.50 6,488.50 152,498.00 333,827.00 457,917.72 950,731.22 TOTAL SDLG 22,257,000.00 2,524,179.31 5,355,707.90 4,514,719.48 9,290,176.75 3,154,114.20 5,297,989.57 4,136,519.26 3,607,330.19 16,195,953.22 Training and Seminars 231,000.00 24,491.25 64,645.57 89,829.83 72,020.17 36,397.00 32,753.00 74,785.50 33,109.50 177,045.00 Supplies and Materials 99,000.00 21,213.25 53,767.00 11,546.25 17,324.50 16,362.25 29,765.00 31,246.25 94,698.00 Communication 37,000.00 4,011.25 14,571.50 11,942.75 6,474.50 4,011.25 23,492.87 3,021.38 37,000.00 TOTAL POC 367,000.00 24,491.25 89,870.07 158,168.33 95,509.17 60,196.00 53,126.50 128,043.37 67,377.13 308,743.00 PEACEFUL, ORDERLY AND SAFE LGUs STRENGTHENING OF PEACE AND ORDER COUNCIL (POCs) 366,931.00 24,491.25 89,870.07 177,116.33 76,492.17 60,196.00 53,126.50 128,043.37 67,377.13 308,743.00 No. of RPOC conducted 4 1 1 1 1 1 1 1 1 4 0.00 4th Qtr - Dec. 19, 2018 in Mansion House, Baguio City 3rd Qtr RPOC was conducted on Sept. 11, 2018 at Ambuclao, Benguet 2nd Qtr RPOC was held at Lagawe, Ifugao on June 18, 2018 1st Qtr- Feb. 23, 2018 PPOC/HUC 17 17 7 24 0.00 LPOC/City 63 63 76 139 0.00 No. of minutes of meetings prepared 4 1 1 1 1 1 1 1 3 0.00 PPOC/HUC 7 7 7 14 0.00 LPOC/City 64 64 76 140 0.00 No. of LGUs oriented on POPs Plan Updating, POPS PCMS Monitoring, and Guidelines on the functionality of POCs and Skills Enhancement 83 83 see remarks 83 83 0.00 set on Sep 26-27 but was moved to November 5-7, 2018 No. OF LPOCs capacitated on their functionality 0 SR2018- 08-1450 Php420,0 00 Measure functionality through Performance Audit; R/PAT orientation on Oct. 11, 2018; Audit Proper Oct. 12 Province 6 6 6 6 0.00 City/Mun 77 77 77 77 0.00 REMARKS (Issues/ Concerns FUND SOURCE ACTUAL TOTAL ACTUAL (7+8+9+10 ) TARGET TOTAL TARGET (13+14+15+16) PHYSICAL TARGET POC: TOTAL ALLOTMENT (1) SDLG MOOE: DEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT REALIGNMENT/ CATCH-UP OF ANNUAL OPERATIONS PLAN & BUDGET AND ACCOMPLISHMENTS As of December 31, 2018 (ACCOMPLISHMENT REPORT) TOTAL ACTUAL (17+18+19+20) ACTUAL FINANCIAL REQUIREMENTS OUTCOME AREA/PROGRAM/ PROJECT/ ACTIVITIES/ PERFORMANCE INDICATOR TOTAL TARGET (3+4+5+ 6) TARGET Form 04: PS-Office-ROPB Page 1 of 21

Upload: others

Post on 04-Feb-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

  • OFFICE/ UNIT: CORDILLERA ADMINISTRATIVE REGIONMOOE : Php 22,257,000.00

    CAPITAL OUTLAY: Php 0

    POC: Php 367,000.00

    Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    Travelling Expense 3,842,000.00 300,000.00 760,500.00 920,000.00 2,130,996.44 247,602.14 543,401.42 477,067.99 418,261.21 1,686,332.76

    Training and Seminars 3,134,000.00 350,000.00 820,000.00 735,000.00 794,605.64 722,980.00 881,414.36 905,962.05 472,240.99 2,982,597.40

    Supplies and Materials 2,555,000.00 175,079.31 933,896.70 189,919.48 1,181,068.65 338,378.39 845,633.48 628,734.50 661,718.67 2,474,465.04

    Utilities 1,450,000.00 170,000.00 170,000.00 185,400.00 908,558.29 175,154.81 180,886.90 233,185.46 205,889.42 795,116.59

    Communication 3,042,000.00 330,000.00 329,911.20 660,000.00 1,722,088.80 321,066.44 338,844.76 320,276.66 342,134.87 1,322,322.73

    Confidential, Intelligence and Extraordinary Expenses 110,000.00 29,400.00 29,400.00 29,400.00 21,800.00 29,400.00 29,400.00 29,400.00 21,800.00 110,000.00

    Professional Services 43,000.00 2,000.00 2,000.00 20,000.00 22,770.00 230.00 230.00 460.00

    General Services 2,814,600.00 700,000.00 700,000.00 500,000.00 194,469.41 868,248.15 1,251,882.44 628,583.70 597,889.59 3,346,603.88

    Repairs and Maintenance 3,525,000.00 317,700.00 800,000.00 800,000.00 1,953,747.54 343,399.51 427,852.95 466,715.04 350,928.08 1,588,895.58

    Taxes, Insurance Premiums and Other Fees 893,900.00 100,000.00 560,000.00 125,000.00 21,558.48 101,396.26 645,945.26 112,536.86 78,549.64 938,428.02

    Other MOOE 847,500.00 50,000.00 250,000.00 350,000.00 338,513.50 6,488.50 152,498.00 333,827.00 457,917.72 950,731.22

    TOTAL SDLG 22,257,000.00 2,524,179.31 5,355,707.90 4,514,719.48 9,290,176.75 3,154,114.20 5,297,989.57 4,136,519.26 3,607,330.19 16,195,953.22

    Training and Seminars 231,000.00 24,491.25 64,645.57 89,829.83 72,020.17 36,397.00 32,753.00 74,785.50 33,109.50 177,045.00

    Supplies and Materials 99,000.00 21,213.25 53,767.00 11,546.25 17,324.50 16,362.25 29,765.00 31,246.25 94,698.00

    Communication 37,000.00 4,011.25 14,571.50 11,942.75 6,474.50 4,011.25 23,492.87 3,021.38 37,000.00

    TOTAL POC 367,000.00 24,491.25 89,870.07 158,168.33 95,509.17 60,196.00 53,126.50 128,043.37 67,377.13 308,743.00

    PEACEFUL, ORDERLY AND SAFE LGUs

    STRENGTHENING OF PEACE AND ORDER COUNCIL (POCs) 366,931.00 24,491.25 89,870.07 177,116.33 76,492.17 60,196.00 53,126.50 128,043.37 67,377.13 308,743.00

    No. of RPOC conducted 4 1 1 1 1 1 1 1 1 4 0.00

    4th Qtr - Dec. 19, 2018 in Mansion House, Baguio City

    3rd Qtr RPOC was conducted on Sept. 11, 2018 at Ambuclao,

    Benguet

    2nd Qtr RPOC was held at Lagawe, Ifugao on June 18, 2018

    1st Qtr- Feb. 23, 2018

    PPOC/HUC 17 17 7 24 0.00

    LPOC/City 63 63 76 139 0.00

    No. of minutes of meetings prepared 4 1 1 1 1 1 1 1 3 0.00

    PPOC/HUC 7 7 7 14 0.00

    LPOC/City 64 64 76 140 0.00

    No. of LGUs oriented on POPs Plan

    Updating, POPS PCMS Monitoring,

    and Guidelines on the functionality

    of POCs and Skills Enhancement

    83 83see

    remarks83 83 0.00 set on Sep 26-27 but was moved to November 5-7, 2018

    No. OF LPOCs capacitated on their

    functionality0

    SR2018-

    08-1450

    Php420,0

    00

    Measure functionality through Performance Audit; R/PAT

    orientation on Oct. 11, 2018; Audit Proper Oct. 12

    Province 6 6 6 6 0.00

    City/Mun 77 77 77 77 0.00

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    POC:

    TOTAL ALLOTMENT

    (1)

    SDLG MOOE:

    DEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT

    REALIGNMENT/ CATCH-UP OF ANNUAL OPERATIONS PLAN & BUDGET AND ACCOMPLISHMENTSAs of December 31, 2018 (ACCOMPLISHMENT REPORT)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    Form 04: PS-Office-ROPB

    Page 1 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    STRENGTHENING OF ANTI-DRUG ABUSE COUNCILS (ADACs) 11,750.00 200.00 7,450.00 2,300.00 9,050.00 200.00 200.00 200.00 1,500.00 2,100.00

    No. of PCMs trained and oriented

    on the functionality of ADACs,

    IDMRIS, and Performance Audit of

    ADACs

    83 83 41 42 83 0.00

    SA -

    Trainings

    Php1,660,

    000

    Training on the Guidelines on the Functionality of ADAC,

    IDMRIS and Performance Audit of ADACs with participants

    including C/PDs, Provl and Regl FPs, MLGOOs, P/MADACs

    representatives

    Abra and Benguet - conducted on Oct. 2-4, 2018

    Apayao, Baguio, Ifugao, Kalinga, Mt. Province on Sept. 12-14,

    2018

    Was moved due to conflict of schedule with other activities

    Realigned- No. of Barangays in

    C/Ms with Community Based

    Rehabilitation Program provided

    with assistance

    2 2 128 0.00SA -

    Meetings

    Php400

    Php 200/ brgy. Brgys of Baguio City

    Strengthening the BADACs for

    2018374 374 557 557 0.00

    SA -

    Trainings

    Php1,309,

    000

    Trained on Strengthening the Brgy. ADACs for FY 2018

    Abra- 293; Benguet- 4; Ifugao- 116; Mt. Province- 144 as of

    Q3

    No. ADACs revitalized- not targeted

    Province 1 1 1

    City/Mun 28 28 28

    No. of BADACs strengthened- not

    targeted152 152 152

    Drug Abuse Treatment and

    Rehabilitation Center (DATRC) Inter-

    agency Task Force PMO Negotiations

    for Real Property Donations with

    LGU

    1 1For DILG MP. for the rest of the FOUs to be conducted 1st

    Quarter of FY 2019

    No. of Coordination meeting

    conducted1 1

    RO on October 15, 2018, Fous with downloaded funds

    (within October 2018); with SA Php 120, 000)

    ENHANCEMENT OF PEOPLE'S LAW ENFORCEMENT BOARD (PLEB) 0 114,285.00 79,795.00 96,085.00 18,200.00 2,420.00 500.00 2,920.00 with SA Php

    Capacity Development/ Training to LGUs

    No. of PLEB system database training

    conducted- realigned1 1

    1-

    realig

    ned

    see

    remarks1 1

    SA

    Trainings-

    Php948,7

    14

    scheduled on July 18-20, 2018, Baguio City, Training on

    Trainers on the PLEB Database System and PLEB Legal

    Skills Enahncement, Pre and post meeting included in the

    activity design, 105 pax, (based on the schedule provided

    by CO).

    Realigned- No. of brgys with

    BADAC members trained on

    Barangay Drug Clearing Program

    for BADACs

    77 77 77 77

    SA-

    Php1,848,

    000

    funds downloaded to Pos 1775600, 3rd quarter

    Monitoring and Evaluation

    No. of LGUs monitored on Inventory

    of cases of PLEBS and monitored

    through occular inspection

    77 (77) (77) (77) 77 77 77 77

    Page 2 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    National Advocacy for the Prevention of Illegal Drugs 0.00 0.00

    No. of barangays conducted

    barangay based symposium on anti-

    illegal drugs

    176 176see

    remarks59 59

    Targeted 75 brgys only as they are the remaining drug

    affected brgy in CAR per data from PDEA/ Abra, Kalinga

    No. of barangays with success

    stories/good practices documented1 1

    1-

    realig

    ned

    see

    remarks

    see

    remarks0 No directive/guideline from CO

    No. R/P/HUC Focal Persons attended

    the orientation on anti-corruption

    law and practices

    8 8see

    remarks

    see

    remarks0

    Attendance is as per invitation by CO

    1. Bantay Korupsyon RD and CSO partner

    2. 888 Orientation - ARD, BK Legal Officer, BK Regl

    Coordinator and CSO partner

    3. REgl Legal case writeshop - 2 lawyers

    No. of barangays covered by the roll-

    out orientation on Anti-corruption

    laws and policies

    29 29see

    remarks0 TOT by CO is on October 23-26, 2018 at Subic

    No. of barangays monitored on the

    DILG-Assistance to municipalities

    projects and compliance of brgys. to

    DILG issuances and National Laws

    relative to Anti-Corruption measures

    29 29see

    remarks0 TOT by CO is on October 23-26, 2018 at Subic

    No. of Regional Coordinator and

    Assistant Regional Coordinator hired2 (2) (2) (2) (2) 2 2 4

    Anti-Illegal Drugs Information System (AIDIS)

    Attendance to trainings/roll our of

    the system100% 100%

    1/1 or

    100%2 attended the AIDIS training on May 28 to June 1, 2018

    National Advocacy for the Prevention of Violent Extremism 0.00 0.00

    No. of C/Ms (PAMANA Areas)

    oriented on the enhanced PVE

    Training Module

    20 6 14see

    remarks14 TOT by CO is on October 23-26, 2018 at Subic

    No. of barangays (PAMANA Areas)

    trained on the enhanced PVE

    Training Module

    41 41see

    remarks0

    TOT by CO is on October 23-26, 2018 at Subic, TARGET IS 18

    BRGY

    E-CLIP

    Monitoring of the Construction of Halfway Houses SA

    No. of Halfway houses monitored

    construction2 (2) (2) 2 2 4 Kalinga and MP

    No. of requests (with complete

    documentary requirements) for

    financial assistance verified and

    processed

    (Immediate, Livelihood,

    Reintegration, Firearms

    Remuneration)

    100% 100% 100% 100% 100% on going completion of documentary reqts

    Attendance to Capability Building

    Activities and Assessment100% 100% 100%

    1/1 or

    100%

    1/1 or

    100%

    Attended the National Orientation on Sept. 29-31, 2018 at

    Quezon City

    Regional Initiative 47,250.00 1,600.00 9,600.00 17,900.00 6,150.00 500.00 22,700.00 1,200.00 2,900.00 27,300.00

    Search for Most Outstanding BPOC

    Conduct of meetings to assess and evaluate BPOC nominees

    Field Validation

    No. of Nominees Assessed

    and Awarded100% of

    nominees

    100% of

    nominee

    s0

    Provincial Initiative 300.00 100.00 100.00 150.00 150.00 100.00 150.00 250.00Page 3 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    PMCC 1,500.00 250.00 250.00 500.00 500.00 500.00 250.00 500.00 1,250.00

    Search for Best MADAC 1,500.00 250.00 250.00 500.00 500.00 500.00 250.00 500.00 1,250.00

    BANNUAR 1 1 21,500.00 21,500.00 21,500.00 21,500.00

    ACCOUNTABLE, TRANSPARENT, PARTICIPATIVE AND EFFECTIVE LOCAL GOVERNANCE

    FULL DISCLOSURE POLICY (FDP) 19,000.00 4,300.00 2,700.00 7,250.00 5,150.00 3,300.00 3,300.00 1,700.00 5,250.00 13,550.00

    Quarterly monitoring of LGU compliance

    No. of LGUs complying to FDP (99%) 100% 98% 87.95% 90.00% 90.00%

    Provinces 6 (6) (6) (6) (6) 6 6 6 6 6

    Cities 2 (2) (2) (2) (2) 2 2 2 2 2

    Municipalities 74 (74) (74) (74) (74) 75 73 73 67 67

    No. of LGUs fully complying to FDP

    (82%)81% 83% 77.11% 84.00% 84.00%

    Provinces 5 (5) (5) (5) (5) 5 6 5 5 5

    Cities 2 (2) (2) (2) (2) 2 2 2 2 2

    Municipalities 62 (62) (62) (62) (62) 61 61 57 63 63

    Quarterly monitoring of Brgy compliance

    No. of Barangays complying to BFDP

    (90%)94% 90% 92% 92.00% 92.00%

    Barangays 1058 (1058)(1058)(1058)(1058) 1103 1063 1077 1077 1077

    LOCAL GOVERNANCE MANAGEMENT SYSTEM - SEAL OF GOOD LOCAL GOVERNANCE (LGPMS- SGLG) 377,300.00 1,500.00 100,260.00 137,150.00 239,150.00 500.00 500.00 58,677.02 1,150.00 60,827.02

    Data Gathering, Regional Assessment, Validation and Certification

    No. of PCMs assessed, validated and

    certified

    Provinces 6 6see

    remark

    s

    6 6

    Cities 2 2see

    remark

    s

    2 2

    Municipalities 75 75see

    remark

    s

    75 75

    No. of PCMs calibrated based on

    actual validation

    Provinces 6 6see

    remark

    s

    6 6

    Cities 2 2see

    remark

    s

    2 2

    Municipalities 75 75see

    remark

    s

    75 75

    National On site Validation 10 10 10 10

    August 13-17- Conducted by DILG NCR for 10 LGUs in CAR

    Abra- 6, MP- 2, Apayao- 2;

    while DILG CAR conducted thesame for 14 LGUs in

    Pampanga

    SGLG Conferment 2,000.00 1,500.00 500.00 500.00 1,000.00

    No. of qualified conferred with SGLG 100% 100% 100% 100%Abra - 6 (Bucay, Dolores, Penarrubia, La Paz, San Juan,

    Tubo)

    MP- Bontoc

    Calibration and validation completed EO June 2018.

    National orientation was conducted on May 2-3, 2018 and

    the schedule for assessment and validation is from May to

    June as per DILG MC No. 2018-49

    ALL assesment was conducted as of June 28, 2018. National

    orientation was conducted on May 2-3, 2018 and the

    schedule for assessment and validation is from May to June

    as per DILG MC No. 2018-49

    Page 4 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    20% of PCMS (17) passed the criteria

    for good governance

    Abra - 6/ 3

    Apayao - 2/ 1

    Baguio - 1/ 0

    Benguet - 3/ 2

    Ifugao - 3/ 2

    Kalinga - 2/ 1

    MP - 3/ 2

    7 7

    7/83 = 8%

    Abra - 6 (Bucay, Dolores, Penarrubia, La Paz, San Juan,

    Tubo)

    MP- Bontoc

    10% of PCMs consistently received

    awards/ incentives for good

    governance

    30% or 7 30%Abra - 6 (Bucay, Dolores, Penarrubia, La Paz, San Juan,

    Tubo)

    MP- Bontoc

    PERFORMANCE CHALLENGE FUND (PCF) 14,500.00 5,500.00 5,500.00 4,500.00 5,000.00 5,000.00 4,000.00 4,000.00 13,000.00

    Policy Dissemination

    No. of PCF 2018 Regional

    Operational Policy Roll-Out

    Conducted

    1 1 1 1 SA December 13-14, 2018

    Provision of Incentive to Eligible LGUs 1,000.00 1,000.00 1,000.00 1,000.00

    No. of 2018 PCF proposed projects

    Reviewed & Approved

    100% of

    Qualified

    LGUs

    100%

    of

    Qualifie

    d LGUs

    100% of

    Qualified

    LGUs

    100% of

    Qualified LGUsSA

    No. of qualified LGUs provided with

    PCF Incentive/Grant

    100% of

    Qualified

    LGUs

    100%

    of

    Qualifie

    d LGUs

    100% of

    Qualified

    LGUs

    100% of

    Qualified LGUs

    Quarterly Monitoring of PCF projects

    PCF 2015: Total SPs -8

    completed 2016 - 4

    completed 2017 - 2

    target 2018: 100% - 2

    100% completed as of May

    2018

    PCF Field Onsite Meeting and Site Validation in Bucay, La

    Paz, Penarubbia, San Juan and Tayum, Aba on July 9-12,

    2018

    On-going 0 1 0 1

    Completed 2 2 1 1 2

    1. Baguio City- CONSTRUCTION OF TRANSPORT TERMINAL

    AT CITY CAMP PROPER

    2. Calanasan -CONSTRUCTION OF YMANDAYA ISNAG

    VILLAGE REPLICA (inaugurated June 13, 2018)

    PCF 2016: Total SPs-22

    completed 2017 - 9

    remaining 2018 - 13

    target 2018: 80% - 9

    completed 1st sem- 11

    remaining 2nd sem- 2

    On-going 4 7 2 1 1 1

    as of Q4:

    1. Baguio City- MULTIPURPOSE/ EVACUATION CENTER

    (LOAKAN APUGAN BARANGAY- 18.83%

    Page 5 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    Completed 5 5 0 6 5 1 12

    Completed Q1:

    1. La Paz, Abra; 2. Luna, Apayao; 3. Itogon and 4. La

    Trinidad, Benguet; 5. Banaue, Ifugao; 6. Paracelis, MP

    Completed Q2:

    1. Dolores- Construction of Drainage Canals at Poblacion

    2. Kapangan- IMPROVEMENT OF MUNICIPAL ECO-TOURISM

    PARK

    3. Tublay- CONSTRUCTION OF MULTIPURPOSE BUILDING

    AT THE MUNICIPAL GROUNDS CUM EVACUATION CENTER,

    CAPONGA, ETC.

    4. Benguet Prov- CONSTRUCTION OF PDRRM OFFICE

    5. Tabuk- IMPROVEMENT OF ROAD (GOBGOB)

    Completed Q3:

    1. Balbalan- POBLACION WATERWORKS SYSTEM

    PCF 2017: Total SPs-23

    completed 2017 - 0

    remaining 2018 - 23

    target 2018: 25%- 6

    completed 1st sem- 5

    remaining 2nd sem-18

    Procurement 23 11 2 0 0

    On-going 17 7 12 6 6

    On Going as of Q4:6

    1. Dolores, Abra- Construction of Multi-Purpose Building

    2.La Trinidad, Benguet- Construction of Tourism Facilities

    3. Bucay, Abra- Construction of Tourism Building

    4. Luna, Apayao- Rehab/Improvement of Public Market in

    Poblacion

    5. Paracelis, MP- Expansion of Paracelis Water System

    Phase IV

    6. La Trinidad- Construction of Tourism Facilities

    Completed 6 21-

    realig

    ned

    0 5 4 8 17

    Completed Q4:

    1. Penarrubia, Abra- Construction of Two (2) Storey

    Disaster Operation Building

    2. Tublay, Benguet- Improvement of the Municipal

    Evacuation Center

    3.Conner, Apayao- Construction of Flood Control/ Spar Dike

    4. Kabugao, Apayao- Improvement of Batlong Street,

    Poblacion

    5. Pudtol, Apayao- Concreting of Acob Street (Capannikan)

    6. Asipulo, Ifugao- Improvement of Bahag-Liwon-Namal

    Access Road

    7. Banaue, Ifugao- Completion of the Levelling of the Multi-

    Purpose Ground

    8. La Paz, Abra- Procurement of Rescue Vehicle

    CSO- PEOPLE'S PARTICIPATION PARTNERSHIP PROGRAM

    CSIS 0.00 1,000.00 0.00

    Page 6 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    No. of LRIs trained on the 2018 CSIS

    Implementation2 2 1 2 2 ASC and MPSPC

    No. of Muncipalities Conducted CSIS

    Survey2 2 2 2 June 20 encoded in the csis portal

    No. of Utilization Conference

    Conducted2 2 2 2

    SA

    Php75,00

    0

    UC schedule is on: Banaue, Ifugao- Oct. 18, 2018

    Bontoc, MP- Oct. 25, 2018

    Monitoring of LGU Citizen-Driven Priority Action Plans

    No. of submitted CPAPs updated

    (online) and monitored2 2 2 2

    No on-line monitoring yet; as per BLGS online monitoring

    will be implemented for 2019 but CPAPs for 2017 target

    LGUs are all submitted to BLGS (for Lamut, Ifugao and

    Dolores, Abra)

    No. of quarterly monitoring reports

    submitted2 1 1 1 1 2

    2018 National Forum

    No. of participants attended 2 2 2 2 Nov. 12- 13, 2018

    TRANSITION TO FEDERALISM 6,000.00 6,000.00 0.00 SA

    No. of Brgys. Provided with IEC 114 114 114 Brgys in the Province of Apayao

    No. of Federalism Roadshow

    conducted1 1 1

    Regional Federalism Roadshow conducted on June 26, 2018.

    Activities were: Town Hall Meeting with Basic Sectors (c/o

    PMO) and Regional Consultation (ConCom) on Federalism

    (c/o PMS) at Crown Legacy Hotel, and the Regional

    Convention on Federalism at University of Baguio Gym,

    Baguio City with over 2500 in attendance

    No. of IEC Paraphernalia developed

    and disseminated100% 100%

    see

    remarks

    0%

    see

    remarks

    0%

    see remarksSA

    Funds for this purpose was downloaded on August but final

    lay-out of the IEC materials were not yet communcated to

    this region as of Sept 30, 2018. Also, a memo from CFCR-

    PMO dated September 26, 2018 signed by Asec. J. Malaya re:

    Advisory extending the deadline of the production of IEC

    materials, was received by this office.

    As of Dec. 31, template for the IEC material was still

    incomplete (c/o CO PMO)

    No. of draft constitution reproduced

    and disseminated100% 100%

    0%

    see

    remarks

    0%

    see remarksSA No sub-allotment and guidelines receiced from CO

    No. of federalism coaltions

    established and conduct of

    Federalism coordination

    1 10

    see

    remarks

    0

    see remarksSA No sub-allotment and guidelines receiced from CO

    Conduct of Federalism Speaker's

    Bureau Regional Training1 1 sa 525000

    Pre and post - Oct. 29 and nov. 15; conduct of training - nov

    12-14

    LUPONG TAGAPAMAYAPA INCENTIVES AWARDS 77,102.46 6,452.46 29,750.00 26,900.00 45,750.00 4,452.46 500.00 4,952.46

    Regional and national awardees recognized and provided with cash

    No. of Lupong Tagapamayapa in all

    brys. Assessed and validated in four

    categories

    100% ####see

    remark

    s

    100% 100%Assessment is on Q2 since the deadline of Submission of

    entries is on April 30, 2018

    No. of Regional Awardees

    recognized and provided with cash

    incentives

    100% 25% 75% 25% or 1 100.00% SA

    One remaining check awarded to Brgy. Tuding, Benguet on

    July 26, 2018.

    3 out of 4 awardees were provided with development grant

    during the 2nd Qtr.

    Local Government Code Anniversary 10,500.00 4,500.00 6,000.00 4,500.00 4,500.00

    No. of related activities to LG Code

    anniversary conducted

    Region/City/Provinces 8 8 8 8

    Community Based Monitoring System 60,331.00 4,840.00 29,500.00 22,500.00 22,500.00 9,250.00 6,081.00 8,000.00 9,790.50 33,121.50

    No. of P/C/Ms provided with

    orientation and have forged MOA

    100% of

    requesting

    LGU

    100%

    of

    reque

    sting

    LGU

    100%

    of

    reque

    sting

    LGU

    100%

    of

    reque

    sting

    LGU

    100%

    of

    reques

    ting

    LGU

    Provinceno

    request

    100% of

    requesting

    LGU

    100% of

    requesting

    LGU

    Covering 6 municipalities of Mt. Province (Bauko, Bontoc,

    Natonin, Sabangan, Sadanga & Sagada)

    Cityno

    request

    NO

    REQUEST

    Page 7 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    Mun 1 1

    No. of requesting PCMs provided

    with technical assistance

    Provinceno

    request

    NO

    REQUEST

    Module 1- Covering 6 municipalities of Mt. Province (Bauko,

    Bontoc, Natonin, Sabangan, Sadanga & Sagada)

    Module 2-Abra (Danglas, Lagangilang & Lagayan)

    Paracelis

    Moduke 4- Lubuagan

    Cityno

    request

    NO

    REQUEST

    Mun 8 8

    Module 1 - Pasil, Tinglayan, Besao

    Module 2- Bucay, Barlig

    Module 3- Lubuagan

    Module 4- Dolores, Tuba

    Modular Training for PFPs, CHs and

    PMs1 1 0 0.00 210,000.00 2,274.00 2,274.00

    Recommended to join the modular trainings at the LGU

    level. Expenses either shouldered by the LGU or DILG-FOUs

    BNEO training 500.00 500.00 500.00 21800 22,300.00

    Component A- No. of brgys. With

    turn-over and inventory team - 1st

    Qtr

    1175 1021 154 1175

    CMs with audit and transition team -

    1st Qtr77 77 77

    No. of Brgys conducted inventory of

    all Brgy properties, financial records

    and financial documents - 2nd Qtr

    1175 736 439 1175there were 1165 brgys. That conducted turn-over ceremony

    and turned over BPFRDs

    Component B- No. of Brgys Oriented

    on "First 100 days in Office" - 3rd Qtr0 1175 1175

    100% of Brgys. Were oriented on BNEO towards GREAT

    Brgy Program from last week of July to 2nd week of August

    2018

    Monitoring of Election Activities

    No. of Election monitoring reports

    submitted0

    83 or

    100%

    83 reprts

    or 100%

    SANGGUNIANG KABATAAN 0.00

    SK Mandatory Training 0.00 3,500.00 0.00

    MOA 0 100% 100%

    No. of SK officials attended

    mandatory training0 90% 90%

    4874/5430

    No. of SK federation elections

    conducted0

    83 or

    100%100% special elections not yet conducted

    Monitoring of Youth Development Fund Utilization 0.00 500.00 500 500.00

    No. of Brgys. With submitted on-line

    reports80% 80% 100% 100%

    KATARUNGANG PAMBARANGGAY 1,500.00 500.00 500.00 500.00 500.00 500 1,500.00

    No. of Brgys. With submitted on-line

    reports80% 80% 100% 100%

    CONDUCT OF BARANGAY ASSEMBLY

    Monitor Compliance 13,500.00 4,500.00 4,500.00 4,500.00 4,500.00 9,000.00

    Page 8 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    No. of Brygs. Conducted Brgy.

    Assembly Day80% 80% 80% 131 100% 100% 92% of brgys conducted

    ENHANCEMENT OF BARANGAY INFORMATION SYSTEM (EBIS)

    Attendance to trainings on BIS 100% 100%100% or

    1/1

    100% or

    1/1

    RFP and Database Administrator of this office attended the

    Conduct of ToT of BIS modules on July 9-11, 2018 at Provision of Technical Assistance 20,950.00 5,950.00 7,300.00 6,300.00 5,950.00 4,250.00 4,450.00 4,500.00 4,500.00 17,700.00

    Provision of Legal Opinion

    No. of queries acted upon

    written (simple , complex and for

    referral)

    80% of

    queries

    received

    80% of

    querie

    s

    receive

    d

    80%

    of

    querie

    s

    receiv

    ed

    80% of

    queries

    receive

    d

    80% of

    queries

    receive

    d

    100% 100% 100% 100%

    verbal80% of

    queries

    received

    80% of

    querie

    s

    receive

    d

    80%

    of

    querie

    s

    receiv

    80% of

    queries

    receive

    d

    80% of

    queries

    receive

    d

    100% 100% 100% 100%

    Fact finding/ InvestigationNo. of fact finding/ investigation

    conductedANA ANA ANA ANA ANA

    no

    request

    no

    request

    NO

    REQUEST

    Provision of CoachingNo. of PCMs that needed coaching

    coachedANA ANA ANA ANA ANA

    no

    request

    NO

    REQUEST

    Review of LGU Annual Report

    No. of LGU annual report reviewed 80%80%

    of 100% 100%

    Province 0

    Cities/ Mun. 12 12 12

    Brgy. 14 14 14

    Provision of Administrative Services 17,000.00 5,000.00 5,000.00 5,000.00 5,000.00 3,500.00 3,500.00 3,500.00 3,500.00 14,000.00

    Processing of Death Benefit Claims

    No. of claims processed 80% 80% 80% 80% 80% 100% 100% 100% 100%

    No. of certificates issued 80% 80% 80% 80% 80% 100% 100% 100% 100%

    1,000.00 500.00 500.00 500.00 500.00 0.00

    No. of applications endorsed 80% 80% 80% 80% 80% 100% 100% 100% 100% 1 application endorsed and 7 scholarships floated

    Provision of Oversight Services 16,600.00 5,300.00 5,800.00 5,800.00 5,800.00 2,500.00 2,500.00 2,500.00 2,500.00 10,000.00

    No. of Decision, Order, or Resolution

    served80% 80% 80% 80% 80% 100%

    no

    receipt

    no

    receiptno receipt 100%

    No. of requests endorsed 80% 80% 80% 80% 80% 100% 100% 100% 100% 100% 22/22 requests endorsed

    No. of requests endorsed 80% 80% 80% 80% 80%no

    request

    no

    request

    no

    requestno request

    NO

    REQUEST

    Regional Initiatives 5,581.00 3,390.50 9,890.50 500.00 500.00 1,190.50 3,390.50 3,390.50 3,390.50 11,362.00

    1. Inter-agency Collaborations/ Partnerships

    No of related activities participated 12 1 1 1 1 10 1 11

    SCOFAD 1 1 1,000.00 1,000.00

    SOCIALLY PROTECTIVE LGUS

    Endorsement of LGU Requests for

    Approval of Additional Confidential

    Fund

    Endorsement of LGU Requests for

    Authority to Purchase Motor Vehicles

    Endorsement of Application for

    Scholarship Grants of LGU Officials and

    Employees

    Implementation of Ombudsman,

    Sandiganbayan/OP/ COMELEC Decision,

    Order, or Resolution

    Issuance of Certificate of Incumbency/

    Services Rendered to Local Officials

    Page 9 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    SUPPORT TO LOCAL GOVERNANCE PROGRAM 25,796.00 3,950.00 4,150.00 4,450.00 4,150.00 2,950.00 14,246.00 2,650.00 2,950.00 22,796.00

    Monitoring of LDC Functionality (municipal level)

    No. of LGUs monitored with

    updated:

    1. PDPFP

    Provinces 6 6 (6) (6) (6) 6 (6) 6

    2. CLUP

    Cities 2 2 (2) (2) (2) 2 (2) 2Municipalities 75 75 (75) (75) (75) 75 (75) 75

    3. CDP

    Cities 2 2 (2) (2) (2) 2 (2) 2Municipalities 75 75 (75) (75) (75) 75 (75) 75

    4. AIP

    Provinces 6 (6) 6 6Cities 2 (2) 2 2

    Municipalities 75 (75) 75 75Barangays 1175 (1175) 1175 1175

    5. LDIPProvinces 6 6 6

    Cities 2 2 2Municipalities 75 75 75

    Improvement of Local Investment Programming and Budgeting

    No. of Regional Validation Workshop

    Conducted (Localization of the

    PDP/SDG Indicators and Results

    Matrices for LGUs

    1 1 1 1 4,820.00 4,820.00 months of October to November 2018

    CDP assessment for HUC 1 1

    SR2018-

    09-1785

    Php

    30,000

    Oct. 29 Orientation (RLAs and BC)and Nov 28/ assessment

    Provinces 6 6Assistance to Municipalitites 91,200.00 29,600.00 57,250.00 57,100.00 29,750.00 2,100.00 2,250.00 1,500.00 1,500.00 7,350.00

    No. of training/ meetings/

    consulations conducted6 1 2 2 1 1 1 2 4

    SA

    Php233,8

    67

    Nov. 7-8, 2018 at Sagada, MP

    ADM 2017:

    Total qualified SPs - 352 (357 but 5

    not eligible)

    completed 2017 - 167

    remaining 2018 - 185

    target 2018: 74% - 94 SPs

    Not eligible: (No. of SPs)

    1. Boliney, Abra (1)

    2. San Isidro, Abra (3)

    3. Pinukpuk, Kalinga (1)

    Document Preparation/ NYS 4 3 3 8 3 Abra - 2; Kalinga- 1

    Procurement 27 0 0 0 0

    On-going 90 69 46 32 32

    As of Q3:

    Abra (10) - Danglas (1), Lacub (1), Lagangilang (1),

    Lagaya(3),

    langiden (1), Licuan (1), Penarrubia (1), Sallapadan (1)

    Apayao (7)- Calanasan (5) ,Conner (1), Pudtol (1)

    Benguet (1) - Kabayan (1)

    Ifugao (7)- Asipulo (1), Hungduan (1), Kiangan (3), Mayoyao

    (1), Tinoc (1)

    Kalinga (5)- Balbalan (1), Lubuagan (1), Tanudan (1),

    Tinglayan (2)

    MP (16)- Barlig (2), Bontoc (2), Natonin (6), Paracelis (3),

    Sabangan (1), Sadanga (1), Sagada (1)

    Completed 94 10 10 10 64 64 49 190 14 317

    As of Q3: 86% complete

    Abra -40/53=75%; Apayao- 17/24=70%; Benguet-

    118/119=99%; Ifugao- 62/69=89%; Kalinga- 15/20=75%;

    MP- 51/67=76%

    AM 2018: 8,904.00 8,904.00Page 10 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    No. of TOT conducted re:

    development live1 1 1

    Development Live Platform National Orientation and

    Training of Trainers on August 28-29, 2018 in Baguio City

    No. of SPs included in 1st Batch fund

    release

    40%

    of

    SPs

    228 228 or

    96%As of Q2: 68 LGUs/ 228 sub projects= 96%

    No. of SPs included in the 3rd Batch

    fund release

    40% of

    SPs

    remai

    ning 5

    SPs

    5adt5

    equivalent

    to 100%

    As of Q3: 233/233 or 100% of SPs with funds

    No. of SPs at risk/non-moving

    provided with TA

    all SPs at

    risk

    all

    SPs at

    risk

    all

    SPs

    at

    risk

    all LGUs all LGUsALL LGUS

    (AT RISK

    OR NOT)

    all municipalitites were provide with needed TA/ at risk,

    Boliney, San Isidro, Pinukpuk (not eligible)

    No. of LGUs monitored (project

    implementation)75 (68) (68) (75) (75) 68 75 75 75 75

    SA

    3rd-

    Php207,5

    92

    4th-

    10,000

    AM 2018:

    Total qualified SPs - 233

    Not Eligible = 5 (Boliney- 1, San

    Isidro- 3, Pinukpuk- 1)

    Document Preparation/ NYS 145 59 9 9

    Procurement 82 79 19 19

    On-going 11 76 110 110

    Completed 0 0 19 76 95BOTTOM-UP BUDGETING 6,800.00 1,400.00 2,000.00 2,000.00 1,400.00 1,400.00 2,000.00 2,000.00 2,000.00 7,400.00

    Provision of Potable Water Supply

    BUB PWS-2014 :

    Total SPs - 118

    remaining 2018 - 2 target 2018:

    100% - 2 SPs

    On-going 0 1 1 1 1 1Aguinaldo- Provision of Water System for MALELEMPFOB-

    POBLACION - 93.36%

    Completed 21 - re-

    aligne

    d

    1 0 0 1as of Q1:

    1. La Paz

    BUB PWS-2015 :

    Total SPs - 91

    remaining 2018 - 2

    target 2018: 100% - 2 SPs

    Cancelled SP- Atok, Benguet- CONSTRUCTION OF POTABLE

    WATER SYSTEM AT SALIDET-SAYET

    On-going 0 2 2 1 1 1As of Q4:

    1. Lagayan

    Completed 32- re-

    aligne

    d

    0 1 1 0 21. Danglas - SALINTUBIG

    as Q3:

    1. Tanudan, Kalinga - LAY-ASAN WWS

    BUB PWS-2016 :

    Total SPs - 17

    remaining 2018 - 6

    target 2018: 100% - 6 SPs

    Doc Prep - Lagayan, Provision of PWS (Awaiting formal

    cancellation of project)

    On-going 0 4 2 2 1 1OG as of Q2 and Q3:

    1. Kiangan

    Page 11 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    Completed 32-

    realig

    ned

    1 2 0 1 4

    Completed Q1:

    1. La Trinidad

    Completed Q2:

    1. Flora

    2. Sta. Marcela

    Completed Q4:

    1. Banaue

    BUB- OTHER INFRA

    BUB Others-2016 :

    Evacuation Facility

    Total SPs - 5

    remaining 2018 - 1

    target 2018: 100% - 1 SP

    100% as of Q2

    on-going 0 1 0 0

    Completed 21-

    realig

    ned

    1 1 Sadanga

    SAGANA AT LIGTAS NA TUBIG PARA SA LAHAT (SAGANA) 8,100.00 1,800.00 2,250.00 2,250.00 1,800.00 1,800.00 2,250.00 2,250.00 2,250.00 8,550.00

    Monitor implementation of the subprojects

    SALINTUBIG 2015:

    Total SPs - 28

    completed 2016 - 3

    completed 2017 - 20

    target 2018: 100% - 5

    100% complete as of Q3

    On-going 0 0 3 1 0 0As of Q2:

    1. Banaue- BANAO WATER SYSTEM (4projects)

    As of Q3: 0

    Completed 5 51- re-

    aligne

    d

    2 2 1 5

    Completed Q1:

    1. Pinukpuk- CONSTRUCTION OF PAKAWIT WATERWORKS

    SYSTEM

    2. Kabugao- REHABILITATION AND UPGRADING OF LEVEL

    2 WATER SYSTEM

    Completed Q2:

    1. Pidigan- CONSTRUCTION OF POTABLE WATER SUPPLY

    SYSTEM (ARAB) SYSTEM

    2. Flora- CONSTRUCTION OF WATER SUPPLY SYSTEM

    LEVEL 2 (MALAYUGAN, BALLUYAN)

    Completed Q3:

    1. Banaue- BANAO WATER SYSTEM (4projects)

    SALINTUBIG 2017:

    Total SPs - 4

    completed 2017 - 0

    target 2018:

    50% - 2nd Qtr

    100% - 4th Qtr

    On-going 0 4 4 2 2 2

    as of Q4:

    1. Sta Marcela- CONSTRUCTION OF STA. MARCELA, APAYAO

    WATER SUPPLY LEVEL II

    2. Flora- CONSTRUCTION OF ATOK WATER SUPPLY

    SYSTEM LEVEL II

    Completed 4 24- re-

    aligne

    d

    0 0 2 0 2

    Completed Q3:

    1. Dolores - CONSTRUCTION OF KIMMALABA LEVEL II

    WATER SUPPLY SYSTEM

    2. Dolores- CONSTRUCTION OF LUBLUBBA LEVEL II

    WATER SUPPLY SYSTEM

    SALINTUBIG 2018:

    Total SPs - 7 LGUs

    Penarrubia, Abra;

    Calanasan, Conner, Kabugao, Pudtol, Apayao

    Kapangan, Tuba, Benguet

    Page 12 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    No. of LGUs monitored 10 (7) (7) (10) (10) 7 7 7 7 7Tuba - awaiting fund release

    all - document preparation

    Document Preparation 6 5 2 2 Kapangan, Pudtol

    For endorsement 1 1 1 Calanasan

    Procurement 2 3 3 Conner, Kabugao, Tuba

    On-going 1 1 Pennarubia

    WSS Projects- realigned

    No. of LGUs trained/ mentored on

    the Municipal Iwash Investment Plan

    Preparation

    12 12see

    remarks1 1 0.00

    SA-

    Php244,0

    00

    The 12 target is for Central Office. Target for CAR is 1 which

    is Barlig, Mt. Province. The activity was set on Sept. 19 but

    was moved on October 3-4 because of Typhoon Ompong (

    the road going to Barlig is closed).

    Regular Program

    Monitoring of the functionality of LCPC 5,200.00 3,450.00 15,150.00 650.00 450.00 3,450.00 650.00 1,150.00 650.00 5,900.00

    No. of LGUs with functional

    LCPCs (submission of status

    report)

    No. of LGUs assessed

    PCPC 6 6 6 6

    CCPC 2 2 2 2

    MCPC 45 45 75 75

    BCPC 588 588 1175 1175

    Institutionalizing Gender Responsive Local Governance - Client Based 85,650.00 8,725.00 99,625.00 55,125.00 21,025.00 2,600.00 6,900.00 2,900.00 1,400.00 13,800.00

    1. 2019 GAD Plan and Budget (GPB)

    reviewedProvince 6 6 6 6

    City 2 2 2 2

    Municipality 75 75 75 75

    Brgy. 1175 1175 1175 11752. GAD Accomplishment Report

    (GAD AR) 2017Province 6 6 6 6

    City 2 2 2 2Municipality 75 75 75 75

    Brgy. 1175 1175 1175 1175

    3. GAD Code Formulation

    Province 3 3City 2 2

    Municipality (20%) 15 15

    4. GAD Responsive CDP/PDPFP

    Province 3 3City 2 2

    Municipality (20%) 15 15

    5. GAD Database

    Province 6 (6) (6) 6 6

    City 2 (2) (2) 2 2

    Municipality 75 (75) (75) 75 75

    6. VAW Desk

    Brgy. 1175 1175 1175 1175 1175 1175 1175 1175 1175

    CHILD FRIENDLY LOCAL GOVERNANCE AUDIT (CFLGA) 517,100.00 1,000.00 251,140.00 330,200.00 1,000.00 1,000.00 184,900.00 231,550.00 179,200.00 596,650.00

    No. of CMs assessed (data gathering)regional table assessment meetings on August 1 and Sept.

    25, 2018

    City 2 2 2 2

    Municipalities 75 75 75 75

    No. of Regional/Provinces conducted

    the table validationAugust 20, at Nene as per AD, 6750 regular fund

    Region 1 1 1 1

    Province 6 6 6 6

    Updating and Maintenance

    No. of LGUs monitored in the following

    institutional mechanisms:

    Page 13 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    BFAWS 100% 100%

    Brgy. Officicals Profile 100% 100%

    Community Based Rehab 100% 100%

    Other Reports

    KASAMBAHAY

    No. of semesteral report

    (consolidation using the KR Forms)

    prepared and submitted

    1 1 1 1KR form 5 - City/Mun Conso

    KR Form 6 - Provincial Conso

    KR form 7- Regional Conso

    Support to National and Local Celebrations 37,100.00 2,600.00 4,750.00 27,750.00 6,600.00 2,750.00 2,750.00 2,750.00 8,250.00

    No. of national and local celebrations

    participated3 1 1 1 1 1 1 1 3 Women's Month Celebration - Regional/Provinces

    Inter-agency collaboration 16,520.00 1,200.00 36,500.00 500.00 500.00 200.00 15,320.00 200.00 200.00 15,920.00

    No. of inter-agency collaboration

    attended

    IMPROVE LGU COMPETITIVESS AND EASE OF DOING BUSINESS

    PPPP (P4)

    No. of LGUs oriented on the

    Preparation of Enhanced Feasibility

    Study

    1 1see

    remarks5 5

    SA

    Php265,4

    86

    Beneficiaries were Baguio, Tabuk, Tineg, Pinukpuk,

    Mankayan; an advisory dated _____ was received by this

    level extending the conduct of orientation until EO October

    23-26, 2018

    BUSINESS PERMIT AND LICENSING SYSTEM (BPLS) 1,200.00 500.00 500.00 500.00 500.00 200.00 200.00 200.00 600.00

    CAPDEV

    No. of LGUs Coached and Mentored

    on BPLS Automation/

    Computerization cum E-BPLS User

    Training- realigned

    City 0

    Municipalities 0

    No. of LGUs trained on BPLS

    Automation/ Computerization6 6

    see

    remarks6 6 SA

    the activity was previously sched on August to September,

    Target LGUs are Bangued, Luna, La Trinidad, Tublay, Rizal,

    Tabuk City but as per DICT a pre-requirment is needed

    before the LGus shall undergo the training. The RFP

    coordinated with BLGD informing them of the requirement.

    As an end result the activity is now set for October 2018.

    No. of LGUs that adopted the BPLS

    Automation/ Computerization

    (based on d requirement of the DICT)

    see

    remarks

    see

    remarkssee remarks

    to monitor only since DILG's work is to advocate the system

    provided by the DICT

    eBPLS Compliance Tracking

    Monitoring

    No. of LGUs monitored on BPLS

    compliance77 77 77 77 77 77 77 77

    as of Q2: non compliant Abra- 8; Benguet- 1; Kalinga- 3

    as of Q3: Compliant 69/75 non compliant Abra- Langiden,

    Manabo, Malibcong, Pidigan, Salapadan; Benguet- Bokod;

    Kalinga- Pasil and Tinglayan

    No. of quarterly compliance report

    submitted on-line2 1 1 1 1 2

    Ease of Doing Business

    No. of e-Gov Awards desk evaluation

    and assessment conducted1 1 1 1 SA Conducted on August 20-30, 2018

    BUILDING PERMIT/ CERTIFICATE OF OCCUPANCY

    No of Cities provided coaching and

    mentoring on re-engineering

    Construction Permitting processes

    2 2see

    remarks3 3 SA

    scheduled on November as per CO

    Baguio City, Tabuk, La Trinidad on Nov. 19-23, 2018

    INTERGRATION OF BRGY. CLEARANCE IN THE LGU PERMITTING PROCESS

    Monitoring data regarding registration

    of Kasambahay

    Page 14 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    No. of FGD/ meeting/ consultation

    with selected LGUs conducted1 1

    1 -

    realig

    ned

    see

    remarks

    see

    remarksno guidance from CO, no SA

    SUPPORT TO CONDITIONAL MATCHING GRANT PROGRAM (SCMGP) 13,500.00 2,000.00 7,000.00 7,000.00 3,000.00 2,000.00 1,500.00 2,000.00 2,000.00 7,500.00SA

    supplies

    No. of provinces that have complied

    with the 2018 fund release

    requirement and provided with TA

    6 6 6 6

    0

    No. of provinces mentored on their

    2018 CMGP procurement activities6 3

    1-

    realig

    ned

    5 6 11 except Ifugao

    SP monitoring and provision of TA 0

    SA

    Php162,0

    00 TE

    field engineers

    No. of field visit to monitor CMGP SP

    implementation and quality of local

    road projects

    once/

    mo./

    proj.

    once/

    mo./

    proj.

    once

    /

    mo./

    proj.

    once/

    mo./

    proj.

    once/

    mo./

    proj.

    24once/

    mo./ proj.

    once/ mo./

    proj.

    22 CMGP

    2 KALSADA

    No. of TA on project implementation

    provided to provincesANA ANA ANA ANA ANA 6 6 6 18

    Provl assessment workshop on Local Road Mgmt. in

    Preparation to the Formulation of Provil Governance

    Reform Roadmap, July 16-17, 2018 at Kalinga Province

    No. of field visit to monitor local road

    maintenance activities of the PLGUs

    75% of fair to good provincial roads

    once/

    mo./

    proj.

    once/

    mo./

    proj.

    once

    /

    mo./

    proj.

    once/

    mo./

    proj.

    once/

    mo./

    proj.

    0once/

    mo./ proj.0 CMGP Engineers are still for hiring

    No. of provinces submitted their lsit

    of fair to good provincial roads to be

    maintained and funded under theri

    2018 AO

    6/6 or

    100%

    6/6 or

    100%

    No. of reports submitted to CMGP

    PMO on issues and concerns related

    to CMGP project implementation

    copy furnish to DILG RO

    ANA ANAno issues

    received

    no issues

    received

    No. of meeting/conferences

    conducted4 1 1 1 1 1 1

    SA

    Php12,00

    0/ qtr

    Year end Review on Nov. 6-7, 2018

    No. of provinces assessed in its

    performance on the achievement of

    2017 governance reform

    6 (6) (6) (6) (6) 6 (6) (6) (6) 6Kalinga- Sept 17-21; Abra, Apayao, Benguet, Ifugao, Mt.

    Province - Sept. 11, 2018

    No. of follow through activities for

    support on PLGUs achievement of

    Governance Reform

    6 3 3 3 6 9

    PGRR Formulation Guideline and Target Situations per

    reform area

    Follow-Thru Workshop on Constructors Performance

    Evaluation System (CPES) on Dec. 12-13, 2018 for 6

    provinces

    Follow-Thru Workshop on Baseline Assessment in Internal

    Control System (BAICS) on Nov. 21-22, 2018 for 6 provinces

    Local Road Mgmt 0

    No. of PLGUs uploaded its updated

    status of provincial roads in the

    Roads and Bridges Information

    System (RBIS)

    6 3 3 2 4 6

    validating the provincial road inventory data into the Roads

    and Bridges Information System (RBIS) accounts of the

    provinces.

    latest RBIS orientation in Manila last October 2018 and with

    confirmation from the CMGP-PMO, deadline of updating is

    up to the 3rd quarter of 2019.

    Percentage of Kilometers mapped

    for:0 0

    Monitor the status of provinces'

    preparation and facilitate submission of

    2018 fund release requirements

    Monitor the status of provinces'

    procurement activities to track the

    timely implementation of SPs

    Page 15 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    a. barangay roads 0.7 70% 70% 70%

    b. municipal roads 0.7 70% 70% 70%

    c. provincial roads 0.7 70% 100% 100%

    No. of PLGUs that have conducted

    traffic count 6 3 3 3 3 6

    No. of PLGUs that have submitted the

    DEDs of their respective FY 2019

    CMGP projects on or before October

    2018

    5 5 6 6all 6 provinces submitted before Oct. 30. Pngoing review by

    PMO

    CMGP 2017

    Total SPs - 220

    Procurement 1 1 Benguet

    On-going 0 21 15 14 8 8 Abra - 3; Apayao- 2; Benguet- 1; MP- 2

    Completed 4 1 3 2 6 12

    Completed Q1:

    1. Kalinga Province- Improvement and Upgrading of Laya-

    Cabaruan-Sucbot-Magaogao Provincial Road

    Completed Q2:(all Ifugao)

    1. Upgrading of Sta. Maria - Quarentinas Road

    2. Upgrading of Pinto - Aurora Boundary Road

    3. Upgrading of Lamut-Sanafe-Hapid Road

    Completed Q3:

    1. Ifugao- Upgrading of Zamora-San Quintin-Bangar Road,

    Ifugao

    2. Kalinga-Improvement and Upgrading of Cabaritan -

    Dugpa Provincial Road

    Completed Q4:

    1. Abra- Improvement and Upgrading of Pidigan Loop

    2. Abra- Improvement and Upgrading of Talogtog - Dolores -

    San Juan - Tineg Road

    3. Abra- Improvement and Upgrading of Bituen - Lacub

    Road

    4. Abra- Improvement and Upgrading of Malibcong

    Provincial Road

    5. Apayao- Upgrading of Nararagan-Consuelo (Sta. Marcela) -

    Balluyan (Flora) Provincial Road

    6. Benguet- Road Upgrading and Improvement of Halsema -

    Madaymen Provincial Road (Phase II)

    Suspended 2 1 1Mt. Province- Improvement/Upgrading of Nacawang-

    Panabungen-Maliten Provincial Road

    CMGP 2018 Total SP- 1 Kalinga

    On-going 1Upgrading/Improvement of Dalnacan-Mangali via Taloctoc

    Provincial Road, Kalinga

    KALSADA 0

    Kalsada 2016

    Total SPs- 14

    For completion - 8

    0

    Procurement 1 1 for Benguet- awaiting reply from CO (termination)

    On-going 0 4 2 2 2

    Abra - 1. UPGRADING AND IMPROVEMENT OF SAN-JUAN

    TINEG ROAD

    2. UPGRADING & IMPROVEMENT OF SALLAPADAN-BUCLOC-

    DAGUIOMAN

    3. UPGRADING AND IMPROVEMENT OF BITUEN-LACUB

    ROAD

    Benguet- 4. REHABILITATION & IMPROVEMENT OF

    GUINAOANG-SUYOC-GAMBANG PROVINCIAL ROAD

    As of Q3:

    1. UPGRADING AND IMPROVEMENT OF SAN-JUAN TINEG

    ROAD

    2. UPGRADING AND IMPROVEMENT OF BITUEN-LACUB

    ROAD

    Page 16 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    Completed 8 4 4 1 5

    1. Benguet- REHABILITATION & IMPROVEMENT OF

    HALSEMA-MADAYMEN

    2. Ifugao- Upgrading of Zamora-San Quintin-Bangar Road3.

    MP - Improvement of Tadian-Nacawang Provincial Road

    4. Improvement of Besao -Tamboan Provincial Road

    Q3:

    1. UPGRADING & IMPROVEMENT OF SALLAPADAN-BUCLOC-

    DAGUIOMAN

    PAMANA 0

    PAMANA 2015- Total SPs 12

    Completed - 9

    For completion - 2

    Terminated Contract- 1 Ifugao and 1

    Benguet

    On-going 2 2 1 1 0 01. Benguet- CONCRETING OF DANGADANGAN-COPCOPIT

    ROAD (BAKUN) (terminated)

    Completed 1 1 1Completed Q2:

    1. Kalinga- CONCRETING OF BUGNAY-BUTBUT ROAD

    PAMANA 2016- Total SPs 24

    Completed - 18

    For completion - 6

    for termination/ terminated/

    suspended3 3

    As of Q4:

    1. Abra- CONCRETING AND IMPROVEMENT OF ACCESS

    ROAD OF BARANGAY DALIMAG CABAYUGAN-OLO TO

    LAPTING, ILOCOS SUR - for termination

    2. ROAD OPENING FROM BOKES SADDLE TO LASILAS,

    TAWANG TOWARDS BADEO (KIBUNGAN) - terminated

    3. IMPROVEMENT OF BETWAGAN ACCESS ROAD -

    suspended

    On-going 2 6 3 3 0 0

    Completed 6 3 3 0 3

    Completed Q2:

    1.Tinoc, Ifugao- IMPROVEMENT OF DANGGO ROAD

    2. Kalinga- CONCRETING AND IMPROVEMENT OF

    ALLAGUIA-ASIBANGLAN ROAD (PINUKPUK)

    3. Kalinga- CONSTRUCTION OF 60 LM WAGUD BUAYA

    BRIDGE (BALBALAN)

    ENVIRONMENT PROTECTIVE, CLIMATE CHANGE ADAPTIVE AND DISASTER RESILIENT LGUs 14,302.25 2,144.25 5,869.25 6,869.25 3,144.25 2,144.25 2,144.50 5,869.25 5,869.25 16,027.25

    OPERATION LISTO

    OPERATION CENTER

    No. of DILG OPCEN Activated

    P/C/M ANA 1 1 1 3activated during the Holy week (Ifugao province and its 11

    mun)

    Q3: Typhoon Ompong

    No. of LGU OpCen Activated

    monitored

    ANA 83 83 83

    No. of LGUs DRRRM plan reviewed

    Management of the Dead Missing TF-LGA

    Disaster Risk Management-Institutional

    Page 17 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    No. of MDM established 1 1 2

    1. Established on Sept. 19 to oct. 2. Due to the landslide at

    Barangay Ucab, Itogon, Benguet on September 15, 2018,`1

    all efforts of the Municipal, Provincial and Regional DRRMCs

    were focused on the

    retrieval of almost 100 persons who are believed to have

    been buried in the area.The mass casualty however,

    required the establishment of the Management of theDead

    and Missing (MDM) Persons, within the incident area.

    2. Established on Oct. 31 to Nov. 7, 2018 at Natonin, Mt.

    Province due to Typhoon Rosita

    Regional Initiatives 14,472.31 1,500.00 7,000.00 7,000.00 3,972.31 1,500.00 2,000.00 2,000.00 2,000.00 7,500.00

    Inter-agency Collaborations/ Partnerships

    Environment-related concerns

    No. of Inter-agency meetings

    activities attended/ participated13 1 1 1 1 11 1 1 13

    Mostly meeting on PDRRM plan and LDRRMC , attendance

    to the full counil OCD-DRR quarterly meetings

    STRENGTHENED INTERNAL ORGANIZATIONAL CAPACITY

    Enhancement of Programs and Projects Management System

    Internet DSL/ Broadband subscribed 1 1 Contract to provide internet for 1 year

    MANAGEMENT PROCESS

    OPERATIONS PLANNING AND BUDGETING 130,999.80 66,006.07 4,000.00 74,099.80 52,650.00 4,250.00 4,250.00 61,150.00

    No. of Meeting/ Workshop

    Conducted2 1 1 1 1 March 21-23, 2018

    QUALITY MANAGEMENT SYSTEM 366,448.00 21,000.00 8,200.00 1,000.00 1,000.00 341,948.00 22,500.00 8,200.00 234,001.00 606,649.00

    QMS Planning

    No. of Risk Assessment Review

    Meeting Conducted by RRCANA 1 1 ANA ANA 1 1 1 1 4

    Risk and Opportunity Management Seminar on June 1, 2018

    in Baguio City

    Meetings conducted 3 3 6

    RISK IDENTIFICATION, EVALUATION AND CONTROL

    SPMS: PERFORMANCE PLANNING AND COMMITMENT 68,700.00 18,750.00 40,250.00 25,450.00 7,200.00 34,550.00 1,500.00 50,300.00 18,250.00 104,600.00

    No. of meetings/workshops in the

    finalization of Region/ division/

    FOU/ Cluster PCRs / PMT meetings

    conducted

    4 1 1 1 1 1 1 1 1 4 4,500.00 4,500.00

    SPMS Performance Planning and

    Commitment (1st Sem/2nd Sem)

    submission

    1 1 1 1 1 2

    SUPPORT TO OPERATIONS- GENERAL

    Preparation of Budget Proposal 0.00 55,000.00

    No. of Consultation with the LGUs

    conducted1 1 1 1 48,900.00 50,000.00 48,900.00 48,900.00 February 21-22, 2018

    No. of Consultation with the CSOs

    conducted1 1 1 1 2,000.00 2,000.00 2,000.00 2,000.00 February 27, 2018

    Presentation of BP to RDC 1 1 1 1 0.00 March 2, 2018 at RDC, NEDA Hall

    2,400.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 2,400.00

    No. of APP prepared (PPMP for OUs)

    Region/Provinces/ HUC 8 8 8 8

    8,400.00 4,200.00 4,200.00 4,200.00 4,200.00 0.00

    Annual Conference with Finance

    Personnel1 1 0

    80% of

    claims

    received

    80%

    of

    claim

    s

    recei

    ved

    80%

    of

    claim

    s

    recei

    ved

    80%

    of

    claim

    s

    recei

    ved

    80%

    of

    claims

    receiv

    ed

    100% 100% 100%

    Financial Management

    Preparation of Annual Procurement

    Plan (APP)

    Processing and Payment of Claims

    Page 18 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    100% 100%

    100% 100%

    19,742.00 4,200.00 4,410.00 15,332.00 4,200.00 25,386.50 49,328.50

    SUPPORT TO OPERATIONS -INFRASTRUCTURE 4,550.00 1,350.00 1,400.00 1,700.00 1,350.00 500.00 1,000.00 500.00 500.00 2,500.00

    169,749.18 169,749.18 500.00 170,249.18

    3,947.00 3,947.00

    No. of PPE Inventory conducted 1 1 0

    15,000.00 15,000.00 15,000.00

    SUPPORT TO OPERATIONS- ORGANIZATIONAL KNOWLEDGE

    LGRRC Audit to be conducted by LGA re (3) on October 15-

    19, 2018, Funds from LGA 85,000

    1 1 40,048.00 5,000.00 5,000.00 5,000.00 5,000.00 30,048.00 30,048.00

    No. of Records disposal cum record

    meeting conducted1 1 0

    No. of records routed 80% 80% 80% 80% 80% 100% 100% 100% 100% 100%

    SUPPORT TO OPERATIONS- COMPETENCE

    Attendance to Training on Core

    Competency, Capacity Development

    Programs and Leadership Trainings

    2 1 1 1 1 1 1 629,715.14 87,600.00 117,680.00 87,600.00 87,600.00 118,147.64 336,367.50 286,581.91 109,277.62 850,374.67

    No. of Teambuilding activities

    conducted1 1 1 1 1 63,840.00 63,840.00

    SUPPORT TO OPERATIONS- COMMUNICATION

    No. of DILG-CAR newsletter

    published (Gongs and Drums)3 2 1 1 1 1 1 2 31,000.00 20,000.00 10,000.00 20,000.00 10,000.00 1,000.00 1,000.00 10,750.00 12,750.00

    No. of DILG-CAR CY 2017 Annual

    Report published and distributed0 1 1 0.00 75,000.00 0.00

    No. of Meetings conducted re: annual

    report publication0 1 1 0.00 33,600.00 0.00

    No. of press releases 1 1

    No. of IEC materials developed 0

    Learning and Development

    Processing of Liquidation for Cash

    Advances

    Maintenance of Vehicles

    Provision of Vehicle Support Service

    Use and Maintenance of Facilities

    Records Management

    Inventory of Property, Plant and

    Equipment (PPE) and Semi Expendable

    Items

    Disposal of Unserviceable Properties

    Website Administration

    Provision of Technical Assistance (TA)

    on Information and Communications

    Technology (ICT) Resources

    Provision of Local Governance Resource

    Center(LGRC)Services

    Review of Memoranda of

    Agreement/Understanding and

    Contracts

    Submission of Financial Reports

    Processing of Cashiering Services

    Page 19 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    SUPPORT TO OPERATIONS- PROCUREMENT 12,000.00 5,500.00 5,500.00 5,500.00 5,500.00 500.00 500.00 500.00 1,500.00

    No. of training on Procurement

    Conducted/ Attended

    Evaluation of Suppliers Performance

    Procurement of Goods and

    Infrastructure

    Inspection, Acceptance and Issuance

    of Deliveries

    SUPPORT TO OPERATIONS- ENVIRONMENT (PHYSICAL AND PSYCHOSOCIAL)

    29,600.00 10,800.00 15,800.00 10,800.00 10,800.00 4,000.00 4,000.00 4,000.00 12,000.00

    Strategic Performance Management

    System (SPMS): Performance

    Rewarding and Development

    Planning

    SUPPORT TO OPERATIONS ON PEOPLE

    240,410.00 64,500.00 64,500.00 64,500.00 64,500.00 111,410.00 31,865.00 143,275.00

    No. of RPSB meetings conducted ANA 1 0.00

    Leave Administration 4,000.00 2,000.00 2,000.00 2,000.00 2,000.00 0.00

    Creation of Leave Cards

    Processing of Application

    Updating of Leave ledgers/cards

    250.00 250.00 250.00 0.00

    MONITORING, MEASUREMENT, ANALYSIS AND EVALUATION

    Internal Quality Auditing

    Management Review

    SUPPORT TO OPERATIONS - OTHERS

    DILG CAR Tribute to Outstanding Performers 2018 431,653.00 147,333.00 149,253.00 248,000.00 34,400.00 1,000.00 2,920.00 38,320.00

    No. of meetings conducted 2 1 1 1

    No. of assessments conducted 1 1

    No. of awarding ceremonies

    conducted 0

    17,000.00 600.00 800.00 1,000.00 14,600.00 600.00 800.00 800.00 1,000.00 3,200.00

    Financial, Supplies and Property Management

    No. of Training on Property & Supply

    Management Conducted1 1

    No. of Mid Year PRA conducted

    Maintenance and Updating of Human

    Resource Database

    Recruitment, Selection and Promotion

    of Personnel

    Strategic Performance Management

    System (SPMS): REWARDS AND

    DEVELOPMENT PLANNING

    SPMS: Performance Review and

    Evaluation

    Program Review of Accomplishment

    OTHER PROVINCIAL INITIATIVE

    (REWARDS AND AWARDS)

    Page 20 of 21

  • Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

    (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23)

    REMARKS (Issues/ ConcernsFUND

    SOURCE

    ACTUALTOTAL

    ACTUAL

    (7+8+9+10

    )

    TARGET

    TOTAL TARGET

    (13+14+15+16)

    PHYSICAL TARGET

    (1)

    TOTAL ACTUAL

    (17+18+19+20)

    ACTUAL

    FINANCIAL REQUIREMENTS

    OUTCOME AREA/PROGRAM/ PROJECT/

    ACTIVITIES/ PERFORMANCE

    INDICATOR

    TOTAL

    TARGET

    (3+4+5+

    6)

    TARGET

    Region 1 1 1 0.00 240,000.00 266,082.55 266,082.55

    City/ Province 7 7 7 0.00 63,630.00 0.00

    No. of Year End PRA cum

    teambuilding conducted

    Region 1 1 1,000,000.00 1,000,000.00 0.00

    City/ Province 7 7 7 7 131,705.06 13,525.06 118,180.00 0.00

    Regional Management Conferences/ Meetings

    No. of Regional Management

    Conferences/ meetings conducted5 1 1 1 1 2 1 1 4 129,520.00 51,250.00 51,250.00 51,250.00 51,250.00 7,920.00 19,100.00 39,190.00 27,530.00 93,740.00 June 5, 2018 at DILG CAR, Nene Pimentel Hall

    No. of City/ Provincial Management

    Conferences, Cluster meetings

    conducted

    35 7 7 7 7 14 7 7 28 403,132.30 178,871.03 127,673.95 148,623.37 107,363.74 58,243.03 88,902.16 90,901.16 92,023.37 330,069.72

    No. of Division/ Unit Meetings

    conducted12 3 3 3 3 3 3 3 9 69,500.00 19,650.00 19,650.00 19,650.00 19,950.00 29,900.00 29,900.00

    0.00 10,800.00 10,800.00

    GAD-related Activities (organic) 11,050.00 600.00 12,150.00 150.00 100.00 10,800.00 12,000.00 22,800.00

    No. of RO released re: reconstitution

    of GADFPS1 1 1 1

    No. of GFPS Quarterly meeting

    conducted5 1 1 1 1 1 2 1 4 1,120.00 1,120.00

    No, of GAD training attended ANA 0

    No. of 2018 GPB and 2016 GAD AR

    submitted on time 2 1 1 1 2

    No. of activities

    conducted/participated67,548.00 50,000.00 50,000.00 4,768.00 12,780.00 9,878.00 18,641.00 46,067.00

    Others:

    No. of Family Day-CSC Month activity

    conducted1 1 1 1 32,000.00 32,000.00 19,250.00 19,250.00

    No. of Regional Office and Field

    Offices conducted the various sports

    and cultural activities conducted/

    participated

    1 1 1 1 405,016.75 8,000.00 64,500.00 169,689.00 33,000.00 202,327.75 64,500.00 266,827.75

    No. of personnel provided with the

    annual medical check up1 1 0 204,000.00 399,000.00 204,000.00 132,000.00 270,180.00 606,180.00

    No. of Monday Convocation

    conducted50 12 12 12 12 14 12 12 12 50 131,400.00 34,200.00 34,200.00 34,200.00 34,200.00 21,000.00 42,000.00 21,982.15 84,982.15

    Attendance to trainings/seminars

    and meetings called for by CO and

    other agencies

    94,653.50 94,653.50

    Maintenance of PACD 800.00 800.00

    Compliance to Admin Requirements 19,776.00 400.00 400.00 400.00 400.00 18,976.00 24,539.50 47,512.50 91,028.00

    53,940.00 52,500.00 1,440.00 57,840.00 59,280.00

    No. of activities participated 1 1through participation in the unity gong relay from July 8 to

    July 16, gasoline expenses of the RD and staff

    OTHER MANDATORY EXPENSES 16,709,034.91 3,265,120.69 2,647,603.30 4,955,981.41 5,806,814.70 2,258,180.32 3,688,058.48 2,614,298.22 2,322,553.45 10,936,516.97

    6,978,274.25 2,042,035.81 2,369,677.47 956,629.88 1,609,931.09 1,650,264.41 1,352,153.87 5,568,179.25

    Prepared by: Approved by:

    FE S. BINAY-AN IRIS B. ESDEN MARLO L. IRINGAN

    Regional Planning Officer Regional Budget Officer Regional Director

    Participation to Cordillera Month

    Support to LGOO Training

    Page 21 of 21